This Task Assignment (TA) DC003F is a work order issued under Contract Number HW681 between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc. The TA authorizes the contractor to conduct a Soil Vapor Extraction (SVE) system rebound evaluation at Nelsons Cleaners, located at 1203 West Highway 50, Clermont, Lake County, Florida (Project Number ERIC_4822). Benjamin Aoki serves as the Department Project Manager, while Kathy Leggoe represents the contractor. The task assignment is effective through October 16, 2026.
The scope of work comprises three subtasks: Subtask 1 involves project management calculated at 13 percent of direct labor; Subtask 2 encompasses the rebound evaluation requiring contractor mobilization to conduct SVE system operations, soil vapor sample collection from five extraction wells, laboratory analysis, and preparation of a technical memorandum with conclusions and recommendations; and Subtask 3 covers utility costs for the SVE system. The total TA value is $9,488.83, consisting of $6,888.83 in fixed unit rate charges for labor and associated costs and $2,600.00 for cost reimbursement of utilities, with a total labor budget of 25 hours. Deliverables include the Rebound Evaluation Technical Memorandum due June 16, 2026, and paid utility invoices due August 14, 2026. Invoices are payable upon FDEP receipt and review of respective deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW681
DC003F Completion October 16, 2026
This Task Assignment authorizes CDM Smith Inc. to conduct rebound evaluation at Nelsons Cleaners per their proposed scope of work and cost estimate form.
Benjamin Aoki 850-245-7527 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
CDM Smith Inc.
CDM Smith Inc.
Kathy Leggoe 813-262-8851
ERIC_4822
1203 West Highway 50, Clermont, Lake County, Florida
Nelsons Cleaners
✔ $ 6,888.83
$ 2,600.00
$ 9,488.83
Scope of Work
Joshua Hirten
Contract Manager
Joshua Hirten Digitally signed by Joshua Hirten Date: 2026.04.14 10:34:56 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.04.14 09:53:09 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW681
DC003F
Subtask 1 & 2: Rebound Evaluation - Rebound Evaluation Technical Memorandum;
Project Management 06/16/2026
Subtask 3: Utilities - Paid utility invoice not to exceed $2,640.00 08/14/2026
Subtask 1 & 2: FDEP receipt and review of Rebound Evaluation Technical Memorandum $ 6,848.83
Subtask 3: FDEP receipt and review of paid utility invoice; Cost Reimbursement for utilities not to exceed $2,600.00 $ 2,640.00
$ 9,488.83
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Alexis A. Lambert Secretary
Memorandum
TO:
FROM:
SUBJECT:
DATE:
HW681 Contract File
Benjamin Aoki, Project Manager
Task Assignment
DC003F
ERIC_4822
April 06, 2026
This Task Assignment authorizes CDM Smith Inc. to conduct rebound evaluation at Nelsons Cleaners per their proposed scope of work and cost estimate form. Specific subtasks are detailed below:
Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.
Subtask 2: Rebound Evaluation Contractor will mobilize to the Site to conduct a rebound evaluation of the SVE system.
Contractor will generate a report summarizing the activities at the Site, show laboratory COC and data, and providing recommendations.
Subtask 3: Utilities This subtask is to separate Utilities payments.
The final cost associated with DC003F is $9,488.83 with 25 labor hours.
Jay Collins Lt. Governor
FDEP COST ESTIMATEContractor: CDM Smith Inc.
Date: 2/16/2026
Task #: DC003F Proposal SubTask 1 Project Management SubTask 6
Site: SubTask 2 Rebound Evaluation SubTask 7
Activity/Phase: Rebound Evaluation SubTask 3 Utilities SubTask 8
Project Manager: Kathy Leggoe SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$80.18 Project Manager 2 2.3 $0.00 0 0 0 0 0 0 0 0 0 0
$90.43 Senior Technical Expert 0 0 0 0 0 0 0 0 0 0 $80.18 Project Technical Leader 3 3.0 0.0 0 0 0 0 0 0 0 $80.18 Project Manager 4 3.5 0.0 0 0 0 0 0 0 0 $55.67 Professional II 16 16.0 0.0 0.0 0.0 0 0 0 0 0 $37.32 Professional I 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 25 2.3 22.5 0.0 0.0 0.0 0.0 0 0 0 0
Direct Labor $1,595.44 $183.55 $1,411.89 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 135.00% $2,153.84 $247.79 $1,906.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.70% $601.48 $69.20 $532.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,350.76 $500.54 $3,850.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Nelsons Cleaners (ERIC_4822)
FDEP COST ESTIMATEContractor: CDM Smith Inc.
Date: 2/16/2026
Task #: DC003F Proposal SubTask 1 Project Management SubTask 6
Site: SubTask 2 Rebound Evaluation SubTask 7
Activity/Phase: Rebound Evaluation SubTask 3 Utilities SubTask 8
Project Manager: Kathy Leggoe SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Nelsons Cleaners (ERIC_4822)
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $2,600.00 $0.00 $2,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $2,600.00 $0.00 $2,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $40.00 $0.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,640.00 $0.00 $2,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,200.00 $1,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $70.00 $70.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,270.00 $1,270.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $198.00 $198.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $435.00 $435.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $673.00 $673.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $9,053.76 $500.54 $5,913.22 $2,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $435.07 $50.05 $385.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $9,488.83 $550.59 $6,298.24 $2,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SITE : Nelsons Cleaners (ERIC_4822) SUBTASK 2: Rebound Evaluation
DATE: 2/16/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Technical Leader Technical Guidance / System Operations & Optimization for Rebound Evaluation 2 PE Review 1
Project Manager Coordinate Site Access with Owner and Tenant 0.5 Rebound Evaluation Conclusions and Recommendations 1 Rebound Evaluation Memo Final Preparation 1 O&M Tables Final Preparation 1
Professional II Field Preparation 1 Mobilization (2 hr) and Demobilization (2 hr) - Rebound Evaluation Field Activities 4 Rebound Evaluation Field Activities 5 Prepare Laboratory Sample Kit 1 Data and Sample Management 2 Update O&M Data Tables 2 Rebound Evalaution and O&M Documentation 1
Total Hours:
PTL 3
PM 3.5
Professional II 16
22.5
TOTAL LABOR 22.5
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 each 1 $120.00
TOTAL VEHICLE $120.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TO-15 $200.00 6 $1,200.00
Large Cooler $70.00 1 $70.00
TOTAL LAB $1,270.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Kit $360.00 Day 1 $360.00 Construction/O&M Supplies $75.00 Day 1 $75.00 Expendables $40.00 Day 1 $40.00 Summa Canister $33.00 Each 6 $198.00
TOTAL EQUIPMENT $673.00
SITE : Nelsons Cleaners (ERIC_4822) SUBTASK 3: Utilities
DATE: 2/16/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Rebound Evaluation Utilities Utility Charges (Electric) $1,300.00 Month 2 $2,600.00 Monthly Handling Fee Utility Handling Fee $20.00 Month 2 $40.00
TOTAL EQUIPMENT $2,640.00
4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109
February 16, 2026
Mr. Benjamin Aoki
Environmental Specialist II
Florida Department of Environmental Protection
Waste Site Cleanup Section
2600 North Blair Stone Road, MS4520
Tallahassee, Florida 32399-2400
Subject: Proposal For SVE System Rebound Evaluation
Nelsons Cleaners (ERIC_4822)
1203 West Highway 50
Clermont, Lake County, Florida
Dear Mr. Aoki:
CDM Smith Inc. is pleased to submit this Task Assignment Request for Soil Vapor Extraction (SVE) System
Rebound Evaluation at Nelsons Cleaners (the Site) located at 1203 West Highway 50, Clermont, Lake
County, Florida (ERIC_4822). The scope of work, proposed deliverable, and deliverable schedule are summarized below, and the cost estimate is also attached.
This Task Assignment, when executed, shall be incorporated in, and become part of Contract No. HW681 between the Florida Department of Environmental Protection (Department), and CDM Smith Inc.
(Contractor), dated January 5, 2022, hereafter referred to as the Contract.
On February 2, 2026, Contractor confirmed a Site Access Agreement (SAA) was executed with Markus
Williams with Lou Natem LLC on May 14, 2025, as the real property owner of the Site listed above. The
Lake County property appraiser database indicates the property owner since 2019, is Lou Natem LLC and that the property has not changed ownership since. As a result, Contractor assumes the current SAA remains valid and in effect.
Project Understanding
Contractor understands that the Department requires the Operations and Maintenance (O&M) of the
SVE system that consists of 5 SVE wells (VE01 through VE05), SVE blower, air injection blower, moisture separator, and a granulated activated carbon (GAC) vapor treatment drum. This proposal includes costs associated with 1 month of SVE system O&M, SVE system monitoring and optimization, Rebound
Evaluation, and a Rebound Evaluation Technical Memorandum. The project duration will be approximately 3 months. Contractor understands that the Site is an actively operating facility, and the
Site work must accommodate Site operations.
Scope of Work
The proposed scope of work includes the following elements:
4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109
Subtask 1: Project Management
Project management activities performed under this task consist of those general administrative functions required to maintain the project on schedule, within budget, and that the quality of the work products defined within this scope is consistent with Contractor’s quality standards. Contractor’s project manager will be Kathy Leggoe, PG, PMP. We will prepare and submit invoices upon approval of each deliverable or milestone completion.
Project Progress Meeting and Status Reports
Contractor will hold bi-weekly meetings or telephone conferences with the Department to review the status of the project and identify and resolve outstanding issues. Contractor will prepare meeting agendas and progress reports as part of this task throughout the duration of this project.
Project Resource Management
Contractor will manage, allocate, and coordinate necessary resources for completion of tasks related to
SVE System O&M.
Project Quality Technical Review
Contractor’s Quality Management System guidelines will be followed. Internal quality reviews will be conducted on plans and on investigation findings and reports.
Subtask 2 Rebound Evaluation
Contractor will mobilize to the Site to conduct a Rebound Evaluation. The SVE system will be brought online, and soil vapor samples will be collected from the SVE influent and soil vapor extraction wells
VE01 through VE05. Soil samples will be submitted to Eurofins Environmental Testing (Eurofins) laboratory for analysis by Method TO-15. Once O&M, including the soil vapor sample collection, is complete, the SVE system will be shut down until results can be discussed with the Department.
Following the completion of the rebound evaluation, Contractor will prepare a Rebound Evaluation
Technical Memorandum. The report will include updated figures and data tables, field forms, a copy of the laboratory analytical report and chain of custody, a summary of sampling methodologies, quality assurance/quality control evaluation of data, conclusions, and recommendations.
Subtask 3 – Utilities (Cost Plus Fixed Fee)
Contractor will provide utilities for the SVE system and assume $1,300 per month including administrative costs. This proposal includes costs associated with two months of utilities to account for the Rebound Evaluation.
Assumptions
The current SAA remains valid and in effect.
Preparing a Groundwater Monitoring Report is not included in this Task Assignment.
It is assumed that only two months of utilities will be provided and the total cost including the utilities handling fees ($20 per month) will not exceed a total of $1,320 per month.
4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109
Schedule
Subtasks 1&2: Rebound Evaluation
Deliverable: Rebound Evaluation Technical Memorandum
Due Date: 60 days from NTP
Subtask 3: Utilities
Deliverable: Paid Utility Invoices
Due Date: 120 days from NTP
CDM Smith appreciates this opportunity to work with the Department on this project. If you have any questions, please do not hesitate to contact us.
Sincerely, Kathy Leggoe, P.G., PMP Joshua Hirten, P.G.
Senior Project Manager / Geologist Environmental Discipline Leader
CDM Smith Inc. CDM Smith Inc.
leggoekr@CDMSmith.com hirtenjj@CDMSmith.com cc: Steve Cobert, P.E., CDM Smith Inc.
Kyle Turner, CDM Smith Inc.
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
| Utility Locate Bids_Compiled.pdf |
| Geosyntec Utility-272_Geotek_1500 |
| Geoview Utility Quote_2000_COT FTF SIS |
| Tallahassee Fire Training Division_V1_Bloodhound_3700 |
| Drilling Bids_Compiled.pdf |
| PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic) |
| Direct Push |
| City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email |
| Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844 |
| GW Protection_Geosyntec (T) 1022060 S.pdf |
| Invoice |
| Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf |
| Sheet1 |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |