673-107.52.Tech.pdf

PDF 443 KB Posted

Attached to
Z2DA--673-20-107 EHRM Infrastructure Upgrades Construction Tampa, FL
Solicitation number
36C77625R0092-RFP
Issued by

About this file

This document consists of two architectural floor plans for Building 52 at James A. Haley Veterans Hospital in Tampa, Florida, as part of the EHRM Infrastructure Upgrade project (VA Project Number 673-20-107).

The drawings depict the overall first floor plan (52-TN101) and second floor plan (52-TN102) for technology infrastructure installation. Key requirements include installation of new low-voltage cabling routed to TR 105-52, with Cat 6A information outlets distributed throughout multiple rooms including bedrooms, bathrooms, hallways, offices, and common areas. The contractor must include an allowance for 10 additional 2-port Cat 6A information outlets on each floor for future locations to be determined by the VA. Critical installation notes specify that all cabling must be scheduled with the owner during occupied operations with staff and patients, requiring coordination of demolition and cable replacement activities. The contractor must provide new J-hook cable routing per manufacturer specifications, with the option to utilize existing cable tray if accessible with spare capacity. Additional requirements include field verification of conduit riser routes with the owner prior to installation and reference to technology general notes, installation specifications, and equipment schedules on related drawing sheets (TN000 and TN700). The drawings were issued for construction on 04/04/2025 and prepared by CB Design Group (architect) with consultants Compass, Scott Przybysz, Mark Dyck, and Clare Kramer.

View the file

Other files

File Type Posted
673-107.30.Tech.pdf PDF
673-107.38.Tech.pdf PDF
673-107.39.Tech.pdf PDF
673-107.54.Tech.pdf PDF
4-15 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Final.pdf PDF
Tampa EHRM Addendum 2 Narrative.pdf PDF
673-107.32.Tech.pdf PDF
673-107.53.Tech.pdf PDF
673-107. 0-TN002.pdf PDF
673-107.01.Tech.pdf PDF
673-107.36.Tech.pdf PDF
673-107.41.Tech.pdf PDF
673-107.68.Tech.pdf PDF
Roof - As Built.pdf PDF
4-8 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 7.pdf PDF
4-7 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 6.pdf PDF
Question 161 - Lay down area.pdf PDF
Amendment 6 - 36C77625R0092 0006.pdf PDF
Amendment 5 - 36C77625R0092 0005.pdf PDF
Revised 2.8 and 2.9 Tampa.pdf PDF
3-30 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 4.pdf PDF
01 32 16.15- Project Schedules-Small Projects.pdf PDF
Amendment 4 - 36C77625R0092 0004.pdf PDF
03-27-2026 Addendum 1 Combined Drawings.pdf PDF
3-27 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 3.pdf PDF
Amendment 3 - 36C77625R0092 0003.pdf PDF
Amendment 2 - 36C77625R0092 0002.pdf PDF
Amendment 1 - 36C77625R0092 0001.pdf PDF
Site Visit Attendance - Tampa EHRM.pdf PDF
Attachment 4 - Drawings Vol 1 Part2.pdf PDF
Attachment 8 - Drawings Vol 2 Part1.pdf PDF
Attachment 13 - Brand Name Justification - Tampa_Redacted.pdf PDF
Attachment 17 - PPQ.docx DOCX document
Attachment 18 - Project Information Sheet for Contractors.docx DOCX document
Attachment 1 - Spec Vol 1 - R1.pdf PDF
Attachment 6 - Drawings Vol 1 Part4.pdf PDF
Attachment 9 - Drawings Vol 2 Part2.pdf PDF
Attachment 11 - Drawings Vol 2 Part4.pdf PDF
Attachment 12 - Drawings Vol 3.pdf PDF
Attachment 19 - Division Cost Breakdown.xlsx XLSX spreadsheet
RFP - 36C77625R0092.pdf PDF
Attachment 2 - Spec Vol 2 - R1.pdf PDF
Attachment 15 - Limitations on Subcontracting Clause.docx DOCX document
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 20 - RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Project 673-20-107.xlsx XLSX spreadsheet
Attachment 3 - Drawings Vol 1 Part1.pdf PDF
Attachment 5 - Drawings Vol 1 Part3.pdf PDF
Attachment 7 - Drawings Vol 1 Part5.pdf PDF
Attachment 10 - Drawings Vol 2 Part3.pdf PDF
Attachment 14 - Construction Wage Rates - Hillsborough 1-2-2025.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

UPS1-x-52

S1-x-52

S1-x-52

104-52

SpaceSpace

112-52 121-52

129-52

128-52127-52

122-52

123-52 124-52

126-52

125-52 105-52

106-5

110-52

Space

111-52

107-52

109-52 113-52

114-52 115-52

108-52

103-52

101-52 100-52102-52

120-52

119-52118-52

117-52

116-52

MAIN STAIR

STAIR A

STAIR B

GUEST

RESTROOM

MECH.MECH.

HALLWAY HALLWAY

BEDROOM

BATHROOM

BATHROOM

BEDROOM

BATHROOM BATHROOM

BEDROOM

BEDROOM

CLOSET

BATHROOM

OFFICE

ELEV. EQUIP.

MECHANICAL

LAUNDRY

FAMILY ROOMBEDROOM

BATHROOM BATHROOM

KITCHEN

HALLWAY

LIVING ROOM

FOYERDINING ROOM

BEDROOM

BATHROOMBATHROOM

BEDROOM

BEDROOM

W

W

W W

W W

W W

W W

W

1D-CAM

1D-CAM

1D-CAM

1D-CAM

1D-CAM

1D-CAM

1D-CAM

1D-CAM

1D-CAM

1D-CAM

1D-GWAP

1D-GWAP

1D-GWAP

1D-GWAP

1D-GWAP

2D

2D

2D

D

2D

2D

2D

2D

2D

D

D

D

D

2D

1D-CAM

1D-CAM

EXISTING FIRE

CONTROL PANEL

52-TN200

F16

PROVIDE WALL

MOUNTED CABINET

PW-CPW-1

TR 105-52

(TYP. OF 4)

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 52 - OVERALL FIRST

FLOOR PLAN - TECHNOLOGY

52-TN101

-2

-1

-T

N

/2

/2

.p d f

1/8" = 1'-0"

BUILDING 52 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

A12

N

BUILDING

NORTH

N

TRUE

NORTH

NOTES:

1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL ROUTE TO TR 105-52 .

2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY

INSTALLATION NOTES AND SYMBOL LIST.

3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.

4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS

IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY

THE VA AT A LATER DATE.

5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.

6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE

OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.

7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO

BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH

SPARE CAPACITY.

A-LEG FIBER

B-LEG FIBER

DN

DN

DN

Space

S2-x-52 b

200-52

203-52

204-52

Space

S2-x-52

216-52

215-52214-52

213-52

212-52

211-52

210-52

209-52 a

208-52

207-52

206-52 205-52 201-52

202-52

CLOSET

STAIR B

H A

LL

W A Y

HALLWAY

BEDROOM

BATHROOM

CLOSET

STAIR A

BEDROOM

BATHROOMBATHROOM

BEDROOM

BATHROOM

BEDROOM

BATHROOM

BEDROOM

H A

LL

W A Y

BATHROOM

BEDROOM

BEDROOM

BATHROOM BATHROOM

BEDROOM

W

W W

W

W

W W

W2D

2D

2D

2D

2D

2D

1D-GWAP

1D-GWAP

1D-GWAP

D

D

1D-CAM

(4) 4" CONDUIT

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 52 - OVERALL SECOND

FLOOR PLAN - TECHNOLOGY

52-TN102

-2

-1

-T

N

/2

/2

.p d f

1/8" = 1'-0"

BUILDING 52 - OVERALL SECOND FLOOR PLAN - TECHNOLOGY

A12

N

BUILDING

NORTH

N

TRUE

NORTH

NOTES:

1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL ROUTE TO TR 105-52 ON THE LEVEL BELOW.

2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY

INSTALLATION NOTES AND SYMBOL LIST.

3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.

4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS

IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY

THE VA AT A LATER DATE.

5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.

6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE

OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.

7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO

BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH

SPARE CAPACITY.

Sheets
52-TN101 - BUILDING 52 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
52-TN102 - BUILDING 52 - OVERALL SECOND FLOOR PLAN - TECHNOLOGY