Attachment 8 - Drawings Vol 2 Part1.pdf
PDF 39 MB Posted
- Solicitation number
- 36C77625R0092-RFP
About this file
This is a comprehensive set of architectural and engineering drawings (Volume 2, Part 1) for the EHRM Infrastructure Upgrades Construction project at James A. Haley Veterans Hospital in Tampa, Florida (Project 673-20-107). The drawings, issued for construction on April 4, 2025, provide detailed plans for Building 30 across multiple disciplines including architectural, mechanical, electrical, plumbing/fire protection, and technology systems. The project involves renovation of three test rooms (TRs) on the ground, first, and second floors of the facility, requiring demolition of existing systems and installation of new infrastructure to support information technology operations while maintaining compliance with infection control and life safety requirements in an active hospital environment.
The drawings include existing condition plans, demolition plans, new work plans, reflected ceiling plans, ICRA (Infection Prevention and Control) containment plans, and detailed system designs prepared by CB Design Group (architect), IMEG Corporation (MEP/structural engineer), and technology consultants. Key work includes removal and replacement of mechanical ductwork and piping, electrical panel and distribution upgrades with new transformers and circuit breaker provisions, modification of fire protection and plumbing systems, installation of new data and communication infrastructure with conduit routing and information outlets, and comprehensive HVAC, lighting, and utility modifications. The project specifications emphasize stringent infection control measures including critical barriers, negative air pressure maintenance with continuous monitoring, HEPA filtration, and coordinated waste removal during operational hours. The Contracting Officer is Sean Kaminski at SCC Division Chief in Independence, Ohio, with Marco Lopez serving as the COR at the Tampa facility.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HANDICAPP ED RAMP
FDOT IND EX #304
HANDICAPP ED RAMP
FDOT IND EX #304
CONCRETE
33.17
S-2
TRASH
DS-BL
EXIT
ENTER
POST
POST
POST
POST
ISLAND
ISLAND
TO P OF W ALL
D
WM
EE
MACHINE ROOM
ELEVATOR
2 ' - 0 "
EX B03
' - 0
E X
B0
UP
B R
U C
E B
D
O W
N S
B L
V D
E FLETCHER AVE
UNIVERSITY OF SOUTH
FLORIDA COLLEGE
E 132ND AVE
N
N
D S
T
N
R
D S
T
L
IV
IN
G
S T
O N
A V
E
N
T
H S
T
N
T
H S
T
E 131ST AVE
E 131ST AVE
B R
U C
E B
D
O W
N S
B L
V D
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
LTCAL
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
COVER SHEET- VOLUME 2
GI-200
-2
-1
G I-
.p d f
Department of Veterans Affairs
673-20-107 EHRM INFRASTRUCTURE UPGRADES- VOL 2
ISSUED FOR CONSTRUCTION
PROJECT DIRECTORY
Medical Center Director
Director of Facility Management Service
Medical Director
Project COR
Project CO
Infection Control
Safety Officer
CONTRACTING OFFICER REPRESENTATIVE (COR)
Marco Lopez
James A. Haley Veteran Hospital 13000 Bruce B. Downs Blvd Tampa, FL 33612
PHONE: (813) 972-2000
Marco.Lopez@va.gov
ARCHITECT
CB DESIGN GROUP, INC
412 King St. Ste. 301 Alexandria, VA 22314
PHONE: (888) 585-CBDG (2234)
wbridge@cbdg-ae.com
MEP/FP/STRUCTURAL ENGINEER
Scott Przybysz
IMEG Corporation 15 Sunnen Drive Ste. 104 St. louis, MO 63143
PHONE: (314) 951-2535
scott.r.przybysz@imegcorp.com
CONTRACTING OFFICER (CO)
Sean Kaminski
Contracting Officer SCC, Division Chief Department of Veterans Affairs | Contracting 6150 Oak Tree Blvd Suite 490 Independence, OH 44131
PHONE: (216) 447-8300
Sean.Kaminski@va.gov
APPROVALS
JAMES A. HALEY VETERAN HOSPITAL
13000 BRUCE B. DOWNS BLVD
TAMPA, FL. 33612
N
PLAN
NORTHSCALE: NOT TO SCALE
VICINITY MAP
COMMUNITY
NURSING
30-095
TELEPHONE
30-096e
OPERATORS
30-096
