CN-370000-HW682-DC014B.pdf

PDF 4 MB Posted

Attached to
Master Agreement FL|HW682|8fccc28dda898687f0dd3c309f3a996b
Contract number
HW682
Issued by
Florida

About this file

This document is a Task Assignment (TA) under Contract Number HW682 between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT). The TA authorizes ECT to perform an initial soil and groundwater site assessment at Aldos Cleaners located at 5970 SW 18th Street, Boca Raton, Palm Beach County, Florida. The project is managed by Karlee Fowler for FDEP and Mark A. Culbreth for ECT, with a completion date of May 14, 2025.

ECT will conduct a comprehensive environmental assessment comprising eight subtasks: project management, Health and Safety Plan preparation and utility clearance, soil and direct push technology (DPT) groundwater sampling with interior well installation, exterior well installation and sampling, soil vapor assessment using Modified Active Gas Sampling (MAGS), professional land survey, investigative derived waste (IDW) management, and Site Assessment Report preparation. The assessment includes utility location surveys, soil borings at multiple depths, groundwater sampling at various intervals, installation of monitoring wells to depths up to 60 feet, and laboratory analyses for volatile organic halocarbons. The total contract value is $94,523.44 on a fixed unit rate basis, payable upon FDEP approval of deliverables for each subtask. Deliverables are scheduled from March 2024 through November 2024, with invoice amounts distributed across subtasks ranging from $4,104.62 for initial HASP and utility clearance work to $39,496.61 for soil and groundwater sampling and interior well installation.

View the file

Other files

File Type Posted
CN-370000-HW682-DC001C.pdf PDF
CN-370000-HW682-DC003A.pdf PDF
CN-370000-HW682-DC003B.pdf PDF
CN-370000-HW682-DC006B.pdf PDF
CN-370000-HW682-DC007C.pdf PDF
CN-370000-HW682-DC007D.pdf PDF
CN-370000-HW682-DC008C.pdf PDF
CN-370000-HW682-DC010B.pdf PDF
CN-370000-HW682-DC010C.pdf PDF
CN-370000-HW682-DC015A.pdf PDF
CN-370000-HW682-DC016A.pdf PDF
CN-370000-HW682-DC016B.pdf PDF
CN-370000-HW682-DC021A.pdf PDF
CN-370000-HW682-DC027A.pdf PDF
CN-370000-HW682-DC03CCO2.pdf PDF
CN-370000-HW682-DC03CCO3.pdf PDF
CN-370000-HW682-DC04BCO2.pdf PDF
CN-370000-HW682-DC04BCO3.pdf PDF
CN-370000-HW682-DC04BCO5.pdf PDF
CN-370000-HW682-DC05BCO6.pdf PDF
CN-370000-HW682-DC05BCO8.pdf PDF
CN-370000-HW682-DC06BCO1.pdf PDF
CN-370000-HW682-DC06BCO2.pdf PDF
CN-370000-HW682-DC08DCO1.pdf PDF
CN-370000-HW682-DC09ACO2.pdf PDF
CN-370000-HW682-DC09ACO3.pdf PDF
CN-370000-HW682-DC10BCO1.pdf PDF
CN-370000-HW682-DC11ACO4.pdf PDF
CN-370000-HW682-DC11ACO6.pdf PDF
CN-370000-HW682-DC13ACO1.pdf PDF
CN-370000-HW682-DC13BCO1.pdf PDF
CN-370000-HW682-DC13BCO7.pdf PDF
CN-370000-HW682-DC16ACO2.pdf PDF
CN-370000-HW682-DC18ACO2.pdf PDF
CN-370000-HW682-DC18ACO3.pdf PDF
CN-370000-HW682-DC20ACO1.pdf PDF
CN-370000-HW682-DC21ACO1.pdf PDF
CN-370000-HW682-DC21BCO1.pdf PDF
CN-370000-HW682-DC22ACO2.pdf PDF
CN-370000-HW682-DC24ACO1.pdf PDF
CN-370000-HW682-DC26ACO3.pdf PDF
CN-370000-HW682-DC27ACO1.pdf PDF
CN-370000-HW682-DC28ACO1.pdf PDF
CN-370000-HW682-FIL2.pdf PDF
CN-370000-HW682-FIL6.pdf PDF
CN-370000-HW682-HW001A.pdf PDF
CN-370000-HW682-HW004A.pdf PDF
CN-370000-HW682-HW006A.pdf PDF
CN-370000-HW682-HW007A.pdf PDF
CN-370000-HW682-HW011A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW682

DC014B Completion May 14, 2025

This Task Assignment authorizes ECT to perform initial soil & groundwater site assessment at Aldos Cleaners. Assessment activities will include utility clearance, soil sampling, DPT sampling, monitoring well installation and sampling, MAGS sampling, and transport and disposal of IDW. ECT will also generate a Site Assessment Report.

Karlee Fowler 850 245-8944 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Environmental Consulting and Technology, Inc. (ECT)

Environmental Consulting and Technology, Inc. (ECT)

Mark A. Culbreth 813-289-9338

ERIC_5188

Boca Raton, Palm Beach County, Florida

Aldos Cleaners

✔ $ 94,523.44

$ 94,523.44

Scope of Work

Mark Culbreth

Contract Manager Digitally signed by Mark Culbreth Date: 2024.04.16 10:00:20-04'00'Mark Culbreth

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.04.16 08:59:15 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HASP and Utility Survey (Subtask 2) 05/24/2024

Soil & DPT Groundwater Sampling & Interior Well Installation (Subtask 3) 06/28/2024

Exterior Well Installation & Sampling (Subtask 4) 07/26/2024

Soil Vapor Assessment (Subtask 5) 09/13/2024

Professional Land Survey & IDW Management (Subtask 6, Subtask 7) 11/01/2024

Project Management, Site Assessment Report (Subtask 1, Subtask 8) 02/14/2025

FDEP Approval of HASP and Utility Survey (Subtask 2) $ 4,104.62

FDEP Approval of Soil & DPT Groundwater Sampling & Interior Well Installation (Subtask 3) $ 39,496.61

FDEP Approval of Exterior Well Installation & Sampling (Subtask 4) $ 24,783.50

FDEP Approval of Soil Vapor Assessment (Subtask 5) $ 6,361.38

FDEP Approval of Professional Land Survey & IDW Management (Subtask 6, Subtask 7) $ 7,253.87

FDEP Approval of Project Management, Site Assessment Report (Subtask 1, Subtask 8) $ 12,523.46

$ 94,523.44

HW682

DC014B

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

From:

Date:

To: HW682 Contract Negotiation File Aldos Cleaners Boca Raton, Palm Beach County

ERIC_3985

Karlee Fowler, Project Manager April 12, 2024

Subject: Negotiation Summary

HW682 DC014B

This Task Assignment authorizes ECT to perform initial soil and groundwater site assessment at Aldos Cleaners. Assessment activities will include utility clearance, soil sampling, DPT sampling, monitoring well installation and sampling, MAGS sampling, and transport and disposal of IDW. ECT will also generate a Site Assessment Report.

