CN-370000-HW681-DC008D.pdf
PDF 1 MB Posted
- Contract number
- HW681
- Issued by
- Florida
About this file
Document Summary
This is a Task Assignment for remedial services under Contract Number HW681 between the Florida Department of Environmental Protection (FDEP) and CDM Smith, Inc. The contract covers Operation and Maintenance (O&M) and groundwater monitoring services for the White Sands Cleaners site (ERIC_5437) located at 3333 North Tamiami Trail, Sarasota County, Florida. The site is a former dry cleaning facility requiring ongoing remediation of soil vapor extraction (SVE) system operations and groundwater monitoring. The real property owner is Ringling College of Art and Design, Inc.
The Task Assignment encompasses eleven subtasks covering the period from December 2024 through November 2025, with a total estimated cost of $86,162.61. Services include project management (Subtask 1), annual groundwater monitoring of 15 wells (Subtask 2), quarterly SVE system O&M and optimization (Subtasks 3-6), utilities provision at $1,800 per month with handling fees (Subtasks 7-10), and a rebound evaluation (Subtask 11). Labor costs total $43,262.82 with overhead calculated at 135 percent and fringe benefits at 37.70 percent. Additional costs include travel ($3,036), laboratory analyses ($4,375), field expenses ($7,040), subcontractor services for investigative derived waste disposal through Erwin Remediation ($21,977.50), and a completion fee of $4,110.54. Deliverables include quarterly field notes and laboratory reports, semiannual and annual remedial action status reports, and a technical memo documenting the rebound evaluation findings.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Assignm ent N otification/C hange O rder D eliverables and Invoice Schedule Attachm ent
C ontract N um ber:
H W
Task Assignm ent #:
D
C 008D
D eliverables:
D eliverable
D eliverable D ue D ate
Subtask 2: Annual G roundw ater M onitoring - field notes, laboratory report, updated tables 03/23/25
Subtask 3: SVE System O
&M and O ptim ization - Q uarter 14 (D
EC
24-FEB25) - field notes, laboraory report, updated tables
04/20/25 Subtask 4: SVE System
O &M and O ptim ization - Q uarter 15
(M
AR
25-M AY25) - Sem iannual R em edial Action Status R eport, including G roundw ater M onitoring
08/17/25
Subtask 5: SVE System O
&M and O ptim ization - Q uarter 16
(JU
N
25-AU
G
25) - field notes, laboraory report, updated tables
10/26/25 Subtask 1 & 6: SVE System
O &M and O ptim ization - Q uarter 17
(SEP25-N
O
V25) - Annual R em edial Action Status R eport; Project
M anagem ent 02/22/26
Subtask 7: U tilities - Q tr 14 - Paid U tility Invoices not to exceed
$5,400.00; H andling fee = $60.00
05/25/25
Subtask 8: U tilities - Q tr 15 - Paid U tility Invoices not to exceed
$5,400.00; H andling fee = $60.00
08/30/25
Subtask 9: U tilities - Q tr 16 - Paid U tility Invoices not to exceed
$5,400.00; H andling fee = $60.00
11/02/25
Subtask 10: U tilities - Q tr 17 - Paid U tility Invoices not to exceed
$5,400.00; H andling fee = $60.00
03/01/25
Subtask 11: R ebound Evaluation - Technical M em o including field docum entation, laboratory report, updated tables and conclusions
03/30/25
Invoice Schedule:R equirem ents for Invoice Subm ittal
Am ount to be Invoiced
Subtask 2: Annual G roundw ater M onitoring - field notes, laboratory report, updated tables $10,828.98
Subtask 3: SVE System O
&M and O ptim ization - Q uarter 14 (D
EC
24-FEB25) - field notes, laboraory report, updated tables
$7,698.62
Subtask 4: SVE System O
&M and O ptim ization - Q uarter 15 (M
AR
25-M
AY25) - Sem iannual R em edial Action Status R eport, including G roundw ater M onitoring $13,184.85
Subtask 5: SVE System O
&M and O ptim ization - Q uarter 16
(JU
N
25-AU
G
25) - field notes, laboraory report, updated tables
$7,698.62
Subtask 1 & 6: SVE System O
&M and O ptim ization - Q uarter 17
(SEP25-N
O V25) - Annual R em edial Action Status R eport; Project M anagem ent
$20,393.33
Subtask 7: U tilities - Q tr 14 - Paid U tility Invoices not to exceed
$5,400.00; H andling fee = $60.00
$5,460.00
Subtask 8: U tilities - Q tr 15 - Paid U tility Invoices not to exceed
$5,400.00; H andling fee = $60.00
$5,460.00
Subtask 9: U tilities - Q tr 16 - Paid U tility Invoices not to exceed
$5,400.00; H andling fee = $60.00
$5,460.00
Subtask 10: U tilities - Q tr 17 - Paid U tility Invoices not to exceed
$5,400.00; H andling fee = $60.00
$5,460.00
Subtask 11: R ebound Evaluation - Technical M em o including field docum entation, laboratory report, updated tables and conclusions
$4,518.21
TO
TAL CO
ST
$86,162.61
BW
C
TA
FO
R M
01_18
JAN
25-M
AR
-KT
APR
25-JU
N E25
-KT
JU
L25-SEP25
-KT
O C T25-D
EC
-KT
JU
L25-SEP25
-KT
O C T25-D
EC
-KT
JAN
25-M
AR
-KT
APR
25-JU
N E25
-KT
RRonn DeSantis Governor
JJeanetteNuñez Lt. Governor
Shawnn Ham ilton
Secretary
TO
FR
O M
D A
TE:
SU
B
JEC
T:
FLORIDAA DEPARTM
ENTT OFF
Environm entall Protectionn
Bob M artinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
FDEP COST ESTI MATEContractor: CDM Smith, Inc.
