CN-370000-HW682-DC18BCO1.pdf
PDF 1 MB Posted
- Contract number
- HW682
- Issued by
- Florida
About this file
Summary
This document collection represents a Task Assignment (TA) and Task Assignment Change Order (TACO) between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT) for environmental consulting services at the South Beach Cleaners site in Jacksonville Beach, Florida. The contract is identified as HW682, with task assignment number DC018B and project number ERIC_4551. The FDEP's project manager is Karlee Fowler, and ECT's project manager is Mark A. Culbreth. The change order was executed on May 29, 2025, and includes approval by FDEP Secretary Mubeen Darji, P.E.
The task assignment authorizes ECT to conduct an annual natural attenuation (NAM) groundwater sampling event for the South Beach Cleaners site. The work is divided into three subtasks: Project Management (Subtask 1), Annual NAM Report (Subtask 2), and IDW (Investigative Derived Waste) Management (Subtask 3). The original task value was $8,484.01, which was increased to $8,695.33 through TACO 1, representing a cost increase of $211.32 caused by a Work Change Directive (WCD-1) while reconciling a decrease in the number of samples analyzed. The change order extends the completion date from May 30, 2025, to September 5, 2025 (an additional 98 days). Deliverables include the Annual NAM Report due May 2, 2025, and Project Management/Waste Manifest documentation also due May 2, 2025, with invoicing contingent upon FDEP approval. The total estimated cost includes 73.45 labor hours, laboratory analytical costs, field expenses, vehicle rental, and subcontractor services. Attachment 1-1 replaced the original attachment, reflecting the cost adjustments and scope modifications detailed in the change order.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
DC018B 1 HW682
Karlee Fowler 850-245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor
Contractor Mark A. Culbreth Contractor 813-289-9338
ERIC_4551
South Beach Cleaners
✔ $ 8,695.33 $ 8,484.01
$ 8,695.33 $ 8,484.01 ✔ Completion
Completion 05/30/2025 09/05/2025 98
✔ 1 1 1
Environmental Consulting and Technology, Inc.
Contractor Mark A. Cubreth
Contract Manager Digitally signed by Mark Culbreth Date: 2025.05.29 18:21:25-04'00'Mark Culbreth
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.05.29 16:43:34 -04'00'
This change order authorizes an overall cost increase caused by WCD-1 and reconciles a decrease in the number of samples analyzed. Additionally, this change order authorizes a time extension.
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW682
DC018B
$ 8,695.33
Annual NAM Report (Subtask 2)
Project Management, Waste Manifest (Subtask 1, Subtask 3)
FDEP Approval of Annual NAM Report (Subtask 2)
FDEP Approval of Project Management, Waste Manifest (Subtask 1, Subtask 3)
05/02/2025
05/02/2025
$ 1,099.03
$ 7,596.30
Printed on recycled paper.
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ronn DeSantis Governor
From:
To: HW Contract Negotiation File
ERIC_
, Project Manager Date:
Subject: Negotiation Summary HW
This Task Assignm is $ with labor hours.
FDEP COST ESTIMATEContractor: Environmental Consulting & Technology, Inc.
Date: 5/29/2025
Task #: DC018B SubTask 1 Project Management
Site: South Beach Cleaners SubTask 2 Annual NAM Report
Activity/Phase: Annual NAM Report SubTask 3 IDW Management
Project Manager: Mark Culbreth SubTask 4
SubTask 5
Totals 1 2 3 Labor Rate Category
$84.17 Project Manager 3.2 3.2 $84.17 Senior Principal Scientist (MC) 4 4.00 0.00 $55.00 Senior Engineer / Scientist (DP) 17 16.00 1.00 $39.06 Staff Engineer / Scientist (LL) 3 3.25 0.00 $28.44 GIS Analyst / Graphics (JV) 4 4.00 0.00 $23.00 Technician (MW) 17 17.00 0.00 $34.81 Administrative (BJ) 4 4.00 0.00
Total Hours 73.45 3.20 69.25 1.00
Direct Labor $2,308.17 $265.54 $1,987.63 $55.00
Overhead 125.30% $2,892.14 $332.72 $2,490.50 $68.92 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $1,094.08 $125.87 $942.14 $26.07 Total Labor $6,294.39 $724.13 $5,420.27 $149.99
Travel Vehicle Rental $240.00 $240.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00
Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Erwin Remediation $125.00 $0.00 $125.00 Subcontractor Subtotal $125.00 $0.00 $125.00 Handling Fee $12.50 $0.00 $12.50 Total Subcontractor Cost $137.50 $0.00 $137.50
Laboratory Analytical Costs $511.00 $511.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 Sample Shipping $70.00 $70.00 $0.00 Total Laboratory $581.00 $581.00 $0.00
Field Expenses Expendables $80.00 $80.00 $0.00 Shallow Groundwater Sampling Kit $580.00 $580.00 $0.00 Metal Detector $40.00 $40.00 $0.00 DOT 55 Gallon Drum $100.00 $100.00 $0.00 Ice $13.00 $13.00 $0.00 Total Field Expenses $813.00 $813.00 $0.00
Subtotal $8,065.89 $724.13 $7,054.27 $287.49 Completion Fee $629.44 $72.41 $542.03 $15.00
Total Estimated Cost $8,695.33 $796.54 $7,596.30 $302.49
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : South Beach Cleaners SUBTASK 2: Annual NAM Report
DATE: 5/23/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations to prepare final Annual NAM Report 4 Total Hours 4
D. Phillips Sr. Scientist Verification of property ownership, notify RPO of field activities & confirm site access 4 QA/QC lab data, update HASP and prepare draft Annual NAM report 12
Total Hours 16 L. Layton Staff Engineer Identify owner and confirm site access agreement is valid, arrange access to interior we 3.25
Total Hours 3.25 J. Von Borstel GIS Analyst/Graphics Update Figures 4
Total Hours 4 M. Wiss Technician Prep for field work and pickup DOT 55 gallon Drum 1
Round trip mobilization to the site 5 Open Well and collect DTW at 16 wells 1 Annual groundwater sampling 9 wells 9 Place purge water in drum, sample and secure the drum onsite 1
Total Hours 17 B. Jarvis Administrative Update Tables 4
Total Hours 4
TOTAL LABOR 48.25
VEHICLE TYPE RATE UNIT USEAGE
Truck M. Wiss $120.00 Day 2 $240.00 Rental Car $80.00 Day 0 $0.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
M. Wiss Per Diem $36.00 Day 2 $72.00 M. Wiss Hotel $150.00 Day 1 $150.00
TOTAL PER DIEM $222.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units Shipping $70.00 1 $70.00 USEPA Method 8260 for VOHs $73.00 7 $511.00
TOTAL LAB $581.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 2 $80.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Metal Detector $40.00 Day 1 $40.00 DOT 55 Gallon Drum $100.00 each 1 $100.00 Ice $6.50 each 2 $13.00
TOTAL EQUIPMEN $813.00
FINAL --7/24/96
SUBTASK 3: IDW Management
DATE: 5/23/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Sr. Scientist Verify IDW hazard classification and coordinate T&D 1 Total Hours 1
TOTAL LABOR 1
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW T&D $125.00 $125.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMEN $0.00
Task #: DC018B SubTask 1 Project Management
Site: South Beach Cleaners SubTask 2 Annual NAM Report
Activity/Phase: Annual NAM Report SubTask 3 IDW Management
Project Manager: Mark Culbreth SubTask 4
SubTask 5
Totals 1 2 3 Labor Rate Category
$84.17 Project Manager 0 0.2 $84.17 Senior Principal Scientist (MC) 0.00 0.00 0.00 $55.00 Senior Engineer / Scientist (DP) 0.00 0.00 0.00 $39.06 Staff Engineer / Scientist (LL) 3.25 3.25 0.00 $28.44 GIS Analyst / Graphics (JV) 0.00 0.00 0.00 $23.00 Technician (MW) 0.00 0.00 0.00 $34.81 Administrative (BJ) 0.00 0.00 0.00
Total Hours 3.45 0.20 3.25 0.00
Direct Labor $143.45 $16.50 $126.95 $0.00
Overhead 125.30% $179.74 $20.67 $159.07 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $67.99 $7.82 $60.17 $0.00 Total Labor $391.18 $44.99 $346.19 $0.00
Travel Vehicle Rental $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Erwin Remediation $0.00 $0.00 $0.00 Subcontractor Subtotal $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00
Laboratory Analytical Costs ($219.00) ($219.00) $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 Total Laboratory ($219.00) ($219.00) $0.00
Field Expenses Expendables $0.00 $0.00 $0.00 Shallow Groundwater Sampling Kit $0.00 $0.00 $0.00 Metal Detector $0.00 $0.00 $0.00 DOT 55 Gallon Drum $0.00 $0.00 $0.00 Ice $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00
Subtotal $172.18 $44.99 $127.19 $0.00 Completion Fee $39.12 $4.50 $34.62 $0.00
Total Estimated Cost $211.30 $49.49 $161.81 $0.00
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 2: Annual NAM Report
DATE: 5/23/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations to prepare final Annual NAM Report 0 Total Hours 0
D. Phillips Sr. Scientist Verification of property ownership, notify RPO of field activities & confirm site access 0 QA/QC lab data, update HASP and prepare draft Annual NAM report 0
Total Hours 0 L. Layton Staff Engineer Identify owner and confirm site access agreement is valid, arrange access to interior we 3.25
Total Hours 3.25 J. Von Borstel GIS Analyst/Graphics Update Figures 0
Total Hours 0 M. Wiss Technician Prep for field work and pickup DOT 55 gallon Drum 0
Round trip mobilization to the site 0 Open Well and collect DTW at 16 wells 0 Annual groundwater sampling 9 wells 0 Place purge water in drum, sample and secure the drum onsite 0
Total Hours 0 B. Jarvis Administrative Update Tables 0
Total Hours 0
TOTAL LABOR 3.25
VEHICLE TYPE RATE UNIT USEAGE
Truck M. Wiss $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
M. Wiss Per Diem $36.00 Day 0 $0.00 M. Wiss Hotel $150.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units Shipping $70.00 0 $0.00 USEPA Method 8260 for VOHs $73.00 -3 ($219.00)
TOTAL LAB ($219.00)
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 0 $0.00 Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00 Metal Detector $40.00 Day 0 $0.00 DOT 55 Gallon Drum $100.00 each 0 $0.00 Ice $6.50 each 0 $0.00
TOTAL EQUIPMEN $0.00
DATE: 5/23/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Sr. Scientist Verify IDW hazard classification and coordinate T&D 0 Total Hours 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW T&D $0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units Shipping $52.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMEN $0.00
Task #: DC018B SubTask 1 Project Management
Site: South Beach Cleaners SubTask 2 Annual NAM Report
Activity/Phase: Annual NAM Report SubTask 3 IDW Management
Project Manager: Mark Culbreth SubTask 4
SubTask 5
Totals 1 2 3 Labor Rate Category
$84.17 Project Manager 2.96 2.96 $84.17 Senior Principal Scientist (MC) 4.00 4.00 0.00 $55.00 Senior Engineer / Scientist (DP) 17.00 16.00 1.00 $28.44 GIS Analyst / Graphics (JV) 4.00 4.00 0.00 $22.85 Associate Engineer / Scientist (JP) 0.00 0.00 0.00 $23.00 Technician (MW) 17.00 17.00 0.00 $34.81 Administrative (BJ) 4.00 4.00 0.00
Total Hours 69.96 2.96 66.00 1.00
Direct Labor $2,164.72 $249.04 $1,860.68 $55.00
Overhead 125.30% $2,712.40 $312.05 $2,331.43 $68.92 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $1,026.07 $118.04 $881.96 $26.07 Total Labor $5,903.19 $679.13 $5,074.07 $149.99
Travel Vehicle Rental $240.00 $240.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00
Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Erwin Remediation $125.00 $0.00 $125.00 Subcontractor Subtotal $125.00 $0.00 $125.00 Handling Fee $12.50 $0.00 $12.50 Total Subcontractor Cost $137.50 $0.00 $137.50
Laboratory Analytical Costs $730.00 $730.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 Sample Shipping $70.00 $70.00 $0.00 Total Laboratory $800.00 $800.00 $0.00
Field Expenses Expendables $80.00 $80.00 $0.00 Shallow Groundwater Sampling Kit $580.00 $580.00 $0.00 Metal Detector $40.00 $40.00 $0.00 DOT 55 Gallon Drum $100.00 $100.00 $0.00 Ice $13.00 $13.00 $0.00 Total Field Expenses $813.00 $813.00 $0.00
Subtotal $7,893.69 $679.13 $6,927.07 $287.49 Completion Fee $590.32 $67.91 $507.41 $15.00
Total Estimated Cost $8,484.01 $747.04 $7,434.48 $302.49
SUBTASK 2: Annual NAM Report
DATE: 10/25/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations to prepare final Annual NAM Report 4 Total 4
D. Phillips Senior Scientist Verification of property ownership, notify RPO of field activities & confirm site access 4 QA/QC lab data, update HASP and prepare draft Annual NAM report 12
Total 16 J. Von Borstel GIS Analyst 4
Total 4 M. Wiss Technician 1
Annual groundwater sampling 9 wells 9 Place purge water in drum, sample and secure the drum onsite 1
Total 17 B. Jarvis Administrative Update Tables 4
Total 4
TOTAL LABOR 45
VEHICLE TYPE RATE UNIT USAGE
Truck $120.00 Day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USAGE
Per Diem MW $36.00 day 2 $72.00 Hotel MW $150.00 day 1 $150.00
TOTAL PER DIEM $222.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
USEPA Method 8260 for VOHs (9 wells + IDW) $73.00 10 $730.00 Shipping Samples $70.00 1 $70.00
TOTAL LAB $800.00
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Expendables $40.00 Event 2 $80.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Metal Detector $40.00 Day 1 $40.00 DOT 55 gallon drum $100.00 each 1 $100.00 Ice $6.50 each 2 $13.00
TOTAL EQUIPMENT $813.00
Round trip mobilization to the site
Update Figures
Prep for field work and pickup DOT 55 gallon Drum
Open Well and collect DTW at 16 wells
DATE: 10/25/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Senior Scientist 1 Total 1
TOTAL LABOR 1
VEHICLE TYPE RATE UNIT USAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW T&D $125.00 1 $125.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
TOTAL EQUIPMENT $0.00
Verify IDW hazard classification and coordinate T&D.
Contract No. HW685
Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Work Change DirectiveForm
ATTACHMENT 6
Site Name: Site ID #:
Contract #:
Task Assignment #:
Contractor:
Work Change Directive #:
Reason for Work Change Directive :
Description of Work Change Directive :
Attachments (if applicable, listdocuments supportingchange):
Costs (if negotiated unitcosts, provide information below):
Maximum Estimated Increase in Task Amount:
AuthorizedContractorSignature:
AuthorizedFDEPSignature:
FDEP SupervisorApproval:
(if applicable)
Fowler, Karlee
From: Courtney Wranosky <cwranosky@ectinc.com> Sent: Tuesday, May 20, 2025 11:42 AM To: Fowler, Karlee Cc: Mark Culbreth; Leif Layton Subject: HW682_ ERIC_4551 _DC018B _South Beach Cleaners TA extension request
Follow Up Flag: Follow up Flag Status: Flagged
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Good Morning Karlee, I would like to request a 60-day extension for ERIC_4551 – South Beach Cleaners. The TA end date is currently May 30th. This extension will allow for the submission and approval of TACO 1 and for any other TACOs needed during the invoicing process.
Thanks, Courtney Wranosky Associate Scientist
Environmental Consulting & Technology, Inc.
1309 Thomasville Road | Suite 217 | Tallahassee, FL, 32303 C: 518.586.4651 | D: 850.383.0009 | cwranosky@ectinc.com
Follow us:
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW682
DC018B May 30, 2025
This Task Assignment authorizes ECT to conduct an annual natural attenuation (NAM) groundwater sampling event for South Beach Cleaners in Jacksonville Beach, Florida.
Karlee Fowler 850 245-8944 Environmental Consulting and Technology, Inc. (ECT)
Mark A. Culbreth 813-289-9338
ERIC_4551
Jacksonville Beach, Florida
South Beach Cleaners
$ 8,484.01
$ 8,484.01
Scope of Work
Environmental Consulting and Technology, Inc. (ECT
Mark A. Culbreth
Contract Manager
12/18/2024
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2024.12.18 13:42:52 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Invoice Schedule:
TOTAL COST
File details come from the government source that posted it. Updated .