This document is a Task Assignment Change Order (TACO) issued by the State of Florida Department of Environmental Protection (FDEP) to Environmental Consulting and Technology, Inc. (ECT). The change order amends Task Assignment DC021B under Contract HW682, which authorizes environmental consulting services for the Koretizing Cleaners II site (D282) located in Jacksonville, Duval County, Florida. The contract manager for ECT is Mark A. Culbreth, and the FDEP project manager is Karlee Fowler.

The TACO authorizes additional labor hours needed to complete PFAS (per- and polyfluoroalkyl substances) monitoring activities. The amended task assignment total value is $10,729.17, representing an increase of $330.54 from the prior amount of $10,398.63. The cost increase is associated with 4 additional labor hours for PFAS monitoring, bringing the total to 61.7 labor hours. The task assignment completion date remains February 27, 2026. Deliverables include an Annual NAM Report (Natural Attenuation Monitoring) due October 24, 2025, PFAS Monitoring due November 21, 2025, and Project Management and Waste Manifest due November 21, 2025. The invoice schedule allocates $7,960.93 for NAM Sampling, $699.15 for PFAS Monitoring, and $2,069.09 for Project Management and Waste Manifest activities. The change order was executed on August 19, 2025, by both parties.

View the file

Other files

File Type Posted
CN-370000-HW682-DC001C.pdf PDF
CN-370000-HW682-DC003A.pdf PDF
CN-370000-HW682-DC003B.pdf PDF
CN-370000-HW682-DC006B.pdf PDF
CN-370000-HW682-DC007C.pdf PDF
CN-370000-HW682-DC007D.pdf PDF
CN-370000-HW682-DC008C.pdf PDF
CN-370000-HW682-DC010B.pdf PDF
CN-370000-HW682-DC010C.pdf PDF
CN-370000-HW682-DC015A.pdf PDF
CN-370000-HW682-DC016A.pdf PDF
CN-370000-HW682-DC016B.pdf PDF
CN-370000-HW682-DC021A.pdf PDF
CN-370000-HW682-DC027A.pdf PDF
CN-370000-HW682-DC03CCO2.pdf PDF
CN-370000-HW682-DC03CCO3.pdf PDF
CN-370000-HW682-DC04BCO2.pdf PDF
CN-370000-HW682-DC04BCO3.pdf PDF
CN-370000-HW682-DC04BCO5.pdf PDF
CN-370000-HW682-DC05BCO6.pdf PDF
CN-370000-HW682-DC05BCO8.pdf PDF
CN-370000-HW682-DC06BCO1.pdf PDF
CN-370000-HW682-DC06BCO2.pdf PDF
CN-370000-HW682-DC08DCO1.pdf PDF
CN-370000-HW682-DC09ACO2.pdf PDF
CN-370000-HW682-DC09ACO3.pdf PDF
CN-370000-HW682-DC10BCO1.pdf PDF
CN-370000-HW682-DC11ACO4.pdf PDF
CN-370000-HW682-DC11ACO6.pdf PDF
CN-370000-HW682-DC13ACO1.pdf PDF
CN-370000-HW682-DC13BCO1.pdf PDF
CN-370000-HW682-DC13BCO7.pdf PDF
CN-370000-HW682-DC16ACO2.pdf PDF
CN-370000-HW682-DC18ACO2.pdf PDF
CN-370000-HW682-DC18ACO3.pdf PDF
CN-370000-HW682-DC20ACO1.pdf PDF
CN-370000-HW682-DC21ACO1.pdf PDF
CN-370000-HW682-DC22ACO2.pdf PDF
CN-370000-HW682-DC24ACO1.pdf PDF
CN-370000-HW682-DC26ACO3.pdf PDF
CN-370000-HW682-DC27ACO1.pdf PDF
CN-370000-HW682-DC28ACO1.pdf PDF
CN-370000-HW682-FIL2.pdf PDF
CN-370000-HW682-FIL6.pdf PDF
CN-370000-HW682-HW001A.pdf PDF
CN-370000-HW682-HW004A.pdf PDF
CN-370000-HW682-HW006A.pdf PDF
CN-370000-HW682-HW007A.pdf PDF
CN-370000-HW682-HW011A.pdf PDF
CN-370000-HW682-HW016A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC021B 1 HW682

Karlee Fowler 850-245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_4575

Koretizing Cleaners II (D282)

✔ $ 10,729.17 $ 10,398.63

$ 10,729.17 $ 10,398.63 ✔ Completion

Completion 02/27/2026 02/27/2026 0

✔ 1 1 1

Environmental Consulting & Technology, Inc.

Contractor Mark A. Culbreth

Contract Manager Digitally signed by Mark Culbreth Date: 2025.08.19 09:18:22-04'00'Mark Culbreth

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.08.18 13:28:57 -04'00'

This change order authorizes four additional labor hours needed to complete PFAS monitoring.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW682

DC021B

$ 10,729.17

Annual NAM Report (Subtask 2)

PFAS Monitoring (Subtask 3)

Project Management and Waste Manifest (Subtask 1 & 4)

FDEP Approval of Annual NAM Report (Subtask 2)

FDEP Approval of Project Management and Waste Manifest (Subtask 1 & 4)

FDEP Approval of PFAS Monitoring (Subtask 3)

10/24/2025

11/21/2025

11/21/2025

$ 699.15

$ 7,960.93

$ 2,069.09

FFLORIDAA DEPARTMENTT OFF

EEnvironmentall Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ronn DeSantiss Governor

Memorandum

TO:

FROM:

SUBJECT:

DATE:

HW682 Contract File Koretizing Cleaners I

ERIC_ 5 5

K , Project Manager Negotiation Summary Task Assignment DC

The Task Assignment total $ The project manager agrees to the scope of work and associated costs. ECT may invoice according to the attached schedule.

FDEP COST ESTIMATE

Contractor: Environmental Consulting & Technology, Inc.

Date: 25-Jul-25

Task #: SubTask 1 Project Management

Site: Koretizing Cleaners II (ERIC_4545) SubTask 2 NAM Sampling (Original + CO1)

Activity/Phase: SubTask 3 PFAS Screening

Project Manager: Mark Culbreth SubTask 4 IDW T&D

SubTask 5

TTotals 1 2 3 4 Labor Rate Category

$85.85 Project Manager 3.7 3.7 $85.85 Senior Principal Scientist (MC) 5 5 0 0 $56.32 Senior Engineer / Scientist (DP) 21 15 3 3

$0.00 Senior Engineer / Scientist 0 0 0 0 $55.16 Senior Engineer / Scientist (RP) 0 0 0 0 $44.40 Staff Engineer / Scientist (LL) 0 0 0 0 $36.85 Sr. Associate Engineer / Scientist (KM) 0 0 0 0 $33.66 Sr. Associate Engineer / Scientist (LL) 0 0 0 0 $29.30 GIS Analyst / Graphics (JV) 5 4 1 0 $24.38 Technician (MW) 22 22 0 0 $34.81 Administrative (BJ) 5 4 1 0

Total Hours 61.70 3.7 50 5 3

Direct Labor $2,789.83 $320.95 $2,066.85 $233.07 $168.96

Overhead 125.30% $3,495.66 $402.15 $2,589.76 $292.04 $211.71 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $1,322.39 $152.13 $979.69 $110.48 $80.09 Total Labor $7,607.88 $875.23 $5,636.30 $635.59 $460.76

Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $222.00 $222.00 $0.00 $0.00 Total Travel $462.00 $462.00 $0.00 $0.00

Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Erwin Remediation $545.00 $0.00 $0.00 $545.00 Subcontractor Subtotal $545.00 $0.00 $0.00 $545.00 Handling Fee $54.50 $0.00 $0.00 $54.50 Total Subcontractor Cost $599.50 $0.00 $0.00 $599.50

Laboratory Analytical Costs $438.00 $438.00 $0.00 $0.00 Sample Shipping $70.00 $70.00 $0.00 $0.00 FDEP PFAS Analytical Cost $0.00 $0.00 $0.00 $0.00 FDEP Shipping $0.00 $0.00 $0.00 $0.00 Total Laboratory $508.00 $508.00 $0.00 $0.00

Field Expenses Expendables $80.00 $80.00 $0.00 $0.00 Equipment (Shallow Groundwater Sampling Kit) $580.00 $580.00 $0.00 $0.00 Equipment (Metal Detector) $40.00 $40.00 $0.00 $0.00 Drum (IDW related) $65.00 $65.00 $0.00 $0.00 Ice $26.00 $26.00 $0.00 $0.00 Total Field Expenses $791.00 $791.00 $0.00 $0.00

Subtotal $9,968.38 $875.23 $7,397.30 $635.59 $1,060.26 Completion Fee $760.79 $87.52 $563.63 $63.56 $46.08

Total Estimated Cost $10,729.17 $962.75 $7,960.93 $699.15 $1,106.34

NAM Sampling (Original + CO1)

REV: 08/22 PRAC ECT Page 1

SITE : Koretizing Cleaners II SUBTASK: 2 (NAM Sampling)

DATE: 7/25/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Annual NAM Report 5 Total Hours 5

D. Phillips Senior Scientist Verification of property ownership, notify RPO & confirm/obtain site access 2 Prepare updated Health & Safety Plan 1 Prepare Draft Annual NAM Report 12

Total Hours 15 J. Von Borstel GIS Analyst Recreate Figures 4

Total Hours 4 M. Wiss Technician Prep for fieldwork and obtain a FDOT 55-gallon drum 2

Roundtrip mobilization from Orlando to Jacksonville for the annual NAM. 5 Open and collect DTW at 15 wells. 3 Groundwater sampling 10 wells and 1 IDW sample for VOHs or PFAS 10 Confirm that MW002 cannot be located and assess the condition of MW009 1 Survey MW010R TOC 1

Total Hours 22 B. Jarvis Administrative Tabulate data for deliverable and report production 4

Total Hours 4

TOTAL LABOR 50

Rental Truck $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USAGE

Per Diem M. Wiss $36.00 day 2 $72.00 Hotel M. Wiss $150.00 day 1 $150.00

TOTAL PER DIEM $222.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE UNIT USAGE

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNITS

USEPA Method 8260 for VOHs (10 wells and 1 drum) $73.00 6 0 $438.00 Shipping Samples $70.00 0 1 $70.00 FDEP Central Lab PFAS Screening (5 wells and 1 drum) $0.00 6 0 $0.00 FDEP PFAS Shipping $0.00 0 1 $0.00

TOTAL LAB $508.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Day 2 $80.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Metal Detector $40.00 Day 1 $40.00 Drum (IDW related) $65.00 each 1 $65.00 Ice $6.50 each 4 $26.00

TOTAL EQUIPMENT $791.00

REV: 08/22 PRAC ECT Page 2

SUBTASK 3 (PFAS Screening)

DATE: 7/25/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist Prepare PFAS email deliverable, lab report, field notes, table & figure. 3 Total Hours 3

J. Von Borstel GIS Analyst Prepare PFAS figure 1 Total Hours 1

B. Jarvis Administrative Update tables 1 Total Hours 1

TOTAL LABOR 5

VEHICLE TYPE RATE UNIT USAGE

$0.00

PER DIEM STAFF RATE UNIT USAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

TOTAL EQUIPMENT $0.00

REV: 08/22 PRAC ECT Page 3

SUBTASK 4 (IDW T&D)

DATE: 7/25/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist IDW Hazardous classification and scheduling T&D. 3 Total Hours 3

TOTAL LABOR 3

VEHICLE TYPE RATE UNIT USAGE

$0.00

PER DIEM STAFF RATE UNIT USAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

Erwin Remediation IDW T&D $545.00 1 $545.00

TOTAL $545.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

$0.00

REV: 08/22 PRAC ECT Page 4

Contractor: Environmental Consulting & Technology, Inc.

