CN-370000-CN306-T3.pdf

PDF 239 KB Posted

Attached to
Master Agreement FL|CN306|0213c5976ed74492a857f85bd20cc16d
Contract number
CN306
Issued by
Florida

About this file

This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) for contract CN306, Task Assignment 3, Project Number 61108C. The contract engages Hydra Engineering & Construction, LLC to provide design and bidding services for the St. George Island State Park Bike Path project. Key personnel include Leslie Hope (Consultant Representative), Mae Roth (FDEP Contract Manager), and Donald Finkbeiner (FDEP Project Manager). The task assignment was executed on December 8, 2017, with a completion date of December 31, 2018.

The scope of work comprises two subtasks: (1) Preparation of 100% Plans consisting of updated design drawings, specifications, and construction details to be delivered in PDF format and five signed hard copies, and (2) Bidding services including technical specifications and responses to Requests for Information (RFIs). The fixed price cost totals $8,260.86, comprised of $7,022.76 for Subtask 1 and $1,238.10 for Subtask 2. Reimbursable costs of $540.00 are authorized for printing and plan set reproduction under Subtask 1, with no reimbursable expenses for Subtask 2. The overall task amount is $8,800.86. Labor costs are based on hourly rates for staff engineers ($78.34), project engineers ($111.92), principal engineers ($279.80), and office administrators ($62.94). Payment is contingent upon FDEP approval of deliverables for each subtask.

View the file

Other files

File Type Posted
CN-370000-CN306-CMC1.pdf PDF
CN-370000-CN306-T10CO2.pdf PDF
CN-370000-CN306-T11CO1.pdf PDF
CN-370000-CN306-T19.pdf PDF
CN-370000-CN306-T20CO1.pdf PDF
CN-370000-CN306-T21CO1.pdf PDF
CN-370000-CN306-T22.pdf PDF
CN-370000-CN306-T23CO2.pdf PDF
CN-370000-CN306-T23CO3.pdf PDF
CN-370000-CN306-T23CO4.pdf PDF
CN-370000-CN306-T26CO1.pdf PDF
CN-370000-CN306-T28.pdf PDF
CN-370000-CN306-T31CO1.pdf PDF
CN-370000-CN306-T32CO1.pdf PDF
CN-370000-CN306-T33CO1.pdf PDF
CN-370000-CN306-T33CO2.pdf PDF
CN-370000-CN306-T3CO1.pdf PDF
CN-370000-CN306-T5CO1.pdf PDF
CN-370000-CN306-T8CO1.pdf PDF
CN-370000-CN306-A1.pdf PDF
CN-370000-CN306-T10.pdf PDF
CN-370000-CN306-T12.pdf PDF
CN-370000-CN306-T13CO1.pdf PDF
CN-370000-CN306-T13CO3.pdf PDF
CN-370000-CN306-T14CO1.pdf PDF
CN-370000-CN306-T15.pdf PDF
CN-370000-CN306-T15CO1.pdf PDF
CN-370000-CN306-T16CO2.pdf PDF
CN-370000-CN306-T17.pdf PDF
CN-370000-CN306-T18.pdf PDF
CN-370000-CN306-T19 CO1.pdf PDF
CN-370000-CN306-T20.pdf PDF
CN-370000-CN306-T22CO1.pdf PDF
CN-370000-CN306-T22CO2.pdf PDF
CN-370000-CN306-T23CO1.pdf PDF
CN-370000-CN306-T24CO1.pdf PDF
CN-370000-CN306-T28CO3.pdf PDF
CN-370000-CN306-T33.pdf PDF
CN-370000-CN306-T5CO2.pdf PDF
CN-370000-CN306-T6.pdf PDF
CN-370000-CN306-T1.pdf.crdownload CRDOWNLOAD file
CN-370000-CN306-T10 CO1.pdf PDF
CN-370000-CN306-T10 CO1.pdf.crdownload CRDOWNLOAD file
CN-370000-CN306-T11CO2.pdf PDF
CN-370000-CN306-T13CO2.pdf PDF
CN-370000-CN306-T16.pdf PDF
CN-370000-CN306-T16CO1.pdf PDF
CN-370000-CN306-T19CO3.pdf PDF
CN-370000-CN306-T1CO1.pdf PDF
CN-370000-CN306-T2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: I Task Assignment No.: Owner's Name: I Project No.:

CN306 TAJ FDEP-BDC-Dl 61108C Project Location: Project Name:

St. George Island State Park Bike Path Consultant Name:

Hydra Engineering & Construction, LLC Consultant Representative: Phone: Email:

Leslie Hope 850-926-2593 lahope@hydraengineering.com FDEP Contract Manager: Phone: Email:

Mae Roth 850-245-2781 mae.roth@dep.state.fl.us Description of Task:

Provide design and bidding services for construction of the Bike Path at St. George Island State Park. Please see consultant proposal dated December 7, 2017.

Project Manager: Donald Finkbeiner

Start Date: I Upon execution Completion Date: I December 3 I, 2018

Greg Turral

Budget Representative, FDEP

Donald Finkbeiner

Project Manager, FDEP

Mae Roth

Contract Manager, FDEP

Leslie Hope

Consultant

Michael W. Foster Jr. P.E.

Contract Authority, FDEP

Pro.iect # Grant# 61108C

29 di2it FLAIR Code:

Or2 Code 37501000068

Schedule Fixed Price Cost: $ 8,260.86

Cost Reimbursement not to exceed: $ 540.00 Total Task Amount: $8,800.86

Approval Signatures:

Greg Tu rra I Digitally signed by Greg Turrel Date: 2017.12.08 16:22:18-05'00'

Signature Digitally signed by Donald J .

Donald J. Finkbeiner Finkbeiner

Signature

Mae Roth Signature

Date: 2017.12.0816:30:54 --05'00'

Digitally signed by Mae Roth Date: 2017.12.13 12:02:28 -05'00'

Lesll·e Hope DigitallysignedbyleslieHope Date: 2017.12.13 12:27:10 --05'00'

Signature

12-8-2017

Date

12-8-2017

Date

12/13/2017

Date

12/13/2017

Cat/Year Fund Module Object Code EO Amount

080039/17 423001 U3100 131500 QK $8,800.86

Total: $8,800.86

HYDRA ENGINEERING & CONSTRUCTION, LLC

Rev. December 7, 2017

Donald Finkbeiner Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520 Tallahassee, FL 32399

RE: CN306-Task Assignment 3, BOC Project No. 61108C St. George Island State Park- Bike Path

Dear Mr. Finkbeiner:

For your review, Hydra Engineering & Construction, LLC, has provided a proposal summary and man-hour documentation for the service tasks identified in CN306 Task Assignment 3, BOC Project No. 61108C - design of bike path at St. George Island State Park.

Please see the attached proposal summary and deliverables.

Sincerely, ' ,J . /) _/-.:Jiulu l1uP-J.

1,../ I

Leslie Hope, P.E., C.B.C.

Hydra Engineering & Construction, LLC

36 Jasper Thomas Road, Crawfordville, Florida 32327 (850) 926-2593 www.hydraec.com

Bike Path St. George Island State Park

CN306, Task Assignment Number 3

Subtask 1: 100% Plans Description: 100% Plans consisting of updates from the 90% design review comments for the cover sheet, general notes, existing conditions, plan and profile sheets, cross-sections sheets, erosion control sheets, and construction details.

Deliverable: Consultant will provide 24"x36" sheet size drawings transmitted electronically in PDF format and five (5) signed and sealed hard copies to project manager.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Fixed Price Cost:

Subtask 1

Firm Name Position Classification Hourly

Hours Total Fixed

Rate Price Cost

Hydra Engineering & Construction, LLC Staff Engineer $78.34 40 $3,133.60

Hydra Engineering & Construction, LLC Project Engineer $111.92 20 $2,238.40

Hydra Engineering & Construction, LLC Principal Engineer $279.80 5 $1,399.00

Hydra Engineering & Construction, LLC Office Administrator $62.94 4 $251.76

Fixed Price Cost Total: $7,022.76

Reimbursable Cost: (if applicable - wovide for each task in which reimbursables are required) Postage N/A Electronic submittals

Printing $1.80 per sheet*60 Sheets*S Plan sets=$540.00

Overnight Travel N/A (if applicable)

Mileage(@ $0.445 per 128 miles * 0 trip * 0.445 = $0.00 mile)

Reimbursable Total Cost $540.00

Total for Subtask 1: (Fixed Price Cost + Reimbursable)= $7,562.76

Subtask 2: Bidding Description: Provide technical specifications and respond to RFI's.

Deliverable: Consultant will provide response letters, memorandums, and technical documents in PDF format to project manager.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language

Fixed Price Cost:

Subtask 2

Firm Name Position Classification Hourly

Hours Total Fixed

Rate Price Cost

Hydra Engineering & Construction, LLC Principal Engineer $279.80 1 $279.80

Hydra Engineering & Construction, LLC Project Engineer $111.92 8 $895.36

Hydra Engineering & Construction, LLC Office Administrator $62.94 1 $62.94

Fixed Price Cost Total $1,238.10

Reimbursable Cost: (if avvlicable - provide for each task in which reimbursables are required) Postage NIA Electronic submittals Printing N/ A Electronic submittals Overnight Travel N/A (if applicable)

Mileage(@ $0.445 per 0 miles * 0 trip * 0.445 = $0.00 mile)

Reimbursable Total Cost $0.00 Total for Subtask 2: (Fixed Price Cost + Reimbursable) =$1,238.10

P. tShdl ro1ec c e u e:

Activity Duration (Calendar Days) Dates

Subtask 1: 100% Plans 21 TBD

Subtask 2: Bidding 12 TBD

S fF ummarv o ees:

Subtask Subtask Fixed Price Cost Subtask Reimbursable

Subtask 1: 100% Plans $7,022.76 $540.00

Subtask 2: Bidding $1,238.10 $0.00

Total Fixed Price Cost: $8,260.86

Total Reimbursable Cost: $540.00

Overall Total Cost: $8,800.86

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)