CN-370000-HW681-DC016C.pdf

PDF 792 KB Posted

Attached to
Master Agreement FL|HW681|acc15804f9112ed94de3c1f0669600ae
Contract number
HW681
Issued by
Florida

About this file

This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to CDM Smith Inc. for environmental remediation services at the Plaza Dry Cleaners and Laundry site located at 934 Patricia Avenue, Dunedin, Pinellas County, Florida. The task assignment is entered pursuant to Contract Number HW681 and is designated as TA Number DC016C, with a completion date of May 27, 2026. CDM Smith Inc. was selected as the lowest responsive and responsible bidder for this work under the indefinite delivery contract vehicle.

The task assignment authorizes CDM Smith to conduct Operation and Maintenance (O&M) and groundwater monitoring services for a soil vapor extraction (SVE) system and seven monitoring wells over a one-year period beginning in December 2024 and ending in November 2025. The total contract value is $70,747.75, comprising $56,347.75 in fixed unit rate labor costs and $14,400.00 in cost reimbursement for utilities. Services include monthly SVE system site visits, quarterly SVE system influent air sampling, annual groundwater sampling, preparation of semiannual and annual Remedial Action Status Reports, project management activities, and utility provision for the SVE system at $1,200 per month. The contract covers 277 total labor hours distributed across various professional classifications including project technical leaders, project managers, professional staff, and technicians. Deliverables include field notes, laboratory reports, data tables, and status reports due at specified intervals through January 2026. IDW disposal services are subcontracted to Erwin Remediation at $125 per drum for liquid waste.

View the file

Other files

File Type Posted
CN-370000-HW681-DC001F.pdf PDF
CN-370000-HW681-DC002D.pdf PDF
CN-370000-HW681-DC005A.pdf PDF
CN-370000-HW681-DC006A.pdf PDF
CN-370000-HW681-DC007A.pdf PDF
CN-370000-HW681-DC011B.pdf PDF
CN-370000-HW681-DC012B.pdf PDF
CN-370000-HW681-DC015C.pdf PDF
CN-370000-HW681-DC018D.pdf PDF
CN-370000-HW681-DC019A.pdf PDF
CN-370000-HW681-DC01ACO4.pdf PDF
CN-370000-HW681-DC020B.pdf PDF
CN-370000-HW681-DC022B.pdf PDF
CN-370000-HW681-DC023A.pdf PDF
CN-370000-HW681-DC023C.pdf PDF
CN-370000-HW681-DC026A.pdf PDF
CN-370000-HW681-DC027B.pdf PDF
CN-370000-HW681-DC029C.pdf PDF
CN-370000-HW681-DC02DCO2.pdf PDF
CN-370000-HW681-DC02DCO4.pdf PDF
CN-370000-HW681-DC02ECO1.pdf PDF
CN-370000-HW681-DC030A.pdf PDF
CN-370000-HW681-DC031A.pdf PDF
CN-370000-HW681-DC031B.pdf PDF
CN-370000-HW681-DC033D.pdf PDF
CN-370000-HW681-DC034A.pdf PDF
CN-370000-HW681-DC034B.pdf PDF
CN-370000-HW681-DC034C.pdf PDF
CN-370000-HW681-DC035A.pdf PDF
CN-370000-HW681-DC035B.pdf PDF
CN-370000-HW681-DC035C.pdf PDF
CN-370000-HW681-DC037C.pdf PDF
CN-370000-HW681-DC03DCO1.pdf PDF
CN-370000-HW681-DC03ECO1.pdf PDF
CN-370000-HW681-DC040A.pdf PDF
CN-370000-HW681-DC044A.pdf PDF
CN-370000-HW681-DC044B.pdf PDF
CN-370000-HW681-DC044C.pdf PDF
CN-370000-HW681-DC06BCO1.pdf PDF
CN-370000-HW681-DC08DCO1.pdf PDF
CN-370000-HW681-DC10BCO1.pdf PDF
CN-370000-HW681-DC11BCO2.pdf PDF
CN-370000-HW681-DC14ACO2.pdf PDF
CN-370000-HW681-DC15ACO1.pdf PDF
CN-370000-HW681-DC15BCO3.pdf PDF
CN-370000-HW681-DC16ACO1.pdf PDF
CN-370000-HW681-DC16ACO2.pdf PDF
CN-370000-HW681-DC16BCO3.pdf PDF
CN-370000-HW681-DC19ACO1.pdf PDF
CN-370000-HW681-DC20BCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW681

DC016C Completion May 27, 2026

This Task Assignment authorizes CDM Smith Inc. to conduct Operation and Maintenance (O&M) and Groundwater Monitoring at Plaza Dry Cleaners and Laundry per their proposed scope of work submitted on 05NOV2024.

Benjamin Aoki 850-245-7527 Contractor CDM Smith Inc. Contractor

Contractor Kyle Turner Contractor 813-262-8851

ERIC_5294

934 Patricia Avenue, Dunedin, Pinellas County, FL

Plaza Dry Cleaners and Laundry

Contractor Contractor

✔ $ 56,347.75

$ 14,400.00

$ 70,747.75

Scope of Work

CDM Smith Inc.

Contractor Leslie Samel

Vice President

Leslie Samel Digitally signed by Leslie Samel Date: 2024.12.11 16:12:34 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.12.11 12:05:25 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number: HW681 Task Assignment #: DC016C

Deliverables:

Deliverable Deliverable Due Date Subtask 2: Annual Groundwater Monitoring - Field notes, laboratory report, updated tables / /2025

Subtask 3: SVE System O&M and Optimization - Quarter 13 (DEC24-FEB25) - Field notes, laboratory report, updated tables

/ 4/2025

Subtask 4: SVE System O&M and Optimization - Quarter 14 (MAR25-MAY25) - Semiannual Remedial Action Status Report, including Groundwater Monitoring

/1 /2025

Subtask 5: SVE System O&M and Optimization - Quarter 15 (JUN25-AUG25) - Field notes, laboratory report, updated tables

1 / /2025

Subtask 1 & 6: SVE System O&M and Optimization - Quarter 16 (SEP25-NOV25) - Annual Remedial Action Status Report; Project Management

/ /2026

Subtask 7: Utilities - Quarter 13 Paid Utility Invoices not to exceed $3,600.00; $60.00 handling fee /25/2025

Subtask 8: Utilities - Quarter 14 Paid Utility Invoices not to exceed $3,600.00; $60.00 handling fee / /2025

Subtask 9: Utilities - Quarter 15 Paid Utility Invoices not to exceed $3,600.00; $60.00 handling fee

/ /202

Subtask 10: Utilities - Quarter 16 Paid Utility Invoices not to exceed $3,600.00; $60.00 handling fee /2 /2026

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced Subtask 2: Annual Groundwater Monitoring - Field notes, laboratory report, updated tables $6,229.43

Subtask 3: SVE System O&M and Optimization - Quarter 13 (DEC24-FEB25) - Field notes, laboratory report, updated tables

$10,211.81

Subtask 4: SVE System O&M and Optimization - Quarter 14 (MAR25-MAY25) - Semiannual Remedial Action Status Report, including Groundwater Monitoring

$12,908.04

Subtask 5: SVE System O&M and Optimization - Quarter 15 (JUN25-AUG25) - Field notes, laboratory report, updated tables

$7,421.81

Subtask 1 & 6: SVE System O&M and Optimization - Quarter 16 (SEP25-NOV25) - Annual Remedial Action Status Report; Project Management

$19,336.66

Subtask 7: Utilities - Quarter 13 Paid Utility Invoices not to exceed $3,600.00; $60.00 handling fee $3,660.00

Subtask 8: Utilities - Quarter 14 Paid Utility Invoices not to exceed $3,600.00; $60.00 handling fee $3,660.00

Subtask 9: Utilities - Quarter 15 Paid Utility Invoices not to exceed $3,600.00; $60.00 handling fee $3,660.00

Subtask 10: Utilities - Quarter 16 Paid Utility Invoices not to exceed $3,600.00; $60.00 handling fee $3,660.00

TOTAL COST $70,747.75

BWC TAFORM 01_18

RRonn DeSantis Governor

JJeanette Nuñez Lt. Governor

Shawnn Hamilton Secretary

TO:

FROM:

DATE:

SUBJECT:

FLORIDAA DEPARTMENTT OFF

Environmentall Protectionn

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

FD

EP

C

OS

T

ES

TI

MA

TE

C on tra ct or

C

D M

S m ith , I nc

D at e:

/5

/2

Ta sk

S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S

V E

S ys te m

O

M a nd O pt im iz at io n

- Q tr

S ite

P la za

D ry

C le an er s an d La un dr y E

R

IC

_5

S ub Ta sk

A nn ua l G ro un dw at er M on ito rin g

S ub

Ta sk

U til iti es

Q tr

A ct iv ity

/P ha se

O

M

Ta sk

S

V E

S ys te m

O

M a nd O pt im iz at io n

- Q tr

S ub Ta sk

U til iti es

Q tr

P ro je ct

M an ag er

S te ve

C ob er t

Ta sk

S V

E S ys te m O

M a nd

O pt im iz at io n

- Q tr

S ub

Ta sk

U til iti es

Q tr

S ub

Ta sk

S

V E

S ys te m

O

M a nd O pt im iz at io n

- Q tr

S ub Ta sk

U til iti es

Q tr

T T ot al s

La bo r R at e

C at eg or y $7

6.

PP

ro je ct

M an ag

.5

.5 $1

.9

Se ni or

O ffi ce r

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$8 6.

Se ni or

T ec hn ic al E xp er t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$7

6.

Pr oj ec t T ec hn ic al

L ea de r

.0

4.

5.

5.

5.

5.

0.

0.

0.

0.

$7 6.

Pr oj ec t M an ag

.0 0.

1.

4.

1.

4.

0.

0.

0.

0.

$7

1.

Se ni or P ro fe ss io na l

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 2.

Pr of es si on al

II

8.

.0

.0

.0

.0

.0 0.

0.

0.

0.

$3

4.

Pr of es si on al

I 8.

8.

0.

0.

0.

0.

0.

0.

0.

0.

$5

4.

Se ni or T ec hn ic ia n 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

0.

St af f T ec hn ic ia n

.0

0.

.0

.0

.0

.0

0.

0.

0.

0.

$4 2.

Pr oj ec t A dm in is tra tio n 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

2.

Se ni or S up po rt Se rv ic es 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

T ot al

H ou rs

.0

.0

.0

.0

.0

0.

0.

0.

0.

D ire ct L ab or

$1

3, 4.

$1 ,5

.1

$1

,5

.9

$1 ,7

.7

$3

,3

.8

$1 ,7

.7

$3

,5

.2

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

5.

$1

8, 6.

$2 ,1

.9

$2

,0

.1

$2 ,3

.3

$4

,5

.3

$2 ,3

.3

$4

,8

.3

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.7 0%

$5 ,1

.0

$5

.0

$5

.5

$6

.4

$1

,2

.5

$6

.4

$1 ,3

.8

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

L ab or

$3 7, 0.

$4

,2

.1

$4 ,1

.6

$4

,8

.5

$9 ,1

.7

$4

,8

.5

$9 ,7

.5

$0

.0

$0 .0

$0

.0

$0 .0

T ra ve l

V eh ic le

R en ta l

$1 ,6

.0

$2

.0

$3

.0

$3

.0

$3

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

RE

V:

2/

CE

F

CD

M Sm it h

Pa ge

FD

EP

C

OS

T

ES

TI

MA

TE

C on tra ct or

C

D M

S m ith , I nc at e:

/5

/2

Ta sk

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S

V E

S ys te m

O

M a nd O pt im iz at io n

- Q tr

S ite

P la za

D ry

C le an er s an d La un dr y E

R

IC

_5

S ub Ta sk

A nn ua l G ro un dw at er M on ito rin g

S ub

Ta sk

U til iti es

Q tr

A ct iv ity

/P ha se

O

M

Ta sk

S

V E

S ys te m

O

M a nd O pt im iz at io n

- Q tr

S ub Ta sk

U til iti es

Q tr

P ro je ct

M an ag er

S te ve

C ob t

Ta sk

S V

E S ys te m O

M a nd

O pt im iz at io n

- Q tr

S ub

Ta sk

U til iti es

Q tr

S ub

Ta sk

S

V E

S ys te m

O

M a nd O pt im iz at io n

- Q tr

S ub Ta sk

U til iti es

Q tr

T T ot al s

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$1 ,1

.0

$0

.0

$0 .0

$5

.0

$0

.0

$5

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$2 ,7

.0

$2

.0

$3

.0

$9

.0

$3

.0

$9

.0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m en t)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(S er vi ce s P ro cu re m en t) ril lin g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ur ve yi ng $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $1

.0

$0

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $1

4, 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$3

,6

.0

$3 ,6

.0

$3

,6

.0

$3 ,6

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $1

4, 5.

$0 .0

$0

.0

$1

.0

$0 .0

$0

.0

$3 ,6

.0

$3

,6

.0

$3 ,6

.0

$3

,6

.0

H an dl in g Fe e $2

.5

$0

.0

$0 .0

$1

2.

$0 .0

$0

.0

$6 0.

$6

0.

$6 0.

$6

0.

T ot al S ub co nt ra ct or

C os t $1

4, 7.

$0 .0

$0

.0

$1

.5

$0 .0

$0

.0

$3 ,6

.0

$3

,6

.0

$3 ,6

.0

$3

,6

.0

La bo ra to ry

A na ly tic al C os ts

$3 ,9

.0

$5

.0

$2

,0

.0

$2

.0

$2

.0

$1 ,0

.0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$2 ,0

.0

$1

.0

$1

,1

.0

$1

.0

$1

.0

$5

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al L ab or at or y $5

,9

.0

$6

.0

$3 ,1

.0

$3

.0

$3

.0

$1

,5

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d E xp en se s

P so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $5

.0

$4

0.

$1

.0

$1

.0

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $5

.0

$5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$5

,2

.0

$0 .0

$1

,3

.0

$1 ,3

.0

$1

,3

.0

$1 ,3

.0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

F ie ld E xp en se s

$6 ,4

.0

$7

.0

$1

,4

.0

$1 ,4

.0

$1

,4

.0

$1 ,4

.0

$0

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $6

7, 7.

$4 ,2

.1

$5

,8

.6

$9 ,7

.5

$1

1, 8.

$6 ,9

.5

$1

3, 4.

$3 ,6

.0

$3

,6

.0

$3 ,6

.0

$3

,6

.0

C om pl et io n

Fe e

$3 ,7

.0

$4

.8

$4

.7

$4

.2

$9

.7

$4

.2

$9

.1

$0

.0

$0 .0

$0

.0

$0 .0

T ot al E st im at ed

C os t $7

0, 7.

$4 ,6

.9

$6

,2

.4

$1 0, 1.

$1

2, 8.

$7 ,4

.8

$1

4, 1.

$3 ,6

.0

$3

,6

.0

$3 ,6

.0

$3

,6

.0

RE

V:

2/

CE

F

CD

M Sm it h

Pa ge

SITE : Plaza Dry Cleaners and Laundry ERIC_5294 SUBTASK 2: Annual Groundwater Monitoring

DATE: 11/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical Evaluation of Data/trend analysis 4

Professional II Site Access with Site Owner 1

Sample Kit Coordination 1

IDW Management 1

Data Package Preparation (Annual Sampling) 6

Travel (1 trip) 2

Field Preparation (Annual Sampling) 1

Annual Groundwater Sampling (7 wells) 6

Professional I Travel (1 trip) 2

Annual Groundwater Sampling (7 wells) 6

Total Hours:

PTL 4

Professional II 18

Professional I 8

TOTAL LABOR 30

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 each 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOH - 8021/8260 $73.00 7 $511.00

Shipping (Large Cooler) $150.00 1 $150.00

Ice $6.50 2 $13.00

TOTAL LAB $674.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00

Expendables $40.00 Day 1 $40.00

Drums $100.00 Each 1 $100.00

TOTAL EQUIPMENT $720.00

SITE :

SUBTASK: 3 SVE System O&M and Optimization - Qtr 13

DATE: 11/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader System Optimization 3

Engineering Evaluation 2

Project Manager Quarterly O&M Documentation Technical Review 1

Staff Technician Travel to/from Site (3 Trips) 6

O&M Site Visit (3 Months) 18

Professional II Updated Data Tables / Review and Interpretation 4

Quarterly O&M Documentation Package 6

Sample Kit Coordination 1

Total Hours:

PTL 5

PM 1

Staff Technician 24

Professional II 11

TOTAL LABOR 41

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 $200.00 10 $2,000.00

Small Cooler $110.00 10 $1,100.00

TOTAL LAB $3,100.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Kit $360.00 Day 3 $1,080.00

Construction/O&M Supplies $75.00 Day 3 $225.00

Expendables $40.00 Day 3 $120.00

TOTAL EQUIPMEN $1,425.00

Plaza Dry Cleaners and Laundry ER

SUBTASK: 4 SVE System O&M and Optimization - Qtr 14

DATE: 11/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader System Optimization / Operations Review 3

Author Engineering Section of Semiannual RASR 2

Project Manager Semiannual RASR / GWMR Technical Review 4

Professional II Semiannual RASR preparation (including GWM) 32

Figures for Semiannual RASR 4

Sample Kit Coordination (Soil Vapor Sample) 1

Staff Technician Travel to/from Site (3 Trips) 6

O&M Site Visit (3 Months) 18

Total Hours:

PTL 5

PM 4

Professional II 37

Staff Technician 24

TOTAL LABOR 70

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

Staff Technician $150.00 Hotel 3 $450.00 Staff Technician $36.00 Per Diem 3 $108.00

TOTAL PER DIEM $558.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

Erwin Remediation IDW Disposal (Water) 1 125.00$ $125.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 $200.00 1 $200.00

Small Cooler $110.00 1 $110.00

TOTAL LAB $310.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Kit $360.00 Day 3 $1,080.00

Construction/O&M Supplies $75.00 Day 3 $225.00

Expendables $40.00 Day 3 $120.00

TOTAL EQUIPMENT $1,425.00

SUBTASK: 5 SVE System O&M and Optimization - Qtr 15

DATE: 11/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader System Optimization 3

Engineering Evaluation 2

Project Manager Quarterly O&M Documentation Technical Review 1

Staff Technician Travel to/from Site (3 Trips) 6

O&M Site Visit (3 Months) 18

Professional II Updated Data Tables / Review and Interpretation 4

Quarterly O&M Documentation Package 6

Sample Kit Coordination 1

Total Hours:

PTL 5

PM 1

Staff Technician 24

Professional II 11

TOTAL LABOR 41

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 $200.00 1 $200.00

Small Cooler $110.00 1 $110.00

TOTAL LAB $310.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot kit $360.00 day 3 $1,080.00

Construction/O&M Supplies $75.00 day 3 $225.00

Expendables $40.00 day 3 $120.00

TOTAL EQUIPMEN $1,425.00

SUBTASK: 6 SVE System O&M and Optimization - Qtr 16

DATE: 11/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader System Optimization / Operations Review 3

Author Engineering Section of Annual RASR 2

Project Manager Annual RASR Technical Review 4

Professional II Annual RASR preparation 36

Figures for Annual RASR 4

Sample Kit Coordination (Soil Vapor Sample) 1

Staff Technician Travel to/from Site (3 Trips) 6

O&M Site Visit (3 Months) 18

Total Hours:

PTL 5

PM 4

Professional II 41

Staff Technician 24

TOTAL LABOR 74

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

Staff Technician $150.00 Hotel 3 $450.00 Staff Technician $36.00 Per Diem 3 $108.00

TOTAL PER DIEM $558.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 $200.00 5 $1,000.00

Small Cooler $110.00 5 $550.00

TOTAL LAB $1,550.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Kit $360.00 Day 3 $1,080.00

Construction/O&M Supplies $75.00 Day 3 $225.00

Expendables $40.00 Day 3 $120.00

TOTAL EQUIPMENT $1,425.00

Plaza Dry Cleaners and Laundry ERIC

SUBTASK: 7 Utilities - Qtr 13

DATE: 11/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

FIELD EXPENSES ITEM RATE COSTING UNIT USEAGE TOTALS

O&M Quarter 13 Utilities Utility Charges (Electric) $1,200.00 month 3 $3,600.00

Quarter 13 Handling Fee Utility Handling Fee $20.00 Month 3 $60.00

TOTAL EQUIPMENT $3,660.00

Plaza Dry Cleaners and Lau

SUBTASK: 8 Utilities - Qtr 14

DATE: 11/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

FIELD EXPENSES ITEM RATE COSTING UNIT USEAGE TOTALS

O&M Quarter 14 Utilities Utility Charges (Electric) $1,200.00 month 3 $3,600.00

Quarter 14 Handling Fee Utility Handling Fee $20.00 Month 3 $60.00

Plaza Dry Cleaners and Laund

SUBTASK: 9 Utilities - Qtr 15

DATE: 11/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

FIELD EXPENSES ITEM RATE COSTING UNIT USEAGE TOTALS

O&M Quarter 15 Utilities Utility Charges (Electric) $1,200.00 month 3 $3,600.00

Quarter 15 Handling Fee Utility Handling Fee $20.00 Month 3 $60.00

SUBTASK: 10 Utilities - Qtr 16

DATE: 11/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

FIELD EXPENSES ITEM RATE COSTING UNIT USEAGE TOTALS

O&M Quarter 16 Utilities Utility Charges (Electric) $1,200.00 month 3 $3,600.00

Quarter 16 Handling Fee Utility Handling Fee $20.00 Month 3 $60.00

4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109

November 5, 2024

Mr. Benjamin Aoki Environmental Specialist II Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Subject: Operation and Maintenance and Groundwater Monitoring Proposal Plaza Dry Cleaners and Laundry 934 Patricia Avenue, Dunedin, Pinellas County, FL

ERIC_5294

Dear Mr. Aoki:

CDM Smith Inc. (CDM Smith) is pleased to respond to the Florida Department of Environmental Protection (FDEP) Task Assignment Request to provide Operation and Maintenance (O&M) and groundwater monitoring services for the Plaza Dry Cleaners and Laundry site under Contract Number HW681. Our project understanding, scope of work, and project schedule are described below, while the cost estimate is also attached.

Project Understanding The former dry-cleaning facility currently operates as a pharmacy and is in a shopping center. An Interim Source Removal Plan (ISRP) for the site was approved by FDEP August 2020. A Remedial Action Startup Report was submitted in June 2022 and a construction completion report has not been submitted. The required O&M activities for this task assignment were taken from the ISRP.

O&M services are required for a soil vapor extraction (SVE) system that consists of four vacuum extraction (VE) wells, SVE blower, air injection blower, moisture separator, and a granulated activated carbon (GAC) vapor treatment drum. Two VE wells are in outdoor locations and two are indoor locations.

SVE system influent air samples are sampled on a quarterly basis and submitted for laboratory analysis by United States Environmental Protection Agency (EPA) Method TO-15 for volatile organic halocarbons.

Air samples are collected from the four operating SVE wells (VE001, VE002, VE003, VE004) on an annual basis and submitted for laboratory analysis by EPA Method TO-15. Operation and Maintenance (O&M) site visits are being completed monthly, and O&M reports are submitted quarterly.

Groundwater monitoring is being completed annually at seven monitoring wells for volatile organic halocarbons (VOHs). Semiannual and Annual Remedial Action Status Reports (RASR) are submitted. The annual groundwater sampling event would be performed in January 2025.

Mr. Benjamin Aoki

Scope of Work This cost proposal covers SVE system O&M and groundwater monitoring for one year, beginning in December 2024 and ending in November 2025.

Subtask 1 – Project Management Project management activities performed under this task consist of administrative functions required to maintain the project schedule, adhere to budget, and deliver the quality of the work products defined by CDM Smith's quality standards. We will prepare and submit invoices upon approval of each deliverable or milestone completion.

Project Kickoff and Progress Meetings CDM Smith expects to have a kickoff meeting or telephone conference with the FDEP to review the status of the project and address FDEP comments regarding the Task Assignment. CDM Smith will prepare meeting agendas and notes as part of this task.

Project Quality Technical Review CDM Smith’s Quality Management System guidelines will be followed. Internal quality reviews will be conducted on plans and on investigation findings and reports.

Project Status Reports CDM Smith’s Project Manager will prepare and submit monthly status reports to accompany each invoice throughout the duration of this project. The Project Manager will also discuss the status of the project with the FDEP on a bi-weekly basis until the project is complete.

Subtask 2 - Groundwater Monitoring The groundwater monitoring requirements for the site were identified in the 2020 ISRP. CDM Smith will complete the groundwater sampling event in January 2025. The required laboratory analyses and the wells included in the monitoring program are listed in the attached Table 1.

CDM Smith will collect water levels from all sampled monitoring wells during the sampling event.

Purging and sampling will be in accordance with FDEP’s Standard Operating Procedures for Groundwater Sampling, FS 2200, and will be collected using low-flow techniques with a peristaltic pump and dedicated polyethylene tubing. A YSI-556 multi-parameter probe and a turbidimeter will be used to collect well purge parameters including dissolved oxygen, pH, conductivity, oxidation reduction potential, temperature, turbidity. The instrumentation will be properly calibrated and recorded. All purge water will be contained in a drum for characterization and disposal as nonhazardous investigation-derived waste (IDW). CDM Smith assumes that one IDW drum will require disposal under Subtask 4 of this Task Assignment.

Deliverables: Laboratory Reports, field notes, and updated tables for the groundwater sampling event.

Subtasks 3, 4, 5 and 6 – Quarterly SVE System Operation and Maintenance O&M Site visits will be completed monthly, and the following work will be completed during each visit.

System operation and alarm status and blower run time.

Moisture separator liquid volume.

System vacuums and velocity/flow rate at blower, before/after GAC (if applicable), and after moisture separator.

Blower oil changes (when applicable) based on manufacture recommendations.

SVE well vacuum/pressure and flow rate.

Total organic vapors measured with a photoionization detector from operating SVE wells, system influent, and system effluent.

Water levels from monitoring wells MW-3, MW-4 and MW-UNK

Adjust vacuums and injection pressures on the SVE wells to optimize the SVE system performance.

The information will be consistently recorded in the field on pre-prepared forms.

SVE system influent samples will be collected quarterly for laboratory analysis by Method TO-15. Per FDEP request on November 4, 2024, a rebound evaluation will be conducted in the first quarter of this TA. Soil vapor sample from the SVE influent and individual legs prior to SVE system shutdown for at least 30 days. After being shut down for at least 30 days, the system will be brough back online and soil vapor samples will be collected from the influent and individual legs. The system will return to normal operational state until rebound evaluation results can be presented and CDM Smith can present a path forward to FDEP. Additionally, soil vapor samples will be collected from each of the four VE wells on an annual basis as part of Subtask 6. The required laboratory analyses and the SVE included in the monitoring program are listed in the attached Table 1.

Following the completion of Subtasks 3 and 4 O&M activities, CDM Smith will prepare a Semiannual RASR and an Annual RASR will be prepared following the completion of Subtask 5 and 6 activities. The reports will summarize the history of the Site, all fieldwork completed by CDM Smith, field and laboratory data, conclusions, and recommendations. Additional elements of the reports will include the following:

Figures depicting site conditions.

Figures depicting groundwater data and estimated extent of impact.

Groundwater elevation contour map.

Tables summarizing field and analytical data.

Groundwater sampling logs and field equipment calibration records.

Laboratory analytical reports and chain of custody documentation.

Waste disposal manifests and weigh tickets.

Deliverables: Semiannual and Annual Remedial Action Status Reports

Subtasks 7, 8, 9, and 10 – Utilities CDM Smith will provide utilities for the SVE system and assume $1,200 per month including administrative costs. The $1,200 per month amount is based off previous utility invoices and Task Assignment Change Orders.

Deliverable: Utilities Handling Fee, receipt of 3 months of utility invoices for each Subtask (Cost Plus Fixed Fee)

Subcontractors Subcontracted services are required for IDW disposal. Rates for IDW removal and disposal were previously requested for HW681 from Erwin Remediation, Enviroserve (formerly Clark Environmental), and Hepaco. Erwin Remediation was the lowest cost and has been selected as the IDW disposal subcontractor for this project as shown in Attachment A

Assumptions CDM Smith will communicate with the FDEP in a timely manner is schedule delays are encountered and will prepare necessary paperwork for change orders.

4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109

Schedule Subtask 2: Annual Groundwater Monitoring Deliverable: Field notes, laboratory report, updated tables Due Date: March 7, 2025 Subtask 3: SVE System O&M and Optimization – Quarter 13 (December 2024 – February 2025) Deliverable: Field notes, laboratory report, updated tables Due Date: April 4, 2025 Subtask 4: SVE System O&M and Optimization – Quarter 14 (March 2025 – May 2025) Deliverable: Semiannual Remedial Action Status Report, including Groundwater Monitoring Due Date: July 11, 2025 Subtask 5: SVE System O&M and Optimization – Quarter 15 (June 2025 – August 2025) Deliverable:

Due Date: October 10, 2025 Subtask 6: SVE System O&M and Optimization – Quarter 16 (September 2025 – November 2025) Deliverable: Annual Remedial Action Status Report Due Date: January 30, 2026 Subtask 7: Utilities – Qtr 13 Deliverable: Paid Utility Invoices Due Date: April 25, 2025 Subtask 8: Utilities – Qtr 14 Deliverable: Paid Utility Invoices Due Date: August 8, 2025 Subtask 9: Utilities – Qtr 15 Deliverable: Paid Utility Invoices Due Date: December 19, 2025 Subtask 10: Utilities – Qtr 16 Deliverable: Paid Utility Invoices Due Date: February 20, 2026

We look forward to working this important project. Feel free to contact me at 407-660-6361 or by email with any questions or comments.

Sincerely, Joshua J. Hirten, PG Leslie S. Samel, P.E.

Program Manager Vice President CDM Smith CDM Smith HirtenJJ@CDMSmith.com SamelLS@CDMSmith.com

Table

Sample ID Monthly Quarterly Semiannual Annual SVE Influent V,F,P 4,V,F,P 4,V,F,P

VE001 V,F,P V,F,P 4,V,F,P

VE002 V,F,P V,F,P 4,V,F,P

VE003 V,F,P V,F,P 4,V,F,P

VE004 V,F,P V,F,P 4,V,F,P

MW-UNK L 1,L

MW-6 1,L

MW-7 1,L

MW-8 1,L

MW-9 1,L

MW-10 1,L

MW-11 1,L

1 = VOHs by Method 8260B 4 = VOHs by Method TO-15 V = Vacuum/Pressure F = Flow Rate

P = PID

L = Depth to Water

Table 1: Sampling Schedule Plaza Dry Cleaning and Laundry

ERIC_5294

Dunedin, Pinellas County, Florida

Attachment A Subcontractor Quotes

In ve st ig at iv e De riv ed

W as te (I

DW

) M an ag em en t Jo b De ta ils

Pe r 5 5-ga llo n Dr um

Pe r E ve nt

He pa co

NA

NA

NA

NA

En vi ro

Se rv e

NA

NA

NA

NA

Er w in

R em ed ia tio n

$1

$1

In clu de d

In clu de d

$1

$1

ID

W

S ub co nt ra ct or E va lu at io n

CD

M S m ith

HW

/1

5/

No R es po ns e

No R es po ns e

Co m pa ny

Di sp os al

Tr an sp or ta tio n To ta l

Li qu id So il Fe e Li qu id

So il

File details come from the government source that posted it. Updated .