Date: 25-Jul-25

Task #: SubTask 1 Project Management

Site: Koretizing Cleaners II (ERIC_4545) SubTask 2 NAM Sampling

Activity/Phase: SubTask 3 PFAS Screening

Project Manager: Mark Culbreth SubTask 4 IDW T&D

SubTask 5

TTotals 1 2 3 4 Labor Rate Category

$85.85 Project Manager 0.1 0.1 $85.85 Senior Principal Scientist (MC) 0 0 0 0 $56.32 Senior Engineer / Scientist (DP) 0 0 0 0

$0.00 Senior Engineer / Scientist 0 0 0 0 $55.16 Senior Engineer / Scientist (RP) 0 0 0 0 $44.40 Staff Engineer / Scientist (LL) 0 0 0 0 $36.85 Sr. Associate Engineer / Scientist (KM) 0 0 0 0 $33.66 Sr. Associate Engineer / Scientist (LL) 0 0 0 0 $29.30 GIS Analyst / Graphics (JV) 0 0 0 0 $24.38 Technician (MW) 4 4 0 0 $34.81 Administrative (BJ) 0 0 0 0

Total Hours 4.10 0.1 4 0 0

Direct Labor $110.20 $12.68 $97.52 $0.00 $0.00

Overhead 125.30% $138.08 $15.89 $122.19 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $52.23 $6.01 $46.22 $0.00 $0.00 Total Labor $300.51 $34.58 $265.93 $0.00 $0.00

Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Erwin Remediation $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 FDEP PFAS Analytical Cost $0.00 $0.00 $0.00 $0.00 FDEP Shipping $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00

Field Expenses Expendables $0.00 $0.00 $0.00 $0.00 Equipment (Shallow Groundwater Sampling Kit) $0.00 $0.00 $0.00 $0.00 Equipment (Metal Detector) $0.00 $0.00 $0.00 $0.00 Drum (IDW related) $0.00 $0.00 $0.00 $0.00 Ice $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00

Subtotal $300.51 $34.58 $265.93 $0.00 $0.00 Completion Fee $30.05 $3.46 $26.59 $0.00 $0.00

Total Estimated Cost $330.56 $38.04 $292.52 $0.00 $0.00

NAM Sampling (CO1 Delta)

SUBTASK: 2 (NAM Sampling)

DATE: 7/25/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Annual NAM Report 0 Total Hours 0

D. Phillips Senior Scientist Verification of property ownership, notify RPO & confirm/obtain site access 0 Prepare updated Health & Safety Plan 0 Prepare Draft Annual NAM Report 0

Total Hours 0 J. Von Borstel GIS Analyst Recreate Figures 0

Total Hours 0 M. Wiss Technician Prep for fieldwork and obtain a FDOT 55-gallon drum 0

Roundtrip mobilization from Orlando to Jacksonville for the annual NAM. 0 Open and collect DTW at 15 wells. 0 Groundwater sampling 10 wells and 1 IDW sample for VOHs or PFAS 4 Confirm that MW002 cannot be located and assess the condition of MW009 0 Survey MW010R TOC 0

Total Hours 4 B. Jarvis Administrative Tabulate data for deliverable and report production 0

Total Hours 0

TOTAL LABOR 4

Rental Truck $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

Per Diem M. Wiss $36.00 day 0 $0.00 Hotel M. Wiss $150.00 day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE UNIT USAGE

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNITS

USEPA Method 8260 for VOHs (5 wells and 1 drum) $73.00 0 0 $0.00 Shipping Samples $70.00 0 0 $0.00 FDEP Central Lab PFAS Screening (5 wells and 1 drum) $0.00 0 0 $0.00 FDEP PFAS Shipping $0.00 0 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Day 0 $0.00 Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00 Metal Detector $40.00 Day 0 $0.00 Drum (IDW related) $65.00 each 0 $0.00 Ice $6.50 each 0 $0.00

SUBTASK 3 (PFAS Screening)

DATE: 7/25/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist Prepare PFAS email deliverable, lab report, field notes, table & figure. 0 Total Hours 0

J. Von Borstel GIS Analyst Prepare PFAS figure 0 Total Hours 0

B. Jarvis Administrative Update tables 0 Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USAGE

$0.00

PER DIEM STAFF RATE UNIT USAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

SUBTASK 4 (IDW T&D)

DATE: 7/25/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist IDW Hazardous classification and scheduling T&D. 0 Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USAGE

$0.00

PER DIEM STAFF RATE UNIT USAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

Erwin Remediation IDW T&D $545.00 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

$0.00

FDEP COST ESTIMATEContractor: Environmental Consulting & Technology, Inc.

Date: 19-Mar-25

Task #: SubTask 1 Project Management

Site: Koretizing Cleaners II (ERIC_4545) SubTask 2 NAM Sampling

Activity/Phase: SubTask 3 PFAS Screening

Project Manager: Mark Culbreth SubTask 4 IDW T&D

SubTask 5

TTotals 1 2 3 4 Labor Rate Category

$85.85 Project Manager 3.6 3.6 $85.85 Senior Principal Scientist (MC) 5 5 0 0 $56.32 Senior Engineer / Scientist (DP) 21 15 3 3

$0.00 Senior Engineer / Scientist 0 0 0 0 $55.16 Senior Engineer / Scientist (RP) 0 0 0 0 $44.40 Staff Engineer / Scientist (LL) 0 0 0 0 $36.85 Sr. Associate Engineer / Scientist (KM) 0 0 0 0 $33.66 Sr. Associate Engineer / Scientist (LL) 0 0 0 0 $29.30 GIS Analyst / Graphics (JV) 5 4 1 0 $24.38 Technician (MW) 18 18 0 0 $34.81 Administrative (BJ) 5 4 1 0

Total Hours 57.60 3.6 46 5 3

Direct Labor $2,679.64 $308.28 $1,969.33 $233.07 $168.96

Overhead 125.30% $3,357.59 $386.27 $2,467.57 $292.04 $211.71 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $1,270.15 $146.12 $933.46 $110.48 $80.09 Total Labor $7,307.38 $840.67 $5,370.36 $635.59 $460.76

Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $222.00 $222.00 $0.00 $0.00 Total Travel $462.00 $462.00 $0.00 $0.00

Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Erwin Remediation $545.00 $0.00 $0.00 $545.00 Subcontractor Subtotal $545.00 $0.00 $0.00 $545.00 Handling Fee $54.50 $0.00 $0.00 $54.50 Total Subcontractor Cost $599.50 $0.00 $0.00 $599.50

Laboratory Analytical Costs $438.00 $438.00 $0.00 $0.00 Sample Shipping $70.00 $70.00 $0.00 $0.00 FDEP PFAS Analytical Cost $0.00 $0.00 $0.00 $0.00 FDEP Shipping $0.00 $0.00 $0.00 $0.00 Total Laboratory $508.00 $508.00 $0.00 $0.00

Field Expenses Expendables $80.00 $80.00 $0.00 $0.00 Equipment (Shallow Groundwater Sampling Kit) $580.00 $580.00 $0.00 $0.00 Equipment (Metal Detector) $40.00 $40.00 $0.00 $0.00 Drum (IDW related) $65.00 $65.00 $0.00 $0.00 Ice $26.00 $26.00 $0.00 $0.00 Total Field Expenses $791.00 $791.00 $0.00 $0.00

Subtotal $9,667.88 $840.67 $7,131.36 $635.59 $1,060.26 Completion Fee $730.75 $84.07 $537.04 $63.56 $46.08

Total Estimated Cost $10,398.63 $924.74 $7,668.40 $699.15 $1,106.34

NAM Sampling

SUBTASK: 2 (NAM Sampling)

DATE: 3/19/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Annual NAM Report 5 Total Hours 5

D. Phillips Senior Scientist Verification of property ownership, notify RPO & confirm/obtain site access 2 Prepare updated Health & Safety Plan 1 Prepare Draft Annual NAM Report 12

Total Hours 15 J. Von Borstel GIS Analyst Recreate Figures 4

Total Hours 4 M. Wiss Technician Prep for fieldwork and obtain a FDOT 55-gallon drum 2

Roundtrip mobilization from Orlando to Jacksonville for the annual NAM. 5 Open and collect DTW at 15 wells. 3 Groundwater sampling 5 wells and 1 IDW sample for VOHs & PFAS 6 Confirm that MW002 cannot be located and assess the condition of MW009 1 Survey MW010R TOC 1

Total Hours 18 B. Jarvis Administrative Tabulate data for deliverable and report production 4

Total Hours 4

TOTAL LABOR 46

Rental Truck $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USAGE

Per Diem M. Wiss $36.00 day 2 $72.00 Hotel M. Wiss $150.00 day 1 $150.00

TOTAL PER DIEM $222.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE UNIT USAGE

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNITS

USEPA Method 8260 for VOHs (10 wells and 1 drum) $73.00 6 0 $438.00 Shipping Samples $70.00 0 1 $70.00 FDEP Central Lab PFAS Screening (5 wells and 1 drum) $0.00 6 0 $0.00 FDEP PFAS Shipping $0.00 0 1 $0.00

TOTAL LAB $508.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Day 2 $80.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Metal Detector $40.00 Day 1 $40.00 Drum (IDW related) $65.00 each 1 $65.00 Ice $6.50 each 4 $26.00

TOTAL EQUIPMENT $791.00

SUBTASK 3 (PFAS Screening)

DATE: 3/19/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist Prepare PFAS email deliverable, lab report, field notes, table & figure. 3 Total Hours 3

J. Von Borstel GIS Analyst Prepare PFAS figure 1 Total Hours 1

B. Jarvis Administrative Update tables 1 Total Hours 1

TOTAL LABOR 5

VEHICLE TYPE RATE UNIT USAGE

$0.00

PER DIEM STAFF RATE UNIT USAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

SUBTASK 4 (IDW T&D)

DATE: 3/19/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist IDW Hazardous classification and scheduling T&D. 3 Total Hours 3

TOTAL LABOR 3

VEHICLE TYPE RATE UNIT USAGE

$0.00

PER DIEM STAFF RATE UNIT USAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

Erwin Remediation IDW T&D $545.00 1 $545.00

TOTAL $545.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

$0.00

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW682

DC021B February 27, 2026

This Task Assignment authorizes ECT to conduct annual Natural Attenuation Monitoring (NAM) at Koretizing Cleaners II (D282) in Jacksonville, FL as outlined in the revised May 8, 2025 Proposal.

Karlee Fowler 850 245-8944 Environmental Consulting and Technology, Inc. (ECT)

Mark A. Culbreth 813-289-9338

ERIC_4575

Jacksonville, Duval County, Florida

Koretizing Cleaners II (D282)

$ 10,398.63

$ 10,398.63

Scope of Work

Environmental Consulting and Technology, Inc. (ECT

Mark A. Culbreth

Contract Manager

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.06.13 11:49:54 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Invoice Schedule:

TOTAL COST

File details come from the government source that posted it. Updated .