30-096f
RESTROOM
30-096d ----
30-096c
CLOSET
30-096b
30-096a
30-039
SEMI-PRIVATE 12
30-038
SEMI-PRIVATE 11
30-037
SEMI-PRIVATE 10
30-036
SEMI-PRIVATE 930-035
PRIVATE 12
30-032
PRIVATE 11
30-031
PRIVATE 10
30-049
PRIVATE 14
30-046
PRIVATE 13
30-045
SEMI-PRIVATE 18
30-044
SEMI-PRIVATE 17
30-043
SEMI-PRIVATE(F) 16
30-042
SEMI-PRIVATE(F) 15
30-041
SEMI-PRIVATE(F) 14
30-042a
TLT/SHOWER
30-043a
TLT/SHOWER
30-044a
TLT
30-045a
TLT
30-046a
TLT
30-047
SHOWER
30-048
SHOWER
30-049a
TLT
30-051a
CLOSET
30-050
SHOWER
30-051
DAYROOM/DINING
30-028
SOILED
30-027C
SECLUSION
30-027
NURSE STATION
30-030
PAT EFFECTS
30-033
CL LINEN
30-034
HAC
30-035a
TLT
30-036a
TLT
30-032a
TLT
30-031a
TLT
30-037a
TLT
30-038a
TLT
30-039a
TLT
30-040a
TLT
30-054B
PSYCHI OFF
30-054A
NP OFFICE
30-053
RN MGR OFF
30-052
MD/RES WKRM
30-027b
SECL TOILET
30-027a
SECLUSION
30-026
SEMI-PRIVATE 8
30-026a
TLT
30-024a
TLT
30-025
ELEC
30-024
PRIVATE 9
30-023
SEMI-PRIVATE 7
30-023a
TLT
30-022
RES INTVW
30-021
RES INTVW
30-020
NURSE RESOURCE
30-019
PSYCOL OFF
30-018
SW OFFICE
30-017a
RN INTERVIEW
30-020a
STAFF TLT
30-055
RN MGR OFF
30-054D
NP OFFICE
30-054
PASSAGE
30-054C
PSYCHI OFF
30-057B
PSYCHI OFFICE
30-057A
NP OFFICE
30-056
SW OFFICE
30-057
PASSAGE
30-058
GROUP ROOM
30-059
EXST ELEC
30-060
PUBLIC TLT
30-061
STAFF TLT
30-062
CLEAN UTIL
30-017
DINING/DAYROOM
30-016
MED RECORDS
30-087
MEDICATION
30-086
RECEPTION/N STATION
30-086f RN REPORT 30-086e
SECLUSION
30-086d
SECLUSION
30-086c
SECLUSION TLT
TEL ALCOVE
30-086a
TREAT/EXAM
30-086b
TREAT/EXAM/OFF
STORAGE
ALCOVE
FUTURE
STAIR #3
30-040
SEMI-PRIVATE 13
30-041a
TLT/SHOWER
30-029
PAT LAUNDRY
30-086j
TELECOM
CO-06-30
CORRIDOR
CO-07-30
CORRIDOR
CO-03-30
VESTIBULE
CO-05-30
CORRIDOR
EXTERIOR COURTYARD
30-051b
DISHWASHING
30-094b
STORAGE
30-093c
CHAPLAIN
30-093b
OFFICE
30-093a
DINING AREA
30-093
NON FOOD
STORAGE
30-094aTRAY MAKE-UP AREA 30-094
ELECTRICAL
30-006
MECHANICAL
30-005
RECREATION
OFFICE
30-004
RECREATION
STORAGE
30-004a
EMS
STORAGE
30-003
DIETETICS OFFICE
30-002a
DIETETICS OFFICE
30-002
MECHANICAL
30-001
STORAGE
30-007b
OCCUPATIONAL THERAPY
30-007
MENS
RESTROOM
30-008
THERAPISTS
OFFICE
30-007a
WOMENS
RESTROOM
30-009
PHYSICAL THERAPY
30-010
30-012
ELECTRICAL
30-011
ELECTRICAL
30-011a
ELECTRICAL
30-013a
ELECTRICAL
30-013
HYDROTHERAPY
30-010b
OFFICE
30-014
STORAGE
30-010a
EQUIPMENT
30-091
ELEVATOR EQUIPMENT
30-092
MECHANICAL
30-090
ELECTRICAL
30-089
ON-CALL
30-086g
RESTROOM
30-086h
30-086i
OFFICE
30-015
STAIR #2
S0-02-30
MECHANICAL
30-075
ELEVATOR LOBBY
30-000
30-074
30-072 30-071
30-070
30-069 30-067
30-067a
30-069a
30-068 30-070a
30-071a
30-073
30-079 30-076
C0-08-30
30-066
30-064
30-064a
30-065 30-066a30-063a
30-063
30-082
30-08030-08130-08330-08430-085
30-085a 30-084a 30-083a
30-081a
30-080a
30-078a
30-078
30-077
30-077a
TELECOM
30-088
H.A.C.
1 BED ROOM
RESTROOM
CORRIDOR
2 BED ROOM
1 BED ROOM
2 BED ROOM2 BED ROOM
1 BED ROOM
RESTROOM
SHOWER
RESTROOM RESTROOM
SHOWER
RESTROOM
RESTROOM
1 BED ROOM
(FEMALE)
RESTROOM
1 BED ROOM
(FEMALE)
2 BED ROOM1 BED ROOM
RESTROOM
SHOWER
RESTROOMRESTROOMRESTROOM
1 BED ROOM 2 BED ROOM 2 BED ROOM
RESTROOM
1 BED ROOM
RESTROOMC0-03-30
CORRIDOR
C
C O R R
ID
O R
C
C O R R
ID
O R
C0-01-30
CORRIDOR
FENCE
F E N C E
EWC
HIGH/LOW
RL
RL RL
RL
RLRL
RL
RL RL
EWC
HIGH/LOW
TYPICAL
HANDRAIL
TYPICAL
CON'T.
HANDRAIL
EXISTING CONDITIONS- GENERAL NOTES
1. EXISTING CONDITION DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL
VERIFY LOCATION OF ALL ITEMS SHOWN ON THIS SHEET PRIOR TO BEGINNING OF WORK.
EXISTING WALL RATING LEGEND
3 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
EXISTING WALL RATING- GENERAL NOTES
1. ALL EXISTING FIRE RATINGS SHOWN HAVE BEEN PROVIDED BY THE VA. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING PARTITIONS WHERE WORK IS BEING PERFORMED AND
