CN-370000-CN306-T32CO1.pdf
PDF 1 MB Posted
- Contract number
- CN306
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for a flood mitigation project at the Florida Geological Survey Annex and Warehouse. The contract involves FDEP as the contracting state agency and Hydra Engineering & Construction, LLC as the consultant. The key FDEP personnel include Ralph Perkins (Contract Manager) and Richard Marcil (Project Manager), while Leslie Weiss, P.E., C.G.C. serves as the consultant representative. The change order is identified as CN306 Task Assignment TA32 Change Order No. 1.
The change order authorizes Hydra Engineering & Construction, LLC to provide an asbestos survey and report for the Department of Environmental Protection Annex flood mitigation work. Subtask 5 requires an AHERA-accredited inspector to conduct a visual assessment of sidewalk structures and collect samples for laboratory analysis of suspected asbestos-containing materials, with deliverables including a signed and sealed electronic copy of the asbestos survey report. The fixed price cost for this subtask is $1,298.57, with no reimbursable costs, resulting in a net increase to the total task amount of $1,298.57. The project execution and end dates are both February 18, 2026, with a 21-day duration from change order execution. Payment will be made upon FDEP approval of deliverables. All required signatures from FDEP budget, project management, and contract authority personnel, as well as the consultant, have been digitally executed.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
( ) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN306 TA32 1 N/A
Flood Mitigation
Hydra Engineering & Construction, LLC
Leslie Weiss, P.E., C.G.C. (850) 926-2593 lahope@hydraengineering.com
Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
To provide an asbestos survey and report, per the attached dated January 20, 2025.
$ 0.00 $ 18,118.42 $ 18,118.42 $ 0.00 $ 18,118.42 $ 18,118.42 $ 0.00 $ 1,298.57 $ 1,298.57 $ 0.00 $ 19,416.99 $ 19,416.99
02/18/2026
02/18/2026
02/18/2026
02/18/2026
Kim Bundage
Richard Marcil
Ralph Perkins
Leslie Weiss, P.E., C.G.C.
Michael W. Foster Jr., P.E.
37050101001 100777 408001 PC $ 1,298.57
$ 1,298.57
Florida Geological Survey Annex and Warehouse