Attachment X - RTC BID DWGS 8 2025.1023.pdf

PDF 18 MB Posted

Attached to
Z2DA--Remediate Temperature Controls 539-21-108 Federal contract opportunity
Solicitation number
36C25026B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

These architectural floor plan drawings for the Cincinnati VA Medical Center depict construction documents for multiple buildings, including Buildings 2, 3, 13, 14, and 15. The drawings, prepared by Heapy Engineering and Levin Porter Architects for the U.S. Department of Veterans Affairs, show basement and first floor plans at 1/8" or 1/16" scale, with detailed room layouts, mechanical spaces, corridors, and electrical equipment locations. The project number is 2020-05099, with Kevin Henderson listed as the project manager, and the plans are dated 10/23/2025. Each building's floor plan includes specific room designations such as mechanical rooms, animal rooms, procedure rooms, corridors, and utility spaces, with accompanying photographs of electrical routing equipment. The documents are fully sprinkled and include general notes sections, though the specific details of those notes are not fully visible in the images.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Remediate Temperature Controls 539-21-108, newest first.
File Type Posted
Sign in Sheet Remediate Temp.pdf PDF
1-M103 - THIRD FLOOR.pdf PDF
1-M110 - TENTH FLOOR PENTHOUSE.pdf PDF
2-M100 - BUILDING 2 BASEMENT.pdf PDF
15-M100 - BUILDING 15 BASEMENT.pdf PDF
M002 - JOHNSON CONTROLS ROUTER SCHEDULE.pdf PDF
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-28.pdf PDF
Updated Specs Addendum 4.pdf PDF
1-M105 - FIFTH FLOOR.pdf PDF
1-M109 - NINTH FLOOR.pdf PDF
13-M101 - BUILDING 13 FIRST FLOOR.pdf PDF
64-M100 - BUILDING 64 BASEMENT.pdf PDF
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17.pdf PDF
REVISED STATEMENT OF BID ITEMS.pdf PDF
ICRA 539.21.108 Patient Areas Level III.pdf PDF
Change Summary of Specs and Drawings.pdf PDF
1-M100 - BASEMENT.pdf PDF
64-M102 - BUILDING 64 SECOND FLOOR.pdf PDF
64-M103 - BUILDING 64 THIRD FLOOR.pdf PDF
M004 - TRIDIUM ROUTER SCHEDULE.pdf PDF
M701 - GENERAL CRITERIA HONEYWELL CONTROLS REPLNT.pdf PDF
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5.pdf PDF
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8.pdf PDF
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12.pdf PDF
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21.pdf PDF
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-29.pdf PDF
36C25026B0002 0004.pdf PDF
1-M104 - FOURTH FLOOR.pdf PDF
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4.pdf PDF
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7.pdf PDF
36C25026B0002 0003.pdf PDF
36C25026B0002 0002.pdf PDF
36C25026B0002 0001.docx DOCX document
Attachment XIV - EMR Form.pdf PDF
Attachment XII - J A - Redacted.pdf PDF
Attachment XI - RTC BID DWGS 9 2025.1023.pdf PDF
Attachment VIII - RTC BID DWGS 6 2025.1023.pdf PDF
Attachment IV - RTC BID DWGS 2 2025.1023.pdf PDF
Attachment XV - 852.219-75 LOS.docx DOCX document
Attachment XIII - RFI Form.pdf PDF
Attachment XVII - ICRA Level 2.pdf PDF
Attachment V - RTC BID DWGS 3 2025.1023.pdf PDF
Attachment II - CD SPECIFICATION 2025.1023.pdf PDF
36C25026B0002.docx DOCX document
Attachment XVI - Directive 1192.01, Flu.pdf PDF
Attachment IX -RTC BID DWGS 7 2025.1023.pdf PDF
Attachment VII - RTC BID DWGS 5 2025.1023.pdf PDF
Attachment VI -RTC BID DWGS 4 2025.1023.pdf PDF
Attachment III -RTC BID DWGS 1 2025.1023.pdf PDF
Attachment I - WD OH20250082.pdf PDF
Show all 50

Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

D

Machine Room

A11001

Elevator Room

A11002

GHILMO

8a

J

Kb

Jb

Hb

Nb

Mb Lb

10a

Ga

N

K

Oa

LGR25 11TH FLR

1 2 4

11TH FLR MER

5 6

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :5

A

M -2

-1

ELEVENTH FLOOR PENTHOUSE

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M111

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

ELEVENTH FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.

FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. PROVIDE A STATIC OUTSIDE AIR PROBE (REFERENCE PRESSURE SENSOR) ON A NEW

TOWER MOUNTED TO ROOF ABOVE. SENSOR SHALL BE INSTALLED AT LEAST FIFTEEN

FEET ABOVE ROOF. COORDINATE EXACT LOCATION WITH COR. PROVIDE TUBING TO

COMMUNICATE WITH NEW PRESSURE SENSORS ON EACH FLOOR AS INDICATED.

6. PROVIDE NEW WEATHER STATION NEAR STATIC OUTSIDE AIR PROBE. COORDINATE

EXACT LOCATION WITH COR.

PHOTO - B1-A11001 LGR25 11TH FLR

# DESCRIPTION DATE

D

D

AA.0

AA.1

AB.0

AB.1

AB.2

AC.0

AC.2

AD.0

AE.0

AF.0

DA.0

DB.0

D2.0 D3.0 D4.0 A1.0

BB.0

BD.0

B0.0 B1.0

B2.0

B2.1

B3.0

B4.0

BD.1

A7.0 A7.1

A8.0 B6.1 B7.0

B7.1

B7.2

A1.1 A2.0 A3.0 A3.1 A4.0 A4.1 A5.0 A5.1 A5.2 A6.0

AC.1

CE.0

AD.1

BA.0

BA.1

BB.1

BB.2

BC.1

AG.0

AG.1

AH.0

CA.0

C1.1 C2.1

B6.0

B5.0

BB.3

E0.1

E1.0

F1.0

F2.0

F2.1 F3.0

F4.0

F5.0

F5.1

F6.0

FC.0

FB.0

FA.3

EF.0

EE.0

ED.0

EC.2

EC.0

EB.2

EB.1

EB.0

EE.1

EA.0

E1.1

E2.0 E3.0 E3.1 E4.0 E4.1 E5.0 E5.1

E5.2

E6.0

EC.1

FA.0

FA.1

FA.2

AHU-52 AHU-51

AHU-53

AC.0

AC.2

AD.0

A1.0

B3.0

A1.1 A2.0 A3.0 A3.1

BA.0

2 5

ECBBPMR EXAM/TREATMENT

PMR

EXAM/TREATMENT

PATIENT CARE STORAGE

HOUSEKEEPING CLOSET

STAFF TOILET

PMR

EXAM/TREATMENT0113

TELEHEALTH

/ PMR

EXAM/TREATMENT

ELECTRICAL GEAR

STORAGE

ELEV. MACH. ROOM

TECH CLOSET

PIPE ROOM

DISH MACHINE

HORTICULTURE

THERAPY

OT OFFICE

KILN ROOM

MEDIA

CENTER

RT OFFICE

ACTIVITIES FOR DAILY LIVING - BATH

0117B

0117A

ACTIVITIES

FOR DAILY

LIVING -

KITCHEN

PATIENT WOMEN'S

RCL OFFICE

CLEAN LINEN

RECREATION

GROUP

ROOM

EXERCISE

MAT / PRIVATE RM

PATIENT MEN'S

SOILED LINEN

TECH. (EXISTING)

RCL OFFICE

PT OFFICE

STAIR (EXISTING)

S1.0

PMR EXAM/TREATMENT

PMR EXAM/TREATMENT

ELECTRICAL (EXISTING)

PMR EXAM/TREATMENT

THERAPY SPACE

CORRIDOR

CHANGING / LOCKERS

CORRIDOR

C*B*4

RESIDENT STORAGE

ELEVATOR EQUIP. ROOM

CLOSET

0024A

NURSE EDUC.

EMS LOCKERS

HAC

CORRIDOR

C*B*1

WOMEN

BREAK ROOM

NURSE EDUC.

PHARMACY WORK ROOM

STAIR 2

S*B*2

MECHANICAL VESTIBULE

EMS WORK LEADER

ELEVATOR LOBBY

C*B*5

NFS STORAGE

0018 MEN

CORRIDOR

C*B*3

ELECTRICAL

MECHANICAL

STAIR 1

S*B*1

Corridor-3

C*B*2-3

RT STORAGE

MECHANICAL (EXISTING)

NAE-33

NAE-15

5 2 4

G5RE ROUTER B2 BSMT

4 3

AHU-54

1 2 4

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :5

A

M -2

-1

BUILDING 2 BASEMENT

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

2-M100

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

BASEMENT FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.

FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED

THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

PHOTO - B2-0012 NAE-15

PHOTO - B2-0125 G5RE ROUTER B2 BSMT

PHOTO - B2-0125 NAE-33

DN

S T

U V

W

BB CC DD EE

FF

GG

HH

II

JJ

KK

Stairs

S*B*2

Clos.

10D

Elev. Equip.

Lobby

010A

Off.

2A

HR Off

3A

HR Off.

Conference Room

Bathroom

10B

H.A.C.

HR Off.

Electrical

Corridor-4

C*B*2-4

Break Room

1A

Stairs

S*B*1

Pipe Basement

1B

HR Off.

HR Off.

Office

HR Office

Lobby

Corridor-3

C*B*1-3

HR Off.

Vestibule

LGR25 BLDG 3

1 2 4

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :5

A

M -2

-1

BUILDING 3 BASEMENT

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

3-M100

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.

FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

PHOTO - B3-013 LGR25 BLDG 3

DN

DN

DN

DN

DN

D

N23

Q

R

S

T

U

V

W

XY

5 6

NAE-11

VALVE OVERRIDE SWITCHES

BUILDING 8 BUILDING 13

NAE-10

5 2 4

2 4

LGR BLDG. 13 1 2 4

MONITOR

PC

PRINTER 6

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :5

A

M -2

-1

BUILDING 13 FIRST FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

13-M101

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.

FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING JOHNSON CONTROLS NCE/NIE

DEVICE. ALL CONTROLS ROUTED THRU EXISTING DEVICE SHALL BE REMOVED, RE-

ROUTED AND FULLY INTEGRATED THRU NEW JACE. NCE/NIE DEVICE SHALL REMAIN AS A

FIELD CONTROLLER. FULLY INTEGRATE ALL EXISTING CONTROLLER POINTS INTO NEW

HEAD END THRU JACE. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

6. REMOVE EXISTING HONEYWELL CONTROLS SYSTEM AFTER ALL POINTS HAVE BEEN

INTEGRATED INTO NEW TRIDIUM SYSTEM.

PHOTO - B13-LGR25 BLDG 13

PHOTO - B13-NAE-10

PHOTO - B13-NAE-11

1 2

C

A

B

2.1

F

D

5.1

E

3.7

ELEC.

G5CE ROUTER BLDG. 14

1 2 4

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :5

A

M -2

-1

BUILDING 14 BASEMENT

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

14-M100

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR PLAN

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.

FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

PHOTO - B14-009 G5CE ROUTER BLDG 14

N

D.1

B

A.1 A

D

123456789

C

MECH. ROOM

B-01

TO

B1

TO

B14 NAE-08 AND NAE-27

1 2 4

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :0

A

M -2

-1

BUILDING 15 BASEMENT

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

15-M100

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. REPLACE EXISTING JOHNSON CONTROLS NAE'S WITH NEW JACE'S (2x). ALL CONTROLS

ROUTED THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU

NEW JACE'S. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE'S. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

PHOTO - B15-B-01 NAE-8 AND NAE-27

D.1

B

A.1 A

D

123456789

C

TO

B14

NAE-35

AHU-31

Clean Procedure Room

111A

Bottle Wash

Vestibule

117A

Animal Room

Animal Room

Animal Room

Animal Room

Animal Room

Animal Room

007 Animal Room

Animal Room

Cage Set Up

103A

Toilet

104C

Clean Procedure Room

Animal Room

Clean Storage

Cage Wash

104A

Cage Dump

Dry Storage

Animal Room

Mechanical

Room

H.A.C.

104B

Necropsy

Clean Corridor

C*1*2

Clean Vestibule

C*1*119A

Lobby

Corridor

C*1*100H

Rack Set-up

Dry Storage

115A

Corridor

C*1*115

Corridor

C*1*116

Clean Corridor

C*1*117

Dirty Corridor

C*1*3

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :0

A

M -2

-1

BUILDING 15 FIRST FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

15-M101

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING JOHNSON CONTROLS NCE/NIE

DEVICE. ALL CONTROLS ROUTED THRU EXISTING DEVICE SHALL BE REMOVED, RE-

ROUTED AND FULLY INTEGRATED THRU NEW JACE. NCE/NIE DEVICE SHALL REMAIN AS A

FIELD CONTROLLER. FULLY INTEGRATE ALL EXISTING CONTROLLER POINTS INTO NEW

HEAD END THRU JACE. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

PHOTO - B15-001 NAE-35

N

File details come from the government source that posted it. Updated .