The FDEP project manager agrees to the scope of work and final cost associated with this Task Assignment which is $94,523.44 with 263 total labor hours.

FDEP COST ESTIMATE

Contractor: Environmental Cosultanting & Technology

Date: 6/22/2023

Task #: SubTask 1 Project Management SubTask 6 Professional Land Survey

Site: Aldos Cleaners SubTask 2 HASP & Utility Clearance SubTask 7 IDW Management

Activity/Phase: Initial Site Assessment SubTask 3 Soil Sampling with DPT & Groundwater Sampling SubTask 8 SAR Preparation

Project Manager: Mark Culbreth SubTask 4 Well Installation & Groundwater Sampling SubTask 9

SubTask 5 MAGS SubTask 10

Totals 1 2 3 4 5 6 7 8

Labor Rate Category

$82.52 Project Manager 17.4 17.4

$82.52 Senior Principal Scientist (MC) 2.0 0 0 0 0 0 0 2

$59.43 Senior Engineer / Scientist (GS) 44.5 3.0 2.5 0.0 6 1 2 30

$55.00 Senior Engineer / Scientist (DP) 109.0 12.0 56.0 33.0 0 0 0 8

$27.35 GIS Analyst / Graphics (JV) 8.0 0 0 0.0 0 0 0 8

$22.85 Associate Engineer / Scientist (JP) 56.5 0 0 26.5 17 13 0 0

$24.26 Technician (BC) 16.0 0 0 0 16 0 0 0

$33.36 Administrative (BJ) 10.0 0 2 2 2 0 0 4

Total Hours 263.4 17.4 15.0 60.5 61.5 41.0 14 2 52

Direct Labor $12,470.99 $1,434.72 $838.29 $3,295.30 $2,487.25 $1,199.91 $356.48 $118.86 $2,740.18

Overhead 125.30% $15,626.15 $1,797.70 $1,050.38 $4,129.01 $3,116.52 $1,503.49 $446.67 $148.93 $3,433.45

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 47.40% $5,911.26 $680.06 $397.35 $1,561.97 $1,178.96 $568.76 $168.97 $56.34 $1,298.85

Total Labor $34,008.40 $3,912.48 $2,286.02 $8,986.28 $6,782.73 $3,272.16 $972.12 $324.13 $7,472.48

Travel

Vehicle Rental $1,812.00 $120.00 $480.00 $840.00 $240.00 $132.00 $0.00 $0.00

Per diem + Hotel $2,448.00 $0.00 $780.00 $1,002.00 $444.00 $222.00 $0.00 $0.00

Total Travel $4,260.00 $120.00 $1,260.00 $1,842.00 $684.00 $354.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $24,102.00 $0.00 $13,977.00 $10,125.00 $0.00 $0.00 $0.00 $0.00

Surveying $3,500.00 $0.00 $0.00 $0.00 $0.00 $3,500.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

GPR $2,740.00 $1,300.00 $0.00 $0.00 $0.00 $0.00 $1,440.00 $0.00

Subcontractor Subtotal $30,342.00 $1,300.00 $13,977.00 $10,125.00 $0.00 $3,500.00 $1,440.00 $0.00

Handling Fee $3,034.20 $130.00 $1,397.70 $1,012.50 $0.00 $350.00 $144.00 $0.00

Total Subcontractor Cost $33,376.20 $1,430.00 $15,374.70 $11,137.50 $0.00 $3,850.00 $1,584.00 $0.00

Laboratory

Analytical Costs $13,504.00 $0.00 $10,672.00 $1,632.00 $1,200.00 $0.00 $0.00 $0.00

Sample Shipping $560.00 $0.00 $350.00 $70.00 $140.00 $0.00 $0.00 $0.00

Total Laboratory $14,064.00 $0.00 $11,022.00 $1,702.00 $1,340.00 $0.00 $0.00 $0.00

Field Expenses

Expendables $520.00 $40.00 $200.00 $200.00 $40.00 $40.00 $0.00 $0.00

Soil Assessment Kit $700.00 $0.00 $700.00 $0.00 $0.00 $0.00 $0.00 $0.00

Monitoring well Install Kit $1,950.00 $0.00 $650.00 $1,300.00 $0.00 $0.00 $0.00 $0.00

Shallow Groundwater Sampling Kit $870.00 $0.00 $290.00 $580.00 $0.00 $0.00 $0.00 $0.00

Ice $91.00 $0.00 $65.00 $26.00 $0.00 $0.00 $0.00 $0.00

Total Survey Station $100.00 $0.00 $50.00 $50.00 $0.00 $0.00 $0.00 $0.00

Deep Groundwater Sampling Kit $415.00 $0.00 $0.00 $415.00 $0.00 $0.00 $0.00 $0.00

MAGS Kit $500.00 $0.00 $0.00 $0.00 $500.00 $0.00 $0.00 $0.00

Air Sampling Canisters $268.00 $0.00 $0.00 $70.00 $198.00 $0.00 $0.00 $0.00

Total Field Expenses $5,414.00 $40.00 $1,955.00 $2,641.00 $738.00 $40.00 $0.00 $0.00

Subtotal $91,122.60 $3,912.48 $3,876.02 $38,597.98 $24,105.23 $6,034.16 $5,216.12 $1,908.13 $7,472.48

Completion Fee $3,400.84 $391.25 $228.60 $898.63 $678.27 $327.22 $97.21 $32.41 $747.25

Total Estimated Cost $94,523.44 $4,303.73 $4,104.62 $39,496.61 $24,783.50 $6,361.38 $5,313.33 $1,940.54 $8,219.73

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Aldos Cleaners SUBTASK 2: HASP & Utility Clearance

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Prepare Health and Safety Plan 2 Verification of property ownership, notify RPO of field activities 1

Total Hours 3 D Phillips Senior Scientist Round trip Mobilization between Orlando and the site in Boca Raton 8

Utility clearance 4 Total Hours 12

TOTAL LABOR 15

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

GeoView Private Utility Location $1,300.00 1 $1,300.00

TOTAL $1,300.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

FINAL --7/24/96

SUBTASK 3: Soil Sampling with DPT & Groundwater Sampling

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer SPLP evaluation 1 SPLP and well placement correspondence and meetings with the FDEP 1.5

Total Hours 2.5 D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8

Soil Borings and DPT Sampling 45 Depth to water measurement at 5 wells and piezomters 1 Groundwater sampling two wells 2

Total Hours 56 B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 60.5

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel D Phillips $150.00 day 4 $600.00 Per Diem D Phillips $36.00 day 5 $180.00

TOTAL PER DIEM $780.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection DPT Soil & Groundwater Sampling $13,977.00 1 $13,977.00

TOTAL $13,977.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNITS

USEPA Method 8260 Full list Soil SBs $110.00 32 $3,520.00 SPLP Extractions $45.00 18 $810.00 USEPA Method 8260 for Full list Groundwater DPT $110.00 33 $3,630.00 USEPA Method 8260 Full list Grab samples from 2 MW's $110.00 2 $220.00 USEPA Method 8260 for SPLP $110.00 18 $1,980.00 Encore Samplers $16.00 32 $512.00 Shipping Samples $70.00 5 $350.00

TOTAL LAB $11,022.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 5 $200.00 Soil Assessment Kit $700.00 Week 1 $700.00 Monitoring well Install Kit $325.00 Day 2 $650.00 Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00 Ice $6.50 each 10 $65.00 Total Survey Station $50.00 day 1 $50.00

TOTAL EQUIPMENT $1,955.00

SUBTASK 4: Well Installation & Groundwater Sampling

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Boca Raton 8 Oversight of well installations 25

Total Hours 33 J. Penia 9

Open Well and collect DTW at 14 wells 2 Groundwater Sampling (4 piezometer, 9 shallow & intermediate wells) 13 Groundwater Sampling deep well 1.5 Containerizieng purge water 1

Total Hours 26.5 B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 61.5

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck DP $480.00 week 1 $480.00 Rental Truck JP $120.00 day 3 $360.00

TOTAL VEHICLE $840.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel D Phillips $150.00 day 3 $450.00 Per Diem D Phillips $36.00 day 4 $144.00

Hotel J. Penia $150.00 day 2 $300.00 Per Diem J. Penia $36.00 day 3 $108.00

TOTAL PER DIEM $1,002.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

Groundwater Protection Well install 1 $10,125.00

TOTAL $10,125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units IDW USEPA Method 8260 for VOHs Soil $73.00 1 $73.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals Soil $56.00 1 $56.00 IDW USEPA Method 8260 for VOHs Purge water $73.00 1 $73.00 USEPA Method 8260 Full list amples from MW's $110.00 13 $1,430.00 Shipping Samples $70.00 1 $70.00

TOTAL LAB $1,702.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 5 $200.00 Monitoring well Install Kit $1,300.00 Week 1 $1,300.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Ice $6.50 each 4 $26.00 Total Survey Station $50.00 day 1 $50.00 Deep Groundwater Sampling Kit $415.00 Day 1 $415.00 Generator $70.00 Day 1 $70.00

TOTAL EQUIPMENT $2,641.00

$10,125.00

Associate Engineer/Scienti st Round trip Mobilization from Orlando to the site in Boca Raton

SUBTASK 5: MAGS

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 3 Check MAGS data. 3

Total Hours 6 J. Penia Round trip Mobilization from Tampa to the site in Boca Raton 9

Preform MAGS Testing 8 Total Hours 17

B. Carrick Technician Round trip Mobilization from Tampa to the site in Boca Raton 8 Preform MAGS Testing 8

Total Hours 16 B. Jarvis Administrative Update tables 2

Total 2

TOTAL LABOR 41

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck J. Penia $120.00 day 2 $240.00 Rental Truck B. Carrick $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00

Hotel B. Carrick $150.00 day 1 $150.00 Per Diem B. Carrick $36.00 day 2 $72.00

TOTAL PER DIEM $444.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

USEPA Method TO-15 for VOHs $200.00 6 $1,200.00 Sampling Shipping Overnight $70.00 2 $140.00

TOTAL LAB $1,340.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 MAGS Kit $500.00 Day 1 $500.00 Air Sampling Canisters $33.00 Day 6 $198.00

TOTAL EQUIPMENT $738.00

Associate Scientist

SUBTASK 6: Professional Land Survey

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Coordinate and schedule with Surveyor 1 Total Hours 1

J. Penia Technician Round trip Mobilize from Tampa to the site in Boca Raton 9 PLS Oversight and aid in location of wells 4

Total Hours 13

TOTAL LABOR 14

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck J. Penia $132.00 day 1 $132.00

TOTAL VEHICLE $132.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel JP $36.00 day 2 $72.00 Per Diem JP $150.00 day 1 $150.00

TOTAL PER DIEM $222.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Southeastern Professional Land Survey $3,500.00 1 $3,500.00

TOTAL $3,500.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

SUBTASK 7: IDW Management

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Characterization of waste to profile soil & water IDW drums for transportation and disposal 1 Schedule IDW transport and disposal 1

Total 2

TOTAL LABOR 2

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW T&D Soil $125.00 8 $1,000.00 Erwin Remediation IDW T&D Water $110.00 4 $440.00

TOTAL $1,440.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 8: SAR Preparation

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal ScientistDevelop conclusions, recommendations, and prepare final Assessment Report 2

Total 2 G Sattler Senior Engineer Prepare the draft SAR site background, SOW, soil, groundwater sections 30

Total 30 D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generation 6

QA/QC of analytical data 2 Total 8

J. Von Borstel GIS Analyst Revise and Update Figures 8 Total 8

B. Jarvis Administrative Update tables, Document Preparation & Publishing 4 Total 4

TOTAL LABOR 52

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

100 % Employee-Owned | www.southeasternsurveying.com Orlando, Florida | Jacksonville, Florida | Chipley, Florida

Tampa, Florida | Kissimmee, Florida | Marianna, Florida | Tavares, Florida | Dothan, Alabama

July 17, 2023 VIA EMAIL: gsattler@ectinc.com

Mr. Gregory Sattler, P.E. | Senior Remediation Engineer Site Assessment & Remediation Environmental Consulting & Technology, Inc.

3751 Maguire Boulevard, Suite 234 Orlando, Florida 32803 P: (321) 245-2124

RE: Aldos Cleaners – Monitoring Wells Survey 5970 SW 18th Street, Boca Raton, Florida 33433 Section 34, Township 47 South, Range 42 East, Palm Beach County, Florida

Dear Mr. Sattler, We are pleased to submit our proposal for Surveying Services on the above referenced project.

TASK I – Monitoring Well Survey

1. Establish horizontal and vertical control.

• Horizontal Control will be based on North American Datum of 1983 (NAD83), State Plane Coordinate System, Florida East Zone.

• Vertical Control will be based on North American Vertical Datum of 1988 (NAVD88).

2. Horizontally and vertically locate 21 additional monitoring wells based on information provided by the client.

3. Top of casing elevations and ground shots for monitoring wells will be collected.

ADDITIONAL SERVICES

Any service not explicitly provided for in the above scope will be billed as additional services and will be performed at our then current hourly rates as provided for in Exhibit A.

INFORMATION PROVIDED BY CLIENT

SSMC shall be entitled to rely on the completeness and accuracy of all information provided by the Client or the Client’s consultants or representatives.

DELIVERABLE

The final product will be an electronically signed and sealed survey, and an AutoCAD Civil 3D file for your use.

DELIVERY

All documents will be sent to the client or the client’s representative(s) via USPS. If overnight shipping is requested or required by the client or the client’s representative(s), then said charges would appear as a separate item on our invoice unless we are provided with the client’s overnight carrier account number for shipping.

PROJECT TIMELINE

We anticipate the completion of the above-described work six (6) weeks after receipt of a written notice to proceed.

EXPENSES AND FEES

Our fee for the above-referenced work will be as follows:

Topographic Survey: $ 3,500.00 mailto:gsattler@ectinc.com

Mr. Gregory Sattler, P.E. | Senior Remediation Engineer Aldos Cleaners – Monitoring Wells Survey July 17, 2023

\\192.168.0.4\admin\Data\Admin Documents\E\Environmental Consulting & Technology, Inc (ECT)\Aldos Cleaners\2_Proposal Letters\Aldos Cleaners_Monitoring Wells.docx

Payment Terms:

Payment is expected within thirty (30) days from the date of the invoice.

PAYMENT OPTIONS

SSMC is committed to ensuring our clients have access to various payment options. These options include cash, paper checks, ACH transfers, wire transfers, and credit cards. Credit card payments are subject to a vendor administrative fee of 3.5% of the invoice total.

We look forward to the opportunity to work with you on this project.

Sincerely, Edwin Munoz Jr., PSM Project Manager

EM: pll

If the above scope, period of service, and method of compensation meets with your approval, please have an authorized person execute below and send via email to contracts@southeasternsurveying.com as an official notice to proceed along with the notice of commencement. Fees and times stated in this agreement are valid for six months from the date of the proposal.

CLIENT AUTHORIZATION

I declare that I am authorized to sign the binding contractual document. I also declare that I have read, understand, and accept this proposal.

Signature Date

Printed Name Title (if any) mailto:contracts@southeasternsurveying.com

Mr. Gregory Sattler, P.E. | Senior Remediation Engineer Aldos Cleaners – Monitoring Wells Survey July 17, 2023

\\192.168.0.4\admin\Data\Admin Documents\E\Environmental Consulting & Technology, Inc (ECT)\Aldos Cleaners\2_Proposal Letters\Aldos Cleaners_Monitoring Wells.docx

EXHIBIT “A”

HOURLY RATES

Professional Surveyor & Mapper $162.00/per hour

Project Manager (Survey) $162.00/per hour

Project Manager (SUE) $162.00/per hour

Senior Technician (Survey) $122.00/per hour

Senior Technician (SUE) $122.00/per hour

CAD Technician $108.00/per hour

2 Person Survey Field Crew $163.00/per hour

3 Person Survey Field Crew $214.00/per hour

4 Person Survey Field Crew $265.00/per hour

2 Person SUE Field Crew $198.00/per hour

3 Person SUE Field Crew $276.00/per hour

GENERAL TERMS AND CONDITIONS

These standard terms and conditions (“STCS”) are incorporated by reference into the foregoing proposal, along with any future modifications or amendments (the "Agreement") between Southeastern Surveying and Mapping Corporation (“SSMC”) and its Client (“You" or “Your”) for the performance of surveying services ("Services"). These STCS are fully binding upon you just as if they were fully outlined in the body of the proposal letter and shall supersede any term or provision elsewhere in the agreement in conflict with these

STCS.

SCOPE OF SERVICES

For the fee outlined in the Agreement, you agree that SSMC shall only be obligated to render the Services expressly described in the Agreement. Unless the Agreement explicitly requires, in no event does SSMC has any obligation or responsibility for:

a. The correctness and completeness of any document which was prepared by another entity.

b. The correctness and completeness of any drawing prepared by SSMC, unless it was duly signed and sealed by a registered professional on SSMC’s behalf.

c. Favorable or timely comment or action by any governmental entity on the submission of any construction documents, land use or feasibility studies, appeals, petitions for exceptions or waivers, or other requests or documents of any nature whatsoever.

d. Taking into account off-site circumstances other than those clearly visible and actually known to SSMC from on-site work.

e. The actual location (or characteristics) of any portion of a utility that is not entirely visible from the surface.

f. Site safety or construction quality, means, methods, or sequences.

g. The correctness of any geotechnical services performed by others, whether or not performed as SSMC’s subcontractor.

Should shop drawing review be incorporated into the Services, SSMC shall pass on the shop drawings with reasonable promptness. Checking and approval of shop drawings will be general, for conformance with the design concept of the project to which this Agreement relates (“Project”) and compliance with the information given in the construction documents, and will not include quantities, detailed dimensions, nor adjustments of dimensions to actual field conditions. Approval shall not be construed as permitting any departure from contract requirements, nor as relieving the Contractor of the sole and final responsibility for any error in details, dimensions, or otherwise, that may exist. SSMC does not provide legal, accounting, or insurance services.

YOUR ORAL DECISIONS

You, or any of your directors, officers, partners, members, managers, employees or agents having apparent authority from you, may orally: (a) make decisions relating to Services or the Agreement; (b) request a change in the scope of Services under the Agreement; or (c) request SSMC to render additional services under the Agreement, subject to our right to require you to submit the request in writing before your decision or request shall be considered to have been effectively made. You may, at any time, limit the authority of any or all persons to act orally on your behalf under this Paragraph, by giving SSMC seven (7) days advance written notice.

STANDARD OF CARE

The standard of care for all professional services performed by SSMC under this Agreement shall be the skill and care used by members of SSMC’s profession practicing under similar circumstances at the same time and in the same locality.

PAYMENT

SSMC may submit invoices at any time to you for Services and reimbursable expenses incurred. Invoices are payable within 30 days of the invoice date. Invoices may be based either upon our estimate of the proportion of the total services completed at the time of billing for lump sum or fixed fee services, or in the case of hourly services, upon rendering of the Services. If any invoice is not paid within 30 days of the invoice date, SSMC shall have the right either to suspend the performance of our Services until all invoices more than 30 days past due are fully paid or to terminate the agreement and to initiate proceedings to recover amounts owed by you. Additionally, SSMC shall have the right to withhold from you the possession or use of any drawings or documents prepared by SSMC for you under this or any other agreement with you until all delinquent invoices are paid in full.

You shall not offset payments of our invoices by any amounts due or claimed to be due for any reason.

If you do not give SSMC written notice disputing an invoice within 20 days of the invoice date, the invoice shall conclusively be deemed correct. All payments made by you should specify the invoice numbers being paid. If SSMC receives payments that do not specify the invoices being paid, you agree that SSMC may apply payments in our sole discretion.

Time is of the essence of your payment obligations, and your failure make full and timely payment shall be deemed a material breach.

PROPRIETARY RIGHTS

The drawings, specifications and other documents prepared by SSMC under this Agreement are instruments of SSMC’s service for use solely for the Project and, unless otherwise provided, SSMC shall be deemed the author of these documents and shall retain all common law, statutory, and other reserved rights, including the copyright and rights to any SSMC trademarks. You shall be permitted to retain copies, including reproducible copies of SSMC’s instruments of service for information and reference for the Project. SSMC’s drawings, specifications, or other documents shall not be used by you or others on other projects for any reason or for completion of this Project by other professionals unless you enter into a written agreement with SSMC allowing for such use. Submission or distribution of documents to meet official regulatory requirements or for similar purposes in connection with the Project is not to be construed as publication inconsistent with our reserved rights.

TERMINATION

Either party may terminate the Agreement if the other party materially breaches the Agreement. You shall immediately pay SSMC for our services rendered and expenses incurred through the termination date, including fees and expenses that SSMC incur as a result of the termination.

ASSIGNMENT

Neither party shall assign or transfer any rights, interests or claims arising under this Agreement without the written consent of the other. This Agreement shall not confer any benefit or right upon any person or entity other than you, SSMC, and its officers, employees, agents, and subcontractors. SSMC’s officers, employees, agents, and subcontractors shall have and shall be entitled to the protections afforded SSMC under this Agreement.

GOVERNING LAW

This Agreement shall be interpreted under and governed by the laws of the State of Florida. The parties agree that the courts of Orange County, Florida, and the US District Court of the Middle District of Florida (Orlando Division) shall have exclusive jurisdiction over any controversy. The parties consent to the jurisdiction of the Courts and waive any objection either party might otherwise be entitled to assert regarding jurisdiction. The parties irrevocably waive all right to trial by jury in any action, proceeding, or counterclaim arising out of or related to this Agreement.

SEVERABILITY

If any part, term, or provision of this agreement is held to be illegal or unenforceable, the validity and enforceability of the remaining parts, terms, and provisions of this agreement shall not be affected, and each party’s rights shall be construed and enforced as if the agreement did not contain the illegal or unenforceable part, term, or provision.

LIMITATIONS ON LIABILITY

SSMC’s liability for any loss, property damage or bodily injury of or to you caused in whole or in part by SSMC in the performance of this Agreement, or in the performance of any supplementary services in any way related to this Agreement, shall be limited in the aggregate to the amount of fees that you have paid to SSMC for the Services. The parties intend that the preceding limitation on liability shall apply to all claims, whether sounding in tort, in contract, in warranty or otherwise. You release, waive, and shall not seek contribution from, or indemnification by, SSMC for any claims of any nature made against you by any other person who may suffer any loss, property damage or bodily injury in any manner associated with SSMC’s services, or SSMC’s officers, employees, agents and subcontractors under this Agreement, or any supplementary services in any way related to this Agreement. SSMC shall not be liable to you, in any event or for any amount, for delays, or consequential, special or incidental damages; or punitive or exemplary damages.

PAYMENT OF ATTORNEY’S FEES

The losing party shall pay the winning party's reasonable attorney's fees and expenses for the prosecution or defense of any cause of action, claim or demand arising under this Agreement in any court or in arbitration.

INDEMNIFICATION

You agree to indemnify and hold SSMC harmless from and against any and all liability, loss, damages, claims, and demands for loss, damages, property damages or bodily injury, arising out of work undertaken on the Project by you, or your contractor, subcontractor or other independent company or consultant employed by you to work on the Project, or their respective partners, members, managers, directors, officers, employees, agents or assigns; or arising out of any other operation, no matter by whom performed, for and on behalf of you, or such contractor, subcontractor or other independent company or consultant, whether or not due in part to errors or omissions by us in the performance of this Agreement, or in the performance of any supplementary service in any way related to this Agreement, provided that you are not required to indemnify and hold SSMC harmless under this Paragraph in the event of SSMC’s sole negligence.

INSURANCE

SSMC represents that it carries and will continue carry General Liability in the amount of $1M per each occurrence and $2M per general aggregate, Worker’s Compensation in the amount of $1M, Automobile Liability in the amount of $1M, Professional Liability also known as Errors and Omissions in the amount of $5M per occurrence and general aggregate, and Umbrella Coverage in the amount of $5M. General Liability, Automobile Liability and Worker’s Compensation are primary and non-contributory with Umbrella following form.

Certificates of Insurance shall be provided upon request, listing your Company as the certificate holder for a period of one (1) year. SSMC and Client shall waive subrogation against one another.

COMPLETE AGREEMENT

This Agreement contains the entire agreement between the parties concerning the matters covered herein. No prior representations, statements, or inducements made by either SSMC, you, or the respective agents of either, that is not contained in the Agreement shall enlarge, modify, alter, or otherwise vary the written terms of the Agreement unless they are made in writing and made a part of the Agreement by attachment, incorporated by reference in the Agreement or signed or initialed on behalf of both parties.

Firm Cost Erwin Remediation $1,500.00 Crystal Clean $3,515.04 Lewis Environmental $20,520.00

IDW T&D Summary

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Gregory Sattler Environmental Consulting & Technology, Inc.

3751 Maguire Boulevard, Suite 234 Orlando, Florida 32803

June 28, 2023

Re: Non-Hazardous Drum Disposal – State of Florida

Mr. Sattler:

The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud and water located in the State of Florida is listed below.

Non-Hazardous Drums:

Description Rate Unit

False Mobilization (No drum found) $ 85.00 Per Stop

T&D - Non-Haz Soil $ 110.00 Per Drum

T&D – Non-Haz Mud or Water $ 125.00 Per Drum

The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate any drum on site.

This quote is valid for 180 days.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: robert@erwinremediation.com Office: (850) 292-6511

[)ate 6/08/22

PRICESERVICES# OF

UNITS

ANNUAL

COST

SVCPRODUCT CODE/DESCRIPTION PER PERFREQUENCY YEAR SERVICE

PRODUCT

CODE

r SERVICE/DESCRIPTION U of M UNIT PRICEQUANTITY

Non Haz Ground Water Drum $256.811040A 55 Gal 1 Energy Surcharge174 1 $36.11Unit

These prices are based on information provided by the customer. This quotation will remain in effect for 30 days. For waste disposal services, final pricing is subject to HCC's Waste Approval review of SDS’s and lab analytical results.

Crystal Clean Representative Signature

Customer Signature

02003 Rev.3/18 Printed inUSA FORM 20345

CUSTOMER

Contact Greg Sattler State FL Zip

CUSTOMER QUOTATION

American Drive-In Claners

Customer Environmental Consulting & Technology Inc. Phone 321-245-2124

Address 11700-1 San Jose BLVD

City Jacksonville

$1,430.00/LoadWaste Transportation (est. 1) $140.00/DrumNon-Hazardous Drum Disposal (est. 2)

Estimated Project Total $1,710.00

June 7, 2022

Gregory Sattler, P.E.

Environmental Consulting & Technology, Inc.

3751 Maguire BLD. Suite 234 Orlando, Florida, 32803

Re: Non-Hazardous Drum Disposal Services 11700-1 San Jose BLVD, Jacksonville, FL Lewis Proposal No. 220468LA

Dear Mr. Sattler:

Lewis Environmental (Lewis) is pleased to present this proposal to Environmental Consulting & Technology, Inc. (ECT) for waste transportation and disposal services for 2 drums of IDW purge water. The following is offered for your review and consideration.

Scope of Work:

Lewis will provide a transport vehicle, CDL driver, drum dolly, and miscellaneous tools to complete the tasks as outlined below:

Lewis will provide a waste profile for approval and signature by the generator.

Lewis will arrive on-site and use a drum dolly to load the drum into a rack truck. The drum will be loaded into rack truck, secured, and hauled off site for disposal.

Lewis will supply a shipping document to generator for signature prior to transportation of waste off-site.

The waste will be taken to an approved disposal facility.

Lewis will provide signed waste manifests and disposal documentation to ETC.

Pricing:

Drum Waste Transportation and Disposal

Firm Mob 1 Mob 2 Total Earth Tech Drilling $17,850.00 $10,480.00 $28,330.00 Groundwater Protection Inc. $13,977.00 $10,125.00 $24,102.00 Preferred Drilling Solutions $18,785.00 $11,540.00 $30,325.00

Drilling Cost Summary

EARTH TECH DRILLING

2703 NW 19TH STREET, POMPANO BEACH, FL 33069

954.974.2424 FAX:954.974.2423

Date: 7/5/2023

FAC ID#:

PROPOSED SCOPE OF WORK: (1st Mobilization)

Drum Soil & Development water - 30 Minutes of Dev. Per well - Estimated at (5) Drums

Unit Unit Rate Number of Units Extended Price

Equipment Type: DPT Track Rig whole day $1,875.00 5 $9,375.00 half day $0.00 each $0.00 each $100.00 4 $400.00 each $60.00 8 $480.00 each $40.00 2 $80.00 each $45.00 4 $180.00 per well $225.00 6 $1,350.00 daily roundtrip $400.00 5 $2,000.00 per crew / per night $0.00 each $80.00 5 $400.00 each $60.00 1 $60.00 each $65.00 44 $2,860.00 each $95.00 7 $665.00

$0.00

TOTAL QUOTE PRICE $17,850.00

Notes:

Project No.: ___________________________

Date: 7/5/2023

MISCELLANEOUS

(4) VEW 2" x 8' w/ 7' .010" Screen - 5" or 8" BD Completion

Mobilization Per Diem

DOT Approved 55-gal Drum

Well Riser (includes all materials) 2" x 5'

Well Completion (includes 30 Min Dev. B-D MH & locking well cap) (3" Brass, 5" or 8" BD)

Slotted PVC Well Screen (includes all materials) 2" x 5'

Auger Attachment, 4" Surface Casing

Direct Push Daily Rate 1 - on-site day (Includes 420M Dolly Rig Upcharge)

Direct Push Half-Day Rate 1 - on-site half day

Pre-Packed PVC Well Screen (includes all materials) 1" x 5'

Well Riser (includes all materials) 1" x 5'

Permits - Install Well

Water Sample

Signature and Title of Person Submitting Quote: Charles Bucher

Concrete Core

Days to Complete Scope of Work: 5 Days

Subcontract Company Name: EARTH TECH DRILLING. Inc.

Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069

ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.

(8) DPT Soil Borings up to 6' - (7) borings are Inside Bldg.

DIRECT PUSH TECHNOLOGY

Contractor Name: ECT - Greg Sattler - 321 245-2124

Site Name: Aldo's Cleaners - 5970 SW 18th Street - Boca Raton, FL

(HAND CLEAR ALL LOCATIONS TO 5' or REFUSAL) - Will bring some water from Shop but an approved water source will be provided by client

(1) DPT Soil Borings to 50' - Grout Abandon

(11) DPT Water Sample borings with samples at 14', 24', 34' & 44' (Total of 44 samples) - Abandon Borehole

(2) MW 1"x15' w/ 10' Pre-Pack Screen & 3" Brass Completion - Inside Bldg. - Concrete Core

Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push

EARTH TECH DRILLING

2703 NW 19TH STREET, POMPANO BEACH, FL 33069

954.974.2424 FAX:954.974.2423

Date: 7/5/2023

FAC ID#:

PROPOSED SCOPE OF WORK: (2nd Mobilization)

Drum Soil & Development water - 30 Minutes of Dev. Per well - Estimated at (5) Drums

Unit Unit Rate Number of Units Extended Price

Equipment Type: DPT Track Rig whole day $1,650.00 2 $3,300.00 half day $1,400.00 1 $1,400.00 each $0.00 each $100.00 12 $1,200.00 each $135.00 0 $0.00 each $40.00 28 $1,120.00 each $45.00 0 $0.00 per well $225.00 8 $1,800.00 daily roundtrip $400.00 3 $1,200.00 per crew / per night $0.00 each $80.00 5 $400.00 each $60.00 1 $60.00 each $65.00 0 $0.00 each $95.00 0 $0.00

$0.00

TOTAL QUOTE PRICE $10,480.00

Notes:

Project No.: ___________________________

Date: 7/5/2023

DIRECT PUSH TECHNOLOGY

Contractor Name: ECT - Greg Sattler - 321 245-2124

Site Name: Aldo's Cleaners - 5970 SW 18th Street - Boca Raton, FL

(HAND CLEAR ALL LOCATIONS TO 5' or REFUSAL) - Will bring some water from Shop but an approved water source will be provided by client

(4) MW 1"x15' w/ 10' Pre-Pack Screen & 8" BD Completion

(3) MW 1"x30' w/ 5' Pre-Pack Screen & 8" BD Completion

(1) MW 1"x50' w/ 5' Pre-Pack Screen & 8" BD Completion

Permits - Install Well

Water Sample

Signature and Title of Person Submitting Quote: Charles Bucher

Concrete Core

Days to Complete Scope of Work: 2.5 Days

Subcontract Company Name: EARTH TECH DRILLING. Inc.

Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069

ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.

MISCELLANEOUS

Mobilization Per Diem

DOT Approved 55-gal Drum

Well Riser (includes all materials) 2" x 5'

Well Completion (includes 30 Min Dev. B-D MH & locking well cap) (3" Brass)

Pre-Packed PVC Well Screen (includes all materials) 2" x 5'

Auger Attachment, 4" Surface Casing

Direct Push Daily Rate 1 - on-site day

Direct Push Half-Day Rate 1 - on-site half day

Pre-Packed PVC Well Screen (includes all materials) 1" x 5'

Well Riser (includes all materials) 1" x 5'

Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push

Sonic Auger DPT Injection Well Abandonment

REVISED DATE: 7/7/2023

ESTIMATE #: 723008

Project Description:

ID QTY Unit Rate TOTAL

1 1 ls 1,000.00$ 1,000.00$

2 4 night 300.00$ 1,200.00$

3 4 day 1,700.00$ 6,800.00$

3a 1 1/2 day 1,250.00$ 1,250.00$

4 1 ls 600.00$ 600.00$

5 12 each 15.00$ 180.00$

6 2 each 10.00$ 20.00$

7 44 each 3.00$ 132.00$

8 4 each 100.00$ 400.00$

9 32 foot 20.00$ 640.00$

10 30 foot 4.00$ 120.00$

11 2 each 175.00$ 350.00$

12 3 each 150.00$ 450.00$

13 1 each 150.00$ 150.00$

14 2 each 150.00$ 300.00$

15 2 each 75.00$ Included

16 55 gallon drums (Soil) (Estimated) 2 each 65.00$ 130.00$

17 55 gallon drums (Water) (Estimated) 2 each 65.00$ 130.00$

18 Permits: Broward County ($75 First Well + $50 Each Additional) 1 each 125.00$ 125.00$

Completion: Subtotal 13,977.00$

Todd Hodgson

TOTAL 13,977.00$

Partner

(11) DPT GW Borings to ~44' with GW Grabs at 4 Intervals 10-14', 20-24', 30-34' and 40-44' (No Soil Sampling)

Materials: GW Sampling Points (Per Sample)

Boca Raton, Florida

Donut Pad w/3" Brass Completion (Indoor MW)

(1) DPT Litho Boring to ~50' (or refusal) w/Macrocore Sampling to Depth/Refusal

Materials: 2" x 8' PVC Well Installation (VEW Wells)

420 M Indoor Rig w/Core Drill and Generator (Interior Wells)

Outdoor Work

(1) 2" x 8' VEW w/7' of .010 Slot Screen, 2' x 2' Pad w/8" BD Completion (Installed at HA Location)

Indoor Work

(1) Hand Auger Boring to 6' with Soil Grabs at 1', 2', 4' and 6' (1 will become VMP)

(7) Hand Auger Borings to 6' with Soil Grabs at 2', 4' and 6'. (2) Backfill w/Concrete Patch.

(3) 2" x 8' VEW w/7' of .010 Slot Screen, Donut Pad w/5" BD Completion (Installed at HA Locations)

DPT Rig and Crew

Materials: Grout Borehole w/Concrete Patch (Litho and GW Profiling Borings)

Per Diem (2 man crew)

Materials: 1" PVC Well Installation (MW Wells-Indoors)

2' x 2' Concrete Pad w/8" BD Completion (Outdoor VEW)

Materials: (2) 1" x 5' PVC .010 Prepack Screen, 3" Expendable Points

Well Development (up to 1/2 hour w/Pump)

Materials: HDPE Tubing (Per 500' Roll)

DPT Soil and GW Sampling w/Well Installation- Mob 1

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

All Locations must be Accessible with Track Mounted DPT (Outside) or DPT Dolly Rig (inside).

THANK YOU FOR YOUR BUSINESS!

Todd Hodgson

DPT Rig and Crew

"Actual quantities used and days on site will be invoiced"

4 to 4.5 days

DESCRIPTION

Mobilization (Includes 420M Indoor Rig)

Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5’ bgs beyond 20 minutes will require a change order for additional time and cost.

(2) 1" x 15' MW w/10' of .010 Prepack, Donut Pad w/3" Brass Completion (Indoor DPT Rig @ HA Locations)

(813) 549-4369

Materials: Backfill w/Concrete Patch (Indoor Borings)

Donut Pad w/5" BD Completion (Indoor VEW)

PROJECT

Aldos Cleaners 5970 SW 18th Street

Damages to utilities on private property during borehole clearance are the responsibility of the client

1408 North Westshore Blvd, Ste 115

CUSTOMER

ECT

Gregory Sattler, P.E.

