CN-370000-HW681-DC02BCO2.pdf
PDF 1014 KB Posted
- Contract number
- HW681
- Issued by
- Florida
About this file
This document comprises a series of Task Assignment Change Orders (TACOs) issued by the State of Florida Department of Environmental Protection (FDEP) to CDM Smith Inc. for environmental assessment work at the First Coast Cleaners site in Jacksonville Beach, Duval County. The primary contract is HW681, with the work documented under Task Assignment DC002B and project number ERIC_4535. The department's project managers included Aaron Cohen, Kyle McMurray, and Patrick McGrane, while CDM Smith's project manager was Shayne Wood.
The contract scope involves a Supplemental Site Assessment (SSAR) including groundwater sampling, soil borings, magnetic and vertical profiling (MAGS/VMP) installation, test pits, and geotechnical evaluation. TACO #1, executed on August 10, 2023, reconciled a work change directive and adjusted the total value from $103,860.72 to $105,603.35. TACO #2, executed on December 6, 2023, authorized a 100-day time extension (extending the completion date from December 20, 2023 to March 29, 2024) and reduced costs by $467.50 due to lower-than-estimated subcontractor invoices from Erwin Remediation for industrial waste (IDW) management. The final contract value was $105,135.85, with invoicing structured in two phases: $77,393.76 for laboratory analytical results and field documentation, and $27,742.09 for the Supplemental Site Assessment Report and project management.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
DC002B 2 HW681
This Task Assignment Change Order authorizes a 100-day time extension and cost decrease due to IDW management changes.
Aaron Cohen 850-245-8974 Contractor CDM Smith Inc. Contractor
Contractor Shayne Wood Contractor 904-527-6703
ERIC_4535
First Coast Cleaners
✔ $ 105,135.85 $ 105,603.35
$ 105,135.85 $ 105,603.35 Completion
✔ Completion 12/20/2023 03/29/2024 100
✔ 1 1 2
CDM Smith Inc.
Contractor Shayne Wood
Vice President
12/6/2023
Shayne Wood Digitally signed by Shayne Wood DN: C=US, E=woodsh@cdmsmith.com, O=CDM Smith, OU=NAU, CN=Shayne Wood Date: 2023.12.06 16:53:54-05'00'
Teresa Booeshaghi
Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2023.12.06 15:33:47 -05'00'
12/6/2023
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW681
DC002B
$ 105,135.85
Supplemental Site Assessment Fieldwork & Project Management
Supplemental Site Assessment Report
Subtask 2: Laboratory analytical results, field documentation, data tables, and paid invoices to subcontractors
Subtasks 3 and 1: Supplemental Site Assessment Report and Project Management
07/30/2023
10/30/2023
$ 27,742.09
$ 77,393.76
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette NNuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File
First Coast Cleaners Jacksonville Beach, Duval County
ERIC_4535
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment Change Order DC002B-2 (HW681)
DATE: Dec 6, 2023
This Change Order authorizes a 100-day time extension and a total cost reduction due to a change in subcontractor utilization.
The previous cost total was $105,603.35. Total costs decreased by $467.50 resulting in a new final cost total of $101,135.85. CDM may invoice according to the included schedule.
Specific negotiated subtasks are as follows:
Subtask 1:
Project Manager is automatically calculated as a percentage of total labor in accordance with Contract
HW681.
Subtask 2:
IDW management subcontractor costs changed as Erwin’s final invoice was lower than what was estimated in the original Task Assignment. This difference reduced project costs by $467.50.
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
C D
M S m ith
, I nc
D at e:
7- M ar -2
Ta sk
TA
C
O
- F in al
S ub Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
Fi rs t C oa st
C le an er s
Ta sk
- S up pl em en ta l S ite
A ss es sm en t F ie ld
W or k S ub Ta sk
A ct iv ity
/P ha se
S S
A R
Ta sk
- S S
A R a nd
G eo te ch ni ca l/S tru ct ur al E va lu at io n S ub Ta sk
P ro je ct
M an ag er
C lin t N ob le
Ta sk
S ub
Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
La bo r R at e
C at eg or y $6
0.
Pr oj ec t T ec hn ic al
L ea d/ P
C . N ob le
.8
.8
$0 .0
Se ni or
O ffi ce r
0.
0.
0.
$6
9.
Se ni or T ec hn ic al
E xp er t
S . C ob er t
.0
.0 4.
$6 0.
Pr oj ec t T ec hn ic al L ea d/
P C
. N ob le
.0
.0 8.
$4 3.
Pr of es si on al
II
A . R ya n
3.
3.
.0
0.
$3
3.
Pr of es si on al
I K
. P ro fit ko
.0
0.
.0
0.
0.
0.
$5 7.
Se n G eo te ch ni ca l P
E M
. P as sa ro
.0
0.
.0
0.
0.
0.
$3 3.
Pr of es si on al I
L.
M ue lle r
8.
.0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T T ot al H ou rs
3.
.8
3.
6.
D ire ct L ab or
$2
3, 5.
$2 ,7
.8
$1
4, 7.
$6 ,5
.4
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
5.
$3
1, 6.
$3 ,6
.8
$1
9, 1.
$8 ,8
.3
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge
.7 0%
$8 ,8
.7
$1
,0
.2
$5 ,3
.1
$2
,4
.3
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L
$6 4, 9.
$7
,3
.9
$3 8, 9.
$1
7, 3.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
CD
M Sm it h
Pa ge
C O
ST
E
ST
IM
A
TE
C on tra ct or
C D
M S m ith
, I ar
TA
C
O
- F
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
Fi rs t C oa st
C le an
Ta sk
- S up pl em en ta l S ite
A ss es sm en t F ie ld
W or k S ub Ta sk
A ct iv ity
/P ha se
S S
Ta sk
- S S
A R a nd
G eo te ch ni ca l/S tru ct ur al E va lu at io n S ub Ta sk
P ro je ct
M an ag er
C lin t N
Ta sk
S ub
Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
T ra ve l
V eh ic le
R en ta l
$2 ,1
.0
$2
,1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$2 ,1
.0
$2
,1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m ril lin g
(C on ve nt io na
l) $1
1, 5.
$1 1, 5.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
E rw in
$3
.0
$3
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H ep ac o
(t es t p its
$1
,2
.0
$1 ,2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til ity
L oc at e
Fi rm
$9
.0
$9
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$1 3, 0.
$1
3, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $1
,3
.0
$1 ,3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$1 5, 7.
$1
5, 7.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry na ly tic al C os ts
$1 0, 0.
$1
0, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g+ pr ep $1
,6
.0
$1 ,6
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$1 2, 0.
$1
2, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se
P so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $1
,5
.0
$1 ,5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O th
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( A na ly tic al re la te d)
$2 ,5
.0
$2
,5
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W d ru m s)
$7
.0
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$2
.0
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al F ie ld
E xp en se s $5
,0
.0
$5 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $9
8, 4.
$7 ,3
.9
$7
3, 4.
$1 7, 3.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$6 ,4
.9
$7
.6
$3
,8
.9
$1 ,7
.3
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al E st im at ed
C os t $1
,1
.8
$8
,1
.6
$7 7, 3.
$1
9, 6.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C os t f ro m P rio r C
E F:
$1
,6
.3
M an ua l E nt ry
C os t f ro m D el ta
C E
F;
7.
M an ua l E nt ry
RE
V:
2/
CE
F
CD
M Sm it h
Pa
C O
ST
E
ST
IM
A
TE
C on tra ct or
C D
M S m ith
, I ar
TA
C
O
- F
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
Fi rs t C oa st
C le an
Ta sk
- S up pl em en ta l S ite
A ss es sm en t F ie ld
W or k S ub Ta sk
A ct iv ity
/P ha se
S S
Ta sk
- S S
A R a nd
G eo te ch ni ca l/S tru ct ur al E va lu at io n S ub Ta sk
P ro je ct
M an ag er
C lin t N
Ta sk
S ub
Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
C os t ( P rio r +
D el ta
$1
,1
.8
Au to
-C al cu la te d
R ou nd in g E rr or
$0
.0
Au to
-C al cu la te d
Fi na l T ot al C os t:
$1
,1
.8
Au to
-C al cu la te d
RE
V:
2/
CE
F
CD
M Sm it h
Pa
SITE : First Coast Cleaners SUBTASK: 2 - Supplemental Site Assessment Field Work
DATE: 3/7/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
2.1 - GW Sampling
Senior Technical Expert S. Cobert Interpretation of Lab Data Eval 4
Interpretation of Lab Data Eval (SPLP) 2
FDEP-Directed Workplan Additions 8
PTL/PM C. Noble Prepare Field Scope of work 4
Determine Field Activities based on Field Data 4
FDEP-Directed Workplan Additions 8
Preparation of data summaries 2
Preparation of data summaries (SPLP) 2
Professional II A. Ryan Mobilization/Demob (2 trips) 8
Field Preparation 1
Arrange for site access with owner 2
Prepare Sample Kit Request 1
Prepare HASP 1
Sample Wells (14) 22
Preparation of data summaries 4
2.2 Soil Borings, MAGS/VMP Install, MAGS testing, and Test Pits Senior Technical Expert S. Cobert Sr. Level Data Evaluation 4
FDEP-Directed Workplan Additions 10
PTL/PM C. Noble Prepare Field Scope of work 4
FDEP-Directed Workplan Additions 10
Professional II A. Ryan Site Inspection 8
Mobilization/Demob (8 trips) 32
Field Preparation 2
Arrange for site access with owner 1
Prepare Sample Kit Request 1
Concrete Coring, Soil Borings, OVA, soil samples, MAGS/VMP wells 50
MAGS testing 10
Test Pits 20
Professional I L. Mueller Utility Locate Oversight 8
Concrete Coring, Soil Borings, OVA, soil samples, MAGS/VMP wells 50
MAGS testing 10
Test Pit 20
Field Preparation Support 2
IDW Management 8
TOTAL LABOR 323
VEHICLE TYPE RATE UNIT USEAGE
2.1 Truck GW Sampling $120.00 days 2 $240.00
2.2 Truck Soil Borings/Well Install $480.00 week 2 $960.00
2.2 Truck Test Pits/MAGS testing $480.00 week 2 $960.00
TOTAL VEHICLE $2,160.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
TOTAL PER DIE $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNITS USEAGE Subtotal
Hepaco Test Pits, Pavement Repair (2.2) $1,200 Per Day 1 $1,200.00
EDS, Inc. $11,325 LS 1 $11,325.00
Erwin Remediation $345 Per Drum 1 $345.00
Utility Locate Firm $900 Per Day 1 $900.00
TOTAL $13,770.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES
2.1 - Groundwater Sampling EPA 8260 for VOHs $73.00 14 $1,022.00
EPA 9060 for TOC $30.00 3 $90.00
RSK175 for volatile gasses $180.00 3 $540.00
FL-PRO for TRPH $88.00 5 $440.00
Shipping - Large Cooler $150.00 2 $300.00
Ice $6.50 4 $26.00
2.2 - Soil Borings and MAGS testing $0.00
VOHs by 8260 37 borings x 2 samples $73.00 74 $5,402.00
VOHs by 8260 5-day TAT $14.60 74 $1,080.40
EPA 8260 for VOHs (SPLP) $73.00 7 $511.00
EPA 8260 for VOHs (Extraction) $50.00 7 $350.00
Sieve 6913/7928 $130.00 3 $390.00
Atterberg 4318 $85.00 1 $85.00
Organic Content 2974 $50.00 1 $50.00
VOCs by TO-15 $200.00 3 $600.00
Shipping - Large Cooler $150.00 8 $1,200.00
Ice $6.50 16 $104.00
TOTAL LAB $12,190.40
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
2.1 GW Sampling
55 gal drum $100.00 per drum 1 $100.00
Shallow GW Sampling Kit $290.00 per day 2 $580.00
Silicon tubing $3.00 per foot 14 $42.00
Tubing Poly/HDPE $0.30 per foot 140 $42.00
Expendables $40.00 per day 2 $80.00
$0.00
