This Task Assignment (TA) is issued under Contract Number HW681 between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc. The agreement authorizes CDM Smith to conduct Long Term Monitoring (LTM), Groundwater Monitoring, and PFAS Waste Profile activities at Gulf States Beauty Supply, located at 5961 Arlington Road in Jacksonville, Duval County, Florida. The project is designated as ERIC_4603 with Benjamin Aoki as the Department Project Manager and Kathy Leggoe as the Contractor's Project Manager. The Task Assignment is effective through June 23, 2025, with a completion date of June 13, 2025 (later amended to June 23, 2025).
The contract establishes a Fixed Unit Rate compensation model of $20,296.65, representing the total Task Assignment value for 97.2 labor hours. The scope of work comprises four subtasks: (1) Project Management calculated at 13% of direct labor; (2) Annual Groundwater Sampling involving mobilization to collect samples from 13 monitoring wells with field parameter analysis and laboratory testing via EPA Method 8260 for volatile organic halocarbon detection; (3) preparation of an Annual Groundwater Monitoring Report including data tables, field notes, laboratory results, and quality assurance documentation; and (4) PFAS Impacted IDW Disposal involving a PFAS waste profile and disposal of one drum of PFAS-impacted nonhazardous water. Deliverables for groundwater sampling and PFAS work are due 90 days following Notice to Proceed, with the annual report due 120 days following NTP. Subcontractor costs for disposal services are provided by Erwin Remediation, Inc., with a PFAS waste profile fee of $350.00 and drum disposal at $195.00 per unit.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
June 23, 2025-KL
3/20/25 - KL
3/20/25 - KL
4/21/25 - KL
END TA CHANGE TO 6/23/25- KL