Tampa, Florida 33607

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

Sonic Auger DPT Injection Well Abandonment

REVISION DATE: 7/7/2023

ESTIMATE #: 723010

Project Description:

ID QTY Unit Rate TOTAL

1 1 ls 1,000.00$ 1,000.00$

2 2 night 300.00$ 600.00$

3 2 day 1,700.00$ 3,400.00$

3a 1 1/2 day 1,250.00$ 1,250.00$

4 200 foot 4.00$ 800.00$

5 4 each 95.00$ 380.00$

6 4 each 170.00$ 680.00$

7 8 each 150.00$ 1,200.00$

8 8 each 75.00$ Included

9 55 gallon drums (Soil) (Estimated) 2 each 65.00$ 130.00$

10 55 gallon drums (Water) (Estimated) 4 each 65.00$ 260.00$

11 Permits: Broward County ($75 First Well + $50 Each Additional) 1 each 425.00$ 425.00$

Subtotal 10,125.00$

Todd Hodgson

TOTAL 10,125.00$

Partner

Materials: (2) 1" x 5' PVC .010 Prepack Screen w/3' Exp Point

Boca Raton, Florida

DPT Well Installation- Mob 2

Materials: 1" PVC Well Installation

(1) 1" x 50' Well w/5' of .010 Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling

ROW Permits and MOT Responsibility of the Client

(3) 1" x 30' Well w/5' of .010 Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling

DPT Rig and Crew

PROJECT

Aldos Cleaners 5970 SW 18th Street

Damages to utilities on private property during borehole clearance are the responsibility of the client

1408 North Westshore Blvd, Ste 115

CUSTOMER

ECT

Gregory Sattler, P.E.

Tampa, Florida 33607

(813) 549-4369

(4) 1" x 15' Well w/10' of .010 Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

All Locations must be accessible with Track Mounted DPT Rig

THANK YOU FOR YOUR BUSINESS!

Todd Hodgson

DPT Rig and Crew

"Actual quantities used and days on site will be invoiced"

DESCRIPTION

Mobilization/Demobilization

Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5’ bgs beyond 20 minutes will require a change order for additional time and cost.

Per Diem (2 man crew)

Materials: 1" x 5' PVC .010 Prepack Screen w/3' Exp Point

Well Development (up to 1/2 hour w/Pump)

2' x 2' Concrete Pad w/8" BD Completion

Completion: 2 to 2.5 days depending on distance between well locations

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

Preferred Drilling Solutions, Inc.

8820 66th St. North, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Date: 7/11/23 FAC ID#: ERIC_5188

Unit Unit Rate Number of Units Extended Price whole day $1,875.00 6 11,250.00$ half day $1,475.00 -$ per foot $30.00 -$ each $110.00 6 660.00$ each $45.00 -$ each $30.00 3 90.00$ per well $125.00 7 875.00$ per roundtrip $850.00 2 1,700.00$ per crew / per night $475.00 4 1,900.00$ each $70.00 13 910.00$ each $125.00 -$ each $75.00 1 75.00$ lump sum $350.00 1 350.00$ per day $100.00 6 600.00$ per day $125.00 3 375.00$ per roundtrip $550.00 -$

TOTAL QUOTE PRICE $18,785.00

Notes: 1. Includes saw cuts, development, standby time, and decon.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator Date: 7/11/23

Days to Complete Scope of Work: 6

Direct Push Daily Rate 1 - on-site day

Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT, Geoprobe 7822DT

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Concrete Core Drill

Decon Pad

Poly Tank w/ Approved Water (from Lakeland, FL)

Refurbished - DOT Approved 55-gal Drum

Per Diem

Mobilization

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Permits

New - DOT Approved 55-gal Drum

Steam Cleaner

Site Name and Location: Aldos Cleaners

Consultant Name: APTIM

PROPOSED SCOPE OF WORK:

(1) DPT borings to 50' (or refusal), abandon by tremie grout, drum soil & water, restore grade

(3) 1" x 15' (or as deep as possible) MW's with 10' .010 prepacked screen, installed via hand auger, drum soil & water, circle pad and 6" bolt-down manhole

Event 1

Decon pad, decon with steam cleaner

PDS to supply concrete core drill for indoor boring locations

6030 SW 18th Street, Boca Raton, Palm Beach County, FL

Well Completion (includes MH w/ cover, concrete, and locking well cap)

Well Riser (includes all materials) ID 1" 5' Length

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"

Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"

2" Well Install (includes all materials)

Direct Push Half-Day Rate 1 - on-site half day

(11) DPT borings to 44', grab groundwater sampling at (4) intervals, drum soil & water, grout and restore grade

Drum cuttings, development water, and decon fluids

(8) Hand auger borings to 6', drum soil, grout and restore grade

(3) Interior 2" x 8' VEW's with 7' .010 screen, installed via hand auger, drum soil, circle pad and 6" bolt-down manhole

(1) Exterior 2" x 8' VEW with 7' .010 screen, soil sampling as needed, drum soil, 4,000 psi pad and 8" manhole

Preferred Drilling Solutions, Inc.

8820 66th St. North, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Date: 7/11/23 FAC ID#: ERIC_5188

Unit Unit Rate Number of Units Extended Price whole day $1,975.00 2 3,950.00$ half day $1,575.00 1 1,575.00$ per foot $30.00 -$ each $110.00 12 1,320.00$ each $45.00 -$ each $30.00 18 540.00$ per well $125.00 8 1,000.00$ roundtrip $850.00 1 850.00$ per crew / per night $475.00 2 950.00$ each $70.00 9 630.00$ each $125.00 -$ each $75.00 1 75.00$ lump sum $350.00 1 350.00$ per day $100.00 3 300.00$ per day $125.00 -$ lump sum $550.00 -$

TOTAL QUOTE PRICE $11,540.00

Notes: 1. Includes saw cuts, development, standby time, and decon.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator Date: 7/11/23

Decon pad, decon with steam cleaner

6030 SW 18th Street, Boca Raton, Palm Beach County, FL

Well Completion (includes MH w/ cover, concrete, and locking well cap)

Well Riser (includes all materials) ID 1" 5' Length

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"

Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"

2" Well Install (includes all materials)

Direct Push Half-Day Rate 1 - on-site half day

Drum cuttings, development water, and decon fluids

(1) 1" x 50'…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .