Task Assignment DC031C Summary

This Task Assignment (TA) is a contract document issued by the State of Florida Department of Environmental Protection (FDEP) to CDM Smith Inc., a consulting firm. The document authorizes CDM Smith to prepare an Interim Source Removal Plan (ISRP) for the Norgetown Cleaners site located at 4336 South Manhattan Avenue, Tampa, Hillsborough County, Florida (ERIC_4745). The task assignment is executed under the umbrella Contract Number HW681, dated January 5, 2022, with a completion date of March 23, 2026. Benjamin Aoki serves as the FDEP Project Manager, while Kathy Leggoe represents CDM Smith as the contractor's project manager.

The scope of work encompasses three primary subtasks: (1) Project Management calculated at 13 percent of direct labor costs; (2) Site Reconnaissance involving a field visit to assess existing MAGS wells, transfer piping layouts, treatment system locations, and electrical requirements; and (3) Interim Source Removal Plan Preparation for a soil vapor extraction system consisting of six vapor extraction wells. The total task assignment value is $12,958.30, representing a reduction of $6,483.29 from the original proposal through negotiation between FDEP and CDM Smith. The contract allocates 61 total labor hours across multiple staff categories, including project managers, senior technical experts, and professional-level engineers. Deliverables include site reconnaissance field notes due 60 days after notice to proceed and the completed Interim Source Removal Plan due 120 days after notice to proceed, with invoicing triggered upon FDEP receipt and approval of each deliverable.

View the file

Other files

File Type Posted
CN-370000-HW681-DC001B.pdf PDF
CN-370000-HW681-DC001E.pdf PDF
CN-370000-HW681-DC002E.pdf PDF
CN-370000-HW681-DC002F.pdf PDF
CN-370000-HW681-DC003B.pdf PDF
CN-370000-HW681-DC005D.pdf PDF
CN-370000-HW681-DC005E.pdf PDF
CN-370000-HW681-DC008B.pdf PDF
CN-370000-HW681-DC008E.pdf PDF
CN-370000-HW681-DC009A.pdf PDF
CN-370000-HW681-DC010A.pdf PDF
CN-370000-HW681-DC010C.pdf PDF
CN-370000-HW681-DC011C.pdf PDF
CN-370000-HW681-DC012D.pdf PDF
CN-370000-HW681-DC013A.pdf PDF
CN-370000-HW681-DC013B.pdf PDF
CN-370000-HW681-DC013C.pdf PDF
CN-370000-HW681-DC013D.pdf PDF
CN-370000-HW681-DC015A.pdf PDF
CN-370000-HW681-DC016C.pdf PDF
CN-370000-HW681-DC017B.pdf PDF
CN-370000-HW681-DC018C.pdf PDF
CN-370000-HW681-DC019B.pdf PDF
CN-370000-HW681-DC01ACO5.pdf PDF
CN-370000-HW681-DC021A.pdf PDF
CN-370000-HW681-DC021B.pdf PDF
CN-370000-HW681-DC021C.pdf PDF
CN-370000-HW681-DC025A.pdf PDF
CN-370000-HW681-DC02BCO2.pdf PDF
CN-370000-HW681-DC02DCO1.pdf PDF
CN-370000-HW681-DC032D.pdf PDF
CN-370000-HW681-DC033C.pdf PDF
CN-370000-HW681-DC037B.pdf PDF
CN-370000-HW681-DC038B.pdf PDF
CN-370000-HW681-DC038C.pdf PDF
CN-370000-HW681-DC03A.pdf PDF
CN-370000-HW681-DC03CCO1.pdf PDF
CN-370000-HW681-DC03CCO2.pdf PDF
CN-370000-HW681-DC041C.pdf PDF
CN-370000-HW681-DC042B.pdf PDF
CN-370000-HW681-DC042C.pdf PDF
CN-370000-HW681-DC043A.pdf PDF
CN-370000-HW681-DC043B.pdf PDF
CN-370000-HW681-DC04BCO1.pdf PDF
CN-370000-HW681-DC05CCO3.pdf PDF
CN-370000-HW681-DC06BCO4.pdf PDF
CN-370000-HW681-DC07ACO1.pdf PDF
CN-370000-HW681-DC07CCO1.pdf PDF
CN-370000-HW681-DC08CCO1.pdf PDF
CN-370000-HW681-DC09BCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW681

DC031C March 23, 2026

This Task Assignment authorizes CDM Smith Inc. to create an Interim Source

Removal Plan for Norgetown Cleaners per their proposed scope of work and revised cost estimate submitted on 19SEP2025.

Benjamin Aoki 850-245-7527 CDM Smith Inc.

Kathy Leggoe 904-527-6727

ERIC_4745

4336 South Manhattan Avenue, Tampa, Hillsborough County, Florida

Norgetown Cleaners

$ 12,958.30

$ 12,958.30

Scope of Work

CDM Smith Inc.

Joshua Hirten

Contract Manager

Joshua Hirten Digitally signed by Joshua Hirten Date: 2025.09.25 09:54:24 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.09.24 08:35:49 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Alexis A. Lambert Secretary

Memorandum

TO:

FROM:

SUBJECT:

DATE:

F D

E P

C O

S T

E S

T

IM

A T

E

C o nt ra ct o r:

C

M S m ith

, I n c.

D a te

9/

8/

T a sk

P ro p os al S u bT as k

P ro je ct M an ag em e nt S u bT as k

S ite

N rg et o w n C le a ne rs

S u bT as k

S ite

R e co nn ai ss an ce

S u bT as k

A ct iv ity

/P ha se

R A

S u bT as k

In te ri m S o ur ce R em o va l P la n

S u bT as k

P ro je ct

M an ag er

C

D M

S m ith bT as k

S u bT as k

S u bT as k

S u bT as k

T o ta ls

L a b o r R a te

C a te g o ry

$8 0.

P ro je ct

M an a g e r

6.

6.

$1

.8

S e ni o r O ff ic er 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$9 0.

S e ni o r T e ch ni ca l E xp er t

.5

5.

.0

0.

0.

0.

0.

0.

0.

0.

$8 0.

P ro je ct

T e ch n ic a l L ea de r

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$8 0.

P ro je ct

M an ag er

2.

0.

2.

0.

0.

0.

0.

0.

0.

0.

$7 5.

S e ni o r P ro fe ss io na l

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 5.

P ro fe ss io na l I I

.0

0.

.0

0.

0.

0.

0.

0.

0.

0.

$3 7.

P ro fe ss io na l I 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 7.

S e ni o r T e ch ni ci a n

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3 2.

S ta ff T e ch ni ci a n

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 4.

P ro je ct

A dm in is tr at io n

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 5.

S e ni o r S u pp or t S er vi ce s

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

T o ta l H o u rs

6.

.0 0.

0.

0.

0.

0.

0.

0.

D ir ec t L ab or

$4

,2

6.

$4

.0

$5

.4

$3 ,1

.9

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh e ad

5.

0% $5

,6

2.

$6

.8

$7

.5

$4 ,3

.8

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G e n

A d m in

0.

0% $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

F ri ng e

.7

$1 ,5

9.

$1

.8

$2

.6

$1

,2

.1

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T o ta l L ab o r

,4

.4

$1

,3

2.

$1 ,4

5.

$8

,7

9.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ra v el

V e hi cl e R en ta l $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile a ge

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir

F ar e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P e r d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T o ta l T ra ve l $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

R E V

C E F

C D M

S m i t h

P a g e

F

E P

C O

S T

E S

T

IM

A T

E

C o nt ra ct r:

C

M S m ith

, I n c.

D a te

9/

8/

T a sk ro p os al S u bT as k

P ro je ct M an ag em e nt S u bT as k

S ite

N rg et o w n C le a ne rs

S u bT as k

S ite

R e co nn ai ss an ce

S u bT as k

A ct iv ity

/P ha se

R bT as k

In te ri m S o ur ce R em o va l P la n

S u bT as k

P ro je ct

M an ag er

C

D M

S m ith bT as k

S u bT as k

S u bT as k

S u bT as k

T o ta ls

S u b c o n tr ac to r

(E q u ip m en t P ro cu re m en t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S u bc on tr a ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P ro cu re m en t F e e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T o ta l S u b c o n tr ac to r C o st

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S u b c o n tr ac to r

(S er v ic es P ro cu re m en t) ri lli ng

C on ve n tio na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ri lli ng

N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M o bi le

L a bo ra to ry

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S u rv ey in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S u bc on tr a ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H a nd lin g F e e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T o ta l S u b c o n tr ac to r C o st

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

L a b o ra to ry n al yt ic al

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

F a st T u rn ar ou nd C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S a m pl e S hi pp in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T o ta l L ab o ra to ry $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

F ie ld E xp en s es rs on al P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp e nd ab le s $4

0.

$4

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E q ui p m en t ( D ril lin g r el a te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E q ui p m en t ( A n al yt ic a l r el a te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E q ui p m en t (

ID

W r e la te d

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E q ui p m en t ( O th e

r) $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T o ta l F ie ld

E x p en se s

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S u b to ta l

$1 1, .4

$1 ,3

2.

$1

,7

5.

$8 ,7

.9

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C o m p le ti o n

F ee

$1 ,1

9.

$1

.2

$1

.5

$8

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T o ta l E st im at ed

C o st $1

2, .3

$1

,4

5.

$1 ,9

2.

$9

,5

.9

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

R E V

C E F

C D M

S m i t h

P a g

SITE : Norgetown Cleaners SUBTASK 2: Site Reconnaissance

DATE: 9/18/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager 0.5

Sr. Technical Expert/PE Mobilization/Demobilization (4 hr roundtrip) 4

Site Reconnaissance Activties 1

Data Deliverable preparation 0.5

PM 0.5

Sr. technical Expert/PE 5.5

Total Hours 6

TOTAL LABOR 6

VEHICLE TYPE RATE UNIT USEAGE

Sr. Technical Expert Truck $120.00 day 1 $120.00

$0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

expendables $40.00 per day 1 $40.00

Site Recon Kit $150.00 each 1 $150.00

TOTAL EQUIPMENT $190.00

Site Reconnaissnace field support and data deliverable

SITE : Norgetown Cleaners SUBTASK: 3 Interim Source Removal Plan

DATE: 9/18/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager ISRP Design Evaluation 2

Senior Technical Expert Technical Design Lead 10

Engineer of Record 2

Professional II ISRP Preparation, Tables, and Figures 35

PM 2

Sr. Technical Expert 12

Professional II 35

Total Hours 49

TOTAL LABOR 49

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00