CN-370000-HW681-DC018A.pdf
PDF 4 MB Posted
- Contract number
- HW681
- Issued by
- Florida
About this file
This is a Task Assignment (TA) document under Contract HW681 between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc. (CDM), dated June 22, 2022, with completion scheduled for January 31, 2023. The task assignment authorizes CDM to conduct annual groundwater monitoring at the Spring Fresh Dry Cleaners site located at 1126 West Pipkin Road, Lakeland, Polk County, Florida (ERIC_5382). The State's Department Project Manager is Walsta Jean-Baptiste, and CDM's Project Manager is Shayne Wood. This work is performed under the Master Agreement FDEP Contract No. HW681 dated January 5, 2022.
The scope of work consists of three subtasks: Project Management (including kickoff meetings, progress meetings, resource management, quality review, and monthly status reports); Groundwater Sampling (mobilization to sample six monitoring wells using low-flow sampling methodology, field parameter collection, laboratory analysis via EPA Method 8260C for volatile organic halocarbon analysis, and purge water disposal); and preparation of a Groundwater Monitoring Report with conclusions and recommendations. The fixed unit rate for this task assignment is $6,205.57 with 39 hours of labor, with payment contingent upon FDEP approval of deliverables. Field notes and laboratory analytical reports are due September 15, 2022, and the final Groundwater Monitoring Report is due November 4, 2022. Cost breakdowns include labor ($1,286.00), vehicle usage ($120.00), subcontractor costs for investigation-derived waste disposal ($100.00), laboratory analysis ($601.00), and equipment ($465.00).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .