This document is an Overall Site Plan - Technology drawing for the James A. Haley Veterans Hospital in Tampa, Florida, prepared by the U.S. Department of Veterans Affairs Office of Construction and Facilities Management. The drawing illustrates the infrastructure upgrade project (EHRM Infrastructure Upgrade) and depicts the technology systems and conduit routing across the hospital campus.

The plan shows the routing of fiber optic cable and electrical conduits throughout the facility, with specific notation for (2) to (6) 4-inch conduits at various locations, including connections between multiple buildings (Buildings 1, 2, 19, 24, 30, 32, 33, 36, 38, 39, 41, 42, 49, 52, 53, 54, 55, 56, 62, 63, 68, 77, 78, 80, 81, 82, 83, and 100). The drawing includes provisions for (2) Maxcell 3-pocket fabric innerducts in each 4-inch conduit and identifies fiber routing through corridors with specific designation of A-leg and B-leg fiber connections. The plan also indicates the locations of pull boxes, handhole structures (PW-HH and PW-MH designations), and notes that the facility is fully sprinklered. The project involves consultants from Compass (Novelty, Ohio), CB Design Group (Alexandria, Virginia), and additional consultants including Scott Przybysz, Mark Dyck, and Clare Kramer. The drawing was issued for construction on April 4, 2025, with a revision dated April 14, 2026, under project number 673-20-107.

View the file

Other files

File Type Posted
673-107.30.Tech.pdf PDF
673-107.38.Tech.pdf PDF
673-107.39.Tech.pdf PDF
673-107.52.Tech.pdf PDF
673-107.54.Tech.pdf PDF
4-15 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Final.pdf PDF
Tampa EHRM Addendum 2 Narrative.pdf PDF
673-107.32.Tech.pdf PDF
673-107.53.Tech.pdf PDF
Amendment 9 - 36C77625R0092 0009.pdf PDF
673-107.Trailer.pdf PDF
Amendment 8 - 36C77625R0092 0008.pdf PDF
Roof - As Built.pdf PDF
Amendment 7 - 36C77625R0092 0007.pdf PDF
4-7 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 6.pdf PDF
Question 161 - Lay down area.pdf PDF
Amendment 6 - 36C77625R0092 0006.pdf PDF
Calculations based on geo report_Sealed.pdf PDF
Amendment 5 - 36C77625R0092 0005.pdf PDF
Revised 2.8 and 2.9 Tampa.pdf PDF
3-31 RFI TRACKING SHEET No.14 - SOLICITATION 36C77625R0092 Amend 5.pdf PDF
3-30 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 4.pdf PDF
01 32 16.15- Project Schedules-Small Projects.pdf PDF
010000 TIL General Specification - Tampa Specific.pdf PDF
Tampa EHRM Addendum 1 Narrative.pdf PDF
3-27 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 3.pdf PDF
Amendment 3 - 36C77625R0092 0003.pdf PDF
PKI Readers.pdf PDF
Amendment 2 - 36C77625R0092 0002.pdf PDF
Attachment 4 - Drawings Vol 1 Part2.pdf PDF
Attachment 8 - Drawings Vol 2 Part1.pdf PDF
Attachment 13 - Brand Name Justification - Tampa_Redacted.pdf PDF
Attachment 17 - PPQ.docx DOCX document
Attachment 18 - Project Information Sheet for Contractors.docx DOCX document
Attachment 1 - Spec Vol 1 - R1.pdf PDF
Attachment 6 - Drawings Vol 1 Part4.pdf PDF
Attachment 9 - Drawings Vol 2 Part2.pdf PDF
Attachment 11 - Drawings Vol 2 Part4.pdf PDF
Attachment 12 - Drawings Vol 3.pdf PDF
Attachment 19 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 3 - Drawings Vol 1 Part1.pdf PDF
Attachment 5 - Drawings Vol 1 Part3.pdf PDF
Attachment 7 - Drawings Vol 1 Part5.pdf PDF
Attachment 10 - Drawings Vol 2 Part3.pdf PDF
Attachment 14 - Construction Wage Rates - Hillsborough 1-2-2025.pdf PDF
RFP - 36C77625R0092.pdf PDF
Attachment 2 - Spec Vol 2 - R1.pdf PDF
Attachment 15 - Limitations on Subcontracting Clause.docx DOCX document
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 20 - RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Project 673-20-107.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

60'-0"

56'-21/4"

' W

ID

E

C O

N C

R E

T E

S

ID

E W

A

LK

6' WIDE CONC. SIDEWALK

WELL

25 regular

67 regular

RICHARD SILVER WAY

GRATE TOP INLET

PEDESTRIAN GATE

CONCRETE WALK

CONCRETE WALK

16"PALM

20"PALM

18"PALM

9"OAK

C H A

IN

L

IN

K

F E N C E

C H A

IN

L

IN

K

F E N C E

SGN

PARK

SGN

UP

HANDICAPPED RAMP

FDOT INDEX #304

HANDICAPPED RAMP

FDOT INDEX #304

CONCRETE

33.17

UP

Guy

131st AVENUE

(6 R

IG

H T

O F

W A Y th

S T R E E T

S-2

HARTLINE BUS

UNIVERSITY

NORTH

TRANSFER

STATION

CONVENIENCE STORE

APARTMENTS

APARTMENTS

TRASH

DS-BL

EXIT

ENTER

PLANTER

PLANTERS

CONC. SLAB

PEARL

GARNET

G

C

T

V

U

H

P

MC

ONLY

F

IS

H E R H

O U S E P

A R K

IN

G A

R E A

E

P S

1 3 1 s t A V E N U E t h

S

T

R

E

E

T

B R

U C

E B

D

O W

N S

B O

U L E

V A

R D t h

S t.

L

IV

IN

G

S T

O N

A v e t h

S t.

POST

POST

POST

POST

MC

ONLY

W/ 1 1/2" P.V.C.

STUB OUT

2'x2'x2' FRENCH DRAIN;

POLE

TRANS. PAD

RETENTION POND "A"

RETENTION POND "A2"

RETENTION POND "A1"RETENTION POND "B"

(UNDER GARAGE)

TANK

CANOPY

CANOPY

T73T74 T75T76

37?

PROPOSED

RELOCATION

CANOPY

SHED

HAZ MAT

T61

T99

TREE

TREE

TREE

20"

24"

16"

12" PINE

22'

14" PINE

30'

12" PINE

24'

12" OAK

30'

P E R

IM

E T E R

SID

EW

ALK

Covered

Patio

Covered Conc. Deck

Covered Conc. Deck

Deck Conc.

Covered

A w n in g

Awning

Covered Concrete

Patio

Conc. Deck

V.B.S.#2

V.B.S.#1

B.S.

1 Story Brick Bldg.

MH

Boxes Signal Traffic

FLAG

POLE

GATE

GATE

GATE GATEGATE

GATE

GATE

GATE

Oxygen Tanks

ISLAND

ISLAND

TOP OF WALL

S

L

POST

SIGN

SIGN

SIGN

SIGN

BASKETBALL

COURT

A/C A/C

A/C

(TYP)

BASE PAD

TOWER

TREE

D

C

B

MARK

A

CRAPE MIRTLE

LIVE OAK

DRAKE ELM

EAST PALATKA HOLLY

D

B

C

D

C

B

C

D

A

A

C

GATED - B

E

B

C

A

A

C

B

A

B

B

~3'x2'

~2'x4'

10 handicap

S

S

BB

BB

S

S

S

S

S

S

S

S

S

S

BB

BB

S

S

S

S

S

S

T

SSS

D

DD

WM

E E

A

B B

A

B

A

B

A

B A

B

A

A/B

B

B

B

A

A/B

A/B

A BSW

A

AA

A

A

B

B

A

LEGEND:

DUCT BANK

PIPE BASEMENT/TUNNEL CONDUITS

BUILDING 38

BUILDING 32

BUILDING 30

BUILDING 1

BUILDING 39

BUILDING 41

BUILDING 42

BUILDING 52

BUILDING 53

BUILDING 54

BUILDING 68

BUILDING 2

BUILDING 36

BUILDING 33

BUILDING 100

BUILDING 63

BUILDING 19

BUILDING 56

BUILDING 82

BUILDING 80

BUILDING 81

BUILDING 83

BUILDING 62

BUILDING 24

BUILDING 49

BUILDING 77BUILDING 78

A & B

B

B

B

A

A

A A

B

AA

B

B

B

DATA CTR

(4) 4" CONDUITS

A

A/B

A

A & B

B B

B

EXISTING

A

B

B

(2) 4" CONDUIT

(2) 4" CONDUIT

(6) 4" CONDUIT

(2) 4" CONDUIT

(2) 4" CONDUIT

(4) 4" CONDUIT

(4) 4" CONDUITS (4) 4" CONDUITS

(4) 4" CONDUITS

(4) 4" CONDUIT

(4) 4" CONDUIT

(2) 4" CONDUIT

(4) 4" CONDUIT

(2) 4" CONDUIT

(2) 4" CONDUIT

PW-HH-2

PW-HH-1

PW-HH-2

PW-HH-2

PW-HH-1PW-HH-1PW-HH-1

PW-HH-2

(32.1)

PW-HH-2

PW-MH-1

PW-MH-1

PW-MH-1

PW-HH-1

PW-HH-1

(21) (25)

PW-HH-1

(20)

PW-HH-2

PW-HH-2

PW-HH-1

PW-HH-1

PW-HH-2

PW-HH-2

PW-HH-2

PW-HH-2

PW-HH-2

PW-HH-2

PW-HH-2

PW-HH-2

PW-HH-2

PW-HH-2

PW-HH-2

PW-HH-2

PW-HH-2

PW-HH-2

PW-HH-1

PW-HH-1

PW-HH-1

B-LEG FIBER

INTO BUILDING 32

A-LEG FIBER OUT

TO BUILDING 78

A & B

B

B

BUILDING 55

BB

PW-HH-1

A

(4) 4" CONDUITS

FIBER BEING ROUTED THROUGH CORRIDOR

(4) 4" CONDUITS

(4) 4" CONDUITS

(4) 4" CONDUITS

(4) 4" CONDUITS

(4) 4" CONDUITS

(4) 4" CONDUITS

(4) 4" CONDUITS

(4) 4" CONDUIT

(6) 4" CONDUIT

(4) 4" CONDUIT

PW-MH-1

(2) 4" CONDUITS

PW-HH-1

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA. FL.

ISSUED FOR CONSTRUCTION

OVERALL SITE PLAN -

TECHNOLOGY

0-TN002

-2

-1

-T

N

/2

/2

.p d f

1" = 60'-0"

OVERALL SITE PLAN - TECHNOLOGY

N

SHEET NOTES:

1. REFER TO CIVIL PLANS FOR ADDITIONAL INFORMATION.

2. PROVIDE (2) MAXCELL 3-POCKET FABRIC INNERDUCTS

IN EACH 4" CONDUIT

Revisions: Date:

Revision 2 4/14/2026

Sheets
0-TN002 - OVERALL SITE PLAN - TECHNOLOGY

File details come from the government source that posted it. Updated .