This document is a Task Assignment Notification Form and associated proposal from the Florida Department of Environmental Protection (FDEP) to Hydra Engineering & Construction, LLC for engineering services related to the Florida Caverns State Park Road Repave and Repair project. The contract is designated as FDEP Contract No. CN306, Project No. 6M115C, with Task Assignment No. 10. Leslie Weiss, P.E., C.G.C. serves as the consultant representative, while Alyssa Skehan functions as the FDEP contract manager. The project is located at Florida Caverns State Park in Florida.
The contract encompasses seven subtasks providing design and permitting documents for the repair and repave of approximately 3.05 miles of park roadway. The subtasks include: topographic survey ($24,295.86), geotechnical investigation ($4,124.38), 30% design plans ($6,463.67), environmental permitting ($5,835.44), 90% design plans ($5,602.84), 100% design plans ($2,957.86), bidding support ($1,238.10), and construction administration ($3,855.20). The total fixed price cost is $53,943.06 with reimbursable costs of $430.29, bringing the overall contract total to $54,373.35. Payment is contingent upon FDEP approval of deliverables for each subtask. The project completion date is June 30, 2023, with authorization effective upon execution of the task assignment.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN306 10 FDEP 6M115C
Florida Caverns State Park Road Repave and Repair
Hydra Engineering & Construction, LLC
Leslie Weiss, P.E., C.G.C. 850- 926-2593 lahope@hydraengineering.com
Alyssa Skehan 850.245.2781 Alyssa.Skehan@FloridaDEP.gov
Consultant to provide design and permitting documents for the repair and repave of approximately 3.05 miles of park roadway as per proposal dated 7/27/2021.
Wayne Thomas
Upon Execution $ 53,943.06 6/30/2023 $ 430.29
$ 54,373.35
Greg Turral Gregory Turral Digitally signed by Gregory Turral Date: 2021.08.12 12:02:50 -04'00'
Wayne Thomas Wayne Thomas Digitally signed by Wayne Thomas Date: 2021.08.12 14:16:38 -04'00'
Alyssa Skehan Alyssa Skehan Digitally signed by Alyssa Skehan Date: 2021.08.12 14:38:58 -04'00'
Leslie Weiss, P.E., C.G.C. Leslie Weiss Digitally signed by Leslie Weiss Date: 2021.08.12 15:49:31 -04'00'
Michael W. Foster Jr. P.E. Michael W. Foster Jr.
Digitally signed by Michael W.
Foster Jr.
Date: 2021.08.25 10:04:09 -04'00'
6M115C FD079 37501000025 080039/22 423001 U3200 131500 QK $ 54,373.35
$ 54,373.35
HYDRA ENGINEERING & CONSTRUCTION, LLC
36 Jasper Thomas Road, Crawfordville, Florida 32327 (850) 926-2593 www.hydraec.com
July 27, 2021
Wayne Thomas Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520 Tallahassee, FL 32399
RE: CN306, BDC Project No. 6M115C
Florida Caverns State Park – Road Repave and Repair
Dear Mr. Thomas:
Hydra Engineering & Construction, LLC is pleased to provide the attached proposal summary and man-hour documentation for the Road Repave and Repair at Florida Caverns State Park.
Please see the attached proposal summary and deliverables.
Sincerely, Leslie Weiss, P.E., C.G.C.
Hydra Engineering & Construction, LLC
Road Repair and Repave Florida Caverns State Park
Subtask 1A: Survey Description: Topographical survey of Florida Caverns State Park Road and Visitor Center Parking area. Topographic Road survey will begin just inside the guard gate on Hickory Drive where the road reduces back down to a standard two lane road and will proceed along Hickory Drive to the Visitor Center parking entrance. Survey will include the entire visitor center parking area (approximately 1.08 miles of roadway). Topographic Road survey will also include Blue Hole Road starting at the intersection of Blue Hole Road & Hickory Drive and will proceed along Blue Hole Road terminating at the cul-de-sec loop located just past the Blue Hole restroom facilities (approximately 1.97 miles of roadway).
Topographical survey to include:
• Topographical Survey of paved roadway surface and Visitor Center Parking area extending
15' outside the edge of pavement.
• Location of visible utilities (no underground utilities will be located).
• Location of any cross drains culverts, headwalls, wingwalls and or storm water structures within topographical corridor.
• Horizontal location only of any potholes located within the paved surface of roadway.
• Horizontal and vertical control points will be established and set appropriately throughout the length of the project.
• Topographical survey will be performed on 1-foot contours and or spot elevations as needed.
• Topographical survey will be performed on NAVD 88 Vertical DATUM and Horizontal control will be on NAD 83/90.
Deliverable: Consultant will provide (2) signed and sealed hard copies as well as electronic copies (Autocad and pdf) of the topographic survey.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Subtask 1A
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost Edwin Brown & Associates Survey Field Crew (3
Man Crew) $150.00 87.5 $13,125.00
Edwin Brown & Associates Licensed Surveyor $155.00 30 $4,650.00 Edwin Brown & Associates Drafting $80.00 70 $5,600.00 Edwin Brown & Associates Office Administrator $20.00 34 $680.00
Hydra Engineering & Construction, LLC Principal Engineer $279.80 0 $0.00
Hydra Engineering & Construction, LLC Project Engineer $111.92 1 $111.92 Hydra Engineering & Construction, LLC Office Administrator $62.94 1 $62.94
Fixed Price Cost Total: $24,229.86
Reimbursable Cost:
Postage 1A=N/A Electronic submittals Printing 30 Sheets*$2.20 per sheet=$66.00 Overnight Travel (if applicable)
N/A
Mileage (@ $0.445 per mile)
0 Miles*$.445 per mile=$0.00
Reimbursable Total Cost $66.00 Total for Subtask 1A: (Fixed Price Cost + Reimbursable) = $24,295.86
Subtask 1B: Geotechnical Investigation:
Description: Pavement Survey and Pavement Design Recommendations for 2 Core Locations.
Prepare a geotechnical report including, subsurface material encountered, estimate existing Structural Number (SNE) of existing roadway and provide pavement design recommendations and pavement milling recommendations.
• Environmental and Geotechnical Specialists, Inc. (EGS) will have access to the pavement coring locations and has permission to be on site and close one (1) lane of traffic;
• Bid assumes that EGS can perform the work between the normal business hours of Monday through Friday, 7:00am to 5:00 pm;
Deliverable: Consultant will provide Geotechnical report with attachments to project manager electronically in PDF format and mail hard copies on 8 ½” x11” sheets.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Subtask 1B
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
EGS, Inc. Project Manager $163.34 2 $326.68 EGS, Inc. Engineer Intern $86.23 6 $517.38 EGS, Inc. Senior Engineering Technician $83.92 12 $1,007.04
EGS, Inc. Field Project Manager $163.34 4 $653.36
EGS, Inc. Pavement Coring Equip Mobilization $357.62 1 $357.62
EGS, Inc. MOT – Mobilization $185.40 1 $185.40 EGS, Inc. MOT – Cones/Flags $28.84 1 $28.84 EGS, Inc. MOT – Flagmen (Each) $43.13 4 $172.52
EGS, Inc. Pavement Coring – Asphalt $126.50 2 $253.00
Hydra Engineering & Construction, LLC Principal Engineer $279.80 1 $279.80
Hydra Engineering & Construction, LLC Project Engineer $111.92 2.5 $279.80
Hydra Engineering & Construction, LLC Office Administrator $62.94 1 $62.94
Fixed Price Cost Total: $4,124.38
Reimbursable Cost:
Postage 1B= N/A Electronic submittals Printing 1B=N/A Overnight Travel (if applicable)
N/A
Mileage (@ $0.445 per mile)
1B = N/A
Reimbursable Total Cost $0.00 Total for Subtask 1B: (Fixed Price Cost + Reimbursable) = $4,124.38
Subtask 2: 30% documents Description: 30% Plans consisting of a cover sheet, general notes, existing conditions and plan and profile sheets. Hydra will review and make recommendations for the abutments and wingwalls of the culvert crossings and all roadway shoulders due to the erosion. It also includes providing an Opinion of Probable Construction Cost.
Deliverable: Consultant will provide 24”x36” sheet size drawings transmitted electronically in PDF format to the project manager.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Subtask 2
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost Hydra Engineering & Construction, LLC Staff Engineer $78.34 45 3,525.30 Hydra Engineering & Construction, LLC Principal Engineer $279.80 10 2,798.00 Hydra Engineering & Construction, LLC Office Administrator $62.94 1 62.94
Fixed Price Cost Total: $6,386.24
Postage N/A Electronic submittals Printing N/A Electronic submittals Overnight Travel (if applicable)
N/A
Mileage (@ $0.445 per mile)
174 miles * 1 trip * 0.445 = $77.43
Reimbursable Total Cost $77.43 Total for Subtask 2: (Fixed Price Cost + Reimbursable) = $6,463.67
Subtask 3: Environmental Permitting Description: Includes a site visit of the project area to perform a wetland delineation based upon State and Federal guidelines. An Environmental Resource Permit application will be prepared and applied for through Northwest Florida Water Management District. Recently, the State took over the Federal Permitting. A State 404 Environmental Permit will be prepared and submitted. This proposal also includes responding to Requests for Additional Information, if needed.
Deliverable: Consultant will prepare permit applications and site report in PDF format to the FDEP project manager for signatures.
Subtask 3
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost Florida Environmental & Land
Services, Inc. Principal Environmental $90.15 38 $3,425.70
Florida Environmental & Land Services, Inc. Staff Project Asst. $78.00 26.5 $2,067.00
Hydra Engineering & Construction, LLC Project Engineer $111.92 2.5 $279.80 Hydra Engineering & Construction, LLC Office Administrator $62.94 1 62.94
Fixed Cost Price Total: $5,835.44
Printing N/A Electronic submittals Overnight Travel (if applicable)
N/A
Mileage (@ $0.445 per mile)
0 miles * trip * 0.445 = $0.00
Total for Subtask 3: (Fixed Price Cost + Reimbursable) = $5,835.44
Subtask 4: 90% Plans Description: 90% Plans consisting of updates from the 30% design review comments for the cover sheet, general notes, existing conditions, plan and profile sheets, cross-sections sheets at culverts, erosion control sheets, and construction details. It also includes providing an Opinion of Probable Construction Cost.
Deliverable: Consultant will provide 24”x36” sheet size drawings transmitted electronically in PDF format to project manager.
Subtask 4
Rate Hours Total Fixed
Price Cost Hydra Engineering & Construction, LLC Staff Engineer $78.34 35 $2,741.90 Hydra Engineering & Construction, LLC Principal Engineer $279.80 10 $2,798.00 Hydra Engineering & Construction, LLC Office Administrator $62.94 1 $62.94
Fixed Price Cost Total: $5,602.84
Overnight Travel (if applicable)
N/A
Mileage (@ $0.445 per mile)
0 miles * 0 trip * 0.445 = $0.00
Total for Subtask 4: (Fixed Price Cost + Reimbursable) =$5,602.84
Subtask 5: 100% Plans
Description: 100% Plans consisting of updates from the 90% design review comments for the cover sheet, general notes, existing conditions, plan and profile sheets, cross-sections sheets at the culvert locations and key road improvement areas, erosion control sheets, and construction details. It also includes providing an Opinion of Probable Construction Cost.
Deliverable: Consultant will provide 24”x36” sheet size drawings transmitted electronically in PDF format and two (2) signed and sealed hard copies to project manager.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Subtask 5
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
Hydra Engineering & Construction, LLC Staff Engineer $78.34 15 $1,175.10 Hydra Engineering & Construction, LLC Principal Engineer $279.80 5 $1,399.00 Hydra Engineering & Construction, LLC Office Administrator $62.94 4 $251.76
Fixed Price Cost Total: $2,825.86
Reimbursable Cost: (if applicable – provide for each task in which reimbursables are required)
Postage N/A Electronic submittals Printing $2.20 per sheet*30 Sheets*2 Plan sets=$132.00 Overnight Travel (if applicable)
N/A
Mileage (@ $0.445 per mile)
0 miles * 0 trip * 0.445 = $0.00
Reimbursable Total Cost $132.00 Total for Subtask 5: (Fixed Price Cost + Reimbursable) = $2,957.86
Subtask 6: Bidding Description: Provide technical specifications and respond to RFI’s.
