CN-370000-HW681-DC005E.pdf
PDF 2 MB Posted
- Contract number
- HW681
- Issued by
- Florida
About this file
This is a Task Assignment (TA) document under Contract Number HW681 between the Florida Department of Environmental Protection (FDEP) and CDM Smith Inc. The task assignment, designated DC005E, is for ISRP (Interim Source Removal Plan) pre-design activities at the Former Bay's Cleaners site located at 214 North Magnolia Avenue, Ocala, Marion County, Florida. The project number is ERIC_4918, with Benjamin Aoki serving as the FDEP project manager and Kathy Leggoe as the contractor's project manager. The task assignment is effective through September 4, 2026.
The scope of work consists of two subtasks: Subtask 1 involves project management activities calculated at 13% of direct labor, including bi-weekly meetings, progress reporting, resource management, and quality technical review; Subtask 2 encompasses ISRP pre-design activities requiring the contractor to communicate with the property owner regarding development plans and conceptual ISRP ideas, review existing site data, and prepare a letter report with pre-design recommendations. The total task assignment value is $3,310.28 on a fixed unit rate basis, representing 16 labor hours. The deliverable—a letter report describing the site redevelopment plan with pre-design ISRP recommendations—is due 90 days from notice to proceed, with FDEP receipt and review serving as the invoice trigger. The document reflects a cost reduction of $2,589.89 from the original proposal through communications between CDM Smith and FDEP.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW681
DC005E Completion September 4, 2026
This Task Assignment authorizes CDM Smith Inc. to communicate with the property owner to obtain their development plans for the Site, and for CDM to develop pre-ISRP figures.
Benjamin Aoki 850-245-7527 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
CDM Smith Inc.
CDM Smith Inc.
Kathy Leggoe 904-527-6727
ERIC_4918
214 North Magnolia Avenue, Ocala, Marion County, Florida
Former Bay's Cleaners
✔ $ 3,310.28
$ 3,310.28
Scope of Work
Joshua Hirten
Contract Manager
Joshua Hirten Digitally signed by Joshua Hirten Date: 2026.03.31 13:53:18 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.03.31 11:36:44 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW681
DC005E
Subtask 1 & 2: Site Redevelopment Plan with Pre-Design ISRP recommendations - Letter Report; PM 07/03/2026
Subtask 1 & 2: FDEP receipt and review of Letter Report $ 3,310.28
$ 3,310.28
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Alexis A. Lambert Secretary
Memorandum
TO:
FROM:
SUBJECT:
DATE:
HW681 Contract File
Benjamin Aoki, Project Manager
Task Assignment
DC005E
ERIC_4918
March 26, 2026
This Task Assignment authorizes CDM Smith Inc. to communicate with the property owner to obtain their development plans for the Site, and for CDM to develop pre-ISRP figures. Specific subtasks are detailed below:
Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.
Subtask 2: ISRP Pre-Design Activities CDM will call and discuss with the property owner to determine and obtain his plans for development of the Site, as well as discuss conceptual ideas for the ISRP.
The final cost associated with DC005E is $3,310.28 with 16 labor hours. Total costs have been reduced by $2,589.89 through communications between CDM and FDEP.
Jay Collins Lt. Governor
FDEP COST ESTIMATE
Contractor: CDM Smith, Inc.
