Document Summary
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for an indefinite delivery contract with VBA Design, Inc., a consulting firm providing engineering and design services. The change order modifies Task Assignment No. TA3 under FDEP Contract No. CN226 for the Waterfront Park Improvements project located in Franklin County, Florida. The contract is managed by FDEP with Victoria Williams serving as the Consultant Representative and Adam Browne as the FDEP Contract Manager.
The change order authorizes additional consultant services to re-design structural wall reinforcing, increasing the total task amount from $63,457.36 to $65,141.04, a net increase of $1,633.68. Task 13 deliverables consist of a 100% re-design submittal and all RFI responses to be provided in PDF format to the FDEP Project Manager within one week of approval. The re-design work is necessitated by differences discovered between actual slab construction and the original design, requiring modifications to CMU wall reinforcement and deck design. Task 12.1, covering Roof Truss and Structural Reinforcing Design, is billed at $156.00 per hour for Project Architect services (4 hours) and $144.24 per hour for Structural Engineering services (7 hours), totaling $1,633.68. The original task execution date was January 19, 2016, with the original end date of December 31, 2016, extended to October 31, 2018. The change order was executed on July 10, 2018.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .