This document set comprises technology infrastructure upgrade plans for Building 30 at James A. Haley Veterans Hospital in Tampa, Florida, as part of the EHRM (Enhanced Healthcare Real estate Management) Infrastructure Upgrade project (VA Project 673-20-107). The plans are issued for construction and were prepared by CB Design Group (Architect) and Compass (Consultant), with additional consulting by Scott Przybysz, Mark Dyck, and Clare Kramer.
The documents contain detailed floor plans across multiple levels (Ground, First, Second, and Third Floors) divided into Areas A and B for each floor, showing technology infrastructure layouts for the building. The plans indicate installation of information outlets, cabling infrastructure, and technology support systems throughout patient rooms, administrative offices, medical examination areas, corridors, and support spaces. Specific outlet types are designated including 2D (standard data outlets), 1D-CAM (camera outlets), 1D-WAP (wireless access point outlets), and 1D-GWAP (guest wireless access point outlets). Standard notes applicable across all sheets require contractors to: (1) reference the TN000 technology coversheet for general notes and symbol definitions; (2) include an allowance for 10 additional CAT 6A information outlets per sheet with locations to be determined by the VA at a later date; (3) field verify conduit riser routes with the owner prior to installation; (4) coordinate all cabling work on a scheduled basis while the facility remains occupied with staff and patients; and (5) provide new J-hook cable routing per manufacturer specifications, with option to use existing cable tray if accessible with spare capacity. The facility is fully sprinklered, and work must be coordinated with ongoing hospital operations.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RL
RL RL
RL
RLRL
RL
RL RL
EWC
HIGH/LOW
D
D
1D-CAM
1D-WAP
1D-WAP 1D-CAM
1D-CAM
1D-WAP1D-CAM1D-WAP
1D-CAM
D
D
D
D
D
D
2D2D
D
D
2D2D
D
D
D
D
2D2D
D
2D2 D
D
1D-CAM
2D
1D-CAM
1D-WAP
1D-WAP
1D-CAM
1D-CAM
D
D
D
D
D
2D2D
2D 2D
1D-CAM
D
D
D
D
D
D
D
D
2D2D
D
2D
D
D
2D
1D-CAM
1D-CAM
1D-WAP
1D-CAM
1D-CAM
1D-WAP
1D-CAM1D-WAP
1D-CAM
1D-WAP
2D
2D 2D
2D
2D
2D
2D 2D
D
D
2D 2D
D
2D
D
D 2
D D
2D
D
2D
2D
2D
2D
D
2D
D
D
D
D
2D
D
D
2D2 D
2D
2D
2D
2D
2D
1D-GWAP
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-WAP
1D-CAM
W
2D
1D-CAM
D
1D-CAM
1D-WAP
D
1D-CAM
1D-WAP
CSS
2D
30-TN301
G15
C12/30-TN100BC12/30-TN100B
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 - GROUND FLOOR
PLAN - AREA A - TECHNOLOGY
30-TN100A
-2
-1
-T
N A
/0
/2
.p d f
N
BUILDING
NORTH
N
TRUE
NORTH
1/8" = 1'-0"
BUILDING 30 - GROUND FLOOR PLAN - AREA A - TECHNOLOGY
C12
NOTES:
1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
TR-30-017a
EWC
HIGH/LOW
TYPICAL
HANDRAIL
TYPICAL
CON'T.
HANDRAIL
D
D
D
1D-CAM
2D
D
1D-CAM
1D-CAM
1D-WAP
D
1D-CAM
1D-WAP
2D
2D
2D
D
W
2D
1D-CAM
1D-WAP
1D-CAM1D-WAP 1D-CAM 1D-WAP 1D-GWAP
D
2D
2D 2D
1D-GWAP
1D-WAP
1D-CAM 1D-CAM
D
D
2D
2D
D
D
W
W
2D W
2D 2D
1D-GWAP
1D-GWAP1D-WAP
1D-GWAP
1D-WAP
1D-CAM
1D-CAM
1D-GWAP
1D-WAP1D-GWAP
1D-WAP
D
D
D
D
D
D
D
D
2D
2D 2D
2D
W 2D 2D
D
D
W
1D-WAP
D
D
D
D
1D-WAP
D
2D
1D-CAM
1D-CAM
2D 2D 2D
W
W
2D
1D-CAM
1D-CAM
1D-CAM
1D-WAP
D
W
D
2D
D
2D
D
2D
1D-CAM
1D-CAM
2D
1D-CAM
2D 2D
2D
2D
D
2D
D
D
1D-WAP
D
D
2D
2D
C12/30-TN100AC12/30-TN100A
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 - GROUND FLOOR
PLAN - AREA B - TECHNOLOGY
30-TN100B
-2
-1
-T
N B
/2
/2
.p d f
1/8" = 1'-0"
BUILDING 30 - GROUND FLOOR PLAN - AREA B - TECHNOLOGY
C12
N
BUILDING
NORTH
N
TRUE
NORTH
NOTES:
1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
RD RD
RDRDRDRD
RD RD RD
RD
HATCH
S
F
S F
373 SF
142 SF
267 SF 266 SF
269 SF 269 SF
177 SF 181 SF
85 SF708 SF
51 SF
406 SF
710 SF
113 SF 87 SF
149 SF
87 SF
35 SF
296 SF
56 SF
283 SF
56 SF
280 SF
280 SF
56 SF
281 SF
179 SF
278 SF
56 SF
281 SF
178 SF
59 SF
188 SF
53 SF
275 SF
52 SF
273 SF
275 SF
52 SF
274 SF
275 SF
273 SF
242 SF
41 SF
52 SF
C 1-
S 1-
1-
V1-01-30
S1-3-30
30-148 30-149 30-111
30-112
30-113
30-116
30-118
30-136
30-135
30-135a
30-134
30-133a
30-133
30-132
30-131a
30-131
30-126
30-130
30-129a
30-129
30-128
30-127a
30-127
30-126a
30-125
30-124a
30-124
30-123
30-122a
30-122
30-121
30-120
30-119
30-119a
30-120a
C O R R
ID
O R
S
TA
IR
VESTIBULE
STAIR #3
H.A.C.
MECHANICAL
STAFF
LOUNGE
NFS
ELECTRICAL
SHOWERS
RESTROOM
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
1 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
1 BED ROOM
RESTROOM
1 BED ROOM
RESTROOM
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
RESTROOM
RESTROOM
F.E.C.
W
2D
2D 2D
2D 2D
2D
2D 2D 2D
2D
2D 2D
2D 2D 2D
2D 2D
2D 2D
2D
1D-WAP
1D-CAM
1D-WAP
1D-GWAP
1D-GWAP
1D-GWAP
2D
2D
2D
2D
1D-WAP
2D 2D
2D 2D 2D
2D 2D
2D 2D
2D
2D
2D
2D
2D
2D
2D
2D
1D-GWAP
1D-WAP
1D-GWAP
2D 2D
2D
2D
2D
1D-GWAP
2D
2D
1D-WAP
D
2D
D
D
1D-GWAP
1D-WAP
D W 2 D
D
D 2
D
D
D
D
D
D
D
D
D
D
D
W
D
2D
2D
2D
2D
2D
TR-30-114
F12/30-TN101B
F12/30-TN101B
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 - FIRST FLOOR
PLAN - AREA A - TECHNOLOGY
30-TN101A
-2
-1
-T
N A
/2
/2
.p d f
1/8" = 1'-0"
BUILDING 30 - FIRST FLOOR PLAN - AREA A - TECHNOLOGY
C12
N
BUILDING
NORTH
N
TRUE
NORTH
NOTES:
1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
B MA C D E F H J K LGF.3 L.5K.5J.5H.5F.5E.5D.5C.5B.6B.3 F.7AA M.2AB
F.E.C
F.E.C
14 5 S
F
S
F 366 SF
152 SF
693 SF
742 SF
95 SF
142 SF
269 SF263 SF241 SF 267 SF 266 SF
269 SF 269 SF
177 SF 181 SF
96 SF 300 SF
54 SF
255 SF 278 SF
