CN-370000-HW681-DC07CCO1.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW681|acc15804f9112ed94de3c1f0669600ae
Contract number
HW681
Issued by
Florida

About this file

This document consists of a Task Assignment (TA) and Task Assignment Change Order (TACO) between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc. for environmental assessment services at the Former Royal Dry Cleaners site (ERIC_5453) located at 2127 South Tamiami Trail in Sarasota County, Florida. The original task assignment (DC007C) was executed on September 10, 2025, and the change order (DC007C-1) was executed on January 12, 2026.

The contract authorizes CDM Smith Inc. to conduct site reconnaissance and groundwater monitoring activities including sampling, analysis, and reporting. The original task assignment value was $31,534.21. Change Order 1, dated January 8, 2025, reduces the total cost by $1,884.77 to a final value of $29,649.44 with 144.07 labor hours. Cost reductions were applied to Subtask 1 (Project Management at 13% of direct labor), Subtask 3 (Groundwater Monitoring, reducing samples by one well that could not be located), and Subtask 5 (PFAS Sampling, reducing sampling well costs and eliminating PFAS IDW drum disposal and equipment costs). Deliverables include site reconnaissance field notes (due 10/23/2025), groundwater monitoring field notes and laboratory documentation (due 12/22/2025), PFAS sampling documentation (due 12/22/2025), and the groundwater monitoring report (due 01/21/2026). Invoice payments are scheduled upon FDEP receipt and approval of each deliverable, with the final completion date of March 20, 2026.

View the file

Other files

File Type Posted
CN-370000-HW681-DC001B.pdf PDF
CN-370000-HW681-DC001E.pdf PDF
CN-370000-HW681-DC002E.pdf PDF
CN-370000-HW681-DC002F.pdf PDF
CN-370000-HW681-DC003B.pdf PDF
CN-370000-HW681-DC005D.pdf PDF
CN-370000-HW681-DC005E.pdf PDF
CN-370000-HW681-DC008B.pdf PDF
CN-370000-HW681-DC008E.pdf PDF
CN-370000-HW681-DC009A.pdf PDF
CN-370000-HW681-DC010A.pdf PDF
CN-370000-HW681-DC010C.pdf PDF
CN-370000-HW681-DC011C.pdf PDF
CN-370000-HW681-DC012D.pdf PDF
CN-370000-HW681-DC013A.pdf PDF
CN-370000-HW681-DC013B.pdf PDF
CN-370000-HW681-DC013C.pdf PDF
CN-370000-HW681-DC013D.pdf PDF
CN-370000-HW681-DC015A.pdf PDF
CN-370000-HW681-DC016C.pdf PDF
CN-370000-HW681-DC017B.pdf PDF
CN-370000-HW681-DC018C.pdf PDF
CN-370000-HW681-DC019B.pdf PDF
CN-370000-HW681-DC01ACO5.pdf PDF
CN-370000-HW681-DC021A.pdf PDF
CN-370000-HW681-DC021B.pdf PDF
CN-370000-HW681-DC021C.pdf PDF
CN-370000-HW681-DC025A.pdf PDF
CN-370000-HW681-DC02BCO2.pdf PDF
CN-370000-HW681-DC02DCO1.pdf PDF
CN-370000-HW681-DC031C.pdf PDF
CN-370000-HW681-DC032D.pdf PDF
CN-370000-HW681-DC033C.pdf PDF
CN-370000-HW681-DC037B.pdf PDF
CN-370000-HW681-DC038B.pdf PDF
CN-370000-HW681-DC038C.pdf PDF
CN-370000-HW681-DC03A.pdf PDF
CN-370000-HW681-DC03CCO1.pdf PDF
CN-370000-HW681-DC03CCO2.pdf PDF
CN-370000-HW681-DC041C.pdf PDF
CN-370000-HW681-DC042B.pdf PDF
CN-370000-HW681-DC042C.pdf PDF
CN-370000-HW681-DC043A.pdf PDF
CN-370000-HW681-DC043B.pdf PDF
CN-370000-HW681-DC04BCO1.pdf PDF
CN-370000-HW681-DC05CCO3.pdf PDF
CN-370000-HW681-DC06BCO4.pdf PDF
CN-370000-HW681-DC07ACO1.pdf PDF
CN-370000-HW681-DC08CCO1.pdf PDF
CN-370000-HW681-DC09BCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC007C 1 HW681

Benjamin Aoki 850-245-7527 Contractor CDM Smith Inc. Contractor

Contractor Kathy Leggoe Contractor 904-527-6727

ERIC_5453

Former Royal Dry Cleaners

✔ $ 29,649.44 $ 31,534.21

$ 29,649.44 $ 31,534.21 Completion

✔ Completion 03/20/2026 03/20/2026 0

✔ 1 1 1

CDM Smith Inc.

Contractor Joshua Hirten

CDM Contract Manager

Joshua Hirten Digitally signed by Joshua Hirten Date: 2026.01.12 09:23:28 -05'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2026.01.12 09:14:30 -05'00'

This Task Assignment Change Order reduces the costs for sampling, IDW, and labor.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW681

DC007C

$ 29,649.44

Subtask 2: Site Reconnaissance - Site reconnaissance field notes

Subtask 3: Groundwater Monitoring - Field notes, laboratory chain of custody, and field equipment calibration records

Subtask 5: PFAS Sampling - Signed IDW manifest, field notes, field equipment calibration records, laboratory chain of custody, subcontractor invoice

Subtask 1 & 4: Groundwater Monitoring Report; Project Management

Subtask 2: FDEP receipt and review of site reconnaissance field notes

Subtask 5: FDEP receipt and review of groundwater monitoring activities deliverable

Subtask 1 & 4: FDEP receipt and approval of Groundwater Monitoring Report

Subtask 3: FDEP receipt and review of groundwater monitoring activities deliverable

10/23/2025

12/22/2025

12/22/2025

01/21/2026

$ 11,602.16

$ 3,462.93

$ 5,515.38

$ 9,068.97

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Ronn DeSantis

Alexiss A.. Lambert

Memorandum

TO:

FROM:

SUBJECT:

DATE:

FD

E

P C

O

ST

E

ST

IM

A

T E

C on tra ct or

C D

M S m ith

, I nc

D at e:

/4

/2

Ta sk

D C

7C

TA

C

O

F in al S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

Fo rm er

R oy al D ry C le an er E

R

IC

_5

S ub Ta sk

S ite

R ec on na is sa nc e

S ub

Ta sk

A ct iv ity

/P ha se

A ss es sm en t

S ub Ta sk

G ro un dw at er

M on ito rin g S ub Ta sk

P ro je ct

M an ag er

C

D M

S m ith

Ta sk

G ro un dw at er M on ito rin g

R ep or t

S ub

Ta sk

S ub

Ta sk

P

FA

S

S am pl in g

ID

W a nd A na ly tic al

S ub

Ta sk

T T ot al s

La bo r R at e

C at eg or y $8

0.

PP

ro je ct

M an ag er

.5

.5

$1

.8

Se ni or

O ffi ce r

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$9 0.

Se ni or

T ec hn ic al E xp er t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$8

0.

Pr oj ec t T ec hn ic al

L ea de r

7.

0.

2.

4.

1.

0.

0.

0.

0.

0.

$8 0.

Pr oj ec t M an

7.

2.

2.

2.

1.

0.

0.

0.

0.

0.

$7

5.

Se ni or P ro fe ss io na l

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 5.

Pr of es si on al

II

.7

.0

.0

.0

.7

0.

0.

0.

0.

0.

$3

7.

Pr of es si on al

I

.7

0.

.0

0.

7.

0.

0.

0.

0.

0.

$5

7.

Se ni or T ec hn ic ia n 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

2.

St af f T ec hn ic ia n

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 4.

Pr oj ec t A dm in is tra tio n 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

5.

Se ni or S up po rt Se rv ic es 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

T ot al

H ou rs

4.

.5

.0

.0

.0

.5

0.

0.

0.

0.

0.

D ire ct L ab or

$8

,0

.5

$9

.7

$1 ,0

.0

$2

,7

.4

$2 ,0

.5

$1

,2

.7

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

5.

$1

0, 7.

$1 ,2

.5

$1

,4

.9

$3 ,6

.3

$2

,8

.9

$1 ,7

.4

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.7 0%

$3 ,0

.3

$3

.7

$3

.2

$1

,0

.2

$7

.0

$4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

L

$2 1, 2.

$2

,5

.0

$2 ,8

.3

$7

,4

.0

$5 ,7

.4

$3

,4

.2

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ra ve l

V eh ic le

R en ta l

$8

.0

$1

.0

$4

.0

$0 .0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$8

.0

$1

.0

$4

.0

$0 .0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

2/

CE

F

CD

M Sm it h

Pa ge

P C

O

ST

E

ST

IM

A

T E

C on tra ct or

C D

M S m ith

, I

/2

D C

7C

TA

C

O

F in al S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

Fo rm er

R oy al D ry C le an er E

R

IC

_5

S ub Ta sk

S ite

R ec on na is sa nc e

S ub

Ta sk

A ct iv ity

/P ha se

A ss es sm

Ta sk

G ro un dw at er

M on ito rin g S ub Ta sk

P ro je ct

M an ag er

C

D M

S

Ta sk

G ro un dw at er M on ito rin g

R ep or t

S ub

Ta sk

S ub

Ta sk

P

FA

S

S am pl in g

ID

W a nd A na ly tic al

S ub

Ta sk

T T ot al s

S ub co nt ra ct or (E qu ip m en t P ro cu re m t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P ro cu re m en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$5

.0

$0 .0

$0

.0

$0 .0

$5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til ity L oc at e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $5

.0

$0

.0

$0 .0

$0

.0

$5

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$5 4.

$0

.0

$0 .0

$0

.0

$5 4.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al S ub co nt ra ct or

C os t $5

.5

$0

.0

$0 .0

$0

.0

$5

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

A na ly tic al

C os ts $1

,0

.0

$0 .0

$1

,0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$4

.0

$0 .0

$3

.0

$0

.0

$5 2.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al L ab or at or y $1

,4

.0

$0 .0

$1

,4

.0

$0 .0

$5

2.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en se s

P so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$5

.6

$4 0.

$3

.5

$0

.0

$1

.1

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

$1 ,7

.0

$0

.0

$1 ,1

.0

$0

.0

$5

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$2

.0

$1

.0

$0

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al F ie ld

E xp en se s $2

,5

.6

$1

.0

$1 ,5

.5

$0

.0

$8

.1

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $2

7, 0.

$2 ,5

.0

$3

,1

.3

$1 0, 0.

$5

,7

.4

$5 ,1

.8

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$2 ,1

.2

$2

.0

$2

.6

$7

.6

$5

.4

$3

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al E st im at ed

C os t $2

9, 9.

$2 ,7

.0

$3

,4

.9

$1 1, 2.

$6

,2

.9

$5 ,5

.3

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C os t f ro m P rio r C

E F:

$3 1, 4.

$2

,9

.3

$3 ,4

.9

$1

1, 5.

$6 ,2

.9

$7

,1

.8

M an ua l E nt ry

C os t f ro m D el ta

C E

F;

1, 4.

2.

$0 .0

.0

0) $0

.0

1, 9.

M an ua l E nt ry

C os t ( P rio r +

D el ta

$2 9, 9.

$2

,7

.0

$3 ,4

.9

$1

1, 2.

$6 ,2

.9

$5

,5

.4

Au to

-C al cu la te d

R ou nd in g E rr or

0.

0.

$0

.0

$0 .0

$0

.0

0.

Au to

-C al cu la te d

Fi na l T ot al C os t:

$2 9, 9.

$2

,7

.0

$3 ,4

.9

$1

1, 2.

$6 ,2

.9

$5

,5

.3

Au to

-C al cu la te d

RE

V:

2/

CE

F

CD

M Sm it h

Pa

SITE : Former Royal Dry Cleaner ERIC_5453 SUBTASK 2: Site Reconnaissance

DATE: 12/4/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager 2

Professional II Mobilization/Demobilization (3 hr roundtrip) 3 Field Preparation 1 Prepare Updated HASP 2 Site Reconnaissance Activties 8 Organize and Submit Field Notes 2

PM 2

Professional II 16

Total Hours 18

TOTAL LABOR 18

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

expendables $40.00 per day 1 $40.00 Site Recon Kit $150.00 each 1 $150.00

TOTAL EQUIPMENT $190.00

Site Reconnaissnace Oversight and data deliverable

SUBTASK: 3 Groundwater Monitoring

DATE: 12/4/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical support during field event 2

Project Manager Preparation and Review of Data Summary 1 Arrange for Site Access with owner 1

MW Sampling and Survey oversight Professional II Mobilization/Demobilization (2 mob, 3 hr each - VOH GW sampling/gauging) 6

Field Preparation 1 Order and Prepare Laboratory Sample Kit 1 Inspect and Gauge monitoring wells (45 wells in one day, ~10 min/well split between 2 people) 3.75 Sample Monitoring Wells (15 MWs, 1.5 hrs each = 22.5 hrs split between 2 people) 11.25 Data and Sample Management 2 Preparation of Data Summary 2

Professional I Mobilization/Demobilization (2 mob, 3 hr each - VOH GW sampling/gauging) 6 Field Preparation 1 Inspect and Gauge monitoring wells (45 wells in one day, ~10 min/well split between 2 people) 3.75 Sample Monitoring Wells (15 MWs, 1.5 hrs each = 22.5 hrs split between 2 people) 11.25 Data and Sample Management 2

PTL 2

PM 2

Professional II 27 Professional I 24 Total Hours 55

TOTAL LABOR 55

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Day 4 $480.00

TOTAL VEHICLE $480.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOH - EPA Method 8260 $73.00 14 $1,022.00 VOH - EPA Method 8260 (water IDW) $73.00 1 $73.00

Shipping large cooler $150.00 2 $300.00 Ice $6.50 8 $52.00

TOTAL LAB $1,447.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit (1) $290.00 2 days $580.00 Groundwater Sampling Kit (2) $290.00 2 days $580.00 Expendables (2 days) $40.00 2 days $80.00

HDPE Tubing (15 wells 700 total ft, 5 ft ext/well) $0.30 775 foot $232.50 Silicon Tubing (1/4") $3.00 15 foot $45.00

TOTAL EQUIPMENT $1,517.50

SITE :

SUBTASK: 4 Groundwater Monitoring Report

DATE: 12/4/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Mann-Kendall review / PE or PG review/Seal 4

Project Manager GWMR Conclusions/Recommendations, submittal 2

Professional II Preparation of GWMR - total of 25 MWs sampled for either VOH/PFAS 29

PTL 4

PM 2

Professional II 29

Total Hours 35

TOTAL LABOR 35

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMEN $0.00

Former Royal Dry Cleaner ERIC_54

SUBTASK: 5 PFAS Sampling IDW and Analytical

DATE: 12/4/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical Guidance on PFAS field support 1.00

Technical evaluation of data for deliverable 0.00

Project Manager Editorial Review of PFAS Data 1.00

Professional II Mobilization/Demobilization (1 mob, 3 hr each - PFAS GW sampling) 3.00

Order and Prepare PFAS laboratory Sample Kit 1.00

Sample PFAS only Monitoring Wells (10 MWs, 1.5 hrs each = 15 hrs split between 2 people) 4.75

Sample Drum for PFAS

Data and Sample Management 2.00

Preparation of Data Summary 2.00

IDW Management and coordination 2.00

Professional I Mobilization/Demobilization (1 mob, 3 hr each - PFAS GW sampling) 3.00

Sample PFAS only Monitoring Wells (10 MWs, 1.5 hrs each = 15 hrs split between 2 people) 2.75

Data and Sample Management 2.00

PTL 1.00

PM 1.00

Professional II 14.75

Professional I 7.75

Total Hours 24.50

TOTAL LABOR 24.5

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST

Erwin Remediation PFAS IDW 1 $195.00 $195.00

Erwin Remediation PFAS Waste Profile 1 $350.00 $350.00

TOTAL $545.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

PFAS Groundwater + QC FDEP laboratory $0.00 14 $0.00

PFAS water IDW sample-1 drum FDEP Laboratory $0.00 1 $0.00

Cooler (0 to 25 lbs) - Shipping $110.00 0 $0.00

Ice $6.50 8 $52.00

TOTAL LAB $52.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit (1) $290.00 1 days $290.00

Groundwater Sampling Kit (2) $290.00 1 days $290.00

Expendables (1 day) $40.00 1 days $40.00

HDPE Tubing (10 wells 157 total ft, 5 ft ext/well) $0.30 207 foot $62.10

Silicon Tubing (1/4") $3.00 10 foot $30.00

Drum $100.00 1 each $100.00

TOTAL EQUIPMEN $812.10

P C

O

ST

E

ST

IM

A

T E

C on tra ct or

C D

M S m ith

, I

/2

D C

7C

TA

C

O

D el ta Su bT as k

Pr oj ec t M an ag em en t Su bT as k

Si te

Fo rm er

R oy al D ry C le an er E

R

IC

_5

Su bT as k

Si te

R ec on na is sa nc e

Su bT as k

Ac tiv ity /P ha se

As se ss m

Su bT as k

G ro un dw at er M on ito rin g

Su bT as k

Pr oj ec t M an ag er

C D

M S as k

G ro un dw at er

M on ito rin g R ep or t Su bT as k

Su bT as k

PF

AS

S am pl in g

ID

W a nd

A na ly tic al Su bT as k

To ta ls

La bo r R at e

C at eg or y $8

0.

Pr oj ec t M an

-0 .7

-0

.7

$1

.8

Se ni or O ffi ce r 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$9

0.

Se ni or T ec hn ic al

E xp er t

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$8 0.

Pr oj ec t T ec hn ic al L ea de r 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$8

0.

Pr oj ec t M an

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$7 5.

Se ni or

P ro fe ss io na l 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5

5.

Pr of es si on al

II

-4

.7

0.

0.

0.

-4 .7

0.

0.

0.

0.

0.

$3

7.

Pr of es si on al

I -4

.7

0.

0.

0.

-4 .7

0.

0.

0.

0.

0.

$5

7.

Se ni or T ec hn ic ia n 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

2.

St af f T ec hn ic ia n

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 4.

Pr oj ec t A dm in is tra tio n 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

5.

Se ni or S up po rt Se rv ic es 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

-1 0.

-0

.7

0.

0.

0.

-9 .5

0.

0.

0.

0.

0.

D ire ct L

9.

.4 2)

$0 .0

$0

.0

$0 .0

1.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

5.

3.

.5 2)

$0 .0

$0

.0

$0 .0

6.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

.7

0%

8.

.6 5)

$0 .0

$0

.0

$0 .0

6.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L

1, 1.

6.

$0 .0

$0

.0

$0 .0

1, 4.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Tr av el Ve hi cl e R en ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

2/

CE

F

CD

M Sm it h

Pa

P C

O

ST

E

ST

IM

A

T E

C on tra ct or

C D

M S m ith

, I

/2

D C

7C

TA

C

O

D el ta Su bT as k

Pr oj ec t M an ag em en t Su bT as k

Si te

Fo rm er

R oy al D ry C le an er E

R

IC

_5

Su bT as k

Si te

R ec on na is sa nc e

Su bT as k

Ac tiv ity /P ha se

As se ss m as k

G ro un dw at er M on ito rin g

Su bT as k

Pr oj ec t M an ag er

C D

M S as k

G ro un dw at er

M on ito rin g R ep or t Su bT as k

Su bT as k

PF

AS

S am pl in g

ID

W a nd

A na ly tic al Su bT as k

To ta ls

Su bc on tr ac to r

(E qu ip m en t P ro cu re m

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pr oc ur em en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r (S er vi ce s

Pr oc ur em ril lin g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W

5.

$0 .0

$0

.0

$0 .0

5.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til ity

L oc at e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

5.

$0

.0

$0 .0

$0

.0

5.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e

.5

0) $0

.0

$0 .0

$0

.0

.5 0)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t

4.

$0 .0

$0

.0

$0 .0

4.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

An al yt ic al

C os ts

.0

0) $0

.0

.0 0)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Sa m pl e Sh ip pi ng $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y

.0

0) $0

.0

.0 0)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

Ex pe ns es

Pe rs on al P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ex pe nd ab le s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( An al yt ic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

O th er

0.

$0

.0

$0 .0

$0

.0

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

0.

$0

.0

$0 .0

$0

.0

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bt ot al

1, 8.

6.

$0

.0

.0 0)

$0 .0

1, 9.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

6.

.6

6) $0

.0

$0 .0

$0

.0

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

1, 4.

2.

$0

.0

.0 0)

$0 .0

1, 9.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

2/

CE

F

CD

M Sm it h

Pa

SUBTASK: 3 Groundwater Monitoring

DATE: 12/4/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical support during field event

Project Manager Preparation and Review of Data Summary Arrange for Site Access with owner

MW Sampling and Survey oversight Professional II Mobilization/Demobilization (2 mob, 3 hr each - VOH GW sampling/gauging)

Field Preparation Order and Prepare Laboratory Sample Kit Inspect and Gauge monitoring wells (45 wells in one day, ~10 min/well split between 2 people) Sample Monitoring Wells (15 MWs, 1.5 hrs each = 22.5 hrs split between 2 people) Data and Sample Management Preparation of Data Summary

Professional I Mobilization/Demobilization (2 mob, 3 hr each - VOH GW sampling/gauging) Field Preparation Inspect and Gauge monitoring wells (45 wells in one day, ~10 min/well split between 2 people) Sample Monitoring Wells (15 MWs, 1.5 hrs each = 22.5 hrs split between 2 people) Data and Sample Management

PTL 0

PM 0

Professional II 0 Professional I 0 Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Day 4 $0.00

TOTAL VEHICLE $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOH - EPA Method 8260 $73.00 -1 (OG 15, used 14) ($73.00) VOH - EPA Method 8260 (water IDW) $73.00 $0.00

Shipping large cooler $150.00 $0.00 Ice $6.50 $0.00

TOTAL LAB ($73.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit (1) $290.00 2 days $0.00 Groundwater Sampling Kit (2) $290.00 2 days $0.00 Expendables (2 days) $40.00 2 days $0.00

HDPE Tubing (15 wells 700 total ft, 5 ft ext/well) $0.30 775 foot $0.00 Silicon Tubing (1/4") $3.00 15 foot $0.00

TOTAL EQUIPMENT $0.00

SUBTASK: 5 PFAS Sampling IDW and Analytical

DATE: 12/4/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical Guidance on PFAS field support

Technical evaluation of data for deliverable

Project Manager Editorial Review of PFAS Data

Professional II Mobilization/Demobilization (1 mob, 3 hr each - PFAS GW sampling)

Order and Prepare PFAS laboratory Sample Kit

Sample PFAS only Monitoring Wells (10 MWs, 1.5 hrs each = 15 hrs split between 2 people) -2.75

Sample Drum for PFAS -2

Data and Sample Management

Preparation of Data Summary

IDW Management and coordination

Professional I Mobilization/Demobilization (1 mob, 3 hr each - PFAS GW sampling)

Sample PFAS only Monitoring Wells (10 MWs, 1.5 hrs each = 15 hrs split between 2 people) -4.75

Data and Sample Management

PTL 0

PM 0

Professional II -4.75

Professional I -4.75

Total Hours -9.5

TOTAL LABOR -9.5

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 day $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST

Erwin Remediation PFAS IDW -1 $195.00 ($195.00)

Erwin Remediation PFAS Waste Profile 1 $350.00 $0.00

TOTAL ($195.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

PFAS Groundwater + QC FDEP laboratory $0.00 $0.00

PFAS water IDW sample-1 drum FDEP Laboratory $0.00 $0.00

Cooler (0 to 25 lbs) - Shipping $110.00 0 $0.00

Ice $6.50 8 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit (1) $290.00 1 days $0.00

Groundwater Sampling Kit (2) $290.00 1 days $0.00

Expendables (1 day) $40.00 1 days $0.00

HDPE Tubing (10 wells 157 total ft, 5 ft ext/well) $0.30 207 foot $0.00

Silicon Tubing (1/4") $3.00 10 foot $0.00

Drum $100.00 -1 each ($100.00)

TOTAL EQUIPMEN ($100.00)

P C

O

ST

E

ST

IM

A

T E

C on tra ct or

C D

M S m ith

, I nc

D

9/ 4/

Pr op os al

Su bT as k

Pr oj ec t M an ag em en t

Su bT as k

Si te

Fo rm er

R oy al D ry C le an er E

R

IC

_5

Su bT as k

Si te

R ec on na is sa nc e

Su bT as k

Ac tiv ity /P ha se

As se ss m as k

G ro un dw at er M on ito rin g

Su bT as k

Pr oj ec t M an ag er

C D

M S as k

G ro un dw at er

M on ito rin g R ep or t Su bT as k

Su bT as k

PF

AS

S am pl in g

ID

W a nd

A na ly tic al Su bT as k

To ta ls

La bo r R at e

C at eg or y $8

0.

Pr oj ec t M an

.3

.3

$1

.8

Se ni or O ffi ce r 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$9

0.

Se ni or T ec hn ic al

E xp er t

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$8 0.

Pr oj ec t T ec hn ic al L ea de r 7.

0.

2.

4.

1.

0.

0.

0.

0.

0.

$8

0.

Pr oj ec t M an

7.

2.

2.

2.

1.

0.

0.

0.

0.

0.

$7 5.

Se ni or

P ro fe ss io na l 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5

5.

Pr of es si on al

II

.5

.0

.0

.0

.5 0.

0.

0.

0.

0.

$3

7.

Pr of es si on al

I

.5 0.

.0 0.

.5 0.

0.

0.

0.

0.

$5

7.

Se ni or T ec hn ic ia n 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

2.

St af f T ec hn ic ia n

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 4.

Pr oj ec t A dm in is tra tio n 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

5.

Se ni or S up po rt Se rv ic es 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

.0

.0

.0

.0 0.

0.

0.

0.

0.

D ire ct L

$8

,5

.7

$9

.2

$1 ,0

.0

$2

,7

.4

$2 ,0

.5

$1

,7

.4

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

5.

$1

1, 1.

$1 ,3

.0

$1

,4

.9

$3 ,6

.3

$2

,8

.9

$2 ,3

.7

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.7 0%

$3 ,2

.5

$3

.4

$3

.2

$1

,0

.2

$7

.0

$6

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L

$2

3, 3.

$2 ,6

.6

$2

,8

.3

$7 ,4

.0

$5

,7

.4

$4 ,6

.8

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Tr av el Ve hi cl e R en ta l $8