SEAL ALL PENETRATIONS THROUGH ALL FLOOR AND FIRE RATED BARRIERS WITH UL
LISTED ASSEMBLIES TO MAINTAIN FIRE RATED BARRIERS IN PLACE
2. SEE LIFE SAFETY SHEETS FOR DETAILED LIFE SAFETY PLANS.
30-AE400
C15
EXISTING TELECOM
ROOM LOCATION
PLAN LEGEND
NEW TELECOM ROOM/TE
CABINET LOCATION
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
LTCAL
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 - EXISTING CONDITION
PLAN - OVERALL GROUND FLOOR
30-GC100
-2
-1
-G
C
/1
/2
.p d f
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
1/16" = 1'-0"A12
BUILDING 30 - EXISTING CONDITION OVERALL FLOOR PLAN - GROUND FLOOR
N
PLAN
NORTH
N
TRUE
NORTH
RD RD
RDRDRDRD
RD RD RD
RD
HATCH
F.E.C
F.E.C
14 5
S
F
S
F
S F
S
F 366 SF
152 SF
693 SF
742 SF
95 SF
373 SF
142 SF
269 SF263 SF241 SF 267 SF 266 SF
269 SF 269 SF
177 SF 181 SF
96 SF 300 SF
54 SF
255 SF 278 SF
284 SF 283 SF 283 SF 284 SF 284 SF
183 SF
68 SF
67 SF
56 SF56 SF56 SF
56 SF 57 SF 56 SF
44 SF99 SF
43 SF
55 SF
85 SF
140 SF
228 SF
8 SF
39 SF
112 SF
100 SF
152 SF
18 SF
112 SF
66 SF127 SF
347 SF
541 SF
156 SF134 SF
129 SF
16 SF
473 SF
56 SF
56 SF
63 SF
708 SF
51 SF
406 SF
710 SF
113 SF 87 SF
149 SF
87 SF
57 SF
35 SF
296 SF
56 SF
283 SF
56 SF
280 SF
280 SF
56 SF
281 SF
179 SF
278 SF
56 SF
281 SF
178 SF
59 SF
188 SF
53 SF
275 SF
52 SF
273 SF
275 SF
52 SF
274 SF
275 SF
273 SF
242 SF
41 SF
52 SF
C 1-
C 1-
S 1-
1-
C 1-
1-
V1-02-30
S1-2-30
C1-04-30
C1-02-30
C1-01a-30
V1-01-30
S1-3-30
30-14330-14230-141 30-144 30-145 30-146 30-147
30-148 30-149
30-161 30-159
30-140
30-157 30-156 30-155 30-154 30-153 30-152 30-151
30-150
30-150a
30-148
30-146a30-144a30-142a
30-155a 30-153a 30-151a 30-157a30-158
30-141a 30-139
30-137 30-138
30-166
30-165
30-162
30-163
30-164
30-167
30-168
30-169 30-17030-171
30-100
30-101
30-10230-103
30-105
30-104
30-106 30-108
30-109
30-107
30-110
30-111
30-112
30-113
30-114 30-115
30-116
30-118
30-117
30-136
30-135
30-135a
30-134
30-133a
30-133
30-132
30-131a
30-131
30-126
30-130
30-129a
30-129
30-128
30-127a
30-127
30-126a
30-125
30-124a
30-124
30-123
30-122a
30-122
30-121
30-120
30-119
30-119a
30-120a
C O R R
ID
O R
C O R R
ID
O R
S
TA
IR
C O R R
ID
O R
VESTIBULE
STAIR #2
CORRIDOR
CORRIDOR
CORRIDOR
VESTIBULE
STAIR #3
EXAMPOST D/CSTAFF ROOM EXAM EXAM
EXAM 2 BED ROOM
FALLS CLINIC DR OFFICE
SOCIAL
WORKER
NURSES STATION
STAFF ROOM
EXAM OFFICE
POST D/C SOCIAL
WORKER
EXAM 2 BED ROOM 2 BED ROOM
DR OFFICE
RESTROOM
RESTROOM
RESTROOMRESTROOMRESTROOM
RESTROOM RESTROOM RESTROOM
RESTROOMLAUNDRY
RESTROOM
H.A.C.
CLEAN LINEN
ELECTRICAL
ROOM
RESIDENT LOUNGE
T.V.F.A.
STAFF
RESTROOM
NURSE
MANAGER
PHARMACY
NURSE
PRACTITIONER
SIGNAL
SOCIAL
WORKERELECTRICALMECHANICAL
ELEVATOR LOBBY
MAIN LOBBY
NURSINGACOS/GECS
OFFICE
CLOSET
CONFERENCE ROOM
MENS RESTROOM
WOMENS RESTROOM
SECRETARY
TREASURE
CAFE
H.A.C.
MECHANICAL
STAFF
LOUNGE
SOILED LINEN SECRETARY
ADMINISTRATIVE
OFFICER
NFS
STORAGE
ELECTRICAL
SHOWERS
RESTROOM
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
1 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
1 BED ROOM
RESTROOM
1 BED ROOM
RESTROOM
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
RESTROOM
RESTROOM
DUCT
CHASE
F.E.C.
F.E.C.
EXISTING CONDITIONS- GENERAL NOTES
1. EXISTING CONDITION DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL
VERIFY LOCATION OF ALL ITEMS SHOWN ON THIS SHEET PRIOR TO BEGINNING OF WORK.
EXISTING WALL RATING LEGEND
3 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
EXISTING WALL RATING- GENERAL NOTES
1. ALL EXISTING FIRE RATINGS SHOWN HAVE BEEN PROVIDED BY THE VA. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING PARTITIONS WHERE WORK IS BEING PERFORMED AND
SEAL ALL PENETRATIONS THROUGH ALL FLOOR AND FIRE RATED BARRIERS WITH UL
LISTED ASSEMBLIES TO MAINTAIN FIRE RATED BARRIERS IN PLACE
2. SEE LIFE SAFETY SHEETS FOR DETAILED LIFE SAFETY PLANS.
30-AE401
D14
EXISTING TELECOM
ROOM LOCATION
PLAN LEGEND
NEW TELECOM ROOM/TE
CABINET LOCATION
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
LTCAL
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 - EXISTING CONDITION
PLAN - OVERALL FIRST FLOOR
30-GC101
-2
-1
-G
C
/1
/2
.p d f
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
3/32" = 1'-0"A12
BUILDING 30 - EXISTING CONDITION OVERALL FLOOR PLAN - 1ST FLOOR
N
PLAN
NORTH
N
MECH.
CHASE
ICE
MACHINE
RESTROOM
MED ROOM
RESTROOMRESTROOM
2 BED ROOM 2 BED ROOM 2 BED ROOM 2 BED ROOM
RESTROOM
2 BED ROOM 2 BED ROOM
1 BED ROOM 1 BED ROOM
RESTROOM
RESTROOMRESTROOMRESTROOMRESTROOM
STORAGE 2 BED ROOM 2 BED ROOM
2 BED ROOM
2 BED ROOM 2 BED ROOM 2 BED ROOM
1 BED ROOM
RESTROOM
STAIR #2
VESTIBULECORRIDOR
C O R R
ID
O R
S
TA
IR
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
RESTROOM
2 BED ROOM
STORAGE
1 BED ROOM
1 BED ROOM
RESTROOM
VESTIBULE
RESTROOM
1 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
RESTROOM
MEDICATION
RESTROOM
1 BED ROOM
CONG. BATH
RESTROOM
RESIDENT LOUNGE
T.V.F.A.
ELECTRICAL
H.A.C.
DINING ROOM
STAIR #3
REC THERAPY
OFFICE P.T. STORAGE
MENS
RESTROOM
WOMENS
RESTROOM
O.T. STORAGE
SOILED LINEN
SPEECH
PATHOLOGY
ELECTRICAL
SIGNAL
SOCIAL WORK HEAD NURSE
STAFF
RESTROOM
OFFICE NURSE STATION
PHARMACY
CORRIDOR
PHARMACY
EXAM/
OFFICE
NOURISHMENTH.A.C.
ELECTRICAL
ROOM
CLEAN LINENWARD SUPPLY
SOILED UTILITY
OFFICE
STAFF ROOM
ELEVATOR LOBBY
CORRIDOR
CORRIDOR
PHYSICAL &
OCCUPATIONAL
THERAPY
30-241
30-241
30-244a30-242a
30-242 30-243 30-244 30-245
30-246a
30-246 30-247 30-248 30-249
30-248a
30-251a30-25330-255a30-257a
30-257 30-256 30-255 30-254
30-253 30-252 30-251
30-250
30-250a
S2-2-30
V2-02-30C2-03-30
C
S 1-
30-234
30-233a
30-233
30-232
30-231a
30-231
30-229a
30-230
30-229
30-227
30-228
30-227a V2-01-30
30-226a
30-226
30-224a
30-225
30-224
30-223
30-222a
30-222
30-221
30-220a
30-220
30-219a
30-219 30-235
30-235a
30-266
30-265
30-236
30-205
30-207
S2-3-30
30-206
30-211 30-210 30-209 30-208
30-213
30-214
30-271
30-270
30-268
30-269 30-263 30-262 30-261 30-259
30-258
C2-02-30
30-264
30-267
30-24030-239
30-238
30-23730-217
30-218
30-216
30-215
30-200
C2-01-30 C2-01-30
30-212
EXISTING CONDITIONS- GENERAL NOTES
1. EXISTING CONDITION DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL
VERIFY LOCATION OF ALL ITEMS SHOWN ON THIS SHEET PRIOR TO BEGINNING OF WORK.
EXISTING WALL RATING LEGEND
3 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
EXISTING WALL RATING- GENERAL NOTES
1. ALL EXISTING FIRE RATINGS SHOWN HAVE BEEN PROVIDED BY THE VA. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING PARTITIONS WHERE WORK IS BEING PERFORMED AND
SEAL ALL PENETRATIONS THROUGH ALL FLOOR AND FIRE RATED BARRIERS WITH UL
LISTED ASSEMBLIES TO MAINTAIN FIRE RATED BARRIERS IN PLACE
2. SEE LIFE SAFETY SHEETS FOR DETAILED LIFE SAFETY PLANS.
30-AE402
D15
EXISTING TELECOM
ROOM LOCATION
PLAN LEGEND
NEW TELECOM ROOM/TE
CABINET LOCATION
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
LTCAL
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 - EXISTING CONDITION
PLAN - OVERALL SECOND FLOOR
30-GC102
-2
-1
-G
C
/1
/2
.p d f
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
3/32" = 1'-0"A12
BUILDING 30 - EXISTING CONDITION OVERALL FLOOR PLAN - 2ND FLOOR
N
PLAN
NORTH
N
C3-04-30 V3-02-30
S3-2-30350-30
350a-30
351-30 352-30
351a-30
353-30354-30 355-30
353a-30355a-30
356-30357-30
357a-30 358-30
359-30361-30
362-30 363-30369-30
364-30368-30
370-30371-30 314-30
312-30
313-30
302-30
303a-30
303-30
V3-03-30
C3-05-30
308-30 309-30 C3-01-30
300-30
310-30
S3-3-30 306-30
305-30
305a-30
307-30
315-30 316-30
318-30
317-30 337-30
336-30
335a-30
319a-30
319-30
335-30
338-30
366-30
366a-30
339-30 340-30
341a-30
341-30 342-30 343-30
342a-30
344-30 345-30
344a-30 346a-30
346-30 347-30
348-30 349-30
348a-30
367-30
334-30
334a-30
333-30
332-30
332a-30322a-30
320a-30
C3-03-30
321-30
320-30
322-30
323-30
324-30
325-30
324a-30 330a-30
330-30
331-30
329-30
328-30
327-30
327a-30V3-01-30
S3-1-30
326a-30
326-30
C3-02-30
CORRIDOR
VESTIBULE
STAIRS #21 BED ROOM
ISOLATION
RESTROOM
EQUIPMENT
STORAGE
2 BED ROOM
RESTROOM
2 BED ROOM2 BED ROOM
2 BED ROOM
RESTROOMRESTROOM
2 BED ROOM----
RESTROOM
LAUNDRY
ROOM
NURSE STATIONOFFICE
RESTROOM
HEAD
NURSE
SOCIAL
WORK
PHARMACYSIGNAL
ELECTRICALHPCU
STORAGE
SOILED
LINEN
CLC MED
DIRECTOR
BUILDING
MANAGEMENT
SUPPLIES
MEN
LOCKER
ROOM
SHOWERS
WOMEN
LOCKER
ROOMVESTIBULE
CORRIDOR
RESTROOM
MALE
RESTROOM
FEMALE
CORRIDOR
ELEVATOR
LOBBY
RECREATION
OFFICE
STAIR #3
RECREATION
OFFICE
CLOSET
DINING ROOM
STAFF ROOM
QUIET ROOM
SOILED LINEN
WARD SUPPLY
CLEAN
LINEN
ELECTRICAL
RESTROOM
RESTROOM
1 BED ROOM
CONG. BATH
ELECTRICAL
LIVING SPACE
TELE
H.A.C.
NOURISHMENT
RESTROOM
BED ROOM MEDICATION
ROOM
RESTROOM
2 BED ROOM 2 BED ROOM
RESTROOM RESTROOM
2 BED ROOM 2 BED ROOM
1 BED ROOM 1 BED ROOM
RESTROOM
EXAM
2 BED ROOM
1 BED ROOM
RESTROOM
1 BED ROOM
RESTROOMRESTROOM
RESTROOM
CORRIDOR
1 BED ROOM
1 BED ROOM
1 BED ROOM
1 BED ROOM
1 BED ROOM
1 BED ROOM
RESTROOM RESTROOM
1 BED ROOM
1 BED ROOM
1 BED ROOM
FAMILY ROOM
FAMILY ROOM
RESTROOMVESTIBULE
STAIRS #1
RESTROOM
OFFICE
1 BED ROOM
CORRIDOR
EXISTING CONDITIONS- GENERAL NOTES
1. EXISTING CONDITION DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL
VERIFY LOCATION OF ALL ITEMS SHOWN ON THIS SHEET PRIOR TO BEGINNING OF WORK.
EXISTING WALL RATING LEGEND
3 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
EXISTING WALL RATING- GENERAL NOTES
1. ALL EXISTING FIRE RATINGS SHOWN HAVE BEEN PROVIDED BY THE VA. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING PARTITIONS WHERE WORK IS BEING PERFORMED AND
SEAL ALL PENETRATIONS THROUGH ALL FLOOR AND FIRE RATED BARRIERS WITH UL
LISTED ASSEMBLIES TO MAINTAIN FIRE RATED BARRIERS IN PLACE
2. SEE LIFE SAFETY SHEETS FOR DETAILED LIFE SAFETY PLANS.
30-AE403
D15
EXISTING TELECOM
ROOM LOCATION
PLAN LEGEND
NEW TELECOM ROOM/TE
CABINET LOCATION
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
LTCAL
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 - EXISTING CONDITION
PLAN - OVERALL THIRD FLOOR
30-GC103
-2
-1
-G
C
/1
/2
.p d f
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
3/32" = 1'-0"A12
BUILDING 30 - EXISTING CONDITION OVERALL FLOOR PLAN - 3RD FLOOR
N
PLAN
NORTH
N
EXISTING CONDITIONS- GENERAL NOTES
1. EXISTING CONDITION DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL
VERIFY LOCATION OF ALL ITEMS SHOWN ON THIS SHEET PRIOR TO BEGINNING OF WORK.
EXISTING WALL RATING LEGEND
3 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
EXISTING WALL RATING- GENERAL NOTES
1. ALL EXISTING FIRE RATINGS SHOWN HAVE BEEN PROVIDED BY THE VA. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING PARTITIONS WHERE WORK IS BEING PERFORMED AND
SEAL ALL PENETRATIONS THROUGH ALL FLOOR AND FIRE RATED BARRIERS WITH UL
LISTED ASSEMBLIES TO MAINTAIN FIRE RATED BARRIERS IN PLACE
2. SEE LIFE SAFETY SHEETS FOR DETAILED LIFE SAFETY PLANS.
EXISTING TELECOM
ROOM LOCATION
PLAN LEGEND
NEW TELECOM ROOM/TE
CABINET LOCATION
NOTE: THERE IS NO ARCHITECTURAL WORK PROPOSED ON THIS LEVEL- SEE ALL
CONSULTANTS' SHEETS FOR WORK THAT IS PROPOSED ON THIS LEVEL.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
LTCAL
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 - EXISTING CONDITION
PLAN - OVERALL PENTHOUSE FLOOR
30-GC104
-2
-1
-G
C
/0
/2
.p d f
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
N
PLAN
NORTH
N
TRUE
NORTH
3/32" = 1'-0"B10
BUILDING 30- EXISTING OVERALL PENTHOUSE FLOOR PLAN
COMMUNITY
NURSING
30-095
30-096
30-096a
30-039
SEMI-PRIVATE 12
30-038
SEMI-PRIVATE 11
30-037
SEMI-PRIVATE 10
30-036
SEMI-PRIVATE 930-035
PRIVATE 12
30-032
PRIVATE 11
30-031
PRIVATE 10
30-049
PRIVATE 14
30-046
PRIVATE 13
30-045
SEMI-PRIVATE 18
30-044
SEMI-PRIVATE 17
30-043
SEMI-PRIVATE(F) 16
30-042
SEMI-PRIVATE(F) 15
30-041
SEMI-PRIVATE(F) 14
30-042a
TLT/SHOWER
30-043a
TLT/SHOWER
30-044a
TLT
30-045a
TLT
30-046a
TLT
30-047
SHOWER
30-048
SHOWER
30-049a
TLT
30-051a
CLOSET
30-050
SHOWER
30-051
DAYROOM/DINING
30-028
SOILED
30-027C
SECLUSION
30-027
NURSE STATION
30-030
PAT EFFECTS
30-033
CL LINEN
30-034
HAC
30-035a
TLT
30-036a
TLT
30-032a
TLT
30-031a
TLT
30-037a
TLT
30-038a
TLT
30-039a
TLT
30-040a
TLT
30-054B
PSYCHI OFF
30-054A
NP OFFICE
30-053
RN MGR OFF
30-052
MD/RES WKRM
30-027b
SECL TOILET
30-027a
SECLUSION
30-026
SEMI-PRIVATE 8
30-026a
TLT
30-024a
TLT
30-025
ELEC
30-024
PRIVATE 9
30-023
SEMI-PRIVATE 7
30-023a
TLT
30-022
RES INTVW
30-021
RES INTVW
30-020
NURSE RESOURCE
30-019
PSYCOL OFF
30-018
SW OFFICE
30-017a
RN INTERVIEW
30-020a
STAFF TLT
30-055
RN MGR OFF
30-054D
NP OFFICE
30-054
PASSAGE
30-054C
PSYCHI OFF
30-057B
PSYCHI OFFICE
30-057A
NP OFFICE
30-056
SW OFFICE
30-057
PASSAGE
30-058
GROUP ROOM
30-059
EXST ELEC
30-060
PUBLIC TLT
30-061
STAFF TLT
30-062
CLEAN UTIL
30-017
DINING/DAYROOM
30-016
MED RECORDS
30-087
MEDICATION
30-086
RECEPTION/N STATION
30-086f RN REPORT 30-086e
SECLUSION
30-086d
SECLUSION
30-086c
SECLUSION TLT
TEL ALCOVE
30-086a
TREAT/EXAM
30-086b
TREAT/EXAM/OFF
STORAGE
ALCOVE
FUTURE
STAIR #3
30-040
SEMI-PRIVATE 13
30-041a
TLT/SHOWER
30-029
PAT LAUNDRY
30-086j
TELECOM
CO-06-30
CORRIDOR
CO-07-30
CORRIDOR
CO-03-30
VESTIBULE
CO-05-30
CORRIDOR
EXTERIOR COURTYARD
30-051b
DISHWASHING
30-094b
STORAGE
30-093c
CHAPLAIN
30-093b
OFFICE
30-093a
DINING AREA
30-093
NON FOOD
STORAGE
30-094aTRAY MAKE-UP AREA 30-094
ELECTRICAL
30-006
MECHANICAL
30-005
RECREATION
OFFICE
30-004
RECREATION
STORAGE
30-004a
EMS
STORAGE
30-003
DIETETICS OFFICE
30-002a
DIETETICS OFFICE
30-002
MECHANICAL
30-001
STORAGE
30-007b
OCCUPATIONAL THERAPY
30-007
MENS
RESTROOM
30-008
THERAPISTS
OFFICE
30-007a
WOMENS
RESTROOM
30-009
PHYSICAL THERAPY
30-010
30-012
ELECTRICAL
30-011
ELECTRICAL
30-011a
ELECTRICAL
30-013a
ELECTRICAL
30-013
HYDROTHERAPY
30-010b
OFFICE
30-014
STORAGE
30-010a
EQUIPMENT
30-091
ELEVATOR EQUIPMENT
30-092
MECHANICAL
30-090
ELECTRICAL
30-089
ON-CALL
30-086g
RESTROOM
30-086h
30-086i
OFFICE
30-015
STAIR #2
S0-02-30
MECHANICAL
30-075
ELEVATOR LOBBY
30-000
30-074
30-072 30-071
30-070
30-069 30-067
30-067a
30-069a
30-068 30-070a
30-071a
30-073
30-079 30-076
C0-08-30
30-066
30-064
30-064a
30-065 30-066a30-063a
30-063
30-082
30-08030-08130-08330-08430-085
30-085a 30-084a 30-083a
30-081a
30-080a
30-078a
30-078
30-077
30-077a
TELECOM
30-088
H.A.C.
1 BED ROOM
RESTROOM
CORRIDOR
2 BED ROOM
1 BED ROOM
2 BED ROOM2 BED ROOM
1 BED ROOM
RESTROOM
SHOWER
RESTROOM RESTROOM
SHOWER
RESTROOM
RESTROOM
1 BED ROOM
(FEMALE)
RESTROOM
1 BED ROOM
(FEMALE)
2 BED ROOM1 BED ROOM
RESTROOM
SHOWER
RESTROOMRESTROOMRESTROOM
1 BED ROOM 2 BED ROOM 2 BED ROOM
RESTROOM
1 BED ROOM
RESTROOMC0-03-30
CORRIDOR
C
C O R R
ID
O R
C
C O R R
ID
O R
C0-01-30
CORRIDOR
FENCE
F E N C E
EWC
HIGH/LOW
RL
RL RL
RL
RLRL
RL
RL RL
EWC
HIGH/LOW
TYPICAL
HANDRAIL
TYPICAL
CON'T.
HANDRAIL
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT. VA COR SHALL APPROVE DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
ICRA NOTES - REMOVAL
1. PROVIDE TEMPORARY / PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY INDICATED ON PLANS. CONTRACTOR
SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.
2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS
SHALL AUTOMATICALLY LOCK UPON CLOSURE.
3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL
ICRA DOORS.
4. ALL ICRA PARTITIONS SHALL BE WALL TYPE "T.1". REFER TO AE300 FOR MORE INFORMATION.
5. CONTRACTOR SHALL COMPLY WITH NFPA 241 FOR DURATION OF DEMOLITION AND CONSTRUCTION.
ICRA NOTES - GENERAL
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD & PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR
IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. THE CONTRACTOR SHALL USE TEMPORARY PRESSURE SENSORS CONNECTED TO THE BUILDING AUTOMATION SYSTEM (BAS)- REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. THE CONTRACTOR SHALL TRACK, TREND, AND ALARM PROJECT AREA PRESSURE TO ENSURE PROOF OF NEGATIVE PRESSURE
ENVIRONMENT AT ALL TIMES UNTIL APPROVED BY VA COR TO REMOVE.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING
A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH
TIME THE WORKER EXITS THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
8. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630. CONTRACTOR SHALL REMOVE CONSTRUCTION WASTE IN CONTAINERS SMALL ENOUGH TO MAINTAIN CORRIDOR EGRESS FOR DAILY VA HOSPITAL
FUNCTIONS.
9. CONTRATOR SHALL USE THE EXISTING SERVICE ELEVATORS FOR MATERIAL LOADING AND WASTE REMOVAL. CONTRACTOR SHALL COORDINATE AND USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS
THROUGH THE FACILITY.
10. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
ICRA NOTES - CONSTRUCTION
ICRA MATRIX- TABLE 04
CONSTRUCTION PROJECT TYPE
A B C D
LOW I II II III
MEDIUM I II III IV
HIGH I II IV IV
HIGHEST II III IV IV
PATIENT
RISK GROUP
TABLE 05- DURING CONSTRUCTION PROJECT TABLE 6- UPON COMPLETION OF PROJECT
PRIOR TO START OF WORK IN THESE AREAS, GC
SHALL CONSULT WITH VA COR TO ENSURE
PERMITS ARE OBTAINED AND ICRA
REQUIREMENTS ARE MET AND MAINTAINED
DURING CONSTRUCTION.
ICRA LEGEND
ICRA BARRIER
ICRA KEYNOTE
TAG
F
CONSTRUCTION
FENCE
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON
COMPLETION OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE
FREE OF CONTAMINANTS AND LOOSE MATERIAL.
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
3. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
4. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN
SPECIFICATIONS.
5. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
C
LA
S
I
ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO
OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G.,
MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).
2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE
LEAVING THE WORK AREA.
3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE
HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM
TO ADDRESS DIFFUSER ISOLATION.
4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING
STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A
WEEK OR ISOLATED FROM THE MAIN SYSTEM.
5. SEAL DOORS TO PREVENT DUST MIGRATION.
6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY
CLEANING AND DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN
IDENTIFIED EXIT ROUTE.
7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA
MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS
PRIOR TO REMOVAL FROM THE AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST
BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION
AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF
VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK
AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY
AND WHEN VISIBLY SOILED.
MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP
MOPPING OR HEPA VACUUMING SURFACES AT LEAST DAILY.
C
LA
II
ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241
REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS
REMOVED, TO THE DECK ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE
COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS
MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK
ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND
CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE
FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE
ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED
OUTDOORS, OR COMPLY WITH THE ALTERNATIVE METHOD OUTLINED IN
APPENDIX A OF THIS DOCUMENT. THESE CONTROL MEASURES MUST BE
MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. HEPA
FILTERED EXHAUST IF DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE AT
A DISTANCE OF 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND
OPERABLE WINDOWS. EXHAUSTING DISCHARGED AIR INTO SHARED OR
RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.,
BATHROOM EXHAUST) IS PROHIBITED.
INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC,
MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO
CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN
THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND
ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR
FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND
CONTROL MEASURES.
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
3. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL
REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE
BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN
PERFORMED. ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.
4. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A
MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN
REMOVING HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA
VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD
BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
5. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE
WORK AREA.
6. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION
EQUIPMENT) MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD
AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM
THE WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.
7. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
8. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
9. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL
AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.
10. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
C
LA
III
ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL
BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE
CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS’ PPE AND CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF
VISIBLE DUST BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA
VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.
WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN
ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM
TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE
CHANGED IMMEDIATELY.
C
LA
IV
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
AuthorChecker
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 GROUND FLOOR ICRA
PLAN
30-GC400
-2
-1
-G
C
/2
/2
.p d f
1" = 20'-0"A12
BUILDING 30 - OVERALL ICRA PLAN - GROUND FLOOR
N
PLAN
NORTH
N
RD RD RD
RD
HATCH
F.E.C
F.E.C
14 5
S
F
S
F
S F
S
F 366 SF
152 SF
693 SF
742 SF
95 SF
373 SF
142 SF
269 SF263 SF241 SF 267 SF 266 SF
269 SF 269 SF
177 SF 181 SF
96 SF 300 SF
54 SF
255 SF
278 SF
284 SF 283 SF 283 SF 284 SF 284 SF
183 SF
68 SF
67 SF
56 SF56 SF56 SF
56 SF 57 SF 56 SF
44 SF99 SF
43 SF
55 SF
85 SF
140 SF
228 SF
8 SF
39 SF
112 SF
100 SF
152 SF
18 SF
112 SF
66 SF127 SF
347 SF
541 SF
156 SF134 SF
129 SF
16 SF
473 SF
56 SF
56 SF
63 SF
708 SF
51 SF
406 SF
710 SF
113 SF 87 SF
149 SF
87 SF
57 SF
35 SF
296 SF
56 SF
283 SF
56 SF
280 SF
280 SF
56 SF
281 SF
179 SF
278 SF
56 SF
281 SF
178 SF
59 SF
188 SF
53 SF
275 SF
52 SF
273 SF
275 SF
52 SF
274 SF
275 SF
273 SF
242 SF
41 SF
52 SF
C 1-
C 1-
S 1-
1-
C 1-
1-
V1-02-30
S1-2-30
C1-04-30
C1-02-30
C1-01a-30
V1-01-30
S1-3-30
30-14330-14230-141 30-144 30-145 30-146 30-147
30-148 30-149
30-161 30-159
30-140
30-157 30-156
30-155 30-154 30-153 30-152 30-151
30-150
30-150a
30-148
30-146a30-144a30-142a
30-155a 30-153a 30-151a 30-157a30-158
30-141a 30-139
30-137 30-138
30-166
30-165
30-162
30-163
30-164
30-167
30-168
30-169 30-17030-171
30-100
30-101
30-10230-103
30-105
30-104
30-106 30-108
30-109
30-107
30-110
30-111
30-112
30-113
30-114 30-115
30-116
30-118
30-117
30-136
30-135
30-135a
30-134
30-133a
30-133
30-132
30-131a
30-131
30-126
30-130
30-129a
30-129
30-128
30-127a
30-127
30-126a
30-125
30-124a
30-124
30-123
30-122a
30-122
30-121
30-120
30-119
30-119a
30-120a
C O R R
ID
O R
C O R R
ID
O R
S
TA
IR
C O R R
ID
O R
VESTIBULE
STAIR #2
CORRIDOR
CORRIDOR
CORRIDOR
VESTIBULE
STAIR #3
EXAMPOST D/CSTAFF ROOM EXAM EXAM
EXAM 2 BED ROOM
FALLS CLINIC DR OFFICE
SOCIAL
WORKER
NURSES STATION
STAFF ROOM
EXAM
OFFICE
POST D/C SOCIAL
WORKER
EXAM 2 BED ROOM 2 BED ROOM
DR OFFICE
RESTROOM
RESTROOM
RESTROOMRESTROOMRESTROOM
RESTROOM RESTROOM RESTROOM
RESTROOMLAUNDRY
RESTROOM
H.A.C.
CLEAN LINEN
ELECTRICAL
ROOM
RESIDENT LOUNGE
T.V.F.A.
STAFF
RESTROOM
NURSE
MANAGER
PHARMACY
NURSE
PRACTITIONER
SIGNAL
SOCIAL
WORKERELECTRICALMECHANICAL
ELEVATOR LOBBY
MAIN LOBBY
NURSINGACOS/GECS
OFFICE
CLOSET
CONFERENCE ROOM
MENS RESTROOM
WOMENS RESTROOM
SECRETARY
TREASURE
CAFE
H.A.C.
MECHANICAL
STAFF
LOUNGE
SOILED LINEN SECRETARY
ADMINISTRATIVE
OFFICER
NFS
STORAGE
ELECTRICAL
SHOWERS
RESTROOM
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
1 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
1 BED ROOM
RESTROOM
1 BED ROOM
RESTROOM
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
RESTROOM
RESTROOM
DUCT
CHASE
F.E.C.
F.E.C.
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT. VA COR SHALL APPROVE DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
ICRA NOTES - REMOVAL
1. PROVIDE TEMPORARY / PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY INDICATED ON PLANS. CONTRACTOR
SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.
2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS
SHALL AUTOMATICALLY LOCK UPON CLOSURE.
3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL
ICRA DOORS.
4. ALL ICRA PARTITIONS SHALL BE WALL TYPE "T.1". REFER TO AE300 FOR MORE INFORMATION.
5. CONTRACTOR SHALL COMPLY WITH NFPA 241 FOR DURATION OF DEMOLITION AND CONSTRUCTION.
ICRA NOTES - GENERAL
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD & PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR
IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. THE CONTRACTOR SHALL USE TEMPORARY PRESSURE SENSORS CONNECTED TO THE BUILDING AUTOMATION SYSTEM (BAS)- REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. THE CONTRACTOR SHALL TRACK, TREND, AND ALARM PROJECT AREA PRESSURE TO ENSURE PROOF OF NEGATIVE PRESSURE
ENVIRONMENT AT ALL TIMES UNTIL APPROVED BY VA COR TO REMOVE.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING
A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH
TIME THE WORKER EXITS THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
8. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630. CONTRACTOR SHALL REMOVE CONSTRUCTION WASTE IN CONTAINERS SMALL ENOUGH TO MAINTAIN CORRIDOR EGRESS FOR DAILY VA HOSPITAL
FUNCTIONS.
9. CONTRATOR SHALL USE THE EXISTING SERVICE ELEVATORS FOR MATERIAL LOADING AND WASTE REMOVAL. CONTRACTOR SHALL COORDINATE AND USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS
THROUGH THE FACILITY.
10. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
ICRA NOTES - CONSTRUCTION
3'
0"
8' - 6"
ICRA MATRIX- TABLE 04
CONSTRUCTION PROJECT TYPE
A B C D
LOW I II II III
MEDIUM I II III IV
HIGH I II IV IV
HIGHEST II III IV IV
PATIENT
RISK GROUP
TABLE 05- DURING CONSTRUCTION PROJECT TABLE 6- UPON COMPLETION OF PROJECT
PRIOR TO START OF WORK IN THESE AREAS, GC
SHALL CONSULT WITH VA COR TO ENSURE
PERMITS ARE OBTAINED AND ICRA
REQUIREMENTS ARE MET AND MAINTAINED
DURING CONSTRUCTION.
ICRA LEGEND
ICRA BARRIER
ICRA KEYNOTE
TAG
F
CONSTRUCTION
FENCE
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON
COMPLETION OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE
FREE OF CONTAMINANTS AND LOOSE MATERIAL.
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
3. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
4. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN
SPECIFICATIONS.
5. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
C
LA
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO
OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G.,
MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).
2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE
LEAVING THE WORK AREA.
3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE
HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM
TO ADDRESS DIFFUSER ISOLATION.
4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING
STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A
WEEK OR ISOLATED FROM THE MAIN SYSTEM.
5. SEAL DOORS TO PREVENT DUST MIGRATION.
6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY
CLEANING AND DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN
IDENTIFIED EXIT ROUTE.
7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA
MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS
PRIOR TO REMOVAL FROM THE AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST
BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION
AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF
VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK
AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY
AND WHEN VISIBLY SOILED.
MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP
MOPPING OR HEPA VACUUMING SURFACES AT LEAST DAILY.
C
LA
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241
REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS
REMOVED, TO THE DECK ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE
COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS
MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK
ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND
CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE
FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE
ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED
OUTDOORS, OR COMPLY WITH THE ALTERNATIVE METHOD OUTLINED IN
APPENDIX A OF THIS DOCUMENT. THESE CONTROL MEASURES MUST BE
MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. HEPA
FILTERED EXHAUST IF DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE AT
A DISTANCE OF 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND
OPERABLE WINDOWS. EXHAUSTING DISCHARGED AIR INTO SHARED OR
RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.,
BATHROOM EXHAUST) IS PROHIBITED.
INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC,
MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO
CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN
THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND
ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR
FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND
CONTROL MEASURES.
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
3. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL
REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE
BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN
PERFORMED. ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.
4. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A
MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN
REMOVING HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA
VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD
BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
5. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE
WORK AREA.
6. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION
EQUIPMENT) MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD
AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM
THE WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.
7. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
8. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
9. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL
AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.
10. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
C
LA
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL
BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE
CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS’ PPE AND CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF
VISIBLE DUST BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA
VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.
WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN
ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM
TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE
CHANGED IMMEDIATELY.
C
LA
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
AuthorChecker
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 1ST FLOOR ICRA PLAN
30-GC401
-2
-1
-G
C
/2
/2
.p d f
1" = 20'-0"A12
BUILDING 30 - OVERALL ICRA PLAN - 1ST FLOOR
N
PLAN
NORTH
N
MECH.
CHASE
ICE
MACHINE
RESTROOM
MED ROOM
RESTROOMRESTROOM
2 BED ROOM 2 BED ROOM 2 BED ROOM 2 BED ROOM
RESTROOM
2 BED ROOM 2 BED ROOM
1 BED ROOM 1 BED ROOM
RESTROOM
RESTROOMRESTROOMRESTROOMRESTROOM
STORAGE 2 BED ROOM 2 BED ROOM
2 BED ROOM
2 BED ROOM 2 BED ROOM 2 BED ROOM
1 BED ROOM
RESTROOM
STAIR #2
VESTIBULECORRIDOR
C O R R
ID
O R
S
TA
IR
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
RESTROOM
2 BED ROOM
STORAGE
1 BED ROOM
1 BED ROOM
RESTROOM
VESTIBULE
RESTROOM
1 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
RESTROOM
MEDICATION
RESTROOM
1 BED ROOM
CONG. BATH
RESTROOM
RESIDENT LOUNGE
T.V.F.A.
ELECTRICAL
H.A.C.
DINING ROOM
STAIR #3
REC THERAPY
OFFICE P.T. STORAGE
MENS
RESTROOM
WOMENS
RESTROOM
O.T. STORAGE
SOILED LINEN
SPEECH
PATHOLOGY
ELECTRICAL
SIGNAL
SOCIAL WORK HEAD NURSE
STAFF
RESTROOM
OFFICE NURSE STATION
PHARMACY
CORRIDOR
PHARMACY
EXAM/
OFFICE
NOURISHMENTH.A.C.
ELECTRICAL
ROOM
CLEAN LINENWARD SUPPLY
SOILED UTILITY
OFFICE
STAFF ROOM
ELEVATOR LOBBY
CORRIDOR
CORRIDOR
PHYSICAL &
OCCUPATIONAL
THERAPY
30-241
30-241
30-244a30-242a
30-242 30-243 30-244 30-245
30-246a
30-246 30-247 30-248 30-249
30-248a
30-251a30-25330-255a30-257a
30-257 30-256 30-255
30-254 30-253 30-252 30-251
30-250
30-250a
S2-2-30
V2-02-30C2-03-30
C
S 1-
30-234
30-233a
30-233
30-232
30-231a
30-231
30-229a
30-230
30-229
30-227
30-228
30-227a V2-01-30
30-226a
30-226
30-224a
30-225
30-224
30-223
30-222a
30-222
30-221
30-220a
30-220
30-219a
30-219 30-235
30-235a
30-266
30-265
30-236
30-205
30-207
S2-3-30
30-206
30-211 30-210 30-209 30-208
30-213
30-214
30-271
30-270
30-268
30-269 30-263 30-262 30-261 30-259
30-258
C2-02-30
30-264
30-267
30-24030-239
30-238
30-23730-217
30-218
30-216
30-215
30-200
C2-01-30 C2-01-30
30-212
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT. VA COR SHALL APPROVE DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
ICRA NOTES - REMOVAL
1. PROVIDE TEMPORARY / PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY INDICATED ON PLANS. CONTRACTOR
SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.