2.2 Soil Borings- Test Pits - MAGS testing $0.00
Soil Sampling Kit (through Concrete) $940.00 per week 1 $940.00
55 gallon Drum $100.00 per drum 6 $600.00
OVA $500.00 per week 1 $500.00
Expendables $40.00 per day 6 $240.00
Survey Station $200.00 per week 1 $200.00
Encores $16.00 each 74 $1,184.00
$0.00
MAGS Investigation Kit $500.00 day 1 $500.00
TOTAL EQUIPMENT $5,008.00
SUBTASK: 3 - SSAR and Geotechnical/Structural Evaluation
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Technical ExpeS. Cobert Technical Data Evaluation for Source Characterization 4
PTL/PM C.Noble Preparation of CSM / MNA; conclusions, recommendations, PG Seal 8
Professional II A. Ryan Preparation of SSAR - body of document 40
Professional II L. Mueller Preparation of SSAR Data Tables, Summaries 40
Professional I K. Profitko Figure / Map preparation 40
Senior Professional M. Passaro Geotechnical and Structural Evaluation 24
TOTAL LABOR 156
VEHICLE TYPE RATE UNIT USEAGE
$0.00
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00
$0.00
$0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
$0.00
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNITUSEAGE TOTALS
$0.00
$0.00
3/7/2023
$0.00
TOTAL EQUIPMENT $0.00
C O
ST
E
ST
IM
A
TE
C on tra ct or
C D
M S m ith
, I ar
TA
C
O
- D el ta
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
Fi rs t C oa st
C le an
Ta sk
- S up pl em en ta l S ite
A ss es sm en t F ie ld
W or k S ub Ta sk
A ct iv ity
/P ha se
S S
Ta sk
- S S
A R a nd
G eo te ch ni ca l/S tru ct ur al E va lu at io n S ub Ta sk ro je ct M an ag er
C lin t N
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
La bo r R at e
C at eg or y $6
0.
Pr oj ec t T ec hn ic al
L ea d/ P
C . N ob le
0.
0.
$0 .0
Se ni or
O ffi ce r
0.
0.
0.
$6
9.
Se ni or T ec hn ic al
E xp er t
S . C ob er t 0.
0.
0.
$6 0.
Pr oj ec t T ec hn ic al L ea d/
P C
. N ob le 0.
0.
0.
$4 3.
Pr of es si on al
II
A . R ya n
0.
0.
0.
0.
$3
3.
Pr of es si on al
I K
. P ro fit ko
0.
0.
0.
0.
0.
0.
$5 7.
Se n G eo te ch ni ca l P
E M
. P as sa ro
0.
0.
0.
0.
0.
0.
$3 3.
Pr of es si on al I
L.
M ue lle r 0.
0.
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T T ot al
H ou rs 0.
0.
0.
0.
D ire ct L
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
5.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge
.7 0%
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
CD
M Sm it h
Pa
C O
ST
E
ST
IM
A
TE
C on tra ct or
C D
M S m ith
, I ar
TA
C
O
- D el ta
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
Fi rs t C oa st
C le an
Ta sk
- S up pl em en ta l S ite
A ss es sm en t F ie ld
W or k S ub Ta sk
A ct iv ity
/P ha se
S S
Ta sk
- S S
A R a nd
G eo te ch ni ca l/S tru ct ur al E va lu at io n S ub Ta sk ro je ct M an ag er
C lin t N
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
T ra ve l
V eh ic le
R en ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
E rw in
5.
5.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H ep ac o
(t es t p its
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til ity
L oc at e
Fi rm
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
5.
5.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e
.5
0)
.5
0) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
7.
7.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra ly tic al C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g+ pr ep $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( A na ly tic al re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W d ru m s)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al F ie ld
E xp en se s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l
7.
$0 .0
7.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al E st im at ed
C os t
7.
$0 .0
7.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
RE
V:
2/
CE
F
CD
M Sm it h
Pa
SUBTASK: 2 - Supplemental Site Assessment Field Work
DATE: 3/7/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
2.1 - GW Sampling
Senior Technical ExS. Cobert Interpretation of Lab Data Eval
Interpretation of Lab Data Eval (SPLP)
FDEP-Directed Workplan Additions
PTL/PM C. Noble Prepare Field Scope of work
Determine Field Activities based on Field Data
FDEP-Directed Workplan Additions
Preparation of data summaries
Preparation of data summaries (SPLP)
Professional II A. Ryan Mobilization/Demob (2 trips)
Field Preparation
Arrange for site access with owner
Prepare Sample Kit Request
Prepare HASP
Sample Wells (14)
Preparation of data summaries
2.2 Soil Borings, MAGS/VMP Install, MAGS testing, and Test Pits Senior Technical ExS. Cobert Sr. Level Data Evaluation
FDEP-Directed Workplan Additions
PTL/PM C. Noble Prepare Field Scope of work
FDEP-Directed Workplan Additions
Professional II A. Ryan Site Inspection
Mobilization/Demob (8 trips)
Field Preparation
Arrange for site access with owner
Prepare Sample Kit Request
Concrete Coring, Soil Borings, OVA, soil samples, MAGS/VMP wells
MAGS testing
Test Pits
Professional I L. Mueller Utility Locate Oversight
Concrete Coring, Soil Borings, OVA, soil samples, MAGS/VMP wells
MAGS testing
Test Pit
Field Preparation Support
IDW Management
TOTAL LABO 0
VEHICLE TYPE RATE UNIT USEAGE
2.1 Truck GW Sampling $120.00 days $0.00
2.2 Truck Soil Borings/Wel $480.00 week $0.00
2.2 Truck Test Pits/MAGS $480.00 week $0.00
TOTAL VEHICL $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIE $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNITS USEAGE Subtotal
Hepaco Test Pits, Pavement Repair (2.2) $1,200 Per Day $0.00
EDS, Inc. $11,325 LS $0.00
Erwin Remediation -$425 Per Drum 1 ($425.00)
Utility Locate Firm $900 Per Day $0.00
TOTAL ($425.00)
LABORATORY COSTS
PARAMETER RATE # SAMPLES
2.1 - Groundwater Sampling EPA 8260 for VOHs $73.00 $0.00
EPA 9060 for TOC $30.00 $0.00
RSK175 for volatile gasses $180.00 $0.00
FL-PRO for TRPH $88.00 $0.00
Shipping - Large Cooler $150.00 $0.00
Ice $6.50 $0.00
2.2 - Soil Borings and MAGS testing $0.00
VOHs by 8260 37 borings x 2 samples $73.00 $0.00
VOHs by 8260 5-day TAT $14.60 $0.00
EPA 8260 for VOHs (SPLP) $73.00 $0.00
EPA 8260 for VOHs (Extraction) $50.00 $0.00
Sieve 6913/7928 $130.00 $0.00
Atterberg 4318 $85.00 $0.00
Organic Content 2974 $50.00 $0.00
VOCs by TO-15 $200.00 $0.00
Shipping - Large Cooler $150.00 $0.00
Ice $6.50 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
2.1 GW Sampling
55 gal drum $100.00 per drum $0.00
Shallow GW Sampling Kit $290.00 per day $0.00
Silicon tubing $3.00 per foot $0.00
Tubing Poly/HDPE $0.30 per foot $0.00
Expendables $40.00 per day $0.00
$0.00
2.2 Soil Borings- Test Pits - MAGS testing $0.00
Soil Sampling Kit (through Concrete $940.00 per week $0.00
55 gallon Drum $100.00 per drum $0.00
OVA $500.00 per week $0.00
Expendables $40.00 per day $0.00
Survey Station $200.00 per week $0.00
Encores $16.00 each $0.00
$0.00
MAGS Investigation Kit $500.00 day $0.00
TOTAL EQUIPMENT $0.00
C O
ST
E
ST
IM
A
TE
C on tra ct or
C D
M S m ith
, I ar
TA
C
O
O rig
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
Fi rs t C oa st
C le an
Ta sk
- S up pl em en ta l S ite
A ss es sm en t F ie ld
W or k S ub Ta sk
A ct iv ity
/P ha se
S S
Ta sk
- S S
A R a nd
G eo te ch ni ca l/S tru ct ur al E va lu at io n S ub Ta sk
P ro je ct
M an ag er
C lin t N
Ta sk
S ub
Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
La bo r R at e
C at eg or y $6
0.
