This is a Task Assignment Change Order Form from the Florida Department of Environmental Protection (FDEP) for Contract CN306, Task Assignment TA23. The change order involves FDEP and Hydra Engineering & Construction, LLC, a consulting firm based in Crawfordville, Florida, with Leslie Weiss, P.E., C.G.C. serving as the consultant representative. Ralph Perkins acts as the FDEP Contract Manager for the project. The work is related to the Grayton Beach State Park Concession Building project (Project No. 61427C).
The change order authorizes additional geotechnical testing services, specifically geotechnical investigation and double ring infiltration testing for a proposed stormwater management facility at the Grayton Beach State Park concession stand site. The work will be performed by Environmental and Geotechnical Specialists, Inc. (EGS) in conjunction with ongoing field investigations and includes hand auger boring, infiltration testing, and laboratory particle size analysis. The net increase in task amount for this change order is $1,419.98 in fixed fees, bringing the total task amount with all change orders to $225,094.95 (comprised of $11,749.40 in reimbursement and $213,345.55 in fixed fees). The original task execution date is June 22, 2023, with an original end date of June 9, 2026; the change order does not alter the end date. Payment will be made upon FDEP approval of deliverables, which includes a geotechnical report in PDF format to be completed within 45 calendar days of authorization.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
( ) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN306 TA23 CO1 61427C
Grayton Beach State Park Concession Building
Hydra Engineering & Construction, LLC.
Leslie Weiss, P.E., C.G.C. (850) 926-2593 lahope@hydraengineering.com
Ralph Perkins, or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
This Change Order is for the additional geotechnical testing proposed for the Concession Stand at Grayton Beach State Park per dated Proposal 10/15/2023.
$ 11,749.40 $ 211,925.57 $ 223,674.97 $ 11,749.40 $ 211,925.57 $ 223,674.97
$ 1,419.98 $ 1,419.98 $ 11,749.40 $ 213,345.55 $ 225,094.95
06/22/2023
06/09/2026
06/09/2026
06/09/2026
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.10.19 08:42:26 -04'00'
Del Cobb Del Cobb Digitally signed by Del Cobb Date: 2023.10.19 11:20:22 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.10.20 13:39:46 -04'00'
Leslie Weiss, P.E., C.G.C. Leslie Weiss Digitally signed by Leslie Weiss Date: 2023.10.24 10:56:02 -04'00'
Bryan Bradner Bryan Bradner Digitally signed by Bryan Bradner Date: 2023.11.01 09:22:13 -04'00'
61427C 37501016033 080039/23 000286 U3100 131500 AD $ 1,419.98
$ 1,419.98
HYDRA ENGINEERING & CONSTRUCTION, LLC
36 Jasper Thomas Road, Crawfordville, Florida 32327 (850) 926-2593 www.hydraec.com
October 15, 2023
Del Cobb Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520 Tallahassee, FL 32399
RE: CN306, BDC Project No. 61427C
Grayton Beach State Park – Concession Stand Change Order for Geotechnical Testing
Dear Mr. Cobb:
Hydra Engineering & Construction, LLC is pleased to provide the attached change order proposal and man-hour documentation for the additional geotechnical testing proposed for the Concession Stand at Grayton Beach State Park.
Please see the attached proposal summary and deliverables.
Sincerely, Leslie Weiss, P.E., C.G.C.
Hydra Engineering & Construction, LLC
TA23 CO1
Grayton Beach State Park – New Concession Building Change Order
Subtask 1E: Geotechnical Investigation for Proposed Parking Facility:
Description:
Perform 4 Hand Augers and Double Ring Infiltration test in the location of the proposed stormwater management facility (SWMF) to determine infiltration rates required for the environmental permitting.
Assumptions:
• Environmental and Geotechnical Specialists, Inc. (EGS) will have perform the work in conjunction with the scheduled field investigation currently underway. No mobilization is included provided it is performed with on-going work.
• Site is assumed to be clear and easily accessible to a pick-up truck.
• The SWMF is assumed to be 2-ft of less in depth and located at the SW corner of the proposed concession building site.
• EGS is not responsible for obtaining necessary permits (excluding utility locate ticket), should they be required, for the proposed site.
Deliverable: Consultant will provide Geotechnical report with attachments to project manager electronically in PDF format.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Subtask 1E Geotech – DRI / SWMF Testing
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
EGS, Inc. Senior Engineer $202.31 1 $202.31 EGS, Inc. Engineering Intern $86.23 4 $344.92
EGS, Inc. Auger Borings - Hand $8.59 6 $51.54
EGS, Inc. Double Ring Infiltration Test $379.49 1 $379.49
EGS, Inc. Laboratory Particle Size Analysis $40.48 4 $161.92
Hydra Engineering & Construction, LLC Principal Engineer $279.80 1 $279.80
Fixed Price Cost Total: $1,419.98
Total for Subtask 1B: (Fixed Price Cost + Reimbursable) = $1,419.98
Project Schedule:
Activity Duration (Calendar Days) Dates Subtask 1E Geotech – DRI / SWMF Testing
45 Upon Receiving Authorization
Summary of Fees:
Subtask Subtask Fixed Price Cost Subtask Reimbursable
Subtask 1E Geotech – DRI / SWMF Testing $1,419.98 $0.00
Total Fixed Price Cost: $1,419.98 Total Reimbursable Cost: $0.00 Overall Total Cost: $1,419.98
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)