Date: 11/14/2024
Task #: SubTask 1 Project Management SubTask 6 SVE System O&M and Optimization - Qtr 17 SubTask 11
Site: White Sands Cleaners ERIC_5437 SubTask 2 Annual Groundwater Monitoring SubTask 7 Utilities - Qtr 14 SubTask 12
Activity/Phase: O&M SubTask 3 SVE System O&M and Optimization - Qtr 14 SubTask 8 Utilities - Qtr 15 SubTask 13
Project Manager: Steve Cobert SubTask 4 SVE System O&M and Optimization - Qtr 15 SubTask 9 Utilities - Qtr 16 SubTask 14
SubTask 5 SVE System O&M and Optimization - Qtr 16 SubTask 10 Utilities - Qtr 17 SubTask 15
TTotals 1 2 3 4 5 6 7 8 9 10 11 Labor Rate Category
$76.49 PProject Manager 23.9 23.9 $100.97 Senior Officer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$86.25 Senior Technical Expert 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $76.49 Project Technical Leader 26.0 4.0 5.0 5.0 5.0 5.0 0.0 0.0 0.0 0.0 2.0 $76.49 Project Manager 11.0 0.0 1.0 4.0 1.0 4.0 0.0 0.0 0.0 0.0 1.0 $71.58 Senior Professional 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $52.60 Professional II 132.0 26.0 11.0 37.0 11.0 41.0 0.0 0.0 0.0 0.0 6.0 $34.90 Professional I 20.0 20.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $54.63 Senior Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $30.76 Staff Technician 116.0 0.0 27.0 27.0 27.0 27.0 0.0 0.0 0.0 0.0 8.0 $42.43 Project Administration 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $42.53 Senior Support Services 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Hours 329 24 50.0 44.0 73.0 44.0 77.0 0.0 0.0 0.0 0.0 17.0
Direct Labor $15,864.62 $1,825.13 $2,371.56 $1,868.06 $3,465.13 $1,868.06 $3,675.53 $0.00 $0.00 $0.00 $0.00 $791.15
Overhead 135.00% $21,417.25 $2,463.93 $3,201.61 $2,521.88 $4,677.93 $2,521.88 $4,961.97 $0.00 $0.00 $0.00 $0.00 $1,068.05 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.70% $5,980.95 $688.07 $894.08 $704.26 $1,306.35 $704.26 $1,385.67 $0.00 $0.00 $0.00 $0.00 $298.26 Total Labor $43,262.82 $4,977.13 $6,467.25 $5,094.20 $9,449.41 $5,094.20 $10,023.17 $0.00 $0.00 $0.00 $0.00 $2,157.46
REV: 02/03 CEF CDM Smith Page 1
FDEP COST ESTI MATEContractor: CDM Smith, Inc.
Date: 11/14/2024
Task #: SubTask 1 Project Management SubTask 6 SVE System O&M and Optimization - Qtr 17 SubTask 11
Site: White Sands Cleaners ERIC_5437 SubTask 2 Annual Groundwater Monitoring SubTask 7 Utilities - Qtr 14 SubTask 12
Activity/Phase: O&M SubTask 3 SVE System O&M and Optimization - Qtr 14 SubTask 8 Utilities - Qtr 15 SubTask 13
Project Manager: Steve Cobert SubTask 4 SVE System O&M and Optimization - Qtr 15 SubTask 9 Utilities - Qtr 16 SubTask 14
SubTask 5 SVE System O&M and Optimization - Qtr 16 SubTask 10 Utilities - Qtr 17 SubTask 15
TTotals 1 2 3 4 5 6 7 8 9 10 11 Travel
Vehicle Rental $1,920.00 $480.00 $360.00 $360.00 $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $120.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $1,116.00 $0.00 $0.00 $558.00 $0.00 $558.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $3,036.00 $480.00 $360.00 $918.00 $360.00 $918.00 $0.00 $0.00 $0.00 $0.00 $120.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $125.00 $0.00 $0.00 $125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $21,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5,400.00 $5,400.00 $5,400.00 $5,400.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $21,725.00 $0.00 $0.00 $125.00 $0.00 $0.00 $5,400.00 $5,400.00 $5,400.00 $5,400.00 $0.00 Handling Fee $252.50 $0.00 $0.00 $12.50 $0.00 $0.00 $60.00 $60.00 $60.00 $60.00 $0.00 Total Subcontractor Cost $21,977.50 $0.00 $0.00 $137.50 $0.00 $0.00 $5,460.00 $5,460.00 $5,460.00 $5,460.00 $0.00
Laboratory Analytical Costs $3,169.00 $1,569.00 $200.00 $200.00 $200.00 $1,000.00 $0.00 $0.00 $0.00 $0.00 $1,000.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $1,206.00 $326.00 $110.00 $110.00 $110.00 $550.00 $0.00 $0.00 $0.00 $0.00 $550.00 Total Laboratory $4,375.00 $1,895.00 $310.00 $310.00 $310.00 $1,550.00 $0.00 $0.00 $0.00 $0.00 $1,550.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $560.00 $80.00 $120.00 $120.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $40.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,160.00 $1,160.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $5,220.00 $0.00 $1,305.00 $1,305.00 $1,305.00 $1,305.00 $0.00 $0.00 $0.00 $0.00 $435.00 Total Field Expenses $7,040.00 $1,340.00 $1,425.00 $1,425.00 $1,425.00 $1,425.00 $0.00 $0.00 $0.00 $0.00 $475.00
Subtotal $77,533.86 $4,977.13 $10,182.25 $7,189.20 $12,239.91 $7,189.20 $13,916.17 $5,460.00 $5,460.00 $5,460.00 $5,460.00 $4,302.46 Completion Fee $4,110.54 $497.71 $646.73 $509.42 $944.94 $509.42 $1,002.32 $0.00 $0.00 $0.00 $0.00 $215.75
Total Estimated Cost $86,162.61 $5,474.84 $10,828.98 $7,698.62 $13,184.85 $7,698.62 $14,918.49 $5,460.00 $5,460.00 $5,460.00 $5,460.00 $4,518.21
REV: 02/03 CEF CDM Smith Page 2
SITE :
W hite Sands C leaners ER
IC
_5437
SU
BTASK 2:
Annual G roundw ater M onitoring
D
ATE:
11/14/2024
LABO
R C
ATEG
O
R Y
*PR
O
VID
E TIM
E R
EQ
U
IR
ED
FO
R
EAC
H
PER
SO
N
STAFF-TITLE
W
O
RK DESCRIPTIO
N
HO
URS
Project Technical Leader
Technical Evaluation of D ata / Trend Analysis
Professional II Travel (2 Trips)
Site Access w ith Site O w ner
Sam ple Kit C oordination
Field Preparation (Annual Sam pling)
Annual G roundw ater Sam pling (15 w ells)
ID
W
M anagem ent
D ata Package Preparation (Annual Sam pling)
Professional I Travel (2 Trips)
Annual G roundw ater Sam pling - 15 w ells
Field Preparation
Total H ours:
PTL
Professional II
Professional I
TO
TAL LABO
R
VEH
IC
LE
TYPE
RATE
UNIT
USEAG
E
Truck $120.00 each
$480.00
TO
TAL VEHICLE
$480.00
PER
D
IEM
STAFF
RATE
UNIT
USEAG
E
TO
TAL PER DIEM
$0.00
SU
BC
O N
TR
AC
TO
R
C O
STS
NAM
E
PURPO
SE
UNIT
CO
ST
TO
TAL
$0.00
LABO
R
ATO
R
Y C O
STS
PARAM
ETER
RATE
# SAM
PLES
#Q
AQ
C
VO
H
- 8021/8260 $73.00
$1,095.00
TR
PH
- FL_PR
O
$88.00
$264.00
Total O rganic C arbon - 9060 $30.00
$30.00
D issolved G ases - R
SK-175
$180.00
$180.00
Shipping (Large C ooler)
$150.00
$300.00
Ice $6.50
$26.00
TO
TAL LAB
$1,895.00
EQ
U
IPM
EN
T
ITEM
RATE
CO
STING
UNIT
USEAG
E
TO
TALS
Shallow G roundw ater Sam pling Kit (2 people x 2 days) $290.00
D ay
$1,160.00
D rum
$100.00 D ay
$100.00
Expendables $40.00
D ay
$80.00
TO
TAL EQ
UIPM
ENT
$1,340.00
SU
BTASK: 3
SVE System
O &M and O ptim ization - Q tr 14
D
ATE:
11/14/2024
LABO
R C
ATEG
O
R Y
*PR
O
VID
E TIM
E R
EQ
U
IR
ED
FO
R
EAC
H
PER
SO
N
STAFF-TITLE
W
O R
K D
ESC
R
IPTIO
N
H O
U R
S
Project Technical Leader System
O ptim ization
Engineering Evaluation
Project M anager
Q uarterly O
&M D ocum entation Technical R eview
Staff Technician Travel to/from
Site (3 Trips)
O &M
Site Visit (3 M onths)
Professional II U pdated D ata Tables / R eview and Interpretation
Q uarterly O &M
D ocum entation Package
Sam ple Kit C oordination
Total H ours:
PTL
PM
Staff Technician
Professional II
TO
TAL LAB
O R
VEH
IC
LE
TYPE
R
ATE
U
N
IT
U
SEAG
E
Truck $120.00
D ay
$360.00
TO
TAL VEH
IC
LE
$360.00
PER
D
IEM
STAFF
R
ATE
U N
IT
U
SEAG
E
TO
TAL PER
D
IE M
$0.00
SU
BC
O N
TR
AC
TO
R
C O
STS
N
AM
E
PU
R
PO
SE
U N
IT
C
O
ST
TO
TAL
$0.00
LABO
R
ATO
R
Y C O
STS
PAR
AM
ETER
R
ATE
# SAM
PLES
#Q
AQ
C
TO
-15
$200.00
$200.00 Sm all C ooler
$110.00
$110.00
TO
TAL LAB
$310.00
EQ
U
IPM
EN
T
ITEM
R
ATE
C O
STIN
G
U N
IT
U
SEAG
E
TO
TALS
C onstruction/O
&M /Pilot Kit
$360.00 D ay
$1,080.00 C onstruction/O &M
Supplies $75.00
D ay
$225.00
Expendables $40.00
D ay
$120.00
TO
TAL EQ
U
IPM
EN
$1,425.00
W hite Sands C leaners ER
IC
_5437
BTASK: 4
SVE System
O &M and O ptim ization - Q tr 15
D
ATE:
11/14/2024
LABO
R C
ATEG
O
R Y
*PR
O
VID
E TIM
E R
EQ
U
IR
ED
FO
R
EAC
H
PER
SO
N
STAFF-TITLE
W
O R
K D
ESC
R
IPTIO
N
HO
UR
S
Project Technical Leader System
O ptim ization / O perations R eview
Author Engineering Section of Sem iannual R
ASR
Project M anager
Sem iannual R
ASR
/ G
W M
R Technical R eview
Professional II Sem iannual R
ASR
preparation (including G W
M
Figures for Sem iannual R
ASR
Sam ple Kit C oordination (Soil Vapor Sam ple)
Staff Technician Travel to/from
Site (3 Trips)
O &M
Site Visit (3 M onths)
Total Hours:
PTL
PM
Professional II
Staff Technician
TO
TAL LAB
O R
VEH
IC
LE
TYPE
R
ATE
UNIT
USEAG
E
Truck $120.00
D ay
$360.00
TO
TAL VEHIC
LE
$360.00
PER
D
IEM
STAFF
R
ATE
UNIT
USEAG
E
Staff Technician $150.00
H otel
$450.00
Staff Technician $36.00
Per D iem
$108.00
TO
TAL PER
D
IEM
$558.00
SU
BC
O N
TR
AC
TO
R
C O
STS
N
AM
E
PU
R
PO
SE
U N
IT
C
O
ST
Erw in R em ediation
ID
W
D isposal (W ater)
125.00
$125.00 IDW from ST 2 sampling
TO
TAL
$125.00
LABO
R
ATO
R
Y C O
STS
PAR
AM
ETER
R
ATE
# SAM
PLES
#Q
AQ
C
TO
-15
$200.00
$200.00
Sm all C ooler $110.00
$110.00
TO
TAL LAB
$310.00
EQ
U
IPM
EN
T
ITEM
R
ATE
C O
STING
UNIT
USEAG
E
TO
TALS
C onstruction/O
&M /Pilot Kit
$360.00 D ay
$1,080.00
C onstruction/O
&M Supplies
$75.00 D ay
$225.00
Expendables $40.00
D ay
$120.00
TO
TAL EQ
UIPM
EN
$1,425.00
W hite Sands C leaners ER
_5437
BTASK: 5
SVE System
O &M and O ptim ization - Q tr 16
D
ATE:
11/14/2024
LABO
R C
ATEG
O
R Y
*PR
O
VID
E TIM
E R
EQ
U
IR
ED
FO
R
EAC
H
PER
SO
N
STAFF-TITLE
W
O R
K D
ESC
R
IPTIO
N
H O
U R
S
Project Technical Leader System
O ptim ization
Engineering Evaluation
Project M anager
Q uarterly O
&M D ocum entation Technical R eview
Staff Technician Travel to/from
Site (3 Trips)
O &M
Site Visit (3 M onths)
Professional II U pdated D ata Tables / R eview and Interpretation
Q uarterly O &M
D ocum entation Package
Sam ple Kit C oordination
Total H ours:
PTL
PM
Staff Technician
Professional II
TO
TAL LAB
O R
VEH
IC
LE
TYPE
R
ATE
U
N
IT
U
SEAG
E
Truck $120.00 day
$360.00
TO
TAL VEH
IC
L E
$360.00
PER
D
IEM
STAFF
R
ATE
U N
IT
U
SEAG
E
TO
TAL PER
D
IEM
$0.00
SU
BC
O N
TR
AC
TO
R
C O
STS
N
AM
E
PU
R
PO
SE
U nit
C O
ST
TO
TAL
$0.00
LABO
R
ATO
R
Y C O
STS
PAR
AM
ETER
R
ATE
# SAM
PLES
#Q
AQ
C
TO
-15
$200.00
$200.00 Sm all C ooler
$110.00
$110.00
TO
TAL LAB
$310.00
EQ
U
IPM
EN
T
ITEM
R
ATE
C O
STIN
G
U N
IT
U
SEAG
E
TO
TALS
C onstruction/O
&M /Pilot kit
$360.00 day
$1,080.00
C onstruction/O
&M Supplies
$75.00 day
$225.00
Expendables $40.00 day
$120.00
TO
TAL EQ
U
IPM
E N $1,425.00
W hite Sands C leaners ER
_54
BTASK: 6
SVE System
O &M and O ptim ization - Q tr 17
D
ATE:
11/14/2024
LABO
R C
ATEG
O
R Y
*PR
O
VID
E TIM
E R
EQ
U
IR
ED
FO
R
EAC
H
PER
SO
N
STAFF-TITLE
W
O R
K D
ESC
R
IPTIO
N
H O
U R
S
Project Technical Leader System
O ptim ization / O perations R eview
Author Engineering Section of Annual R
ASR
Project M anager
Annual R
ASR
Technical R eview
Professional II Annual R
ASR
preparation
Figures for Annual R
ASR
Sam ple Kit C oordination (Soil Vapor Sam ple)
Staff Technician Travel to/from
Site (3 Trips)
O &M
Site Visit (3 M onths)
Total H ours:
PTL
PM
Professional II
Staff Technician
TO
TAL LAB
O R
VEH
IC
LE
TYPE
R
ATE
U
N
IT
U
SEAG
E
Truck $120.00
D ay
$360.00
TO
TAL VEH
IC
LE
$360.00
PER
D
IEM
STAFF
R
ATE
U N
IT
U
SEAG
E
Staff Technician $150.00
H otel
$450.00
Staff Technician $36.00
Per D iem
$108.00
TO
TAL PER
D
IEM
$558.00
LABO
R
ATO
R
Y C O
STS
PAR
AM
ETER
R
ATE
# SAM
PLES
#Q
AQ
C
TO
-15
$200.00
$1,000.00
Sm all C ooler $110.00
$550.00
TO
TAL LAB
$1,550.00
EQ
U
IPM
EN
T
ITEM
R
ATE
C O
STIN
G
U N
IT
U
SEAG
E
TO
TALS
C onstruction/O
&M /Pilot Kit
$360.00 D ay
$1,080.00
C onstruction/O
&M Supplies
$75.00 D ay
$225.00
Expendables $40.00
D ay
$120.00
TO
TAL EQ
U
IPM
EN
T
$1,425.00
W hite Sands C leaners ER
BTASK: 7
U tilities - Q tr 14
D
ATE:
11/14/2024
LABO
R C
ATEG
O
R Y
*PR
O
VID
E TIM
E R
EQ
U
IR
ED
FO
R
EAC
H
PER
SO
N
STAFF-TITLE
W
O R
K D
ESC
R
IPTIO
N
H O
U R
S
FIELD
EXPEN
SES
ITEM
R
ATE
C O
STIN
G
U N
IT
U
SEAG
E
TO
TALS
O
M Q uarter 14 Utilities U tility C harges (Electric)
$1,800.00 m onth
$5,400.00
Q uarter 14 H andling Fee U tility H andling Fee
$20.00 M onth
$60.00
TO
TAL EQ
U
IPM
EN
$5,460.00
W hite Sands C leaners ER
BTASK: 8
U tilities - Q tr 15
D
ATE:
11/14/2024
LABO
R C
ATEG
O
R Y
*PR
O
VID
E TIM
E R
EQ
U
IR
ED
FO
R
EAC
H
PER
SO
N
STAFF-TITLE
W
O
RK DESCRIPTIO
N
HO
URS
FIELD
EXPEN
SES
ITEM
RATE
CO
STING
UNIT
USEAG
E
TO
TALS
O &M
Q uarter 15 Utilities
U tility C harges (Electric) $1,800.00 m onth
$5,400.00
Q uarter 15 H andling Fee U tility H andling Fee
$20.00 M onth
$60.00
TO
TAL EQ
UIPM
E N
$5,460.00
W hite Sands C leaners ER
_5
BTASK: 9
U tilities - Q tr 16
D
ATE:
11/14/2024
LABO
R C
ATEG
O
R Y
*PR
O
VID
E TIM
E R
EQ
U
IR
ED
FO
R
EAC
H
PER
SO
N
STAFF-TITLE
W
O
RK DESCRIPTIO
N
HO
URS
FIELD
EXPEN
SES
ITEM
RATE
CO
STING
UNIT
USEAG
E
TO
TALS
O &M
Q uarter 16 Utilities
U tility C harges (Electric) $1,800.00 m onth
$5,400.00
Q uarter 16 H andling Fee U tility H andling Fee
$20.00 M onth
$60.00
TO
TAL EQ
UIPM
E N
$5,460.00
W hite Sands C leaners ER
BTASK: 10
U tilities - Q tr 17
D
ATE:
11/14/2024
LABO
R C
ATEG
O
R Y
*PR
O
VID
E TIM
E R
EQ
U
IR
ED
FO
R
EAC
H
PER
SO
N
STAFF-TITLE
W
O R
K D
ESC
R
IPTIO
N
H O
U R
S
FIELD
EXPEN
SES
ITEM
R
ATE
C O
STIN
G
U N
IT
U
SEAG
E
TO
TALS
O
M Q uarter 17 U tilities
U tility C harges (Electric) $1,800.00 m onth
$5,400.00
Q uarter 17 H andling Fee U tility H andling Fee
$20.00 M onth
$60.00
TO
TAL EQ
U
IPM
EN
$5,460.00
W hite Sands C leaners ER
BTASK: 11
R ebound Evaluation D
ATE:
11/14/2024
LABO
R
C
ATEG
O R
Y
*PR
O
VID
E TIM
E R
EQ
U
IR
ED
FO
R
EAC
H
PER
SO
N
STAFF-TITLE
W
O R
K D
ESC
R
IPTIO
N
H O
U R
S
Project Technical Leader System
O ptim ization / O perations R eview (R ebound Evaluation)
Project M anager
R ebound Evaluation Technical M em o C onclusions
Professional II U pdated D ata Tables
R ebound Evaluation Technical M em o
Sam ple Kit C oordination (Soil Vapor Sam ples)
Staff Technician Travel to/from
Site (1 Trip)
O &M
Site Visit (R ebound Evaluation) (1 M onth)
Total H ours:
PTL
PM
Professional II
Staff Technician
VEH
IC
LE
TYPE
R
ATE
U
N
IT
U
SEAG
E
Truck $120.00
D ay
$120.00
TO
TAL VEH
IC
LE
$120.00
PER
D
IEM
STAFF
R
ATE
U N
IT
U
SEAG
E
$0.00 $0.00 $0.00 $0.00
TO
TAL PER
D
IE M
$0.00
SU
BC
O N
TR
AC
TO
R
C O
STS
N
AM
E
PU
R
PO
SE
C O
ST
$0.00 $0.00 $0.00
TO
TAL
$0.00
LABO
R
ATO
R
Y C O
STS
PAR
AM
ETER
R
ATE
# SAM
PLES
#Q
AQ
C
TO
-15
$200.00
$1,000.00 Post shutdow n sam ples only
Sm all C ooler $110.00
$550.00
TO
TAL LAB
$1,550.00
FIELD
EXPEN
SES
ITEM
R
ATE
C O
STIN
G
U N
IT
U
SEAG
E
TO
TALS
C onstruction/O
&M /Pilot Kit
$360.00 D ay
$360.00 C onstruction/O &M
Supplies $75.00
D ay
$75.00
Expendables $40.00
D ay
$40.00
TO
TAL EQ
U
IPM
EN
$475.00
W hite Sands C leaners ER
4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109
Novem ber 21, 2024
M
r. Benjam in Aoki Environm ental Specialist II Florida Departm ent of Environm ental Protection
W aste Site Cleanup Section
2600 Blair Stone Road, M S 4520
Tallahassee, FL 32399-2400
Subject:
O peration and M aintenance and Groundw ater M onitoring Proposal hite Sands Cleaners
3333 North Tam iam i Trail, Sarasota, Sarasota County, FL
ERIC_5437
Dear M
r. Aoki:
CDM
Sm ith Inc. (CDM Sm ith) is pleased to respond to the Florida Departm ent of Environm ental Protection (FDEP) Task Assignm ent Request to provide O peration and M aintenance (O& M
) and groundw ater m onitoring services for the W hite Sands Cleaners site under Contract Num ber HW