Date: 3/12/2026
Task #: Proposal SubTask 1 Project Management
Site: Bays Cleaner ERIC_4918 SubTask 2 ISRP Pre-Design Activities
Activity/Phase: RA SubTask 3
Project Manager: CDM Smith SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$80.18 Project Manager 1.6 1.6 $104.89 Senior Officer 0.0 0.0 0.0 0.0 0.0
$90.43 Senior Technical Expert 2.5 2.5 0.0 0.0 0.0 $80.18 Project Technical Leader 0.0 0.0 0.0 0.0 0.0 $80.18 Project Manager 4.5 4.5 0.0 0.0 0.0 $75.85 Senior Professional 0.0 0.0 0.0 0.0 0.0 $55.67 Professional II 7.0 7.0 0.0 0.0 0.0 $37.32 Professional I 0.0 0.0 0.0 0.0 0.0 $57.32 Senior Technician 0.0 0.0 0.0 0.0 0.0 $32.69 Staff Technician 0.0 0.0 0.0 0.0 0.0 $44.88 Project Administration 0.0 0.0 0.0 0.0 0.0 $45.08 Senior Support Services 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0
Total Hours 16 2 14.0 0.0 0.0 0.0
Direct Labor $1,103.54 $126.96 $976.58 $0.00 $0.00 $0.00
Overhead 135.00% $1,489.78 $171.40 $1,318.38 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.70% $416.03 $47.86 $368.17 $0.00 $0.00 $0.00 Total Labor $3,009.35 $346.22 $2,663.13 $0.00 $0.00 $0.00
Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $3,009.35 $346.22 $2,663.13 $0.00 $0.00 $0.00 Completion Fee $300.93 $34.62 $266.31 $0.00 $0.00 $0.00
Total Estimated Cost $3,310.28 $380.84 $2,929.44 $0.00 $0.00 $0.00
REV: 02/03 CEF CDM Smith Page 1
SITE : Bays Cleaner ERIC_4918 SUBTASK: 2 ISRP Pre-Design Activities
DATE: 3/12/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager Coordination with Property Owner 1 Call with Site Owner (redevelopment plans, request plans, and touch on conceptual ISRP ideas) 2 Review and submit ISRP Pre-Design Deliverable 1.5
Senior Technical Expert Review and plan excavation boundaries and treatment depth, piping placement + Pre-Desing Deliverable 2.5
Professional II Review and research, plus ISRP Pre-Design Figures + cut lines 5 ISRP Pre-Design Deliverable 2
PM 4.5
Sr. Technical Expert 2.5
Professional II 7
Total Hours 14
TOTAL LABOR 14
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 day $0.00
TOTAL VEHICLE $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
expendables $40.00 per day $0.00 $150.00 each $0.00
TOTAL EQUIPMENT $0.00
4651 Salisbury Road, Jacksonville, Florida 32256| tel: 904.527.6716
March 12, 2026
Mr. Benjamin Aoki
Florida Department of Environmental Protection
Division of Waste Management
2600 North Blair Stone Road
Tallahassee, Florida 32399
Subject: ISRP Pre-Design Activities
Scope of Work/Level of Effort
Former Bay’s Cleaners (ERIC_4918)
214 North Magnolia Avenue, Ocala, Marion County, Florida
Dear Mr. Aoki:
CDM Smith Inc. is pleased to submit this Task Assignment Request for Interim Source Removal Plan
(ISRP) Pre-Design Activities at the Former Bay’s Cleaners Site (the Site) located at 214 North Magnolia
Avenue, Ocala, Florida. The scope of work, proposed deliverable, and deliverable schedule are summarized below, and the cost estimate is attached.
This Task Assignment, when executed, shall be incorporated in, and become part of Contract No.
HW681, between the Florida Department of Environmental Protection (FDEP), and CDM Smith, Inc.
(Contractor), dated January 5, 2022, hereafter referred to as the Contract.
On January 12, 2026, CDM Smith confirmed a Site Access Agreement (SAA) was executed with JALMJ 21, LLC (Aaron Campo, signee) on August 12, 2021, as the real property owner of the Site listed above. The
Marion County property appraiser database indicates the property owner since October 2005, is
Thomas D. and Jeanne D. Sawaya, et. al. and that the property has not changed ownership since. As a result, CDM Smith believes the current SAA remains valid and in effect.
Project Understanding
CDM Smith performed site assessment activities at the Site from September 2022 to August 2023. Soil impacts in the shallow zone (0-24 feet below land surface [bls]) are horizontally delineated on Site. Soil impacts are not horizontally delineated and extend offsite at depths 24 to 45 feet bls and additional assessment is needed. Groundwater sampling at the site was last performed in January 2023. Depth to water at the site is deep (35-45 feet bls) and groundwater impacts exceed Natural Attenuation Default
Concentrations, extend offsite in each cardinal direction, and extend to multiple depth levels.
Groundwater flow during site assessment sampling in September 2022 was to the east-northeast in the shallow zone and southwest in the intermediate zone. PFAS screening was performed at the site in May
2023. Groundwater samples were collected from shallow monitoring wells MW-3, MW-4, and MW-5, and intermediate monitoring well MW-6. All wells showed a presence of PFAS with results above 70 ng/L in monitoring wells MW-3 and MW-5, and groundwater flow was generally east-southeast. A review of the 2023 Potable well survey shows no private or public water supply wells within the 0.25-mile and 0.5-mile the respective radius of the Site.
Mr. Benjamine Aoki
4651 Salisbury Road, Jacksonville, Florida 32256| tel: 904.527.6716
Completion of the soil and groundwater assessment has been hindered at off-site properties where owners have denied access. CDM Smith submitted a Supplemental Site Assessment Report (SSAR) to the
FDEP in August 2024. The report presented the August 2023 MAGS testing and recommended additional assessment including soil borings, soil sampling, monitor well installation, and groundwater sampling. As of the date of this proposal FDEP has not provided technical review of the report.
Sitewide groundwaters sampling was performed in March 2025. During the sampling event Contractor spoke with the Property Owner who stated he has plans to redevelop the Site once cleanup has been completed. This proposal includes costs to perform preliminary remedial design and coordinate with the
Property Owner to establish a plan to achieve site cleanup and site redevelopment.
Scope of Work
The proposed scope of work includes the following elements:
Subtask 1: Project Management
Project management activities performed under this task consist of those general administrative functions required to maintain the project on schedule, within budget, and that the quality of the work products defined within this scope is consistent with Contractor’s quality standards. Contractor’s project manager will be Kathy Leggoe, PMP. We will prepare and submit invoices upon approval of each deliverable or milestone completion.
Project Progress Meetings and Status Reports
Contractor expects to have bi-weekly meetings or telephone conferences with the FDEP to review the status of the project and identify and resolve any outstanding issues. Contractor will prepare meeting agendas and progress reports as part of this task throughout the duration of this project.
Project Resource Management
Contractor will manage, allocate, and coordinate necessary resources for completion of tasks related to groundwater sampling.
Project Quality Technical Review
Contractor’s Quality Management System guidelines will be followed. Internal quality reviews will be conducted on plans and on investigation findings and reports.
Subtask 2: ISRP Pre-Design Activities
Contractor will contact the Site property owner to discuss site redevelopment plans, to request those plans, and will touch on conceptual ISRP ideas. Contractor will review existing data and determine excavation depth and area, and vapor barrier placement. Contractor will review possible SVE well placement and depths required, potential location of treatment system. Contractor will provide tables and figures needed to illustrate and will prepare brief narrative describing the findings and proposed path forward.
Deliverable: Contractor will prepare letter report describing the findings and proposed path forward for
Site redevelopment inclusive of site remediation.
Mr. Benjamine Aoki
4651 Salisbury Road, Jacksonville, Florida 32256| tel: 904.527.6716
Assumptions:
• The current SAA remains valid and in effect.
Schedule:
Contractor will schedule the meeting with the Site property owner after the receipt of formal notice to proceed (NTP). The deliverable will be submitted as detailed below:
Subtask 2: Site Redevelopment Plan with Pre-Design ISRP recommendations
Deliverable: Letter Report
Due Date: 90 days from NTP
CDM Smith appreciates this opportunity to work with FDEP on this contract. If you have any questions, please do not hesitate to contact us.
Sincerely, Approved By:
Kathy Leggoe, P.G., PMP Josh Hirten, PG
Contract Manager Environmental Discipline Leader
CDM Smith Inc. CDM Smith Inc.
Attachments: Level of Effort/Cost Estimate Forms
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
| Utility Locate Bids_Compiled.pdf |
| Geosyntec Utility-272_Geotek_1500 |
| Geoview Utility Quote_2000_COT FTF SIS |
| Tallahassee Fire Training Division_V1_Bloodhound_3700 |
| Drilling Bids_Compiled.pdf |
| PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic) |
| Direct Push |
| City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email |
| Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844 |
| GW Protection_Geosyntec (T) 1022060 S.pdf |
| Invoice |
| Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf |
| Sheet1 |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |