This document is a Task Assignment (TA) under Contract Number HW681 between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc., a contractor providing environmental consulting services. The task assignment is effective through May 25, 2026, and authorizes work at the Former Dry Cleaners site located at 2626 Hillsborough Avenue, Tampa, Hillsborough County, Florida (ERIC_4794). The Department Project Manager is Benjamin Aoki, and the Contractor's Project Manager is Kathy Leggoe.

The scope of work comprises three subtasks: Project Management (calculated at 13% of direct labor), Annual Groundwater Sampling from 23 monitoring wells with laboratory analysis, and preparation of an Annual Groundwater Monitoring Report. The total task assignment value is $17,872.03 on a fixed unit rate basis, with invoice payments contingent upon FDEP receipt and approval of deliverables. Subtask 2 deliverables (groundwater sampling data, field notes, and laboratory chain of custody) are due January 23, 2026, with invoice amount of $10,053.01. Subtask 1 & 3 deliverables (Annual Groundwater Monitoring Report) are due March 24, 2026, with invoice amount of $7,819.02. The task assignment includes 85 total labor hours with reductions of $467.43 in costs and 10 hours through negotiation. Subcontracted Investigation Derived Waste disposal services are provided by Erwin Remediation at $125.00.

View the file

Other files

File Type Posted
CN-370000-HW681-DC001B.pdf PDF
CN-370000-HW681-DC001E.pdf PDF
CN-370000-HW681-DC002E.pdf PDF
CN-370000-HW681-DC002F.pdf PDF
CN-370000-HW681-DC003B.pdf PDF
CN-370000-HW681-DC005D.pdf PDF
CN-370000-HW681-DC005E.pdf PDF
CN-370000-HW681-DC008B.pdf PDF
CN-370000-HW681-DC008E.pdf PDF
CN-370000-HW681-DC009A.pdf PDF
CN-370000-HW681-DC010A.pdf PDF
CN-370000-HW681-DC010C.pdf PDF
CN-370000-HW681-DC011C.pdf PDF
CN-370000-HW681-DC012D.pdf PDF
CN-370000-HW681-DC013A.pdf PDF
CN-370000-HW681-DC013B.pdf PDF
CN-370000-HW681-DC013C.pdf PDF
CN-370000-HW681-DC013D.pdf PDF
CN-370000-HW681-DC015A.pdf PDF
CN-370000-HW681-DC016C.pdf PDF
CN-370000-HW681-DC017B.pdf PDF
CN-370000-HW681-DC018C.pdf PDF
CN-370000-HW681-DC019B.pdf PDF
CN-370000-HW681-DC01ACO5.pdf PDF
CN-370000-HW681-DC021A.pdf PDF
CN-370000-HW681-DC021B.pdf PDF
CN-370000-HW681-DC021C.pdf PDF
CN-370000-HW681-DC025A.pdf PDF
CN-370000-HW681-DC02BCO2.pdf PDF
CN-370000-HW681-DC02DCO1.pdf PDF
CN-370000-HW681-DC031C.pdf PDF
CN-370000-HW681-DC032D.pdf PDF
CN-370000-HW681-DC033C.pdf PDF
CN-370000-HW681-DC037B.pdf PDF
CN-370000-HW681-DC038B.pdf PDF
CN-370000-HW681-DC038C.pdf PDF
CN-370000-HW681-DC03A.pdf PDF
CN-370000-HW681-DC03CCO1.pdf PDF
CN-370000-HW681-DC03CCO2.pdf PDF
CN-370000-HW681-DC041C.pdf PDF
CN-370000-HW681-DC042B.pdf PDF
CN-370000-HW681-DC042C.pdf PDF
CN-370000-HW681-DC043A.pdf PDF
CN-370000-HW681-DC043B.pdf PDF
CN-370000-HW681-DC04BCO1.pdf PDF
CN-370000-HW681-DC05CCO3.pdf PDF
CN-370000-HW681-DC06BCO4.pdf PDF
CN-370000-HW681-DC07ACO1.pdf PDF
CN-370000-HW681-DC07CCO1.pdf PDF
CN-370000-HW681-DC08CCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW681

DC017D May 25, 2026

This Task Assignment authorizes CDM Smith Inc. to conduct Annual Groundwater

Monitoring at Former Dry Cleaners per their proposed scope of work and revised level of effort.

Benjamin Aoki 850-245-7527 CDM Smith Inc.

Kathy Leggoe 904-527-6727

ERIC_4794

2626 Hillsborough Avenue, Tampa, Hillsborough County, Florida

Former Dry Cleaners

$ 17,872.03

$ 17,872.03

Scope of Work

CDM Smith Inc.

Joshua Hirten

Contract Manager

Joshua Hirten Digitally signed by Joshua Hirten Date: 2025.11.12 09:00:58 -05'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.11.07 19:31:27 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Alexis A. Lambert Secretary

Memorandum

TO:

FROM:

SUBJECT:

DATE:

P a g e

P a g e

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Former Dry Cleaner SUBTASK 2: Annual Groundwater Sampling

DATE: 9/8/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager Review and Submittal of Data Deliverable 1

Project Technical Lead Technical field support for field event 1

Professional II Mobilization/Demobilization (2 trip GW Sampling - 2 hr per trip) 4 Field Preparation 1 Arrange for Site Access with owner 1 Order and Prepare Laboratory Sample Kit 1 Inspect and gauge Depth to Water in 23 monitoring wells (~10 minutes each well) 2 Sample Monitoring Wells (14) (1.5 hrs per wel) 10.5 Preparation of Data Deliverable 2 Sample Management 2 IDW Management 2

Professional I Mobilization/Demobilization (2 trip GW Sampling - 2 hr per trip) 4 Field Preparation 1 Inspect and gauge Depth to Water in 23 monitoring wells (~10 minutes each well) 2 Sample Monitoring Wells (14) (1.5 hrs per wel) 10.5

Total Hours

PM 1

PTL 1

Prof II 25.5

Prof I 17.5 Total 45

TOTAL LABOR 45

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 4 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOH - EPA Method 8260 $73.00 14 $1,022.00

Cooler (0 to 25 lbs) - Shipping $110.00 2 $220.00 Ice $6.50 6 $39.00

TOTAL LAB $1,281.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit $290.00 4 days $1,160.00 Expendables $40.00 2 days $80.00 HDPE Tubing (14 wells ~50 ft each w $0.30 700 foot $210.00 Silicon Tubing (1/4") $3.00 14 foot $42.00 Drum $100.00 1 each $100.00

TOTAL EQUIPMENT $1,592.00

FINAL --7/24/96

SITE : Former Dry Cleaner SUBTASK 3: Annual Groundwater Monitoring Report

DATE: 9/8/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader PE review/Seal 5 Project Manager GWMR Conclusions/Recommendations 2

Profesisonal II Preparation of GWMR 26

Total Hours

PTL 5

PM 2

Prof II 26 Prof I 0 Total 33

TOTAL LABOR 33

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST

Erwin Remediation IDW 1 $125.00 $125.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00