.0

$1

.0

$4

.0

$0

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$8

.0

$1

.0

$4

.0

$0 .0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

2/

CE

F

CD

M

Sm it h

Pa

P C

O

ST

E

ST

IM

A

T E

C on tra ct or

C D

M S m ith

, I nc

D

9/ 4/

Pr op os al

Su bT as k

Pr oj ec t M an ag em en t

Su bT as k

Si te

Fo rm er

R oy al D ry C le an er E

R

IC

_5

Su bT as k

Si te

R ec on na is sa nc e

Su bT as k

Ac tiv ity /P ha se

As se ss m as k

G ro un dw at er M on ito rin g

Su bT as k

Pr oj ec t M an ag er

C D

M S as k

G ro un dw at er

M on ito rin g R ep or t Su bT as k

Su bT as k

PF

AS

S am pl in g

ID

W a nd

A na ly tic al Su bT as k

To ta ls

Su bc on tr ac to r

(E qu ip m en t P ro cu re m

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s Pr oc ur em en

t) D ril lin g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $7

.0

$0

.0

$0 .0

$0

.0

$7

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til ity

L oc at e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$7

.0

$0 .0

$0

.0

$0 .0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $7

4.

$0 .0

$0

.0

$0 .0

$7

4.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $8

.0

$0

.0

$0 .0

$0

.0

$8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

An al yt ic al C os ts

$1 ,1

.0

$0

.0

$1 ,1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$4

.0

$0 .0

$3

.0

$0

.0

$5 2.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$1 ,5

.0

$0

.0

$1 ,5

.0

$0

.0

$5 2.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d Ex pe ns es Pe rs on al P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ex pe nd ab le s $5

.6

$4

0.

$3

.5

$0 .0

$1

.1

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

An al yt ic al re la te

d) $1

,7

.0

$0 .0

$1

,1

.0

$0 .0

$5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

O th er

$3

.0

$1

.0

$0 .0

$0

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $2

,6

.6

$1

.0

$1 ,5

.5

$0

.0

$9

.1

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bt ot al

$2 9, 8.

$2

,6

.6

$3 ,1

.3

$1

0, 3.

$5 ,7

.4

$6

,6

.9

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

C om pl et io n Fe e $2

,3

.3

$2

.6

$2

.6

$7

.6

$5

.4

$4

.9

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l E st im at ed C os t

$3 1, 4.

$2

,9

.3

$3 ,4

.9

$1

1, 5.

$6 ,2

.9

$7

,1

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

RE

V:

2/

CE

F

CD

M

Sm it h

Pa

From: Leggoe, Kathy R.

To: Aoki, Benjamin Cc: Hirten, Joshua J.; Turner, Kyle M.

Subject: Former Royal Dry Cleaner (ERIC_5453) ST3+5 Groundwater Sampling Data Deliverable Date: Thursday, December 4, 2025 3:34:25 PM Attachments: 2025.11.25.RoyalDC.ERIC_5453.HW681.DC007C.Subtask3.Groundwater.Data.Deliverable.pdf

2025.11.25 T1 Original HW681 DC007C CEFLOE Royal.xlsx

2025.11.25 T1 Delta HW681 DC007C CEFLOE Royal.xlsx

2025.11.25 T1 Final HW681 DC007C CEFLOE Royal.xlsx

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Good afternoon, Benjamin. Attached is the Subtask 3 and 5 Groundwater Sampling Data Deliverable. During the event there were a few reductions, and the associated TACO is attached.

Mobilization took a little more, sampling took a little less, 2 hrs to drum sampling were not needed, one well was not located/sampled and only one drum needed.

If you have any questions or need additional information, please let me know.

Very Respectfully, Kathy R. Leggoe, PG, PMP CDM Smith office: 904-527-6727, cell: 904-651-0740

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW681

DC007C March 20, 2026

This Task Assignment authorizes CDM Smith Inc. to conduct a Site Reconnaissance and Groundwater Monitoring Activities at the Former Royal Dry Cleaners site per their proposed scope of work and revised CEF/LOE submitted on 04SEP2025.

Benjamin Aoki 850-245-7527 CDM Smith Inc.

Kathy Leggoe 904-527-6727

ERIC_5453

2127 South Tamiami Trail, Sarasota County, Florida

Former Royal Dry Cleaners

$ 31,534.21

$ 31,534.21

Scope of Work

CDM Smith Inc.

Joshua Hirten

Contract Manager

Joshua Hirten Digitally signed by Joshua Hirten Date: 2025.09.10 11:44:59 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.09.09 15:48:48 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

File details come from the government source that posted it. Updated .