This Task Assignment (TA) DC003F is a work order issued under Contract Number HW681 between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc. The TA authorizes the contractor to conduct a Soil Vapor Extraction (SVE) system rebound evaluation at Nelsons Cleaners, located at 1203 West Highway 50, Clermont, Lake County, Florida (Project Number ERIC_4822). Benjamin Aoki serves as the Department Project Manager, while Kathy Leggoe represents the contractor. The task assignment is effective through October 16, 2026.

The scope of work comprises three subtasks: Subtask 1 involves project management calculated at 13 percent of direct labor; Subtask 2 encompasses the rebound evaluation requiring contractor mobilization to conduct SVE system operations, soil vapor sample collection from five extraction wells, laboratory analysis, and preparation of a technical memorandum with conclusions and recommendations; and Subtask 3 covers utility costs for the SVE system. The total TA value is $9,488.83, consisting of $6,888.83 in fixed unit rate charges for labor and associated costs and $2,600.00 for cost reimbursement of utilities, with a total labor budget of 25 hours. Deliverables include the Rebound Evaluation Technical Memorandum due June 16, 2026, and paid utility invoices due August 14, 2026. Invoices are payable upon FDEP receipt and review of respective deliverables.

View the file

Other files

File Type Posted
CN-370000-HW681-DC001B.pdf PDF
CN-370000-HW681-DC001E.pdf PDF
CN-370000-HW681-DC002E.pdf PDF
CN-370000-HW681-DC002F.pdf PDF
CN-370000-HW681-DC003B.pdf PDF
CN-370000-HW681-DC005D.pdf PDF
CN-370000-HW681-DC005E.pdf PDF
CN-370000-HW681-DC008B.pdf PDF
CN-370000-HW681-DC008E.pdf PDF
CN-370000-HW681-DC009A.pdf PDF
CN-370000-HW681-DC010A.pdf PDF
CN-370000-HW681-DC010C.pdf PDF
CN-370000-HW681-DC011C.pdf PDF
CN-370000-HW681-DC012D.pdf PDF
CN-370000-HW681-DC013A.pdf PDF
CN-370000-HW681-DC013B.pdf PDF
CN-370000-HW681-DC013C.pdf PDF
CN-370000-HW681-DC013D.pdf PDF
CN-370000-HW681-DC015A.pdf PDF
CN-370000-HW681-DC016C.pdf PDF
CN-370000-HW681-DC017B.pdf PDF
CN-370000-HW681-DC018C.pdf PDF
CN-370000-HW681-DC019B.pdf PDF
CN-370000-HW681-DC01ACO5.pdf PDF
CN-370000-HW681-DC021A.pdf PDF
CN-370000-HW681-DC021B.pdf PDF
CN-370000-HW681-DC021C.pdf PDF
CN-370000-HW681-DC025A.pdf PDF
CN-370000-HW681-DC02BCO2.pdf PDF
CN-370000-HW681-DC02DCO1.pdf PDF
CN-370000-HW681-DC031C.pdf PDF
CN-370000-HW681-DC032D.pdf PDF
CN-370000-HW681-DC033C.pdf PDF
CN-370000-HW681-DC037B.pdf PDF
CN-370000-HW681-DC038B.pdf PDF
CN-370000-HW681-DC038C.pdf PDF
CN-370000-HW681-DC03A.pdf PDF
CN-370000-HW681-DC03CCO1.pdf PDF
CN-370000-HW681-DC03CCO2.pdf PDF
CN-370000-HW681-DC041C.pdf PDF
CN-370000-HW681-DC042B.pdf PDF
CN-370000-HW681-DC042C.pdf PDF
CN-370000-HW681-DC043A.pdf PDF
CN-370000-HW681-DC043B.pdf PDF
CN-370000-HW681-DC04BCO1.pdf PDF
CN-370000-HW681-DC05CCO3.pdf PDF
CN-370000-HW681-DC06BCO4.pdf PDF
CN-370000-HW681-DC07ACO1.pdf PDF
CN-370000-HW681-DC07CCO1.pdf PDF
CN-370000-HW681-DC08CCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW681

DC003F Completion October 16, 2026

This Task Assignment authorizes CDM Smith Inc. to conduct rebound evaluation at Nelsons Cleaners per their proposed scope of work and cost estimate form.

Benjamin Aoki 850-245-7527 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

CDM Smith Inc.

CDM Smith Inc.

Kathy Leggoe 813-262-8851

ERIC_4822

1203 West Highway 50, Clermont, Lake County, Florida

Nelsons Cleaners

✔ $ 6,888.83

$ 2,600.00

$ 9,488.83

Scope of Work

Joshua Hirten

Contract Manager

Joshua Hirten Digitally signed by Joshua Hirten Date: 2026.04.14 10:34:56 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2026.04.14 09:53:09 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW681

DC003F

Subtask 1 & 2: Rebound Evaluation - Rebound Evaluation Technical Memorandum;

Project Management 06/16/2026

Subtask 3: Utilities - Paid utility invoice not to exceed $2,640.00 08/14/2026

Subtask 1 & 2: FDEP receipt and review of Rebound Evaluation Technical Memorandum $ 6,848.83

Subtask 3: FDEP receipt and review of paid utility invoice; Cost Reimbursement for utilities not to exceed $2,600.00 $ 2,640.00

$ 9,488.83

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Alexis A. Lambert Secretary

Memorandum

TO:

FROM:

SUBJECT:

DATE:

HW681 Contract File

Benjamin Aoki, Project Manager

Task Assignment

DC003F

ERIC_4822

April 06, 2026

This Task Assignment authorizes CDM Smith Inc. to conduct rebound evaluation at Nelsons Cleaners per their proposed scope of work and cost estimate form. Specific subtasks are detailed below:

Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.

Subtask 2: Rebound Evaluation Contractor will mobilize to the Site to conduct a rebound evaluation of the SVE system.

Contractor will generate a report summarizing the activities at the Site, show laboratory COC and data, and providing recommendations.

Subtask 3: Utilities This subtask is to separate Utilities payments.

The final cost associated with DC003F is $9,488.83 with 25 labor hours.

Jay Collins Lt. Governor

FDEP COST ESTIMATEContractor: CDM Smith Inc.

Date: 2/16/2026

Task #: DC003F Proposal SubTask 1 Project Management SubTask 6

Site: SubTask 2 Rebound Evaluation SubTask 7

Activity/Phase: Rebound Evaluation SubTask 3 Utilities SubTask 8

Project Manager: Kathy Leggoe SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$80.18 Project Manager 2 2.3 $0.00 0 0 0 0 0 0 0 0 0 0

$90.43 Senior Technical Expert 0 0 0 0 0 0 0 0 0 0 $80.18 Project Technical Leader 3 3.0 0.0 0 0 0 0 0 0 0 $80.18 Project Manager 4 3.5 0.0 0 0 0 0 0 0 0 $55.67 Professional II 16 16.0 0.0 0.0 0.0 0 0 0 0 0 $37.32 Professional I 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 25 2.3 22.5 0.0 0.0 0.0 0.0 0 0 0 0

Direct Labor $1,595.44 $183.55 $1,411.89 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 135.00% $2,153.84 $247.79 $1,906.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.70% $601.48 $69.20 $532.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,350.76 $500.54 $3,850.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Nelsons Cleaners (ERIC_4822)

FDEP COST ESTIMATEContractor: CDM Smith Inc.

Date: 2/16/2026

Task #: DC003F Proposal SubTask 1 Project Management SubTask 6

Site: SubTask 2 Rebound Evaluation SubTask 7

Activity/Phase: Rebound Evaluation SubTask 3 Utilities SubTask 8

Project Manager: Kathy Leggoe SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Nelsons Cleaners (ERIC_4822)

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $2,600.00 $0.00 $2,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $2,600.00 $0.00 $2,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $40.00 $0.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,640.00 $0.00 $2,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,200.00 $1,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $70.00 $70.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,270.00 $1,270.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $198.00 $198.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $435.00 $435.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $673.00 $673.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $9,053.76 $500.54 $5,913.22 $2,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $435.07 $50.05 $385.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $9,488.83 $550.59 $6,298.24 $2,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SITE : Nelsons Cleaners (ERIC_4822) SUBTASK 2: Rebound Evaluation

DATE: 2/16/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical Guidance / System Operations & Optimization for Rebound Evaluation 2 PE Review 1

Project Manager Coordinate Site Access with Owner and Tenant 0.5 Rebound Evaluation Conclusions and Recommendations 1 Rebound Evaluation Memo Final Preparation 1 O&M Tables Final Preparation 1

Professional II Field Preparation 1 Mobilization (2 hr) and Demobilization (2 hr) - Rebound Evaluation Field Activities 4 Rebound Evaluation Field Activities 5 Prepare Laboratory Sample Kit 1 Data and Sample Management 2 Update O&M Data Tables 2 Rebound Evalaution and O&M Documentation 1

Total Hours:

PTL 3

PM 3.5

Professional II 16

22.5

TOTAL LABOR 22.5

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 each 1 $120.00

TOTAL VEHICLE $120.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 $200.00 6 $1,200.00

Large Cooler $70.00 1 $70.00

TOTAL LAB $1,270.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Kit $360.00 Day 1 $360.00 Construction/O&M Supplies $75.00 Day 1 $75.00 Expendables $40.00 Day 1 $40.00 Summa Canister $33.00 Each 6 $198.00

TOTAL EQUIPMENT $673.00

SITE : Nelsons Cleaners (ERIC_4822) SUBTASK 3: Utilities

DATE: 2/16/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Rebound Evaluation Utilities Utility Charges (Electric) $1,300.00 Month 2 $2,600.00 Monthly Handling Fee Utility Handling Fee $20.00 Month 2 $40.00

TOTAL EQUIPMENT $2,640.00

4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109

February 16, 2026

Mr. Benjamin Aoki

Environmental Specialist II

Florida Department of Environmental Protection

Waste Site Cleanup Section

2600 North Blair Stone Road, MS4520

Tallahassee, Florida 32399-2400

Subject: Proposal For SVE System Rebound Evaluation

Nelsons Cleaners (ERIC_4822)

1203 West Highway 50

Clermont, Lake County, Florida

Dear Mr. Aoki:

CDM Smith Inc. is pleased to submit this Task Assignment Request for Soil Vapor Extraction (SVE) System

Rebound Evaluation at Nelsons Cleaners (the Site) located at 1203 West Highway 50, Clermont, Lake

County, Florida (ERIC_4822). The scope of work, proposed deliverable, and deliverable schedule are summarized below, and the cost estimate is also attached.

This Task Assignment, when executed, shall be incorporated in, and become part of Contract No. HW681 between the Florida Department of Environmental Protection (Department), and CDM Smith Inc.

(Contractor), dated January 5, 2022, hereafter referred to as the Contract.

On February 2, 2026, Contractor confirmed a Site Access Agreement (SAA) was executed with Markus

Williams with Lou Natem LLC on May 14, 2025, as the real property owner of the Site listed above. The

Lake County property appraiser database indicates the property owner since 2019, is Lou Natem LLC and that the property has not changed ownership since. As a result, Contractor assumes the current SAA remains valid and in effect.

Project Understanding

Contractor understands that the Department requires the Operations and Maintenance (O&M) of the

SVE system that consists of 5 SVE wells (VE01 through VE05), SVE blower, air injection blower, moisture separator, and a granulated activated carbon (GAC) vapor treatment drum. This proposal includes costs associated with 1 month of SVE system O&M, SVE system monitoring and optimization, Rebound

Evaluation, and a Rebound Evaluation Technical Memorandum. The project duration will be approximately 3 months. Contractor understands that the Site is an actively operating facility, and the

Site work must accommodate Site operations.

Scope of Work

The proposed scope of work includes the following elements:

4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109

Subtask 1: Project Management

Project management activities performed under this task consist of those general administrative functions required to maintain the project on schedule, within budget, and that the quality of the work products defined within this scope is consistent with Contractor’s quality standards. Contractor’s project manager will be Kathy Leggoe, PG, PMP. We will prepare and submit invoices upon approval of each deliverable or milestone completion.

Project Progress Meeting and Status Reports

Contractor will hold bi-weekly meetings or telephone conferences with the Department to review the status of the project and identify and resolve outstanding issues. Contractor will prepare meeting agendas and progress reports as part of this task throughout the duration of this project.

Project Resource Management

Contractor will manage, allocate, and coordinate necessary resources for completion of tasks related to

SVE System O&M.

Project Quality Technical Review

Contractor’s Quality Management System guidelines will be followed. Internal quality reviews will be conducted on plans and on investigation findings and reports.

Subtask 2 Rebound Evaluation

Contractor will mobilize to the Site to conduct a Rebound Evaluation. The SVE system will be brought online, and soil vapor samples will be collected from the SVE influent and soil vapor extraction wells

VE01 through VE05. Soil samples will be submitted to Eurofins Environmental Testing (Eurofins) laboratory for analysis by Method TO-15. Once O&M, including the soil vapor sample collection, is complete, the SVE system will be shut down until results can be discussed with the Department.

Following the completion of the rebound evaluation, Contractor will prepare a Rebound Evaluation

Technical Memorandum. The report will include updated figures and data tables, field forms, a copy of the laboratory analytical report and chain of custody, a summary of sampling methodologies, quality assurance/quality control evaluation of data, conclusions, and recommendations.

Subtask 3 – Utilities (Cost Plus Fixed Fee)

Contractor will provide utilities for the SVE system and assume $1,300 per month including administrative costs. This proposal includes costs associated with two months of utilities to account for the Rebound Evaluation.

Assumptions

The current SAA remains valid and in effect.

Preparing a Groundwater Monitoring Report is not included in this Task Assignment.

It is assumed that only two months of utilities will be provided and the total cost including the utilities handling fees ($20 per month) will not exceed a total of $1,320 per month.

4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109

Schedule

Subtasks 1&2: Rebound Evaluation

Deliverable: Rebound Evaluation Technical Memorandum

Due Date: 60 days from NTP

Subtask 3: Utilities

Deliverable: Paid Utility Invoices

Due Date: 120 days from NTP

CDM Smith appreciates this opportunity to work with the Department on this project. If you have any questions, please do not hesitate to contact us.

Sincerely, Kathy Leggoe, P.G., PMP Joshua Hirten, P.G.

Senior Project Manager / Geologist Environmental Discipline Leader

CDM Smith Inc. CDM Smith Inc.

leggoekr@CDMSmith.com hirtenjj@CDMSmith.com cc: Steve Cobert, P.E., CDM Smith Inc.

Kyle Turner, CDM Smith Inc.

COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf
Table 1 for SAWP
Monitoring Well Locations
Utility Locate Bids_Compiled.pdf
Geosyntec Utility-272_Geotek_1500
Geoview Utility Quote_2000_COT FTF SIS
Tallahassee Fire Training Division_V1_Bloodhound_3700
Drilling Bids_Compiled.pdf
PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic)
Direct Push
City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email
Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844
GW Protection_Geosyntec (T) 1022060 S.pdf
Invoice
Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf
Sheet1
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf
Table 1 for SAWP
Monitoring Well Locations

File details come from the government source that posted it. Updated .