Pr oj ec t T ec hn ic al
L ea d/ P
C . N ob le
.8
.8
$0 .0
Se ni or
O ffi ce r
0.
0.
0.
$6
9.
Se ni or T ec hn ic al
E xp er t
S . C ob er t
.0
.0 4.
$6 0.
Pr oj ec t T ec hn ic al L ea d/
P C
. N ob le
.0
.0 8.
$4 3.
Pr of es si on al
II
A . R ya n
3.
3.
.0
0.
$3
3.
Pr of es si on al
I K
. P ro fit ko
.0
0.
.0
0.
0.
0.
$5 7.
Se n G eo te ch ni ca l P
E M
. P as sa ro
.0
0.
.0
0.
0.
0.
$3 3.
Pr of es si on al I
L.
M ue lle r
8.
.0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T T ot al H ou rs
3.
.8
3.
6.
D ire ct L
$2
3, 5.
$2 ,7
.8
$1
4, 7.
$6 ,5
.4
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
5.
$3
1, 6.
$3 ,6
.8
$1
9, 1.
$8 ,8
.3
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge
.7 0%
$8 ,8
.7
$1
,0
.2
$5 ,3
.1
$2
,4
.3
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L
$6 4, 9.
$7
,3
.9
$3 8, 9.
$1
7, 3.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
CD
M Sm it h
Pa
C O
ST
E
ST
IM
A
TE
C on tra ct or
C D
M S m ith
, I ar
TA
C
O
O rig
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
Fi rs t C oa st
C le an
Ta sk
- S up pl em en ta l S ite
A ss es sm en t F ie ld
W or k S ub Ta sk
A ct iv ity
/P ha se
S S
Ta sk
- S S
A R a nd
G eo te ch ni ca l/S tru ct ur al E va lu at io n S ub Ta sk
P ro je ct
M an ag er
C lin t N
Ta sk
S ub
Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
T ra ve l
V eh ic le
R en ta l
$2 ,1
.0
$2
,1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$2 ,1
.0
$2
,1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m lin g
(C on ve nt io na
l) $1
1, 5.
$1 1, 5.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
E rw in
$7
.0
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H ep ac o
(t es t p its
$1
,2
.0
$1 ,2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til ity
L oc at e
Fi rm
$9
.0
$9
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$1 4, 5.
$1
4, 5.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $1
,4
.5
$1 ,4
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$1 5, 4.
$1
5, 4.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra ly tic al C os ts
$1 0, 0.
$1
0, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g+ pr ep $1
,6
.0
$1 ,6
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$1 2, 0.
$1
2, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $1
,5
.0
$1 ,5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( A na ly tic al re la te d)
$2 ,5
.0
$2
,5
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W d ru m s)
$7
.0
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$2
.0
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al F ie ld
E xp en se s $5
,0
.0
$5 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $9
9, 2.
$7 ,3
.9
$7
3, 2.
$1 7, 3.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$6 ,4
.9
$7
.6
$3
,8
.9
$1 ,7
.3
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al E st im at ed
C os t $1
,6
.3
$8
,1
.6
$7 7, 1.
$1
9, 6.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
CD
M Sm it h
Pa
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
DC002B 1 HW681
This Task Assignment Change Order reconciles WCD #1
Kyle McMurray 850-245-8973 CDM Smith Inc.
Shayne Wood 904-527-6703
ERIC 4535
First Coast Cleaners
$ 105,603.35 $ 103,860.72
$ 105,603.35 $ 103,860.72
1 1 1
CDM Smith Inc.
Shayne Wood
CDM Contract Manager
8/10/2023
Teresa Booeshaghi
Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2023.08.10 11:21:08 -04'00'
8/10/2023
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
File details come from the government source that posted it. Updated .