284 SF 283 SF 283 SF 284 SF 284 SF
183 SF
68 SF
67 SF
56 SF56 SF56 SF
56 SF 57 SF 56 SF
44 SF99 SF
43 SF
55 SF
85 SF
140 SF
228 SF
8 SF
39 SF
112 SF
100 SF
152 SF
18 SF
112 SF
66 SF127 SF
347 SF
541 SF
156 SF134 SF
129 SF
16 SF
473 SF
56 SF
56 SF
63 SF
708 SF
51 SF
113 SF 87 SF
149 SF
87 SF
57 SF
35 SF
C 1-
C 1-
1-
V1-02-30
S1-2-30
C1-04-30
C1-02-30
C1-01a-30
S1-3-30
30-14330-14230-141 30-144 30-145 30-146 30-147
30-148 30-149
30-161 30-159
30-140
30-157 30-156 30-155 30-154 30-153 30-152 30-151
30-150
30-150a
30-148
30-146a30-144a30-142a
30-155a 30-153a 30-151a 30-157a30-158
30-141a 30-139
30-137 30-138
30-166
30-165
30-162
30-163
30-164
30-167
30-168
30-169 30-17030-171
30-100
30-101
30-10230-103
30-105
30-104
30-106 30-108
30-109
30-107
30-110
30-111
30-114 30-115
30-116
30-118
30-117
30-136
30-119a
C O R R
ID
O R
C O R R
ID
O R
VESTIBULE
STAIR #2
CORRIDOR
CORRIDOR
CORRIDOR
STAIR #3
EXAMPOST D/CSTAFF ROOM EXAM EXAM
EXAM 2 BED ROOM
FALLS CLINIC DR OFFICE
SOCIAL
WORKER
NURSES STATION
STAFF ROOM
EXAM OFFICE
POST D/C SOCIAL
WORKER
EXAM 2 BED ROOM 2 BED ROOM
DR OFFICE
RESTROOM
RESTROOM
RESTROOMRESTROOMRESTROOM
RESTROOM RESTROOM RESTROOM
RESTROOMLAUNDRY
RESTROOM
H.A.C.
CLEAN LINEN
ELECTRICAL
ROOM
RESIDENT LOUNGE
T.V.F.A.
STAFF
RESTROOM
NURSE
MANAGER
PHARMACY
NURSE
PRACTITIONER
SIGNAL
SOCIAL
WORKERELECTRICALMECHANICAL
ELEVATOR LOBBY
MAIN LOBBY
NURSINGACOS/GECS
OFFICE
CLOSET
CONFERENCE ROOM
MENS RESTROOM
WOMENS RESTROOM
SECRETARY
TREASURE
CAFE
H.A.C.
SOILED LINEN SECRETARY
ADMINISTRATIVE
OFFICER
NFS
STORAGE
ELECTRICAL
SHOWERS
RESTROOM
DUCT
CHASE
F.E.C.
2D
2D
2D
D
1D-WAP2
D
1D-GWAP
1D-WAP
1D-GWAP
D
D
W 2 D
D
D 2
D
D
D
D
D
D
D 2 D
D
D
D
D
D
D
D
D
D
D
W
D
W
1D-CAM
1D-CAM
1D-WAP
1D-WAP
1D-CAM
1D-GWAP
2D
D
2D
2D
D
D
D
D
D
D
D
1D-WAP
D
2D
1D-CAM 1D-CAM
1D-WAP
1D-CAM
1D-CAM
1D-WAP
1D-GWAP
W
D
D
2D
D
D
D
D
D 1D-GWAP
2D
2D
2D
D
D
D
D
1D-GWAP
1D-CAM
1D-GWAP
1D-WAP 1D-GWAP 1D-WAP
1D-GWAP
1D-CAM
D
D
D
D
2D
W2D
2D
D
D
D
D
D
D
D
D
D
D
1D-GWAP
1D-GWAP
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
1D-GWAP 1D-GWAP
D
30-TN302
G15
TR-30-114
C12/30-TN101AC12/30-TN101A
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 - FIRST FLOOR
PLAN - AREA B - TECHNOLOGY
30-TN101B
-2
-1
-T
N B
/2
/2
.p d f
1/8" = 1'-0"
BUILDING 30 - FIRST FLOOR PLAN - AREA B - TECHNOLOGY
F12
N
BUILDING
NORTH
N
TRUE
NORTH
NOTES:
1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY INSTALLATION NOTES AND SYMBOL LIST.
2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY THE VA AT A LATER DATE.
4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE OCCUPIED WITH STAFF AND
PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH SPARE CAPACITY.
MECH.
