This is a Task Assignment Change Order Form (Change Order No. 3) issued by the Florida Department of Environmental Protection (FDEP) for contract CN306 with Hydra Engineering & Construction, LLC. The change order modifies Task Assignment TA23 related to the New Concession Building project at Grayton Beach State Park in Walton County, Florida. The FDEP Contract Manager is Ralph Perkins, and the consultant representative is Leslie Weiss, P.E. The document was digitally signed by authorized representatives including Budget Representative Tamika Bass, Project Manager Meena Senthil, Contract Manager Ralph Perkins, Consultant Leslie Weiss, and Contract Authority Bryan Bradner on June 19-28, 2024.

The change order authorizes funding for a Cultural Resource Assessment Survey (CRAS) for the new concession building located off Main Park Road, comprising two subtasks: Subtask 9A (Background Research and 1a-32 Permit) and Subtask 9B (CRAS fieldwork and reporting). The net increase to the task amount is $11,074.35 in fixed fees with no reimbursable costs, bringing the total task amount to $236,169.30. Subtask 9A, valued at $3,003.42, involves permit application and background research with a 37-day duration. Subtask 9B, valued at $8,070.93, includes archaeological fieldwork using subsurface testing and visual inspection, archival research, and report preparation within 63 calendar days of permit receipt. Payment is contingent upon FDEP approval of deliverables for each subtask. The work is funded through FLAIR code 61427C, Project 61427C, with an allocation code of 37501016033, category/year 080039/23, fund 000286, module U3100, object code 131500, and EO code AD. The task end date is February 18, 2026, with no net change in days from the original schedule.

View the file

Other files

File Type Posted
CN-370000-CN306-A1.pdf PDF
CN-370000-CN306-T10.pdf PDF
CN-370000-CN306-T12.pdf PDF
CN-370000-CN306-T13CO1.pdf PDF
CN-370000-CN306-T13CO3.pdf PDF
CN-370000-CN306-T14CO1.pdf PDF
CN-370000-CN306-T15.pdf PDF
CN-370000-CN306-T15CO1.pdf PDF
CN-370000-CN306-T16CO2.pdf PDF
CN-370000-CN306-T17.pdf PDF
CN-370000-CN306-T18.pdf PDF
CN-370000-CN306-T19 CO1.pdf PDF
CN-370000-CN306-T20.pdf PDF
CN-370000-CN306-T22CO1.pdf PDF
CN-370000-CN306-T22CO2.pdf PDF
CN-370000-CN306-T23CO1.pdf PDF
CN-370000-CN306-T24CO1.pdf PDF
CN-370000-CN306-T28CO3.pdf PDF
CN-370000-CN306-T33.pdf PDF
CN-370000-CN306-T5CO2.pdf PDF
CN-370000-CN306-T6.pdf PDF
CN-370000-CN306-CMC1.pdf PDF
CN-370000-CN306-T10CO2.pdf PDF
CN-370000-CN306-T11CO1.pdf PDF
CN-370000-CN306-T19.pdf PDF
CN-370000-CN306-T20CO1.pdf PDF
CN-370000-CN306-T21CO1.pdf PDF
CN-370000-CN306-T22.pdf PDF
CN-370000-CN306-T23CO2.pdf PDF
CN-370000-CN306-T23CO4.pdf PDF
CN-370000-CN306-T26CO1.pdf PDF
CN-370000-CN306-T28.pdf PDF
CN-370000-CN306-T31CO1.pdf PDF
CN-370000-CN306-T32CO1.pdf PDF
CN-370000-CN306-T33CO1.pdf PDF
CN-370000-CN306-T33CO2.pdf PDF
CN-370000-CN306-T3CO1.pdf PDF
CN-370000-CN306-T5CO1.pdf PDF
CN-370000-CN306-T8CO1.pdf PDF
CN-370000-CN306-T1.pdf.crdownload CRDOWNLOAD file
CN-370000-CN306-T10 CO1.pdf PDF
CN-370000-CN306-T10 CO1.pdf.crdownload CRDOWNLOAD file
CN-370000-CN306-T11CO2.pdf PDF
CN-370000-CN306-T13CO2.pdf PDF
CN-370000-CN306-T16.pdf PDF
CN-370000-CN306-T16CO1.pdf PDF
CN-370000-CN306-T19CO3.pdf PDF
CN-370000-CN306-T1CO1.pdf PDF
CN-370000-CN306-T2.pdf PDF
CN-370000-CN306-T23.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

( ) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN306 TA23 CO3 61427C

Grayton Beach State Park Concession Building

Hydra Engineering & Construction, LLC.

Leslie Weiss, P.E. (850)926-2593 lahope@hydraengineering.com

Ralph Perkins, or successor (850)245-2460 Ralph.Perkins@FloridaDEP.gov

This proposal is for performing Cultural Resource Assessment Survey (CRAS) for the New Concession Building located off Main Park Road per attached proposal dated 06/05/2024.

$ 11,749.40 $ 211,925.57 $ 223,674.97 $ 11,749.40 $ 213,345.55 $ 225,094.95

$ 0.00 $ 11,074.35 $ 11,074.35 $ 11,749.40 $ 224,419.90 $ 236,169.30

06/22/2023

06/09/2026

02/18/2026

02/18/2026

Tamika Bass

Meena Senthil

Ralph Perkins

Leslie Weiss, P.E.

Bryan Bradner

61427C 37501016033 080039/23 000286 U3100 131500 AD $ 11,074.35