This is a Task Assignment Change Order Form (Change Order No. 1) issued by the Florida Department of Environmental Protection (FDEP) for FDEP Contract No. CN306. The change order modifies services provided by Hydra Engineering, LLC for the Stephen Foster Folk Culture Center State Park Road Rehabilitation and Culvert Repairs project. FDEP's project manager is Ralph Perkins, and Hydra Engineering's representative is Leslie Weiss, P.E. The document was executed with digital signatures from representatives of both parties and FDEP approving authorities on March 25-26, 2025.
The change order authorizes additional construction administration of geotechnical services for the project. The modification increases the fixed fee task amount by $6,368.26, bringing the total task amount with all change orders to $9,124.26. Services include two subtasks: Subtask 10A—Geotechnical Construction Administration ($4,612.78 fixed price cost) with contributions from Environmental and Geotechnical Specialists, Inc. and Hydra Engineering personnel at various classification levels, and Subtask 10B—Geotechnical Construction Administration Site Visit ($1,755.48 fixed price cost) to investigate geotechnical concerns. Both subtasks require deliverables in PDF format transmitted electronically to the project manager and are contingent on department scheduling. The original task end date of February 18, 2026 remains unchanged, and payment will be made upon approval of deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
( ) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN306 22 1 61495C
Road Rehabs and Culvert Repairs
Hydra Engineering, LLC
Leslie Weiss, PE (850) 926-2593 leslie@hydrac.com
Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
Additional construction administration of geotechnical services Per attached doc dated March 17, 2025
$ 0.00 $ 2,756.00 $ 2,756.00 $ 0.00 $ 2,756.00 $ 2,756.00 $ 0.00 $ 6,368.26 $ 6,368.26 $ 0.00 $ 9,124.26 $ 9,124.26
10/08/2024
02/18/2026
02/18/2026
02/18/2026
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2025.03.25 11:13:13 -04'00'
Mal'Lica Benton Mallica Benton Digitally signed by Mallica Benton Date: 2025.03.20 16:37:33 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2025.03.25 13:21:28 -04'00'
Leslie Weiss, P.E Leslie Weiss Digitally signed by Leslie Weiss Date: 2025.03.25 13:54:08 -04'00'
Michael W Foster Jr., P.E Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2025.03.26 13:37:07 -04'00'
61495C 37502000137 080039/23 423001 U3200 131500 QK $ 6,368.26
$ 6,368.26
Stephen Foster Folk Culture Center State Park
File details come from the government source that posted it. Updated .