Deliverable: Consultant will provide response letters, memorandums, and technical documents in PDF format to project manager.
complete, accurate, and timely. (Please do not alter this language
Subtask 6
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost Hydra Engineering & Construction, LLC Principal Engineer $279.80 1 $279.80 Hydra Engineering & Construction, LLC Project Engineer $111.92 8 $895.36 Hydra Engineering & Construction, LLC Office Administrator $62.94 1 $62.94
Fixed Price Cost Total $1,238.10
Reimbursable Cost: (if applicable – provide for each task in which reimbursables are required)
Postage N/A Electronic submittals Printing N/A Electronic submittals Overnight Travel (if applicable)
N/A
Mileage (@ $0.445 per mile)
0 miles * 0 trip * 0.445 = $0.00
Total for Subtask 6: (Fixed Price Cost + Reimbursable) =$1,238.10
Subtask 7: Construction Administration
Description: Construction administration includes answering Requests for Information, reviewing shop drawings, 1 progress site inspections, Project certification and site visit for final inspection. It also includes assisting FDEP and contractor in obtaining a building permit by supplying necessary plans needed for the applications.
Deliverable: Responses to RFI’s, shop drawings, site visit notes transmitted electronically in PDF format to project manager. RFI’s will be responded to within 7 working days and submittals will be responded to within 5 working days.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are
Subtask 7
Rate Hours Total Fixed
Price Cost Hydra Engineering & Construction, LLC Principal Engineer $279.80 5 $1,399.00 Hydra Engineering & Construction, LLC Project Engineer $111.92 20 $2,238.40 Hydra Engineering & Construction, LLC Office Administrator $62.94 1 $62.94
Fixed Price Cost Total $3,700.34
Overnight Travel (if applicable)
N/A
Mileage (@ $0.445 per mile)
174 miles * 2 trips * 0.445 = $154.86
Reimbursable Total Cost $154.86 Total for Subtask 7: (Fixed Price Cost + Reimbursable) =$3,855.20
Project Schedule:
Activity Duration (Calendar Days) Dates Subtask 1A- Topographic Survey
45 Upon Receiving Authorization
Subtask 1B- Geotechnical Investigation
30 Upon Receiving Authorization
Subtask 2: 30% plans 35 TBD Subtask 3: Environmental Permitting
60 TBD
Subtask 4: 90% Plans 21 TBD Subtask 5: 100% Plans 21 TBD Subtask 6: Bidding *Contingent on when department advertises the project for bidding
TBD
Subtask 7: Construction Admin
*Contingent on when construction starts
TBD
Summary of Fees:
Subtask Subtask Fixed Price Cost Subtask Reimbursable Subtask 1A- Topographic Survey $24,229.86 $66.00
Subtask 1B- Geotechnical Investigation $4,124.38 0 Subtask 2: 30% plans $6,386.24 $77.43
Subtask 3: Environmental Permitting $5,835.44 $0.00 Subtask 4: 90% Plans $5,602.84 $0.00
Subtask 5: 100% Plans $2,825.86 $132.00 Subtask 6: Bidding $1,238.10 $0.00
Subtask 7: Construction Admin $3,700.34 $154.86 Total Fixed Price Cost: $53,943.06
Total Reimbursable Cost: $430.29 Overall Total Cost: $54,373.35
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)
| Hydra Proposal FL Caverns Road 07202021.pdf |
| July 20, 2021 |
| Hydra Proposal FL Caverns Road 07272021.pdf |
| July 27, 2021 |
File details come from the government source that posted it. Updated .