This is a Task Assignment (TA) issued under Contract Number HW681 between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc. The task assignment authorizes work at the Elite Cleaners site (ERIC_4708) located at 11301 N 56th Street, Temple Terrace, Hillsborough County, Florida. The FDEP's Department Project Manager is Benjamin Aoki, and CDM Smith's Project Manager is Kathy Leggoe, PG, PMP. The task assignment is effective as of April 16, 2026, with a completion date of September 4, 2026.
CDM Smith Inc. has been tasked with preparing an Interim Source Removal Plan (ISRP) for the design and installation of a Soil Vapor Extraction (SVE) system to address perchloroethylene (PCE) soil vapor contamination in the vadose zone. The scope includes two subtasks: Subtask 1 covers project management calculated at 13 percent of direct labor, and Subtask 2 involves ISRP preparation with anticipated 12 vapor extraction wells and associated equipment. The total task assignment value is $12,962.06, based on 65 labor hours utilizing various staff categories including a Senior Technical Expert (13.5 hours at $90.43), Project Manager (4 hours at $80.18), and Professional II (41 hours at $55.67). The deliverable—the Interim Source Removal Plan—is due 120 days following the Notice to Proceed, with invoice submission required upon FDEP receipt and review of the completed plan. This task assignment is incorporated into and becomes part of the underlying Contract HW681 dated January 5, 2022.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW681
DC010C Completion September 4, 2026
This Task Assignment authorizes CDM Smith Inc. to create a Interim Source Removal Plan (ISRP) for Elite Cleaners per their proposed scope of work and cost estimate.
Benjamin Aoki 850-245-7527 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
CDM Smith Inc.
CDM Smith Inc.
Kathy Leggoe 904-527-6727
ERIC_4708
11301 N 56th Street, Temple Terrace, Hillsborough County, Florida
Elite Cleaners
✔ $ 12,962.06
$ 12,962.06
Scope of Work
Joshua Hirten
Contract Manager
Joshua Hirten Digitally signed by Joshua Hirten Date: 2026.04.16 17:26:50 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.04.15 10:05:41 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW681
DC010C
Subtask 1 & 2: Interim Source Removal Plan Preparation - Interim Source Removal Plan; Project Management 08/07/2026
Subtask 1 & 2: FDEP receipt and review of Interim Source Removal Plan $ 12,962.06
$ 12,962.06
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Alexis A. Lambert Secretary
Memorandum
TO:
FROM:
SUBJECT:
DATE:
HW681 Contract File
Benjamin Aoki, Project Manager
Task Assignment
DC010C
ERIC_4708
February 25, 2026
This Task Assignment authorizes CDM Smith Inc. to create a Interim Source Removal Plan (ISRP) for Elite Cleaners per their proposed scope of work and cost estimate. Specific subtasks are detailed below:
Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.
Subtask 2: Interim Source Removal Plan Preparation CDM will prepare an ISRP for the construction of a Soil Vapor Extraction (SVE) system.
The final cost associated with DC010C is $12,962.06 with 65 labor hours.
Jay Collins Lt. Governor
FDEP COST ESTIMATE
Contractor: CDM Smith, Inc.
Date: 10/10/2025
Task #: Proposal SubTask 1 Project Management SubTask 6
Site: Elite ERIC_4708 SubTask 2 Interim Source Removal Plan SubTask 7
Activity/Phase: RA SubTask 3 SubTask 8
Project Manager: CDM Smith SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$80.18 Project Manager 6.2 6.2 $104.89 Senior Officer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$90.43 Senior Technical Expert 13.5 13.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $80.18 Project Technical Leader 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $80.18 Project Manager 4.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $75.85 Senior Professional 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $55.67 Professional II 41.0 41.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $37.32 Professional I 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $57.32 Senior Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $32.69 Staff Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $44.88 Project Administration 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $45.08 Senior Support Services 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Hours 65 6 58.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Direct Labor $4,321.12 $497.12 $3,824.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 135.00% $5,833.51 $671.11 $5,162.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.70% $1,629.06 $187.41 $1,441.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $11,783.69 $1,355.64 $10,428.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF CDM Smith Page 1
FDEP COST ESTIMATE
Contractor: CDM Smith, Inc.
Date: 10/10/2025
Task #: Proposal SubTask 1 Project Management SubTask 6
Site: Elite ERIC_4708 SubTask 2 Interim Source Removal Plan SubTask 7
Activity/Phase: RA SubTask 3 SubTask 8
Project Manager: CDM Smith SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $11,783.69 $1,355.64 $10,428.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,178.37 $135.56 $1,042.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $12,962.06 $1,491.20 $11,470.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF CDM Smith Page 2
SITE : Elite ERIC_4708
SUBTASK: 2 0
DATE: 10/10/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager ISRP Design Evaluation 4
Senior Technical Expert Technical Design Lead 12
Engineer of Record 1.5
Professional II ISRP Preparation, Tables, and Figures 41
PM 4
Sr. Technical Expert 13.5
Professional II 41
Total Hours 58.5
TOTAL LABOR 58.5
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
4651 Salisbury Road, Jacksonville, Florida 32256| tel: 904.527.6716
October 10, 2025
Revised February 19, 2026
Mr. Benjamin Aoki
Environmental Specialist II
Florida Department of Environmental Protection
Waste Site Cleanup Section
2600 Blair Stone Road, MS 4520
Tallahassee, Florida 32399-2400
Subject: Interim Source Removal Plan
Scope of Work/Level of Effort
Elite Cleaners (ERIC_4708)
11301 N 56th St
Temple Terrace, Hillsborough County, Florida
Dear Mr. Aoki:
CDM Smith Inc. (CDM Smith) is pleased to submit this Task Assignment Request for the preparation of an Interim Source Removal Plan (ISRP) for the Elite Cleaners (ERIC_4708) (the Site) located at 11301 N
56th St, Temple Terrace, Hillsborough County, Florida. The scope of work, proposed deliverable, and deliverable schedule are summarized below, and the cost estimate is attached.
This Task Assignment (TA), when executed, shall be incorporated in, and become part of Contract No.
HW681, between the Florida Department of Environmental Protection (Department), and CDM Smith
(Contractor), dated January 5, 2022, hereafter referred to as the Contract.
On August 13, 2025, Contractor confirmed a Site Access Agreement (SAA) was executed with Saad
Investment, Inc, on May 20, 2021, as the real property owner of the Elite Cleaners (ERIC_4708) located at the above address. The Hillsborough County Property Appraiser database shows that the property owner since March 28, 2024, is Saad Investments, Inc. Therefore, Contractor assumes the SAA is valid.
Project Understanding:
A Site Assessment Report (SAR) was submitted by the Contractor in April 2024. Laboratory analytical results from groundwater and soil samples showed the Site meets the regulatory criteria for No Further
Action in accordance with Chapter 62-780.680 F.A.C.; however, MAGS™ testing indicated PCE soil vapor contamination in the vadose zone above the current FDEP guidance criteria. CDM Smith and the FDEP discussed the potential need for additional soil samples to pinpoint the source of soil vapor contamination prior to remedial action. During the discussion, both FDEP technical staff and CDM Smith determined that due diligence was completed under the SAR, and that further soil sampling was not needed. CDM Smith recommended preparing an Interim Source Removal Plan (ISRP) to include the design and installation details of an active soil vapor extraction (SVE) system. Elevated soil concentrations near the rear of the drycleaning facility indicated the presence of impacts in the vadose zone, between land surface and approximately 30 ft bls. Site conditions are not optimal for excavation due to the vast number of underground utilities serving the strip mall and retail suites. SVE appears to
October 10, 2025 Revised February 19, 2026
4651 Salisbury Road, Jacksonville, Florida 32256| tel: 904.527.6716 be the most feasible remedial technology and is recommended based on current site conditions.
Contractor performed PFAS screening at the Site in October 2023. No concentrations were detected above the Provisional Groundwater Cleanup Target Level (PGCTL) of 70 nanograms per liter (ng/L).
Scope of Work
The proposed scope of work includes the following elements:
Subtask 1: Project Management
Project management activities performed under this task consist of those general administrative functions required to maintain the project on schedule, within budget, and that the quality of the work products defined within this scope is consistent with Contractor’s quality standards. Contractor’s project manager will be Kathy Leggoe, PG, PMP. We will prepare and submit invoices upon approval of each deliverable or milestone completion.
Project Progress Meetings and Status Reports
Contractor expects to have bi-weekly meetings or telephone conference with the Department to review the status of the project and identify and resolve any outstanding issues. Contractor will prepare meeting agendas and progress reports as part of this task throughout the duration of this project.
Project Resource Management
Contractor will manage, allocate, and coordinate necessary resources for completion of tasks ISRP design.
Project Quality Technical Review
Contractor’s Quality Management System guidelines will be followed. Internal quality reviews will be conducted on plans and on investigation findings and reports.
Subtask 2: Interim Source Removal Plan Preparation
Per the request of the Department, Contractor submitted a SVE Presumptive Remedy Approval Form to the FDEP for completion and approval in April 2024. The Department signed the Presumptive Remedy
Approval Form on February 12, 2026. At the Annual Site Review Meeting in May 2025, FDEP stated this proposal should be submitted once the PRF was approved with the consensus that Contractor would submit a proposal for the completion of an ISRP, which would include an engineering assessment as to whether sufficient MAGSTM data exists to complete the design of a SVE system, and whether any additional vapor extraction wells would be needed.
Contractor anticipates that the ISRP will include an SVE system consisting of 12 vapor extraction wells, including existing MAGSTM wells VEW-01 to VEW-07, and VEW-03I to VEW-07I. The system will also include an SVE blower, an air injection blower, granulated activated carbon treatment, and all ancillary equipment.
Deliverable: Interim Source Removal Plan
October 10, 2025 Revised February 19, 2026
4651 Salisbury Road, Jacksonville, Florida 32256| tel: 904.527.6716
Assumptions
• This scope and schedule may change depending on surveys and the drilling conditions. Drillers and other subcontractors’ availability may be limited and impact the schedule. In addition, this scope does not consider any weather delays. CDM Smith will communicate with the FDEP in a timely manner if this occurs to prepare the necessary paperwork for change orders.
Schedule:
Contractor will schedule the field events after the receipt of formal notice to proceed (NTP). The deliverables will be submitted as detailed below:
Subtask 2: Interim Source Removal Plan Preparation
Deliverable: Interim Source Removal Plan
Due Date: 120 days following NTP
CDM Smith appreciates this opportunity to work with FDEP on this contract. If you have any questions, please do not hesitate to contact us.
Sincerely, Approved By:
Kathy Leggoe, PG, PMP Joshua Hirten, P.G.
Project Manager Environmental Discipline Leader
CDM Smith Inc. CDM Smith Inc.
Attachments: Cost Estimate
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
| Utility Locate Bids_Compiled.pdf |
| Geosyntec Utility-272_Geotek_1500 |
| Geoview Utility Quote_2000_COT FTF SIS |
| Tallahassee Fire Training Division_V1_Bloodhound_3700 |
| Drilling Bids_Compiled.pdf |
| PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic) |
| Direct Push |
| City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email |
| Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844 |
| GW Protection_Geosyntec (T) 1022060 S.pdf |
| Invoice |
| Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf |
| Sheet1 |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |