This document contains architectural floor plans for Building 68 at James A. Haley Veterans Hospital in Tampa, Florida, specifically depicting technology infrastructure layouts for the EHRM Infrastructure Upgrade project (VA Project 673-20-107). The plans show the first and second floor technology installations with detailed room layouts, net square footage for each space, and comprehensive low-voltage cabling and wireless access point distributions.
The plans indicate that all new low-voltage cabling routes to Technology Room TR-121-68 on the first floor and TR-68-229 on the second floor. Key requirements specified in the notes include contractor provisions for 10 additional 2-port CAT 6A information outlets per floor for future installation, field verification of conduit riser routes with the VA prior to installation, scheduled cabling work coordinated with building occupancy by staff and patients, and provision of new J-hook cable routing infrastructure per manufacturer specifications. The technology symbols include 2D (standard 2-port information outlets), 1D-WAP (wireless access points), 1D-CAM (cameras), and 1D-GWAP (gateway wireless access points) distributed throughout patient care areas, administrative offices, transitional housing units, therapy rooms, and support spaces. The drawings were prepared by CB Design Group (architect) with consultants Compass, Scott Przybysz, Mark Dyck, and Clare Kramer, and issued for construction on April 4, 2025.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U P
U P
U P
NET: 383 SFNET: 383 SF
NET: 331 SFNET: 331 SF
NET: 39 SFNET: 39 SF
NET: 455 SFNET: 455 SF
NET: 202 SFNET: 202 SF
NET: 72 SFNET: 72 SF
NET: 72 SFNET: 72 SF
NET: 160 SFNET: 160 SF
NET: 160 SFNET: 160 SF
NET: 570 SFNET: 570 SF
NET: 570 SFNET: 570 SF
NET: 160 SFNET: 160 SF
NET: 160 SFNET: 160 SF
NET: 72 SFNET: 72 SF
NET: 72 SFNET: 72 SF
NET: 202 SFNET: 202 SF
NET: 455 SFNET: 455 SF
NET: 72 SFNET: 72 SF
NET: 164 SFNET: 164 SF
NET: 337 SFNET: 337 SF
NET: 390 SFNET: 390 SF
NET: 1,001 SFNET: 1,001 SF
NET: 299 SFNET: 299 SF
NET: 161 SFNET: 161 SF
NET: 51 SFNET: 51 SF
NET: 51 SFNET: 51 SF
NET: 311 SFNET: 311 SF
NET: 91 SFNET: 91 SF
NET: 689 SFNET: 689 SF
NET: 251 SFNET: 251 SF
NET: 133 SFNET: 133 SF
NET: 146 SFNET: 146 SF
NET: 146 SFNET: 146 SF
NET: 83 SFNET: 83 SF
NET: 186 SFNET: 186 SFNET: 185 SFNET: 185 SF
NET: 200 SFNET: 200 SF
NET: 200 SFNET: 200 SF
NET: 186 SFNET: 186 SFNET: 185 SFNET: 185 SF
NET: 40 SFNET: 40 SFNET: 94 SFNET: 94 SF
NET: 274 SFNET: 274 SFNET: 180 SFNET: 180 SF
NET: 182 SFNET: 182 SF
NET: 182 SFNET: 182 SF
NET: 174 SFNET: 174 SF
NET: 126 SFNET: 126 SF
NET: 126 SFNET: 126 SF
NET: 125 SFNET: 125 SF
NET: 481 SFNET: 481 SF NET: 196 SFNET: 196 SF NET: 196 SFNET: 196 SF
NET: 591 SFNET: 591 SF
NET: 78 SFNET: 78 SF
NET: 40 SFNET: 40 SF
NET: 319 SFNET: 319 SFNET: 319 SFNET: 319 SF
NET: 269 SFNET: 269 SF
N E
T : 1
S
F N
E T
: 1
S F
NET: 341 SFNET: 341 SF
N E
T : 3
S
F N
E T
: 3
S F
N E
T : 3
S
F N
E T
: 3
S F
NET: 617 SFNET: 617 SF NET: 106 SFNET: 106 SF
N E
T : 3
S
F N
E T
: 3
S F
N E
T : 1
S
F N
E T
: 1
S F
NET: 252 SFNET: 252 SF
100-68100-68
101-68101-68
101a-68101a-68 140-68140-68
140b-68140b-68
140a-68140a-68
139a-68139a-68
139b-68139b-68
139c-68139c-68
139-68139-68
138-68138-68
138c-68138c-68
138b-68138b-68
138a-68138a-68
136a-68136a-68
136b-68136b-68
136-68136-68
135a-68135a-68
135b-68135b-68
135-68135-68
137-68137-68
102-68102-68
128-68128-68
134-68134-68
130-68130-68
129-68129-68
103-68103-68
103a-68103a-68
104-68104-68
127-68127-68
126-68126-68
125-68125-68
124-68124-68
123-68123-68
122-68122-68116-68116-68
114-68114-68
113-68113-68
105-68105-68111-68111-68
120-68120-68119-68119-68
121-68121-68118a-68118a-68
118-68118-68
117-68117-68
115-68115-68
112-68112-68
110-68110-68
109-68109-68
108-68108-68 107-68107-68 106-68106-68
131-68131-68
133-68133-68
132-68132-68
S1-02-68S1-02-68S1-03-68S1-03-68
S1-01-68S1-01-68
C 1-
-6
C
1-
-6
C1-05-68C1-05-68
C 1-
-6
C
1-
-6
C 1-
-6
C
1-
-6
C1-02-68C1-02-68 C1-01-68C1-01-68
C 1-
-6
C
1-
-6
C 1-
-6
C
1-
-6
C1-07-68C1-07-68
LOBBYLOBBY
MAIN LOBBYMAIN LOBBY
RESTROOMRESTROOM
APARTMENT/
TRANSITIONAL
HOUSING 5
APARTMENT/
TRANSITIONAL
HOUSING 5
BEDROOMBEDROOM
RESTROOMRESTROOM
RESTROOMRESTROOM
BEDROOMBEDROOM
BEDROOMBEDROOM
APARTMENT/
TRANSITIONAL
HOUSING 4
APARTMENT/
TRANSITIONAL
HOUSING 4
APARTMENT/
TRANSITIONAL
HOUSING 3
APARTMENT/
TRANSITIONAL
HOUSING 3
BEDROOMBEDROOM
BEDROOMBEDROOM
RESTROOMRESTROOM
RESTROOMRESTROOM
BEDROOMBEDROOM
APARTMENT/
TRANSITIONAL
HOUSING 2
APARTMENT/
TRANSITIONAL
HOUSING 2
RESTROOMRESTROOM
BEDROOMBEDROOM
APARTMENT/
TRANSITIONAL
HOUSING 1
APARTMENT/
TRANSITIONAL
HOUSING 1
INTERNET VIDEO
GAMES/REC
INTERNET VIDEO
GAMES/REC
ADL ROOM
REC ROOM
ADL ROOM
REC ROOM
RESEARCH
WORK AREA
RESEARCH
WORK AREA
STAFF BREAK AREASTAFF BREAK AREA
RESTROOMRESTROOM
RESTROOMRESTROOM
NURSES RNS/LPNSNURSES RNS/LPNS
MEDSMEDS
THERAPYTHERAPY
PTRP REC THERAPY (5)PTRP REC THERAPY (5)
SPEECHSPEECH
TRANSITION SW (2)TRANSITION SW (2)
CLEAN LINENCLEAN LINEN
STORAGESTORAGE
MD REHABMD REHABMD PSYCHMD PSYCH
ROTATING EXAMROTATING EXAM
STUDENTS
INTERNS/
RESIDENTS
STUDENTS
INTERNS/
RESIDENTS
OT/PTOT/PTOT (2)OT (2)
SOILED UTILITYSOILED UTILITYSYSTEMSSYSTEMS
PHONE/DATAPHONE/DATAMECHANICALMECHANICAL
MENS RESTROOMMENS RESTROOM
WOMENS RESTROOMWOMENS RESTROOM
PMR STORAGEPMR STORAGE
PMRPMR
PSYCHPSYCH
NEURO PSYCHNEURO PSYCH
EDUCATIONAL ROOM
(V-TEL)
EDUCATIONAL ROOM
(V-TEL)
ADMIN DIRADMIN DIR ADMINADMIN
GROUP & FAMILY
THERAPY
GROUP & FAMILY
THERAPY
ELECTRICALELECTRICAL
HACHAC
STAIR #2STAIR #2STAIR #3STAIR #3
STAIR #1STAIR #1
C O
R R
ID
O
R C
O R
R
ID
O R
CORRIDORCORRIDOR
C O
R R
ID
O
R C
O R
R
ID
O R
C O
R R
ID
O
R C
O R
R
ID
O R
CORRIDORCORRIDOR CORRIDORCORRIDOR
C O
R R
ID
O
R C
O R
R
ID
O R
C O
R R
ID
O
R C
O R
R
ID
O R
CORRIDORCORRIDOR
W
W
W
W
W W
W
W
W
2D
D 2 D
D
2D
1D-WAP
1D-CAM
D
D
D
D
D
D
2D
D
2D 2D2D
D
D
2D2D2D
1D-WAP
2D
D
D
D
1D-GWAP
D
1D-CAM
1D-WAP
2D
D
1D-CAM
1D-CAM
D
D
D
2D
2D
D
D
D
D
D
D
D
D
D
1D-GWAP
1D-WAP
2D
D
1D-CAM
1D-CAM
1D-CAM
2D
D
D
2D2D
D
D
2D 2D
1D-WAP
1D-CAM
D
D
D
D
D
D 2
D D
2D2D2D
2D 2D
2D
D
D
D
D
D
D
D
2D
D
D
D
D
2D
2D2D
D
2D2D 2D
2D
D2D
2D2D
2D
1D-GWAP
D
D
D
D
D
D
2D
2D2D
2D
2D2D
1D-GWAP
2D
D
2D
D
1D-WAP
1D-WAP
D
2D
D
D
D
1D-GWAP
2D
2D
D
D
D
1D-WAP
1D-CAM
1D-CAM
1D-CAM1D-CAM
1D-CAM
D
D
D
D
2D2D
2D 2D
D
D
2D
D
1D-GWAP
1D-WAP
1D-WAP
1D-WAP
D
2D
D
ROOM IS ACCEPTABLE
UPDATE EQUIPMENT RACK 68-TN200
F15
TR-121-68
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 68 - OVERALL FIRST
FLOOR PLAN - TECHNOLOGY
68-TN101
-2
-1
-T
N
/0
/2
.p d f
1/8" = 1'-0"
BUILDING 68 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
A12
N
BUILDING
NORTH
N
TRUE
NORTH
NOTES:
1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL ROUTE TO TR 121-68.
2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
D N
D N
D N
NET: 386 SFNET: 386 SF
NET: 878 SFNET: 878 SF
NET: 419 SFNET: 419 SF
NET: 135 SFNET: 135 SF
NET: 104 SFNET: 104 SF
NET: 104 SFNET: 104 SF
NET: 41 SFNET: 41 SFNET: 36 SFNET: 36 SF
NET: 92 SFNET: 92 SFNET: 92 SFNET: 92 SF NET: 92 SFNET: 92 SF NET: 92 SFNET: 92 SF
NET: 154 SFNET: 154 SF
NET: 156 SFNET: 156 SF
NET: 97 SFNET: 97 SF
NET: 97 SFNET: 97 SF
NET: 98 SFNET: 98 SF
NET: 96 SFNET: 96 SF
NET: 96 SFNET: 96 SF
NET: 96 SFNET: 96 SF
NET: 96 SFNET: 96 SF
NET: 96 SFNET: 96 SF
NET: 94 SFNET: 94 SF
NET: 96 SFNET: 96 SF
NET: 96 SFNET: 96 SF
NET: 96 SFNET: 96 SF
NET: 150 SFNET: 150 SF
NET: 34 SFNET: 34 SF
NET: 95 SFNET: 95 SF
NET: 95 SFNET: 95 SF
NET: 182 SFNET: 182 SF
NET: 96 SFNET: 96 SF
NET: 96 SFNET: 96 SF
NET: 14 SFNET: 14 SF
NET: 79 SFNET: 79 SF
NET: 79 SFNET: 79 SF
NET: 159 SFNET: 159 SF
NET: 584 SFNET: 584 SF
NET: 87 SFNET: 87 SF
NET: 216 SFNET: 216 SFNET: 209 SFNET: 209 SF
NET: 112 SFNET: 112 SF
NET: 112 SFNET: 112 SF
NET: 112 SFNET: 112 SF
NET: 115 SFNET: 115 SF
NET: 112 SFNET: 112 SF
NET: 112 SFNET: 112 SF
NET: 504 SFNET: 504 SF
NET: 131 SFNET: 131 SFNET: 131 SFNET: 131 SF
NET: 112 SFNET: 112 SF
NET: 112 SFNET: 112 SF
NET: 308 SFNET: 308 SF
NET: 254 SFNET: 254 SFNET: 118 SFNET: 118 SFNET: 124 SFNET: 124 SFNET: 308 SFNET: 308 SF
NET: 119 SFNET: 119 SF NET: 115 SFNET: 115 SF
NET: 258 SFNET: 258 SF
NET: 115 SFNET: 115 SFNET: 119 SFNET: 119 SF
NET: 41 SFNET: 41 SF
NET: 123 SFNET: 123 SF
NET: 123 SFNET: 123 SF
NET: 123 SFNET: 123 SF
NET: 123 SFNET: 123 SF
NET: 175 SFNET: 175 SF
NET: 175 SFNET: 175 SF
NET: 176 SFNET: 176 SF
NET: 170 SFNET: 170 SF
NET: 89 SFNET: 89 SF
NET: 180 SFNET: 180 SF
NET: 37 SFNET: 37 SF
NET: 137 SFNET: 137 SF
NET: 137 SFNET: 137 SF NET: 131 SFNET: 131 SF
NET: 132 SFNET: 132 SF
NET: 271 SFNET: 271 SF
NET: 319 SFNET: 319 SFNET: 319 SFNET: 319 SF
NET: 138 SFNET: 138 SF
N E
T : 4
S
F N
E T
: 4
S F
NET: 497 SFNET: 497 SF
N E
T : 4
S
F N
E T
: 4
S F
NET: 68 SFNET: 68 SF
NET: 598 SFNET: 598 SF
N E
T : 1
S
F N
E T
: 1
S F
N E
T : 1
S
F N
E T
: 1
S F
NET: 64 SFNET: 64 SF
N E
T : 5
S
F N
E T
: 5
S F
NET: 230 SFNET: 230 SF
N E
T : 6
S
F N
E T
: 6
S F
200-68200-68
201-68201-68
202-68202-68
257-68257-68
258-68258-68
259-68259-68
260-68260-68A2-01-68A2-01-68
263-68263-68265-68265-68 262-68262-68 261-68261-68
201b-68201b-68
201a-68201a-68
256-68256-68
255-68255-68
254-68254-68
253-68253-68
252-68252-68
251-68251-68
250-68250-68
249-68249-68
246-68246-68
245-68245-68
248-68248-68
247-68247-68
238-68238-68
237-68237-68
240-68240-68
241-68241-68
239-68239-68
244-68244-68
243-68243-68
242-68242-68
234-68234-68
235-68235-68
236-68236-68
231-68231-68
233-68233-68 232-68232-68230-68230-68
274-68274-68
273-68273-68
272-68272-68
271-68271-68
270-68270-68
269-68269-68
266-68266-68
204-68204-68205-68205-68
268-68268-68
267-68267-68
206-68206-68 203-68203-68207-68207-68209-68209-68211-68211-68
210-68210-68 208-68208-68
215-68215-68
220-68220-68219-68219-68
212-68212-68
213-68213-68
214-68214-68
216-68216-68
217-68217-68
223a-68223a-68
223-68223-68
224-68224-68
229-68229-68
226-68226-68
224a-68224a-68
228-68228-68
225-68225-68
222-68222-68 221-68221-68
227-68227-68
S2-01-68S2-01-68
S2-02-68S2-02-68S2-03-68S2-03-68
C2-11-68C2-11-68
C 2-
-6
C
2-
-6
C2-12-68C2-12-68
C 2-
-6
C
2-
-6 8 271a-68271a-68
C2-07-68C2-07-68
C 2-
-6
C
2-
-6
C 2-
-6
C
2-
-6
C2-02-68C2-02-68
C 2-
-6
C
2-
-6
C2-03-68C2-03-68
C 2-
-6
C
2-
-6
W
W
W
W
W
1D-CAM
1D-CAM
1D-WAP
1D-GWAP
2D
D
D
D
D
2D
D
D
2D
D
2D
2D2D
D
1D-WAP
2D
2D
D
D
D
D 2 D
D
2D
1D-WAP
2D2D
2D
1D-WAP
2D
2D2D
D2D
D
D2
D
2D
D
D
D
2D
D
2D
D
D
2D
2D2D
D
D
D
D
D
2D2D
2D 2D D
D
D
D
D
2D
2D
D
D
2D2D
2D 2 D 2
D
D
D2D
D 2
D D
2D
2D2D
2D 2D
D
D
2D2D
D
D
D
D
2D2D
D
D
D
2D
D
D
D
D
D
1D-WAP
2D
2D
2D
2D
2D2D
2D 2D
2D
2D2D
2D
2D 2D
2D
D
D
D
D
D
D
D
D
D
D
1D-WAP
2D
2D2D
2D
2D2D
1D-WAP
2D 2D
2D 2D
2D 2D
2D2D
2D
D
2D
D
1D-WAP
2D
2D
2D
2D
1D-WAP
2D
2D
2D
2D
2D
2D
2D
D
1D-GWAP
2D
2D2 D
D
2D
1D-WAP
D
D
D
D
D
D
2D
2D
2D
D
2D
1D-GWAP
1D-WAP
D
2D
D
68-TN201
F15
TR-68-229
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 68 - OVERALL SECOND
FLOOR PLAN - TECHNOLOGY
68-TN102
-2
-1
-T
N
/0
/2
.p d f
N
BUILDING
NORTH
N
TRUE
NORTH
1/8" = 1'-0"
BUILDING 68 - OVERALL SECOND FLOOR PLAN - TECHNOLOGY
A12
NOTES:
1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL ROUTE TO TR 121-68.
2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
| Sheets |
| 68-TN101 - BUILDING 68 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY |
| 68-TN102 - BUILDING 68 - OVERALL SECOND FLOOR PLAN - TECHNOLOGY |
File details come from the government source that posted it. Updated .