This is a Task Assignment (TA) document under Contract Number HW681 between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc. The TA authorizes CDM Smith to conduct long-term monitoring (LTM) and groundwater monitoring services at the East Bay Dry Cleaners site located at 2519 North McMullen Booth Road, Clearwater, Pinellas County, Florida (ERIC_5277). The task assignment was effective June 27, 2024, with a completion date of December 7, 2024. Benjamin Aoki serves as the FDEP Project Manager, and Kathy Leggoe is the Contractor's Project Manager.
The total contract value for Task Assignment DC034B is $15,928.96 with 80 labor hours allocated across four subtasks: (1) Project Management calculated at 13% of direct labor; (2) Annual Groundwater Sampling involving collection and field analysis of samples from 10 monitoring wells using a YSI-556 multi-parameter probe with laboratory analysis by EPA Method 8260C for volatile organic halocarbon detection; (3) Annual Groundwater Monitoring Report preparation including data tables, analytical reports, quality assurance/quality control evaluations, and recommendations; and (4) PFAS Impacted Investigative Derived Waste (IDW) Disposal including waste profiling and disposal costs. The deliverables are scheduled for October 29, 2024, with invoice amounts of $15,013.89 for Subtasks 1 and 3 combined and $915.07 for Subtask 4. The scope of work was submitted by CDM Smith on June 6, 2024, and both parties executed the agreement on June 27, 2024.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW681
DC034B Completion December 7, 2024
This Task Assignment authorizes CDM Smith Inc. to conduct Long Term Monitoring (LTM) and Groundwater Monitoring at East Bay Dry Cleaners, per their proposed scope of work submitted on 06JUN2024
Benjamin Aoki 850-245-7527 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
CDM Smith Inc.
CDM Smith Inc.
Kathy Leggoe 904-527-6727
ERIC_5277
2519 North McMullen Booth Road, Clearwater, Pinellas County, Florida
East Bay Dry Cleaners
✔ $ 15,928.96
$ 15,928.96
Scope of Work
Leslie Samel
Vice President
Leslie Samel Digitally signed by Leslie Samel Date: 2024.06.27 20:24:13 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2024.06.27 10:54:16 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW681
DC034B
Subtasks 1 & 3: Annual Groundwater Monitoring Report - 2024 Annual Groundwater Sampling Report including tabulated data, conclusions, historical summary, and recommendations; Project Management
10/29/2024
Subtask 4: PFAS Impacted IDW Disposal 10/29/2024
Subtasks 1 & 3: Annual Groundwater Monitoring Report - 2024 Annual Groundwater Sampling Report including tabulated data, conclusions, historical summary, and recommendations; Project Management
$ 15,013.89
Subtask 4: PFAS Impacted IDW Disposal $ 915.07
$ 15,928.96
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
TO:
FROM:
DATE:
SUBJECT:
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
HW681 Contract File
Benjamin Aoki, Project Manager
June 10, 2024
Task Assignment DC034B East Bay Dry Cleaners
ERIC_5277
Long Term Monitoring (LTM) will permit and abandon wells that are located within the excavation area. Wells will be abandoned bottom up using Portland cement grout. Completion reports will be obtained following well abandonment at wells MW002S, MW004S, MW004I, MW004D, MW005S, MW005I, MW005D, MW008S, MW008I, and MW008D.
This Task Assignment authorizes CDM Smith Inc., hereby referred to as CDM, to conduct Long Term Monitoring (LTM) at East Bay Dry Cleaners, Pinellas County, Florida (FL). Erwin Remediation (Erwin) was selected as the lowest responsive and responsible bidder. Specific subtasks are detailed below:
Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.
Subtask 2: Annual Groundwater Sampling CDM will mobilize to the Site to collect groundwater samples from 10 monitoring wells. CDM will perform monitoring well inspections to determine the condition and gauge depth-to-groundwater in all 10 monitoring wells at the Site.
A YSI-556 multi-parameter probe and a turbidimeter will be used to collect field data.
Field parameter data to be collected will include dissolved oxygen, pH, conductivity, oxidation reduction potential, temperature, and turbidity.
All groundwater samples will be collected and delivered to a NELAP certified laboratory for analysis by United States Environmental Protection Agency Method 8260C for volatile organic halocarbons (VOHs).
Subtask 3: Annual Groundwater Monitoring Report CDM will prepare an Annual Groundwater Monitoring Report. The report will include updated figures and data tables, field notes, a copy of the laboratory analytical report and chain of custody, a summary of sampling methodologies, quality assurance/quality control evaluation of data, groundwater samplings logs and field equipment calibration records, conclusions, a summary of the file review, and recommendations.
Subtask 4: PFAS Impacted IDW Disposal This subtask is for costs associated with a PFAS Waste Profile and PFAS impacted IDW disposal.
The total cost for Task Assignment DC034B is $15,928.96 with 80 labor hours.
recommendations, source removal activities will be conducted. The following sequence of activities is proposed for the source removal. The excavation activities will be conducted using a track-mounted excavator. Initially the deeper soils (up to 12 feet below land surface) with impacts will be excavated, stockpiled, and loaded for offsite disposal. Once the deeper
FDEP COST ESTI MATEContractor: CDM Smith Inc.
Date: 6/24/2024
Task #: DC034A Proposal SubTask 1 Project Management SubTask 6
Site: East Bay Dry Cleaners (ERIC_5277) SubTask 2 Annual Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 Annual Groundwater Monitoring Report SubTask 8
Project Manager: Kathy Leggoe SubTask 4 Investigative Derived Waste SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$76.49 Project Manager 7 6.6 $100.97 Senior Officer 0 0 0 0 0 0 0 0 0 0
$86.25 Senior Technical Expert 0 0 0 0 0 0 0 0 0 0 $76.49 Project Technical Leader 4 0 4 0 0 0 0 0 0 0 $76.49 Project Manager 4 2.0 2.0 0 0 0 0 0 0 0 $71.58 Senior Professional 0 0 0 0 0 0 0 0 0 0 $52.60 Professional II 57 33.0 22.0 2 0 0 0 0 0 0 $34.90 Professional I 8 0.0 8 0 0 0 0 0 0 0 $54.63 Senior Technician 0 0.0 0 0 0 0 0 0 0 0 $30.76 Staff Technician 0 0 0 0 0 0 0 0 0 0 $42.43 Project Administration 0 0 0 0 0 0 0 0 0 0 $42.53 Senior Support Services 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 80 6.6 35.0 36.0 2 0 0 0 0 0 0
Direct Labor $4,394.93 $505.61 $1,888.78 $1,895.34 $105.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 135.00% $5,933.15 $682.57 $2,549.85 $2,558.71 $142.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.70% $1,656.88 $190.61 $712.07 $714.54 $39.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $11,984.96 $1,378.79 $5,150.70 $5,168.59 $286.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP COST ESTI MATEContractor: CDM Smith Inc.
Date: 6/24/2024
Task #: DC034A Proposal SubTask 1 Project Management SubTask 6
Site: East Bay Dry Cleaners (ERIC_5277) SubTask 2 Annual Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 Annual Groundwater Monitoring Report SubTask 8
Project Manager: Kathy Leggoe SubTask 4 Investigative Derived Waste SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $545.00 $0.00 $0.00 $545.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $545.00 $0.00 $0.00 $545.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $54.50 $0.00 $0.00 $54.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $599.50 $0.00 $0.00 $599.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $730.00 $730.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $136.00 $136.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $866.00 $866.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $700.00 $700.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $920.00 $920.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $14,730.46 $1,378.79 $7,296.70 $5,168.59 $886.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,198.50 $137.88 $515.07 $516.86 $28.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $15,928.96 $1,516.67 $7,811.77 $5,685.45 $915.07 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : East Bay Dry Cleaners (ERIC_5277) SUBTASK 2: Annual Groundwater Monitoring
DATE: 6/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager Prepare Field Scope of Work 1 Preparation of Data Summary 1
Professional II Mobilization/Demobilization (3 mobs - 2 GW, 1 IDW) 6 Field Preparation 2 Arrange for Site Access with owner 1 Prepare Sample Kit 1 Inspect and Gauge monitoring well 1 day (~10 min each) 1.5 Sample Monitoring Wells (10) 15 Deliverable Documentation Preparation 1 Sample Management 1.5 IDW Management 2 Data Tabulation 2
PM 2
Professional II 33 Professional I 0
TOTAL LABOR 35
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOH - EPA Method 8260 $73.00 10 $730.00
$0.00 Cooler (0 to 25 lbs) - Shipping $110.00 1 $110.00 Ice $6.50 4 $26.00
TOTAL LAB $866.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 per day 3 $120.00 Groundwater Sampling Kit $290.00 per day 2 $580.00 HDPE Tubing $0.30 per foot 300 $90.00 Silicon Tubing (1/4") $3.00 per foot 10 $30.00 Drum $100.00 each 1 $100.00
TOTAL EQUIPMENT $920.00
FINAL --7/24/96
SUBTASK 3: Annual Groundwater Monitoring Report
DATE: 6/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Technical Leader PE Technical review/Seal 4 Project Manager GWMR Conclusions/File Review/Recommendations 2
Professional II Preparation of GWMR - body of report, Figures/Maps 22 Professional I Preparation of GWMR Data Tables, Summaries 8
PTL 4
PM 2
Professional II 22 Professional I 8
TOTAL LABOR 36
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
SUBTASK 4: Investigative Derived Waste
DATE: 6/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Professional II Preparation of PFAS IDW Paid Subcontractor Invoices and PFAS IDW Manifests 2
PTL 0
PM 0
Professional II 2 Professional I 0
TOTAL LABOR 2
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
Erwin PFAS Waste Profile 1 $350.00 $350.00 Erwin PFAS Water Drum disposal 1 $195.00 $195.00
TOTAL $545.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
�����/���0�#�����������������"������ 1����0� �����������������2�����
3456789:; <=<>;?@@4AB;CDE4@FGA97D;HE@I9EDI@J;
; ; 38EK7;EL;MEDNOP7Q7B;EL;RLLED9;
; ; RAS9;TAU;VDU;WB7A@7DS;XRYZW[\<]]̂;
; ; <\_̀;aED9b;H8H4BB7@;TEE9b;YEAFc;WB7ADGA97Dc;dI@7BBAS;WE4@9Uc;eBEDIFA;
| .*"��%��0�)�� �f.*"��%��0g�� | �(��� | ������ | � | ||
| %����0� | �1� | ��& | �h�%������i�� | ��+��������&������ | |
| j�����k�������%(���h�����0��'� | ��#� |
| �.������ | �f'�).l��!!g�f�0������g������������������/���0� | |
| "�"������#���0�������.����k������,������ | �.���� | |
| ��������� �10�� | ��(���+�k�����(��(� | ����������� |
| ��� | �0���������� | �%%���m��� | ||
| ���k�������0���� | ��� | ��%����� | ��� | �������0�� ��� |
10� �1� ��& �h�%�����k0����n�������� 0���� ���%��(�����+�.��������/� �o-�p��
��k�����0����������*�(���%�����+�'������%������,����������f�*',g������.*"��%��0�f.���������g��
����������0����+������+���������� ��0��.������� � q����������������.*"��%��0����+��%����������&��� �&h���%����f�&&g�k� ��n�������k��0�.0�� ��(0���
| �0��+��+�.&�'����/���0k����,������ | �rr.����*���% |
| ����������p��� | ��0�������(��(��� |
��k�����+�
�0��'� ��#�
| �.������ | �f'�).l��!!g�������������0��� | ||
| ��������� | �10��,������ | �.���� |
| �((��� | ������� | |
| � | ���������� | ��0��(��(��� |
| ��k���� | �������(��% | |
| �������������� | �'.&�'����/���0k���� |
| ,������ | �rr.������0����0��(��(��� | ||||
| �0� | ������0��h����k��� | 0�(� | ���� �& | ����� | �����.*"��%��0� |
| ������ | � |
�0�����������&&���%��� ���������������++��� ��
38EK7;EL;MEDN;
10��(��(� ��� ��(���+�k����������� ��0��+����k��h����%��� ��
3459ASN;_:;dDE6789;HA@AJ7s7@9;;
| ,��$����%���h�%������������� | �(��+��%����������0� | ��� | ����� | � | ���+��0� | ��h���������%��� | �������� |
| +������� | ���i���������%���������0��(��$������� | �0�������k��0��� |
��h���������0����0��i����� ��+��0��k���� (������ ���+�����k��0����0� � ��(��� ���� � �����k��0�.�tuvwxuyvz{|}~w��u�|{uwt�wv�{�|�ytuvwxuyvz{|�vy��xu| %���h���k���� �����0
| �r�hh����,", �-��k����(��(�������� | � |
| %���������� | ��(����((�������+����0� |
| .�����������n(��� | ��������++�%�����h��������(0�������+�������k��0��0���*',���������k��0��(��$���� | |||||
| ���� | ���������� | ��*',���%%��� | ���h�����h��0��1� | ��& | �h�%��� �� |
)*+,-./01-2+3*.-045657-8-6/0
9�� ��! ���:
| ��� | �����������!� �������!���� |
| �� ����!�������������!���;���!� | <�� |
)*+,-./0=35>?/@0A-.B6?.5>01-C?-D0
EFGHIJKHFILMNOPJQRHSNTJGJUVWVGHNXSMHVWNUPRYVQRGVMNZRQQN[VN\FQQFZVY]N̂GHVIGJQN_PJQRHSNIV̀RVZMNZRQQN[VN
)*+,-./0a/5/3201-b+*/20
EFGHIJKHFILMNcIFdVKHNTJGJUVINZRQQNeIVeJIVNJGYNMP[WRHNWFGHfQSNMHJHPMNIVeFIHMNHFNJKKFWeJGSNVJKfN
!�� g����g�� � g������ ����;� g ��<����! ��0 hijklmnopqorssiltouvwisxylkzvohl{|t}s~o
�� g�����$��������������:� ������ �����<�� ��� ������!g�$������$�� g�� 9�� ��! ���:
��� �� g��� ���:������9�� ��! ���:
��� g��!���
���������������< g� ��������:� ��� � � g��� ����!g���< g������!�������� �� ����;��� g���"�� �� g�#����� ��������<���
| !�<� | <������������ |
| �� | |
| �<��� | � ���<����������� ��� |
����<��� � ����� ������!g�
�g��������:� ����� <����:
�������!���� g��������;��� !�g���!���������
������:� ���� � g��� �g��������<�����:� ���:
� ��������� ���g���
| ��� | �� �������������#������ �����; |
| �������������� | ��;��#��� |
| <�! ��� |
���g���������:� ���;��� g hijklmno�qorssiltouvwisxylkzvo�ws}kwv}s~o�z|wvko
�zt}�zvljtz&�9�� ��! ���:
�����<�� ���g����<�� �:
������ ������!�<���;� g�������� ��������� !�����<�� �����!g�
| !�� ��������� | �����;��� | <� | |
| ��� | � g������ |
��������� �����;� g��;
h��zxitzqo
9�� ��! ���:
����!g������ g��������:� ����� <�
����; ��� g����!� <��!������������g��<��" �<��!�������������$������#��������������$���g��
,-./0-123.-4�������������)���� *�!����� +� ,5-6,27-4����� ����8�� �9:��
��"��!��"!��?8�����=�#������@���!
� � � � � � � A
B�!=��C��������)������ C��� �����"!��������� D
| �!!�"= | ��!�&��C�#����8�>88��!E;��!�>�! | |
| �!��$�� | �� |
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Kyle Turner CDM Smith 4010 West Boy Scout Boulevard, Suite 450 Tampa, FL 33607
January 15, 2024
Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials
Mr. Turner:
The price for the transportation and disposal (T&D) of non-hazardous drums of soil, mud, and water located in the State of Florida is listed below:
Non-Hazardous PFAS/PFOS Impacted Material:
Description Rate Unit
Profile Fee (Charged once per site) $ 350.00 Per Site
T&D - Non-Haz PFOS/PFAS Impacted Soil/ Mud/Water $ 195.00 Per Drum
Non-Hazardous Material not Impacted with PFAS/PFOS:
Description Rate Unit
T&D - Non-Haz (no PFOS/PFAS) Impacted Mud/Water $ 125.00 Per Drum
T&D - Non-Haz (no PFOS/PFAS) Impacted Soil $ 110.00 Per Drum
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
This quote is valid for 90 days.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: Robert@ErwinRemediation.com Office: (850) 466-2358
Turner, Kyle M.
From: Turner, Kyle M.
Sent: Tuesday, January 16, 2024 10:03 AM To: stephenharris2@enviroserve.com Subject: IDW Rates - FDEP - CDM Smith
Good morning Steve, I hope you are doing well. I remember working with you back when I was with HSW/Verdantas. I have since moved companies and am trying to get some new quotes for drum disposal. I was wondering if you could provide me with quotes/rates for transportaƟon and disposal of the following. This will be for our FDEP Drycleaning Sites.
IDW Drum – Soil IDW Drum – Soil – PFAS Impacted IDW Drum – Water IDW Drum – Water – PFAS Impacted
Please include any addiƟonal charges such are mileage, low volume, waste profiling etc….
Thank you, Kyle M. Turner, MS, GIT Geologist CDM Smith 4010 W Boy Scout Blvd, Suite 450, Tampa, FL 33607 O: 813.262.8851 M: 727.488.4471 cdmsmith.com
Turner, Kyle M.
From: Kevin Hamilton <khamilton@hepaco.com> Sent: Friday, January 19, 2024 11:04 AM To: Turner, Kyle M.; Matthew Merritt Subject: Re: IDW Rates - FDEP - CDM Smith
I have sent this to my waste support group. Someone should reach out shortly.
Kevin Hamilton Territory Account Manager
1830 Clarkson Street Jacksonville, Florida 32202 T (904) 706 3040 | M (904) 303 8696 E khamilton@hepaco.com | HEPACO.com
1-800-888-7689 24/7 EMERGENCY RESPONSE
From: Turner, Kyle M. <turnerkm@cdmsmith.com> Sent: Thursday, January 18, 2024 3:54 PM To: Kevin Hamilton <khamilton@hepaco.com> Cc: Leggoe, Kathy R. <leggoekr@cdmsmith.com> Subject: FW: IDW Rates - FDEP - CDM Smith
HEPACO Notice: This communication is from an [EXTERNAL] sender.
If this email looks suspicious, do NOT click or open any links or attachments in the email. To report a suspicious email, click on the Phish Alert Report icon located on the Outlook menu ribbon.
Kevin, Just wanted to make sure you saw this and see if you had any questions. Please provide your rates to us by COB Tuesday 1/23/24 or we will assume the bid is no response.
CDM Smith 4010 W Boy Scout Blvd, Suite 450, Tampa, FL 33607 O: 813.262.8851
To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.
From: Turner, Kyle M.
Sent: Tuesday, January 16, 2024 10:15 AM To: khamilton@hepaco.com Subject: IDW Rates - FDEP - CDM Smith
Good morning Kevin, It’s a new year which means we must update our IDW transportation and disposal rates. I was wondering if you could provide me with quotes/rates for transportation and disposal for the following. This will be for our FDEP Drycleaning Sites.
IDW Drum – Soil IDW Drum – Soil – PFAS Impacted IDW Drum – Water IDW Drum – Water – PFAS Impacted
Please include any additional charges such are mileage, low volume, waste profiling etc….
Please let me know if you have any questions, and if not, please provide rates at your earliest convenience.
CDM Smith 4010 W Boy Scout Blvd, Suite 450, Tampa, FL 33607 O: 813.262.8851
To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.
This e-mail and any attachments to it contain confidential and proprietary material of HEPACO, LLC, its affiliates or agents, and is solely for the use of the intended recipient. Any review, use, disclosure, distribution or copying of this transmittal is prohibited except by or on behalf of the intended recipient. If you have received this transmittal in error, please notify the sender and destroy this e-mail and any attachments and all copies, whether electronic or printed.
Please consider the environment before printing this email.
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
| Utility Locate Bids_Compiled.pdf |
| Geosyntec Utility-272_Geotek_1500 |
| Geoview Utility Quote_2000_COT FTF SIS |
| Tallahassee Fire Training Division_V1_Bloodhound_3700 |
| Drilling Bids_Compiled.pdf |
| PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic) |
| Direct Push |
| City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email |
| Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844 |
| GW Protection_Geosyntec (T) 1022060 S.pdf |
| Invoice |
| Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf |
| Sheet1 |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
File details come from the government source that posted it. Updated .