CHASE
C O R R
ID
O R
S
TA
IR
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
RESTROOM
2 BED ROOM
STORAGE
1 BED ROOM
1 BED ROOM
RESTROOM
VESTIBULE
RESTROOM
1 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
RESTROOM
2 BED ROOM
2 BED ROOM
RESTROOM
MEDICATION
RESTROOM
1 BED ROOM
CONG. BATH
RESTROOM
ELECTRICAL
H.A.C.
DINING ROOM
STAIR #3
REC THERAPY
SOILED UTILITYSTAFF ROOM
30-248 30-249
C
S 1-
30-234
30-233a
30-233
30-232
30-231a
30-231
30-229a
30-230
30-229
30-227
30-228
30-227a V2-01-30
30-226a
30-226
30-224a
30-225
30-224
30-223
30-222a
30-222
30-221
30-220a
30-220
30-219a
30-219 30-235
30-235a
30-236
30-205
30-207
S2-3-30
30-206
30-218
30-216
30-215
W
2D
D
2D
2D
2D
2D 2D
2D
1D-CAM
1D-WAP
1D-GWAP
1D-WAP
2D
2D
2D
2D
2D
2D
2D
2D
2D
2D
2D
2D
1D-GWAP
1D-GWAP
1D-GWAP
1D-GWAP
2D
2D
2D
2D
2D
2D
2D
2D
2D
2D
2D
1D-WAP
1D-CAM
1D-GWAP
1D-GWAP
1D-GWAP
2D
2D
D
1D-WAP
1D-WAP
30-TN303
F15
TR-30-215
F12/30-TN102B
F12/30-TN102B
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 - SECOND FLOOR
PLAN - AREA A - TECHNOLOGY
30-TN102A
-2
-1
-T
N A
/2
/2
.p d f
1/8" = 1'-0"
BUILDING 30 - SECOND FLOOR PLAN - AREA A - TECHNOLOGY
C12
N
BUILDING
NORTH
N
TRUE
NORTH
NOTES:
1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
ICE
MACHINE
RESTROOM
MED ROOM
RESTROOMRESTROOM
2 BED ROOM 2 BED ROOM 2 BED ROOM 2 BED ROOM
RESTROOM
2 BED ROOM 2 BED ROOM
1 BED ROOM 1 BED ROOM
RESTROOM
RESTROOMRESTROOMRESTROOMRESTROOM
STORAGE 2 BED ROOM 2 BED ROOM
2 BED ROOM
2 BED ROOM 2 BED ROOM 2 BED ROOM
1 BED ROOM
RESTROOM
STAIR #2
VESTIBULECORRIDOR
RESTROOM
1 BED ROOM
CONG. BATH
RESIDENT LOUNGE
T.V.F.A.
ELECTRICAL
STAIR #3
REC THERAPY
OFFICE P.T. STORAGE
MENS
RESTROOM
WOMENS
RESTROOM
O.T. STORAGE
SOILED LINEN
SPEECH
PATHOLOGY
ELECTRICAL
SIGNAL
SOCIAL WORK HEAD NURSE
STAFF
RESTROOM
OFFICE NURSE STATION
PHARMACY
CORRIDOR
PHARMACY
EXAM/
OFFICE
NOURISHMENTH.A.C.
ELECTRICAL
ROOM
CLEAN LINENWARD SUPPLY
SOILED UTILITY
OFFICE
STAFF ROOM
ELEVATOR LOBBY
CORRIDOR
CORRIDOR
PHYSICAL &
OCCUPATIONAL
THERAPY
30-241
30-241
30-244a30-242a
30-242 30-243 30-244 30-245
30-246a
30-246 30-247
30-248 30-249
30-248a
30-251a30-25330-255a30-257a
30-257 30-256 30-255 30-254
30-253 30-252 30-251
30-250
30-250a
S2-2-30
V2-02-30C2-03-30
30-219a
30-266
30-265
30-236 S2-3-30
30-206
30-211 30-210 30-209 30-208
30-213
30-214
30-271
30-270
30-268
30-269 30-263 30-262 30-261 30-259
30-258
C2-02-30
30-264
30-267
30-24030-239
30-238
30-23730-217
30-218
30-216
30-215
30-200
C2-01-30 C2-01-30
30-212
2D
2D
2D
2D
1D-GWAP
1D-GWAP
2D
D
D
D
W
1D-WAP
2D
D
W
2D
D
1D-GWAP1D-CAM 1D-CAM
1D-CAM
1D-WAP
1D-CAM
1D-WAP
2D
2D
D
1D-WAP
D
D
2D
D
D
2D
D
2D
D
2D
D
2D
D
1D-WAP
1D-GWAP W
2D
2D
2D
D
D
2D 2D 2D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
1D-WAP
1D-GWAP
1D-WAP
1D-GWAP
1D-CAM
1D-GWAP
W
1D-WAP1D-GWAP
1D-WAP
2D
1D-CAM
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
2D
D
1D-GWAP
1D-CAM 1D-GWAP
1D-WAP
30-TN303
F15
TR-30-215
C12/30-TN102AC12/30-TN102A
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 - SECOND FLOOR
PLAN - AREA B - TECHNOLOGY
30-TN102B
-2
-1
-T
N B
/2
/2
.p d f
1/8" = 1'-0"
BUILDING 30 - SECOND FLOOR PLAN - AREA B - TECHNOLOGY
F12
N
BUILDING
NORTH
N
TRUE
NORTH
NOTES:
1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY INSTALLATION NOTES AND SYMBOL LIST.
2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY THE VA AT A LATER DATE.
4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE OCCUPIED WITH STAFF AND PATIENTS.
COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH SPARE CAPACITY.
S3-3-30 306-30
305-30
305a-30
307-30
315-30 316-30
318-30 336-30
335a-30
319a-30
319-30
335-30
348-30 349-30
334-30
334a-30
333-30
332-30
332a-30322a-30
320a-30
C3-03-30
321-30
320-30
322-30
323-30
324-30
325-30
324a-30 330a-30
330-30
331-30
329-30
328-30
327-30
327a-30V3-01-30
S3-1-30
326a-30
326-30
STAIR #3
RECREATION
OFFICE
CLOSET
DINING ROOM
STAFF ROOM
QUIET ROOM
SOILED LINEN
ELECTRICAL
RESTROOM
RESTROOM
1 BED ROOM
CONG. BATH
1 BED ROOM
RESTROOM
1 BED ROOM
RESTROOMRESTROOM
RESTROOM
CORRIDOR
1 BED ROOM
1 BED ROOM
1 BED ROOM
1 BED ROOM
1 BED ROOM
1 BED ROOM
RESTROOM RESTROOM
1 BED ROOM
1 BED ROOM
1 BED ROOM
FAMILY ROOM
FAMILY ROOM
RESTROOMVESTIBULE
STAIRS #1
RESTROOM
OFFICE
1 BED ROOM
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
2D 2D
1D-GWAP
1D-GWAP
1D-GWAP
1D-WAP
1D-GWAP
1D-GWAP
2D 2D
2D 2D
2D 2D 2D
2D
2D
2D
1D-GWAP
1D-WAP
1D-CAM
2D
D
D
D
D
D
D
1D-WAP
1D-GWAP
1D-GWAP
2D
D
D
D
D
D 2 D
D
1D-GWAP
1D-CAM
2D
F12/30-TN103B
F12/30-TN103B
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 - THIRD FLOOR
PLAN - AREA A - TECHNOLOGY
30-TN103A
-2
-1
-T
N A
/2
/2
.p d f
1/8" = 1'-0"
BUILDING 30 - THIRD FLOOR PLAN - AREA A - TECHNOLOGY
C12
N
BUILDING
NORTH
N
TRUE
NORTH
NOTES:
1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
C3-04-30 V3-02-30
S3-2-30350-30
350a-30
351-30 352-30
351a-30
353-30354-30 355-30
353a-30355a-30
356-30357-30
357a-30 358-30
359-30361-30
362-30 363-30369-30
364-30368-30
370-30371-30 314-30
312-30
313-30
302-30
303a-30
303-30
V3-03-30
C3-05-30
308-30 309-30 C3-01-30
300-30
310-30
S3-3-30 306-30
315-30 316-30
318-30
317-30 337-30
336-30
319a-30
338-30
366-30
366a-30
339-30 340-30
341a-30
341-30 342-30 343-30
342a-30
344-30 345-30
344a-30 346a-30
346-30 347-30
348-30 349-30
348a-30
367-30
C3-02-30
CORRIDOR
VESTIBULE
STAIRS #21 BED ROOM
ISOLATION
RESTROOM
EQUIPMENT
STORAGE
2 BED ROOM
RESTROOM
2 BED ROOM2 BED ROOM
2 BED ROOM
RESTROOMRESTROOM
2 BED ROOM----
RESTROOM
LAUNDRY
ROOM
NURSE STATIONOFFICE
RESTROOM
HEAD
NURSE
SOCIAL
WORK
PHARMACYSIGNAL
ELECTRICALHPCU
STORAGE
SOILED
LINEN
CLC MED
DIRECTOR
BUILDING
MANAGEMENT
SUPPLIES
MEN
LOCKER
ROOM
SHOWERS
WOMEN
LOCKER
ROOMVESTIBULE
CORRIDOR
RESTROOM
MALE
RESTROOM
FEMALE
CORRIDOR
ELEVATOR
LOBBY
RECREATION
OFFICE
STAIR #3
RECREATION
STAFF ROOM
QUIET ROOM
SOILED LINEN
WARD SUPPLY
CLEAN
LINEN
ELECTRICAL
RESTROOM
CONG. BATH
ELECTRICAL
LIVING SPACE
TELE
H.A.C.
NOURISHMENT
RESTROOM
BED ROOM MEDICATION
ROOM
RESTROOM
2 BED ROOM 2 BED ROOM
RESTROOM RESTROOM
2 BED ROOM 2 BED ROOM
1 BED ROOM 1 BED ROOM
RESTROOM
EXAM
2 BED ROOM
CORRIDOR
2D 2D
D
1D-GWAP
2D
D
D
D
D
D
D
D 2 D
D
D
D
1D-GWAP
1D-CAM
1D-GWAP
2D 2D
1D-WAP
1D-CAM
1D-WAP
1D-CAM
2D
2D
1D-CAM
D
D
D
2D
1D-WAP
D
2D
D
D
D
2D
D
2D
D
2D
2D
1D-WAP
1D-CAM
1D-GWAP
2D
2D
2D 2D
2D
D
D
D
1D-GWAP
1D-GWAP
D
D
2D2D
1D-GWAP
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
1D-WAP
1D-GWAP
1D-GWAP
1D-GWAP
1D-GWAP
D
D
W
W
2D
1D-WAP
1D-GWAP
1D-WAP
1D-CAM
D
D
D
D 2 D
D
1D-GWAP
EXISTING VOICE
CLOSET
EXISTING TR
C12/30-TN103A
C12/30-TN103A
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 30 - THIRD FLOOR
PLAN - AREA B - TECHNOLOGY
30-TN103B
-2
-1
-T
N B
/2
/2
.p d f
1/8" = 1'-0"
BUILDING 30 - THIRD FLOOR PLAN - AREA B - TECHNOLOGY
F12
N
BUILDING
NORTH
N
TRUE
NORTH
NOTES:
1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
| Sheets |
| 30-TN100 - BUILDING 30 - OVERALL GROUND FLOOR PLAN - TECHNOLOGY |
| 30-TN100A - BUILDING 30 - GROUND FLOOR PLAN - AREA A - TECHNOLOGY |
| 30-TN100B - BUILDING 30 - GROUND FLOOR PLAN - AREA B - TECHNOLOGY |
| 30-TN101 - BUILDING 30 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY |
| 30-TN101A - BUILDING 30 - FIRST FLOOR PLAN - AREA A - TECHNOLOGY |
| 30-TN101B - BUILDING 30 - FIRST FLOOR PLAN - AREA B - TECHNOLOGY |
| 30-TN102 - BUILDING 30 - OVERALL SECOND FLOOR PLAN - TECHNOLOGY |
| 30-TN102A - BUILDING 30 - SECOND FLOOR PLAN - AREA A - TECHNOLOGY |
| 30-TN102B - BUILDING 30 - SECOND FLOOR PLAN - AREA B - TECHNOLOGY |
| 30-TN103 - BUILDING 30 - OVERALL THIRD FLOOR PLAN - TECHNOLOGY |
| 30-TN103A - BUILDING 30 - THIRD FLOOR PLAN - AREA A - TECHNOLOGY |
| 30-TN103B - BUILDING 30 - THIRD FLOOR PLAN - AREA B - TECHNOLOGY |
| 30-TN104 - BUILDING 30 - OVERALL ROOF PLAN - TECHNOLOGY |
File details come from the government source that posted it. Updated .