673-107.Trailer.pdf

PDF 936 KB Posted

Attached to
Z2DA--673-20-107 EHRM Infrastructure Upgrades Construction Tampa, FL
Solicitation number
36C77625R0092-RFP
Issued by

About this file

These are architectural and technology infrastructure drawings for the EHRM Infrastructure Upgrade project at James A. Haley Veterans Hospital in Tampa, Florida (VA Project Number 673-20-107). The drawings depict overall first floor plans for multiple trailers (Buildings 30-33, 56, 60-62, 73-78, 80-83, and 99) showing technology installations including low voltage cabling, information outlets, and related infrastructure components.

The drawings specify that all new low voltage cabling in each building will route to designated technology rooms (TRs), with routing specifications varying by building. Key requirements include: contractors must include allowances for 10 additional 2-port CAT 6A information outlets per sheet with future locations to be determined by the VA; contractors must field-verify conduit riser routes with the owner prior to installation; all information outlet cabling must be scheduled and coordinated with the owner while the facility is occupied with staff and patients; and contractors must provide new J-hook routes for all new cabling with sizing and quantities per manufacturer recommendations, with the option to use existing cable tray if accessible with spare capacity. The drawings reference a Technology Coversheet (TN000) for general notes and installation details, and a Technology Equipment Schedule (TN700). The project was issued for construction on 04/04/2025, with architect CB Design Group and consultant Compass.

View the file

Other files

File Type Posted
673-107.30.Tech.pdf PDF
673-107.38.Tech.pdf PDF
673-107.39.Tech.pdf PDF
673-107.52.Tech.pdf PDF
673-107.54.Tech.pdf PDF
673-107. 0-TN002.pdf PDF
673-107.01.Tech.pdf PDF
673-107.36.Tech.pdf PDF
673-107.41.Tech.pdf PDF
673-107.68.Tech.pdf PDF
4-15 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Final.pdf PDF
Tampa EHRM Addendum 2 Narrative.pdf PDF
673-107.32.Tech.pdf PDF
673-107.53.Tech.pdf PDF
Roof - As Built.pdf PDF
4-8 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 7.pdf PDF
4-7 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 6.pdf PDF
Question 161 - Lay down area.pdf PDF
Amendment 6 - 36C77625R0092 0006.pdf PDF
Amendment 5 - 36C77625R0092 0005.pdf PDF
Revised 2.8 and 2.9 Tampa.pdf PDF
3-30 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 4.pdf PDF
Amendment 4 - 36C77625R0092 0004.pdf PDF
03-27-2026 Addendum 1 Combined Drawings.pdf PDF
01 32 16.15- Project Schedules-Small Projects.pdf PDF
3-27 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 3.pdf PDF
Amendment 3 - 36C77625R0092 0003.pdf PDF
Amendment 2 - 36C77625R0092 0002.pdf PDF
Amendment 1 - 36C77625R0092 0001.pdf PDF
Site Visit Attendance - Tampa EHRM.pdf PDF
Attachment 4 - Drawings Vol 1 Part2.pdf PDF
Attachment 8 - Drawings Vol 2 Part1.pdf PDF
Attachment 13 - Brand Name Justification - Tampa_Redacted.pdf PDF
Attachment 17 - PPQ.docx DOCX document
Attachment 18 - Project Information Sheet for Contractors.docx DOCX document
RFP - 36C77625R0092.pdf PDF
Attachment 2 - Spec Vol 2 - R1.pdf PDF
Attachment 15 - Limitations on Subcontracting Clause.docx DOCX document
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 20 - RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Project 673-20-107.xlsx XLSX spreadsheet
Attachment 1 - Spec Vol 1 - R1.pdf PDF
Attachment 6 - Drawings Vol 1 Part4.pdf PDF
Attachment 9 - Drawings Vol 2 Part2.pdf PDF
Attachment 11 - Drawings Vol 2 Part4.pdf PDF
Attachment 12 - Drawings Vol 3.pdf PDF
Attachment 19 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 3 - Drawings Vol 1 Part1.pdf PDF
Attachment 5 - Drawings Vol 1 Part3.pdf PDF
Attachment 7 - Drawings Vol 1 Part5.pdf PDF
Attachment 10 - Drawings Vol 2 Part3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C O R R

ID

O R

CORRIDOR

SOCIAL WORK

SOCIAL WORK

SOCIAL WORK

SOCIAL WORK

SOCIAL WORK

SOCIAL WORK

EMS

EMS

MULTI-PURPOSE

ROOM

RESTROOM

WATER HEATER

STORAGE

EMSEMSEMS

C T3

C0-01-T33

001-T33 002-T33

003-T33

004-T33

005-T33

006-T33 012-T33

007-T33

008-T33

008a-T33

009-T33

010-T33011-T33012a-T33

HOT LAB UPTAKE UPTAKE UPTAKE PUBLIC

RESTROOM

WAITING ROOM

CHECK IN

READING

ROOM

CONTROL

ROOM

PET/CT

SCAN ROOM

EQUIPMENT

ROOM

ELECTRICAL

CLOSET

HOT

RESTROOM

CORRIDOR

68 SF 84 SF 58 SF 58 SF 61 SF 131 SF

70 SF

122 SF

136 SF389 SF

106 SF

53 SF

57 SF

242 SF

010-56 008-56 007-56 006-56 005-56 001-56

002-56

003a-56

003-56004-56 009-56

009a-56

011-56

C0-01-56

GENERAL NOTES:

1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 009-T33.

TR 009-T33

T49-TN102

G15

GENERAL NOTES:

ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 009A-56.

TR 009A-56

T56-TN103

G15

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

33 & 56

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

TRAILER 33 & 56 - OVERALL

FIRST FLOOR PLAN -

TECHNOLOGY

T30-TN101

-2

-1

T -T

N

/0

/2

.p d f

1/8" = 1'-0"

TRAILER 33 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

A13

1/8" = 1'-0"

TRAILER 56 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

F13

N

BUILDING

NORTH

N

TRUE

NORTH

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY

INSTALLATION NOTES AND SYMBOL LIST.

2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.

3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS

IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY

THE VA AT A LATER DATE.

4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.

5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE

OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.

6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO

BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH

SPARE CAPACITY.

OFFICE AREA

OFFICE

OFFICE

RESTROOM

CLOSET

OFFICE AREA

OFFICE

OFFICE

101-T61

102-T61

103-T61

104-T61

105-T61

106-T61

107-T61

108-T61

CORNER

SINK

SERVICE

TILE

TILE (SITE INSTALL)

TILE

TILE

TILE

TILE

TILE

TILE

TILE

W/H

TILE (SITE INSTALL)

TILE (SITE INSTALL)

TILE (SITE INSTALL)

TILE TILE

TILE TILE TILE

TILE

TILE TILE

TILE TILETILE

TILE

TILE

TILE

TILE

TILE

TILE

TILE (SITE INSTALL)

TILE (SITE INSTALL)

113-T62 111-T62 109-T62 107-T62

108-T62110-T62112-T62

115-T62 117-T62 120-T62

106-T62 104-T62

105-T62 101-T62

100-T62

128-T62

127-T62

126-T62

125-T62

123-T62

122-T62

121-T62119-T62118-T62116-T62114-T62

124-T62

102-T62

103-T62

2D

D

D

D

D 2 D

D

D

2D

D

D

D

D

D

2D

2D

2D

2D 2D 2D

2D

2D

2D 2D 2D

D

D

D

D

2D

D

D

D

2D

D

D

D

D

2D

D

2D 2D

2D 2D

D

D

1D-WAP 1D-GWAP

1D-CAM 1D-WAP 1D-WAP

1D-GWAP

D

D

D

2D

PROVIDE NEW TE CABINET

GENERAL NOTES:

1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 105-T61.

TR 105-T61

T61-TN102

F15

TR 102-T62

GENERAL NOTES:

1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 102-T62.

T62-TN103

F15

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

TRAILER 61 & 62 - OVERALL

FIRST FLOOR PLAN -

TECHNOLOGY

T60-TN101

-2

-1

T -T

N

/0

/2

.p d f

1/8" = 1'-0"

TRAILER 61 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

A12

1/8" = 1'-0"

TRAILER 62 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

E12

N

BUILDING

NORTH

N

TRUE

NORTH

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY

INSTALLATION NOTES AND SYMBOL LIST.

2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.

3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS

IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY

THE VA AT A LATER DATE.

4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.

5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE

OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.

6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO

BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH

SPARE CAPACITY.

