These are architectural and technology infrastructure drawings for the EHRM Infrastructure Upgrade project at James A. Haley Veterans Hospital in Tampa, Florida (VA Project Number 673-20-107). The drawings depict overall first floor plans for multiple trailers (Buildings 30-33, 56, 60-62, 73-78, 80-83, and 99) showing technology installations including low voltage cabling, information outlets, and related infrastructure components.
The drawings specify that all new low voltage cabling in each building will route to designated technology rooms (TRs), with routing specifications varying by building. Key requirements include: contractors must include allowances for 10 additional 2-port CAT 6A information outlets per sheet with future locations to be determined by the VA; contractors must field-verify conduit riser routes with the owner prior to installation; all information outlet cabling must be scheduled and coordinated with the owner while the facility is occupied with staff and patients; and contractors must provide new J-hook routes for all new cabling with sizing and quantities per manufacturer recommendations, with the option to use existing cable tray if accessible with spare capacity. The drawings reference a Technology Coversheet (TN000) for general notes and installation details, and a Technology Equipment Schedule (TN700). The project was issued for construction on 04/04/2025, with architect CB Design Group and consultant Compass.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O R R
ID
O R
CORRIDOR
SOCIAL WORK
SOCIAL WORK
SOCIAL WORK
SOCIAL WORK
SOCIAL WORK
SOCIAL WORK
EMS
EMS
MULTI-PURPOSE
ROOM
RESTROOM
WATER HEATER
STORAGE
EMSEMSEMS
C T3
C0-01-T33
001-T33 002-T33
003-T33
004-T33
005-T33
006-T33 012-T33
007-T33
008-T33
008a-T33
009-T33
010-T33011-T33012a-T33
HOT LAB UPTAKE UPTAKE UPTAKE PUBLIC
RESTROOM
WAITING ROOM
CHECK IN
READING
ROOM
CONTROL
ROOM
PET/CT
SCAN ROOM
EQUIPMENT
ROOM
ELECTRICAL
CLOSET
HOT
RESTROOM
CORRIDOR
68 SF 84 SF 58 SF 58 SF 61 SF 131 SF
70 SF
122 SF
136 SF389 SF
106 SF
53 SF
57 SF
242 SF
010-56 008-56 007-56 006-56 005-56 001-56
002-56
003a-56
003-56004-56 009-56
009a-56
011-56
C0-01-56
GENERAL NOTES:
1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 009-T33.
TR 009-T33
T49-TN102
G15
GENERAL NOTES:
ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 009A-56.
TR 009A-56
T56-TN103
G15
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
33 & 56
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
TRAILER 33 & 56 - OVERALL
FIRST FLOOR PLAN -
TECHNOLOGY
T30-TN101
-2
-1
T -T
N
/0
/2
.p d f
1/8" = 1'-0"
TRAILER 33 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
A13
1/8" = 1'-0"
TRAILER 56 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
F13
N
BUILDING
NORTH
N
TRUE
NORTH
NOTES:
1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
OFFICE AREA
OFFICE
OFFICE
RESTROOM
CLOSET
OFFICE AREA
OFFICE
OFFICE
101-T61
102-T61
103-T61
104-T61
105-T61
106-T61
107-T61
108-T61
CORNER
SINK
SERVICE
TILE
TILE (SITE INSTALL)
TILE
TILE
TILE
TILE
TILE
TILE
TILE
W/H
TILE (SITE INSTALL)
TILE (SITE INSTALL)
TILE (SITE INSTALL)
TILE TILE
TILE TILE TILE
TILE
TILE TILE
TILE TILETILE
TILE
TILE
TILE
TILE
TILE
TILE
TILE (SITE INSTALL)
TILE (SITE INSTALL)
113-T62 111-T62 109-T62 107-T62
108-T62110-T62112-T62
115-T62 117-T62 120-T62
106-T62 104-T62
105-T62 101-T62
100-T62
128-T62
127-T62
126-T62
125-T62
123-T62
122-T62
121-T62119-T62118-T62116-T62114-T62
124-T62
102-T62
103-T62
2D
D
D
D
D 2 D
D
D
2D
D
D
D
D
D
2D
2D
2D
2D 2D 2D
2D
2D
2D 2D 2D
D
D
D
D
2D
D
D
D
2D
D
D
D
D
2D
D
2D 2D
2D 2D
D
D
1D-WAP 1D-GWAP
1D-CAM 1D-WAP 1D-WAP
1D-GWAP
D
D
D
2D
PROVIDE NEW TE CABINET
GENERAL NOTES:
1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 105-T61.
TR 105-T61
T61-TN102
F15
TR 102-T62
GENERAL NOTES:
1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 102-T62.
T62-TN103
F15
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
TRAILER 61 & 62 - OVERALL
FIRST FLOOR PLAN -
TECHNOLOGY
T60-TN101
-2
-1
T -T
N
/0
/2
.p d f
1/8" = 1'-0"
TRAILER 61 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
A12
1/8" = 1'-0"
TRAILER 62 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
E12
N
BUILDING
NORTH
N
TRUE
NORTH
NOTES:
1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
OFFICE AREA
OFFICE
OFFICE
RESTROOM
STORAGE
OFFICE
OFFICE
101-T73
102-T73
103-T73
104-T73
105-T73
106-T73
107-T73
2D
2D
2D
2D 2D 2D
2D
2D 2D
2D 2D
1D-WAP 1D-WAP
D
D
D
D
D
2D 2D 2D
D
2D 2 D
2D
2D
1D-GWAP
1D-WAP
OFFICE AREA
COMM
RESTROOM
OFFICE
OFFICE
OFFICE
OFFICE
101-T75
105-T75
104-T75
103-T75
102-T75 107-T75
106-T75
2D
2D
2D
2D
2D 2D
2D
2D
1D-WAP
1D-WAP
1D-GWAP
2D
OFFICE AREA
RESTROOM
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
101-T76
104-T76
105-T76
103-T76
102-T76 107-T76
106-T76
2D
2D
2D
D
2D 2D
D
2D
D
2D
2D
2D
2D 2D
2D
1D-WAP 1D-WAP1D-GWAP
RESTROOM
2D
2D
2D
2D
2D 2D 2D
2D
2D
2D 2D 2D
1D-WAP
1D-GWAP 1D-WAP
2D
RESTROOM
2D 2D 2D 2D 2D 2D 2D 2D
2D
2D
2D2D2D2D
2D
2D
1D-WAP 1D-GWAP 1D-WAP
GENERAL NOTES:
1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 105-T74 IN BUILDING 74.
NEW TE
74-105
GENERAL NOTES:
1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 105-T74.
TR 105-T74
T73-TN102
G15
GENERAL NOTES:
1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 105-T75.
TR 105-T75
T73-TN102
B15
GENERAL NOTES:
1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 105-T75 IN BUILDING 75.
T76-TN103
G16
GENERAL NOTES:
1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 107 IN BUILDING 78.
TR 107
GENERAL NOTES:
1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 107.
T76-TN103
B16
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
TRAILER 73 TO 78 - OVERALL
FIRST FLOOR PLAN -
TECHNOLOGY
T73-TN101
-2
-1
T -T
N
/0
/2
.p d f
1/8" = 1'-0"
TRAILER 73 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
A9
1/8" = 1'-0"
TRAILER 74 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
D9
1/8" = 1'-0"
TRAILER 75 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
G9
1/8" = 1'-0"
TRAILER 76 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
A15
1/8" = 1'-0"
TRAILER 77 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
D15
1/8" = 1'-0"
TRAILER 78 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
G15
NOTES:
1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
C1-01-T80 C1-02-T80
C1-03-T80
104-T80 129-T80
125-T80
126-T80
127-T80
124-T80 123-T80 122-T80 121-T80 119-T80 117-T80 115-T80 114-T80
113-T80
112-T80110-T80
116-T80118-T80
108-T80106-T80
120-T80
111-T80109-T80107-T80105-T80103-T80102-T80 100-T80
CORRIDOR CORRIDOR
CORRIDOR
NURSE STATION
RESTROOM
RESTROOM
----CLEAN
DIRTY
--------------------RESTROOM
2D 2D 2D 2D 2D 2D 2D
2D 2D 2D
D
2D 2D
D
D 2 D
2D
2D
D
2D
D
D
2D 2D2D
D
2D
D
2D
2D2D
D
D
1D-WAP
2D
1D-GWAP
1D-GWAP
1D-WAP
W
1D-WAP
1D-CAM
C1-01-T81 C1-02-T81
C1-03-T81
100-T81
128-T81
129-T81 127-T81
126-T81
125-T81
124-T81 123-T81 122-T81 121-T81 119-T81 117-T81 115-T81 114-T81
113-T81116-T81118-T81120-T81
106-T81
104-T81
108-T81 110-T81 112-T81
111-T81 109-T81
107-T81105-T81103-T81102-T81
CORRIDOR CORRIDOR
CORRIDOR
RESTROOM
RESTROOM
------------SOILED
CLEAN
NURSE STATION
------------RESTROOM
2D 2D 2D 2D 2D 2D 2D
2D
2D 2D
2D 2D 2D
2D
D
2D
2D
2D
D
2D
2D
D
D
2D
2D
2D2D
2D
2D
D
D
D
D
D
D
D
D
D
1D-WAP
1D-WAP
1D-GWAP
D
D
D
D
D
D
W
2D
1D-WAP
1D-GWAP
EXISTING 6 STRANDS
OF MULTIMODE
ON POLE IN
PARKING LOT
GENERAL NOTES:
1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 125-T80.
TR-125-T80
T80-TN102
G15
EXISTING TR
TR 103-T81
GENERAL NOTES:
1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 103-T81.
T80-TN103
G15
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
80s
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
TRAILER 80 & 81 - OVERALL
FIRST FLOOR PLAN -
TECHNOLOGY
T80-TN101
-2
-1
T -T
N
/0
/2
.p d f
1/8" = 1'-0"
TRAILER 80 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
A15
1/8" = 1'-0"
TRAILER 81 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
F15
N
TRUE
NORTH
N
BUILDING
NORTH
N
TRUE
NORTH
N
BUILDING
NORTH
NOTES:
1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
106-T82
105-T82101-T82
100-T82
104-T82103-T82
102-T82
C1-01-T82
100a-T82
CONFERENCE
ROOM
OFFICEOFFICE
CONFERENCE
ROOM
TELECOMELECTRICAL
RESTROOM
CORRIDOR
STORAGE2D 2D
D
D
D
2D 2D
D 2 D
2D
2D
D
D
2D 2D
D
D
D
2D2D
D
1D-WAP
1D-GWAP
1D-WAP
D
D
D
101-T83 113-T83111-T83110-T83108-T83106-T83104-T83
105-T83
C1-01-T83
107-T83 109-T83
112-T83 114-T83
118-T83120-T83122-T83124-T83
123-T83 121-T83 119-T83 117-T83 116-T83 115-T83
C1-02-T83
126-T83
125-T83127-T83129-T83130-T83
103-T83102-T83
133-T83
131a-T83
131-T83
132-T83 128-T83
WAITING
CORRIDOR
------------CLEAN
CORRIDOR
--------RELERETNIALH.A.C.
RESTROOMRESTROOM
RESTROOM
RESTROOM
102-T99
103-T99
101-T99
108-T99
107-T99
110-T99
109-T99106-T99105-T99
104-T99
OFFICE
OFFICE
RESTROOM
OFFICE
RESTROOMOFFICEOFFICE
OFFICE
TR 103-T82
GENERAL NOTES:
1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 103-T82.
T82-TN102
G15
EXISTING 6-PAIR INCOMING COPPER
EXISTING 6 STRAND INCOMING FIBER
TR 131-T83
GENERAL NOTES:
1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 131-T83.
T83-TN103
G15
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
80s
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
TRAILER 82 TO 99 - OVERALL
FIRST FLOOR PLAN -
TECHNOLOGY
T82-TN101
-2
-1
T -T
N
/0
/2
.p d f
1/8" = 1'-0"
TRAILER 82 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
A9
1/8" = 1'-0"
TRAILER 83 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
F14
1/8" = 1'-0"
TRAILER 99 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
A15
NOTES:
1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
| Sheets |
| T30-TN101 - TRAILER 33 & 56 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY |
| T49-TN101 - TRAILER 49 - OVERALL FIRST FLOOR DEMO PLAN - TECHNOLOGY |
| T49-TN102 - TRAILER 33 - TECHNOLOGY ENLARGEMENT |
| T56-TN103 - TRAILER 56 - TECHNOLOGY ENLARGEMENT |
| T60-TN101 - TRAILER 61 & 62 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY |
| T61-TN102 - TRAILER 61 - TECHNOLOGY ENLARGEMENT |
| T62-TN103 - TRAILER 62 - TECHNOLOGY ENLARGEMENT |
| T73-TN101 - TRAILER 73 TO 78 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY |
| T73-TN102 - TRAILER 74 & 75 - TECHNOLOGY ENLARGEMENT |
| T76-TN103 - TRAILER 76 & 78 - TECHNOLOGY ENLARGEMENT |
| T80-TN101 - TRAILER 80 & 81 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY |
| T80-TN102 - TRAILER 80 - TECHNOLOGY ENLARGEMENT |
| T80-TN103 - TRAILER 81 - TECHNOLOGY ENLARGEMENT |
| T82-TN101 - TRAILER 82 TO 99 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY |
| T82-TN102 - TRAILER 82 - TECHNOLOGY ENLARGEMENT |
| T83-TN103 - TRAILER 83 - TECHNOLOGY ENLARGEMENT |
File details come from the government source that posted it. Updated .