This document is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Contract No. CN306, Project No. 61428C. The change order involves Hydra Engineering and Construction, LLC, a consulting firm based in Crawfordville, Florida, and represents the third change order for Task Assignment 24 related to the New Campground project at Dr. Julian G. Bruce St. George Island State Park. The FDEP Project Manager is Terry McCullum Jr., and the consultant representative is Leslie Weiss, P.E., C.G.C.

The change order authorizes additional services for a subsurface utility investigation survey of the existing water main located at the park's shop road and main park drive intersection, as well as the site of the park's deactivated water tank. The investigation will utilize electromagnetic equipment and ground penetrating radar to locate the 8-inch PVC water main and identify any valves present across three locations. The fixed price cost for this subtask is $6,858.95, comprised of labor from Bloodhound LLC (field technician at 13 hours for $3,302.00), and Hydra Engineering staff including a principal engineer (3 hours at $279.80/hour), project engineer (24 hours at $111.92/hour), and office administrator (0.5 hours at $62.94/hour). The total task amount with all change orders is now $344,005.83, with no change to the task execution timeline, which remains February 18, 2026. The deliverable is a subsurface investigation report in PDF format to be provided electronically to the project manager.

View the file

Other files

File Type Posted
CN-370000-CN226-TA3CO5.pdf PDF
CN-370000-CN306-CMC2.pdf PDF
CN-370000-CN306-CMC3.pdf PDF
CN-370000-CN306-T1.pdf PDF
CN-370000-CN306-T11.pdf PDF
CN-370000-CN306-T13.pdf PDF
CN-370000-CN306-T13CO4.pdf PDF
CN-370000-CN306-T14.pdf PDF
CN-370000-CN306-T17CO1.pdf PDF
CN-370000-CN306-T17CO2.pdf PDF
CN-370000-CN306-T19CO2.pdf PDF
CN-370000-CN306-T21.pdf PDF
CN-370000-CN306-T25CO1.pdf PDF
CN-370000-CN306-T26.pdf PDF
CN-370000-CN306-T27CO1.pdf PDF
CN-370000-CN306-T28CO2.pdf PDF
CN-370000-CN306-T29.pdf PDF
CN-370000-CN306-T3.pdf PDF
CN-370000-CN306-T32.pdf PDF
CN-370000-CN306-T34.pdf PDF
CN-370000-CN306-T4.pdf PDF
CN-370000-CN306-T5CO3.pdf PDF
CN-370000-CN306.pdf PDF
CN-370000-CN306-CMC1.pdf PDF
CN-370000-CN306-T10CO2.pdf PDF
CN-370000-CN306-T11CO1.pdf PDF
CN-370000-CN306-T19.pdf PDF
CN-370000-CN306-T20CO1.pdf PDF
CN-370000-CN306-T21CO1.pdf PDF
CN-370000-CN306-T22.pdf PDF
CN-370000-CN306-T23CO2.pdf PDF
CN-370000-CN306-T23CO3.pdf PDF
CN-370000-CN306-T23CO4.pdf PDF
CN-370000-CN306-T26CO1.pdf PDF
CN-370000-CN306-T28.pdf PDF
CN-370000-CN306-T31CO1.pdf PDF
CN-370000-CN306-T32CO1.pdf PDF
CN-370000-CN306-T33CO1.pdf PDF
CN-370000-CN306-T33CO2.pdf PDF
CN-370000-CN306-T3CO1.pdf PDF
CN-370000-CN306-T5CO1.pdf PDF
CN-370000-CN306-T8CO1.pdf PDF
CN-370000-CN306-T1.pdf.crdownload CRDOWNLOAD file
CN-370000-CN306-T10 CO1.pdf PDF
CN-370000-CN306-T10 CO1.pdf.crdownload CRDOWNLOAD file
CN-370000-CN306-T11CO2.pdf PDF
CN-370000-CN306-T13CO2.pdf PDF
CN-370000-CN306-T16.pdf PDF
CN-370000-CN306-T16CO1.pdf PDF
CN-370000-CN306-T19CO3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

( ) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN306 24 3 61428C

New Campground

Hydra Engineering and Construction, LLC.

Leslie Weiss, P.E., C.G.C. (850) 926-2593 lahope@hydraengineering.com

Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov

Additional services to locate subsurface utilities, per attached proposal dated January 24, 2025.

$ 15,460.00 $ 269,572.41 $ 285,032.41 $ 16,060.00 $ 321,086.88 $ 337,146.88

$ 0.00 $ 6,858.95 $ 6,858.95 $ 16,060.00 $ 327,945.83 $ 344,005.83

02/18/2026

02/18/2026

02/18/2026

02/18/2026

Tamika Bass

Terry McCullum, Jr.

Ralph Perkins

Leslie Weiss

Mara Gambineri

61428C 37501000068 080039/23 000286 U3100 134000 AD $ 6,858.95

$ 6,858.95

HYDRA ENGINEERING & CONSTRUCTION, LLC

36 Jasper Thomas Road, Crawfordville, Florida 32327 (850) 926-2593 www.hydraec.com

January 24, 2025

Terry McCullum Jr.

Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520 Tallahassee, FL 32399

RE: CN306, BDC Project No. 61428C Task Assignment 24 Change Order 03

Dr. Julian G. Bruce St. George Island State Park – New Campground Change Order Request

Dear Mr. McCullum:

Hydra Engineering & Construction, LLC is pleased to provide the attached request for a change order and man-hour documentation for the Campground Expansion at Dr. Julian G. Bruce St. George Island State Park for the investigation into the existing water main conditions at the park’s shop road and main park drive intersection and the site of the parks previous water tank site.

Please see the attached proposal summary and deliverables.

Sincerely, Leslie Weiss, P.E., C.G.C.

Hydra Engineering & Construction, LLC

HYDRA ENGINEERING & CONSTRUCTION, LLC

36 Jasper Thomas Road, Crawfordville, Florida 32327 (850) 926-2593 www.hydraec.com

New Campground Change Order Request St. Geroge Island State Park

Task Assignment 24 Change Order 03

Subtask 1E: Subsurface Investigation Survey of Exiting Watermain Along Main Park Drive

Description: Tasks include a subsurface utility investigation survey of the existing water main located at the park’s shop road and main park drive. The investigation includes utilizing electromagnetic (EM) equipment and ground penetrating radar to locate the limits of the existing 8” PVC water main and specifically any valves that may or may not be present. Blood Hound LLC. will investigate the existing water main in three locations. The primary location is along the northeastern corner of Main Park Dr and Camp Shop Rd, where the water main cuts across the corner. Blood Hound will also investigate if there is an extension of the existing 8” water main across Camp Shop Rd that connects back along the Main Park Drive (secondary). Blood Hound will also investigate the site of the deactivated water tank and chlorinator site (tertiary), to see what subsurface infrastructure exists in this area. Blood Hound will flag limits of water main and any areas where a previously unknown valve is suspected.

Deliverable: Consultant will provide subsurface investigation report with attachments to project manager electronically in PDF format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Fixed Price Cost:

Subtask 1E: Subsurface Investigation Survey of Existing Watermain Along Main Park Drive

Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Bloodhound LLC. Field Technician $254.00 13 $3,302.00

Hydra Engineering & Construction, LLC Principal Engineer $279.80 3 $839.40 Hydra Engineering & Construction, LLC Project Engineer $111.92 24 $2,686.08 Hydra Engineering & Construction, LLC Office Administrator $62.94 0.5 $31.47

Fixed Price Cost Total: $6,858.95

Total for Subtask 1E: (Fixed Price Cost + Reimbursable) = $6,858.95