OFFICE AREA

OFFICE

OFFICE

RESTROOM

STORAGE

OFFICE

OFFICE

101-T73

102-T73

103-T73

104-T73

105-T73

106-T73

107-T73

2D

2D

2D

2D 2D 2D

2D

2D 2D

2D 2D

1D-WAP 1D-WAP

D

D

D

D

D

2D 2D 2D

D

2D 2 D

2D

2D

1D-GWAP

1D-WAP

OFFICE AREA

COMM

RESTROOM

OFFICE

OFFICE

OFFICE

OFFICE

101-T75

105-T75

104-T75

103-T75

102-T75 107-T75

106-T75

2D

2D

2D

2D

2D 2D

2D

2D

1D-WAP

1D-WAP

1D-GWAP

2D

OFFICE AREA

RESTROOM

STORAGE

OFFICE

OFFICE

OFFICE

OFFICE

101-T76

104-T76

105-T76

103-T76

102-T76 107-T76

106-T76

2D

2D

2D

D

2D 2D

D

2D

D

2D

2D

2D

2D 2D

2D

1D-WAP 1D-WAP1D-GWAP

RESTROOM

2D

2D

2D

2D

2D 2D 2D

2D

2D

2D 2D 2D

1D-WAP

1D-GWAP 1D-WAP

2D

RESTROOM

2D 2D 2D 2D 2D 2D 2D 2D

2D

2D

2D2D2D2D

2D

2D

1D-WAP 1D-GWAP 1D-WAP

GENERAL NOTES:

1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 105-T74 IN BUILDING 74.

NEW TE

74-105

GENERAL NOTES:

1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 105-T74.

TR 105-T74

T73-TN102

G15

GENERAL NOTES:

1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 105-T75.

TR 105-T75

T73-TN102

B15

GENERAL NOTES:

1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 105-T75 IN BUILDING 75.

T76-TN103

G16

GENERAL NOTES:

1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 107 IN BUILDING 78.

TR 107

GENERAL NOTES:

1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 107.

T76-TN103

B16

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

TRAILER 73 TO 78 - OVERALL

FIRST FLOOR PLAN -

TECHNOLOGY

T73-TN101

-2

-1

T -T

N

/0

/2

.p d f

1/8" = 1'-0"

TRAILER 73 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

A9

1/8" = 1'-0"

TRAILER 74 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

D9

1/8" = 1'-0"

TRAILER 75 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

G9

1/8" = 1'-0"

TRAILER 76 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

A15

1/8" = 1'-0"

TRAILER 77 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

D15

1/8" = 1'-0"

TRAILER 78 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

G15

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY

INSTALLATION NOTES AND SYMBOL LIST.

2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.

3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS

IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY

THE VA AT A LATER DATE.

4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.

5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE

OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.

6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO

BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH

SPARE CAPACITY.

C1-01-T80 C1-02-T80

C1-03-T80

104-T80 129-T80

125-T80

126-T80

127-T80

124-T80 123-T80 122-T80 121-T80 119-T80 117-T80 115-T80 114-T80

113-T80

112-T80110-T80

116-T80118-T80

108-T80106-T80

120-T80

111-T80109-T80107-T80105-T80103-T80102-T80 100-T80

CORRIDOR CORRIDOR

CORRIDOR

NURSE STATION

RESTROOM

RESTROOM

----CLEAN

DIRTY

--------------------RESTROOM

2D 2D 2D 2D 2D 2D 2D

2D 2D 2D

D

2D 2D

D

D 2 D

2D

2D

D

2D

D

D

2D 2D2D

D

2D

D

2D

2D2D

D

D

1D-WAP

2D

1D-GWAP

1D-GWAP

1D-WAP

W

1D-WAP

1D-CAM

C1-01-T81 C1-02-T81

C1-03-T81

100-T81

128-T81

129-T81 127-T81

126-T81

125-T81

124-T81 123-T81 122-T81 121-T81 119-T81 117-T81 115-T81 114-T81

113-T81116-T81118-T81120-T81

106-T81

104-T81

108-T81 110-T81 112-T81

111-T81 109-T81

107-T81105-T81103-T81102-T81

CORRIDOR CORRIDOR

CORRIDOR

RESTROOM

RESTROOM

------------SOILED

CLEAN

NURSE STATION

------------RESTROOM

2D 2D 2D 2D 2D 2D 2D

2D

2D 2D

2D 2D 2D

2D

D

2D

2D

2D

D

2D

2D

D

D

2D

2D

2D2D

2D

2D

D

D

D

D

D

D

D

D

D

1D-WAP

1D-WAP

1D-GWAP

D

D

D

D

D

D

W

2D

1D-WAP

1D-GWAP

EXISTING 6 STRANDS

OF MULTIMODE

ON POLE IN

PARKING LOT

GENERAL NOTES:

1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 125-T80.

TR-125-T80

T80-TN102

G15

EXISTING TR

TR 103-T81

GENERAL NOTES:

1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 103-T81.