681. O ur project understanding, scope of w ork, and project schedule are described below
, w hile the cost estim ate is also attached.
Project Understanding The real property ow ner of the site is Ringling College of Art and Design, Inc., and the form er W hite Sands Cleaners is a unit w ithin a strip m all know n as the Trail Plaza Shopping Center. A previous FDEP contractor initiated start-up of the SVE system in August 2021. Q uarterly sam ples w ere collected from
August 2021 through February 2022. O perations continued until CDM Sm ith becam e the new
FDEP
contractor for the Site. The required O
M activities for this task assignm ent w ere taken from the M ay 2020 ISRP, and the schedule is based on w ork com pleted during rem edial system startup.
O
M services are required for a soil vapor extraction (SVE) system that consists of four vacuum extraction (VE) w ells, SVE blow er, air injection blow er, m oisture separator, and a granulated activated carbon (GAC) vapor treatm ent drum . O ne VE w ell is located on the inside of the building, and three are located outside. SVE operations began in August 2021.
SVE system influent air sam ples are sam pled on a quarterly basis and subm itted for laboratory analysis by United States Environm ental Protection Agency (EPA) M ethod TO
-15 for volatile organic halocarbons.
Air sam ples are collected from the four operating SVE w ells (VE001, VE002, VE003, VE004) on an annual basis and subm itted for laboratory analysis by EPA M ethod TO
-15. O peration and M aintenance (O
M site visits are being com pleted m onthly, and O
M reports are subm itted quarterly.
Groundw ater m onitoring has historically com pleted annually at 17 m onitoring w ells for volatile organic halocarbons (VO Hs). Three select m onitoring w ells are m onitored for pertinent UIC param eters, per the approved ISRP dated M ay 7, 2020. Groundw ater sam ples from m onitoring w ells M W
-1, M W
-3R, and M
W -6 w ill be analyzed for UIC param eter TRPH by FL-PRO
M ethod. Additionally, a groundw ater sam ple
M
r. Benjam in Aoki Novem ber 21, 2024 Page 2 4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109 from m onitoring w ell M
W -3/M
W -3R w ill be analyzed for TO C by USEPA M ethod 9060 and dissolved gases by USEPA M ethod RSK-175. Sem iannual and Annual Rem edial Action Status Reports (RASR) are subm itted. The annual sam pling event w ould be perform ed in January 2025.
Scope of W ork
This cost proposal covers SVE system O&
M and groundw ater m onitoring for one year, beginning in
Decem ber 2024 and ending in Novem ber 2025.
Subtask 1 – Project M anagem ent Project m anagem ent activities perform ed under this task consist of adm inistrative functions required to m aintain the project schedule, adhere to budget, and deliver the quality of the w ork products defined by CDM
Sm ith's quality standards. W e w ill prepare and subm it invoices upon approval of each deliverable or m ilestone com pletion.
Project Kickoff and Progress M eetings
CDM
Sm ith expects to have a kickoff m eeting or telephone conference w ith the FDEP to review the status of the project and address FDEP com m ents regarding the Task Assignm ent. CDM
Sm ith w ill prepare m eeting agendas and notes as part of this task.
Project Q uality Technical Review
CDM
Sm ith’s Q uality M anagem ent System guidelines w ill be follow
ed. Internal quality review s w ill be conducted on plans and on investigation findings and reports.
Project Status Reports
CDM
Sm ith’s Project M anager w ill prepare and subm it m onthly status reports to accom pany each invoice throughout the duration of this project. The Project M anager w ill also discuss the status of the project w ith the FDEP on a bi-w eekly basis until the project is com plete.
Subtask 2 - Groundw ater M onitoring The groundw ater m onitoring requirem ents for the site w ere identified in the 2020 ISRP. Groundw ater m onitoring has historically been conducted on an annual basis. During the 2023 annual m onitoring event, CDM Sm ith personnel noted that M W
-13, DW
-4 and DW
-9 w ere abandoned. These w ells are assum ed to have been abandoned during redevelopm ent surrounding the site and have been rem oved from the sam pling plan. Per FDEP technical review of the Annual RASR dated July 28, 2023, m onitoring w ell DW
-3 w ill be added to the m onitoring schedule, for a total of 15 m onitoring w ells to be sam pled.
CDM
Sm ith w ill com plete the annual groundw ater sam pling event in January 2025. The required laboratory analyses and the w ells included in the m onitoring program are listed in the attached Table 1.
CDM
Sm ith w ill collect w ater levels from all sam pled m onitoring w ells during the sam pling event.
Purging and sam pling w ill be in accordance w ith FDEP’s Standard O perating Procedures for Groundw ater Sam pling, FS 2200, and w ill be collected using low -flow techniques w ith a peristaltic pum p and dedicated polyethylene tubing. A YSI-556 m ulti-param eter probe and a turbidim eter w ill be used to collect w ater quality indicator param eters including dissolved oxygen, pH, conductivity, oxidation reduction potential, tem perature, turbidity. The instrum entation w ill be properly calibrated and in Aoki Novem
Page 3 4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109 recorded. All purge w ater w ill be contained in drum s for characterization and disposal as nonhazardous investigation-derived w aste (IDW
). CDM
Sm ith assum es that one IDW drum w ill require disposal under Subtask 4 of this task assignm ent.
Deliverables: Laboratory Reports, field notes, and updated tables for the groundw ater sam pling event.
Subtasks 3, 4, 5 and 6 – Q uarterly SVE System
O peration and M aintenance O
M
Site visits w ill be com pleted m onthly, and the follow ing w ork w ill be com pleted during each visit.
System operation and alarm status and blow er run tim e.
oisture separator liquid volum e.
System vacuum s and velocity/flow rate at blow er, before/after GAC (if applicable), and after oisture separator.
Blow er oil changes (w hen applicable) based on m anufacture recom endations.
SVE w ell vacuum /pressure and flow rate.
Total organic vapors m easured w ith a photoionization detector from operating SVE w ells, system influent, and system effluent.
ater levels from m onitoring w ells M
W -3R, M
W -4 and M
-10
Adjust vacuum s and injection pressures on the SVE w ells to optim ize the SVE system perform ance.
The inform ation w ill be consistently recorded in the field on pre-prepared form s.
SVE system influent sam ples w ill be collected quarterly for laboratory analysis by M ethod TO -15. Air sam ples w ill be collected from each of the four VE w ells on an annual basis as part of Subtask 6. The required laboratory analyses and the SVE included in the m onitoring program are listed in the attached
Table 1.
Follow ing the com pletion of Subtasks 3 and 4 O
M activities, CDM
Sm ith w ill prepare a Sem iannual
RASR and an Annual RASR w ill be prepared follow ing the com pletion of Subtask 5 and 6 activities. The reports w ill sum m arize the history of the Site, all fieldw ork com pleted by CDM
Sm ith, field and laboratory data, conclusions, and recom m endations. Additional elem ents of the reports w ill include the follow ing:
Figures depicting site conditions.
Figures depicting groundw ater data and estim ated extent of im pact.
Groundw ater elevation contour m ap.
Tables sum arizing field and analytical data.
Groundw ater sam pling logs and field equipm ent calibration records.
in Aoki Novem
Page 4 4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109
Laboratory analytical reports and chain of custody docum entation.
aste disposal m anifests and w eigh tickets.
Deliverables: Sem iannual and Annual Rem edial Action Status Reports
Subtasks 7, 8, 9, and 10 – U tilities
CDM
Sm ith w ill provide utilities for the SVE system and assum e $1,800 per m onth including adm inistrative costs. The $1,800 per m onth am ount is based off previous utility invoices and Task Assignm ent Change O rders.
Deliverable: Utilities Handling Fee, receipt of 3 m onths of utility invoices for each Subtask (Cost Plus
Fixed Fee)
Subtask 11 – Rebound Evaluation A m odified Rebound Evaluation w ill be conducted in the first m onth of operation under this Task Assignm ent. The system has been off since the O ctober 2024 O
M event; therefore, pre-shutdow n sam ples w ill not be collected. CDM
Sm ith w ill turn the system on, purge one pore volum e of soil vapor, and then collect soil vapor sam ples from VE001, VE002, VE003, VE004 and system influent prior to shutting the system off until Rebound Evaluation results and a path forw ard can be discussed w ith the
FDEP. CDM
Sm ith w ill sum m arize the Rebound Evaluation and conclusions in a technical m em o to FDEP.
Deliverable: Rebound Evaluation Technical M em o including field docum entation, updated analytical tables, and conclusions.
Subcontractors Subcontracted services are required for IDW disposal. Rates for IDW rem oval and disposal w ere previously requested for HW 681 from
Erw in Rem ediation, Enviroserve (form erly Clark Environm ental), and Hepaco. Erw in Rem ediation w as the low est cost and has been selected as the IDW disposal subcontractor for this project as show n in Attachm ent A
Assum ptions
CDM
Sm ith w ill com m unicate w ith the FDEP in a tim ely m anner if schedule delays are encountered and w ill prepare necessary paperw ork for change orders.
in Aoki Novem
Page 5 4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109
Schedule Subtask 2: Annual Groundw ater M onitoring
Deliverable: Field notes, laboratory report, updated tables Due Date: February 21, 2025 Subtask 3: SVE System
O
M and O ptim ization – Q uarter 14 (Decem ber 2024 – February 2025)
Deliverable: Field notes, laboratory report, updated tables Due Date: M arch 21, 2025 Subtask 4: SVE System
O
M and O ptim ization – Q uarter 15 (M arch 2025 – M ay 2025) Deliverable: Sem iannual Rem edial Action Status Report, including Groundw ater M onitoring
Due Date: July 18, 2025 Subtask 5: SVE System
O
M and O ptim ization – Q uarter 16 (June 2025 – August 2025) Deliverable: Field notes, laboratory report, updated tables Due Date: Septem ber 26, 2025 Subtask 6: SVE System
O
M and O ptim ization – Q uarter 17 (Septem ber 2025 – N ovem ber 2025)
Deliverable: Annual Rem edial Action Status Report
Due Date: January 23, 2026 Subtask 7: Utilities – Q tr 14 Deliverable: Paid Utility Invoices Due Date: April 25, 2025 Subtask 8: Utilities – Q tr 15 Deliverable: Paid Utility Invoices Due Date: July 31, 2025 Subtask 9: Utilities – Q tr 16 Deliverable: Paid Utility Invoices Due Date: O ctober 3, 2025 Subtask 10: Utilities – Q tr 17 Deliverable: Paid Utility Invoices Due Date: January 30, 2026 Subtask 11: Rebound Evaluation Deliverable: Technical M em o including field docum entation, laboratory report, updated tables and conclusions Due Date: February 28, 2025 in Aoki Novem
Page 6 4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109 e look forw ard to w orking on this im portant project. Feel free to contact m e at 407-660-6361 or by em ail w ith any questions or com m ents.
Sincerely, Joshua J. Hirten, PG
Leslie S. Sam el, P.E.
Program anager
Vice President ith ith HirtenJJ@
CDM
ith.com
Sam elLS@
CDM
ith.com
Table
Sam ple ID
M onthly
Q uarterly
Sem iannual
Annual SVE Influent
V,F,P 4,V,F,P
4,V,F,P
VE001
V,F,P V,F,P
4,V,F,P
VE002
V,F,P V,F,P
4,V,F,P
VE003
V,F,P V,F,P
4,V,F,P
VE004
V,F,P V,F,P
4,V,F,P M
W -1
1,2,L M
W -2
1,L M
W -3R
L 1,2,L
M W
-4 L
1,L M
W -6
1,2,3,L M
W -7
1,L M
W -8
1,L M
W -10
L 1,L
M W
-11 1,L
M W
-13 Abandoned 2023
D W
-1R 1,L
D W
-2R 1,L
D W
-3 1,L
D W
-4 Abandoned 2023
D W
-8 1,L
D W
-9 Abandoned 2023
D W
-10 1,L
D W
-11 1,L
1 = VO
H s by M ethod 8260B
2 = TR
PH
by FL-PR O
3 = Total O rganic C arbon and D issolved G asses
4 = VO
H s by M ethod TO -15
V = Vacuum /Pressure
F = Flow R ate
P = PID
L = D epth to W ater
Table 1: Sam pling Schedule
W hite Sands C leaners
ER
IC
_5437
Sarasota, Sarasota C ounty, Florida
Attachm ent A Subcontractor Q uotes
Investigative Derived Waste (IDW) Management Job Details - Per 55-gallon Drum
Per Event Hepaco NA NA NA NA EnviroServe NA NA NA NA Erwin Remediation $125 $110 Included Included $125 $110
IDW Subcontractor Evaluation CDM Smith - HW681
05/15/24
No Response No Response
Company Disposal Transportation Total
Liquid Soil Fee Liquid Soil
408 D itm ar Street Pensacola, FL 32503
To: M
r. K yle Turner C
D M
Sm ith
4010 W est B oy Scout B oulevard, Suite 450
Tam pa, FL 33607
January 15, 2024
R e: N on-H azardous D rum D isposal of PFO
S/PFA
S Im pacted M aterials
M
r. Turner:
The price for the transportation and disposal (T& D
) of non-hazardous drum s of soil, m ud, and w ater located in the State of Florida is listed below
N on-H azardous PFA
S/PFO
S Im pacted M aterial:
D escription R ate U nit Profile Fee (C harged once per site) $ 350.00
Per Site T&
D
- N on-H az PFO
S/PFA
S Im pacted Soil/ M ud/W ater $ 195.00
Per D rum
N on-H azardous M aterial not Im pacted w ith PFA
S/PFO
S:
D escription
R ate
U nit
T& D
- N on-H az (no PFO
S/PFA
S) Im pacted M ud/W ater
$ 125.00
T& D
- N on-H az (no PFO
S/PFA
S) Im pacted Soil
$ 110.00
Please ensure that all drum lids are properly secured and that drum s are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False M obilization fee w ill apply if our driver is not able to locate a drum on site or if w e are unable to access the property due to a locked gate, etc.
The prices listed are all inclusive w ithout any additional fees or charges (fuel surcharge, low volum e stop fee etc.) and are valid for all regions in the State of Florida except for the Florida K eys. Pricing for sites located in the Florida K eys w ill be bid on a case-by-case basis dependent on the volum e of drum s and the location.
This quote is valid for 90 days.
R espectfully, R obert D onado Erw in R em ediation, Inc.
Em ail:R obert@ Erw inR em ediation.com
O ffice:(850) 466-2358
R espectfully, R obertD onado