CN-370000-CN306-T27CO2.pdf
PDF 1 MB Posted
- Contract number
- CN306
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for contract CN306, Task Assignment 27, Change Order 2. The document involves FDEP and Hydra Engineering and Construction, LLC, the consultant performing services for the Seawall Repair project at Gamble Rogers Memorial State Recreation Area. FDEP's Project Manager is Rafael De Leon, and the contract manager is Ralph Perkins. Leslie Weiss, P.E., C.G.C., serves as the consultant representative.
The change order authorizes an additional $5,961.94 in fixed fee costs for Subtask 8A—Structural Dock Design, which involves the demolition plan and design of replacement for approximately 110 linear feet of boat ramp docks on both sides of the seawall. The structural design deliverable consists of 24"x36" sheet size drawings in PDF format. The fixed price cost includes work by G.S. Preble Engineering, Inc. (Structural Engineer at $4,500.00), Hydra Engineering & Construction, LLC personnel (Principal Engineer, Project Engineer, and Office Administrator totaling $1,461.94). The change order extends the task completion date by 598 days from June 30, 2024, to February 18, 2026, due to permitting delays. The cumulative total task amount with all change orders is $84,549.22, with a net increase of $5,961.94 for this change order. Payment is contingent upon FDEP approval of deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
( ) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN306 27 2 61475C
Seawall Repair
Hydra Engineering and Construction, LLC.
Leslie Weiss, P.E., C.G.C. (850) 926-2593 lahope@hydraengineering.com
Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
Change order summary structural dock design for the boat ramp for both sides of the Seawall Repairs at Gamble Roger per attached dated 3/18/24 and 2/29/24.
$ 1,500.00 $ 64,638.41 $ 66,138.41 $ 1,500.00 $ 77,087.28 $ 78,587.28
$ 0.00 $ 5,961.94 $ 5,961.94 $ 1,500.00 $ 83,049.22 $ 84,549.22
08/10/2023
06/30/2024
06/30/2024
02/18/2026
Tamika Bass
Rafael De Leon
Ralph Perkins
Leslie Weiss
Michael W. Foster Jr., P.E.
61475C 37503000024 080039/23 423001 U3200 131500 QK $ 5,961.94
$ 5,961.94
From: Leslie Weiss To: DeLeon, Rafael Cc: Courtney Armitage; Dylan Jones; Alexis Browning Subject: CN306 TA27 CO2 Gamble Rogers - Seawall Repairs Date: Monday, March 18, 2024 12:04:20 PM
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Good afternoon Rafael, Hydra would like to request an additional 598 days to the Gamble Rogers SP Seawall Repairs CN306 TA 27 due to permitting delays. That would bring the new end date to February 18, 2026.
Thank you for the consideration!
Leslie Weiss, PE, GCG, F.ASCE President Hydra Engineering & Construction, LLC 36 Jasper Thomas Road Crawfordville, FL 32327 Office (850) 926-2593