T80-TN103

G15

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

80s

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

TRAILER 80 & 81 - OVERALL

FIRST FLOOR PLAN -

TECHNOLOGY

T80-TN101

-2

-1

T -T

N

/0

/2

.p d f

1/8" = 1'-0"

TRAILER 80 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

A15

1/8" = 1'-0"

TRAILER 81 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

F15

N

TRUE

NORTH

N

BUILDING

NORTH

N

TRUE

NORTH

N

BUILDING

NORTH

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY

INSTALLATION NOTES AND SYMBOL LIST.

2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.

3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS

IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY

THE VA AT A LATER DATE.

4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.

5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE

OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.

6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO

BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH

SPARE CAPACITY.

106-T82

105-T82101-T82

100-T82

104-T82103-T82

102-T82

C1-01-T82

100a-T82

CONFERENCE

ROOM

OFFICEOFFICE

CONFERENCE

ROOM

TELECOMELECTRICAL

RESTROOM

CORRIDOR

STORAGE2D 2D

D

D

D

2D 2D

D 2 D

2D

2D

D

D

2D 2D

D

D

D

2D2D

D

1D-WAP

1D-GWAP

1D-WAP

D

D

D

101-T83 113-T83111-T83110-T83108-T83106-T83104-T83

105-T83

C1-01-T83

107-T83 109-T83

112-T83 114-T83

118-T83120-T83122-T83124-T83

123-T83 121-T83 119-T83 117-T83 116-T83 115-T83

C1-02-T83

126-T83

125-T83127-T83129-T83130-T83

103-T83102-T83

133-T83

131a-T83

131-T83

132-T83 128-T83

WAITING

CORRIDOR

------------CLEAN

CORRIDOR

--------RELERETNIALH.A.C.

RESTROOMRESTROOM

RESTROOM

RESTROOM

102-T99

103-T99

101-T99

108-T99

107-T99

110-T99

109-T99106-T99105-T99

104-T99

OFFICE

OFFICE

RESTROOM

OFFICE

RESTROOMOFFICEOFFICE

OFFICE

TR 103-T82

GENERAL NOTES:

1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 103-T82.

T82-TN102

G15

EXISTING 6-PAIR INCOMING COPPER

EXISTING 6 STRAND INCOMING FIBER

TR 131-T83

GENERAL NOTES:

1. ALL NEW LOW VOLTAGE CABLING IN THIS BUILDING WILL ROUTE TO TR 131-T83.

T83-TN103

G15

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

80s

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

TRAILER 82 TO 99 - OVERALL

FIRST FLOOR PLAN -

TECHNOLOGY

T82-TN101

-2

-1

T -T

N

/0

/2

.p d f

1/8" = 1'-0"

TRAILER 82 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

A9

1/8" = 1'-0"

TRAILER 83 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

F14

1/8" = 1'-0"

TRAILER 99 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

A15

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY

INSTALLATION NOTES AND SYMBOL LIST.

2. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.

3. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS

IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY

THE VA AT A LATER DATE.

4. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.

5. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE

OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.

6. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO

BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH

SPARE CAPACITY.

Sheets
T30-TN101 - TRAILER 33 & 56 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
T49-TN101 - TRAILER 49 - OVERALL FIRST FLOOR DEMO PLAN - TECHNOLOGY
T49-TN102 - TRAILER 33 - TECHNOLOGY ENLARGEMENT
T56-TN103 - TRAILER 56 - TECHNOLOGY ENLARGEMENT
T60-TN101 - TRAILER 61 & 62 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
T61-TN102 - TRAILER 61 - TECHNOLOGY ENLARGEMENT
T62-TN103 - TRAILER 62 - TECHNOLOGY ENLARGEMENT
T73-TN101 - TRAILER 73 TO 78 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
T73-TN102 - TRAILER 74 & 75 - TECHNOLOGY ENLARGEMENT
T76-TN103 - TRAILER 76 & 78 - TECHNOLOGY ENLARGEMENT
T80-TN101 - TRAILER 80 & 81 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
T80-TN102 - TRAILER 80 - TECHNOLOGY ENLARGEMENT
T80-TN103 - TRAILER 81 - TECHNOLOGY ENLARGEMENT
T82-TN101 - TRAILER 82 TO 99 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
T82-TN102 - TRAILER 82 - TECHNOLOGY ENLARGEMENT
T83-TN103 - TRAILER 83 - TECHNOLOGY ENLARGEMENT

File details come from the government source that posted it. Updated .