673-107.39.Tech.pdf

PDF 559 KB Posted

Attached to
Z2DA--673-20-107 EHRM Infrastructure Upgrades Construction Tampa, FL
Solicitation number
36C77625R0092-RFP
Issued by

About this file

This document consists of architectural/engineering drawings for Building 39 at James A. Haley Veterans Hospital in Tampa, Florida, specifically depicting technology infrastructure plans for the first and second floors as part of the EHRM Infrastructure Upgrade project (VA Project Number 673-20-107).

The first floor plan (39-TN101) illustrates the main building technology layout at 1/8" = 1'-0" scale, identifying multiple rooms totaling 9,666 SF including electrical rooms, boiler room, instrument closet, engineering control center, chiller room, air compressor room, and various support spaces. The plan designates technology routing to termination point TR 39-A108, indicates locations for Cat 6A information outlets (with an allowance for 10 additional future outlets), and specifies conduit riser routes requiring owner field verification. The second floor plan (39-TN102) at the same scale shows 2,551 SF across mezzanine levels with office, locker rooms, and mechanical spaces, with cabling routing to TR 39-A108 on the level below. Both drawings include notes requiring contractor coordination with owner during occupied facility operations, provision of new J-hook cable routes per manufacturer specifications, and utilization of existing cable tray where accessible. The documents are issued for construction dated 04/04/2025 and were prepared by CB Design Group (architect), Compass (consultant), with additional consulting by Scott Przybysz, Mark Dyck, and Clare Kramer.

View the file

Other files

File Type Posted
4-15 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Final.pdf PDF
Tampa EHRM Addendum 2 Narrative.pdf PDF
673-107.32.Tech.pdf PDF
673-107.53.Tech.pdf PDF
673-107.30.Tech.pdf PDF
673-107.38.Tech.pdf PDF
673-107.52.Tech.pdf PDF
673-107.54.Tech.pdf PDF
673-107. 0-TN002.pdf PDF
673-107.01.Tech.pdf PDF
673-107.36.Tech.pdf PDF
673-107.41.Tech.pdf PDF
673-107.68.Tech.pdf PDF
Roof - As Built.pdf PDF
4-8 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 7.pdf PDF
Amendment 6 - 36C77625R0092 0006.pdf PDF
4-7 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 6.pdf PDF
Question 161 - Lay down area.pdf PDF
Amendment 5 - 36C77625R0092 0005.pdf PDF
Revised 2.8 and 2.9 Tampa.pdf PDF
01 32 16.15- Project Schedules-Small Projects.pdf PDF
3-30 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 4.pdf PDF
Amendment 4 - 36C77625R0092 0004.pdf PDF
03-27-2026 Addendum 1 Combined Drawings.pdf PDF
Amendment 3 - 36C77625R0092 0003.pdf PDF
3-27 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 3.pdf PDF
Amendment 2 - 36C77625R0092 0002.pdf PDF
Amendment 1 - 36C77625R0092 0001.pdf PDF
Site Visit Attendance - Tampa EHRM.pdf PDF
Attachment 1 - Spec Vol 1 - R1.pdf PDF
Attachment 6 - Drawings Vol 1 Part4.pdf PDF
Attachment 9 - Drawings Vol 2 Part2.pdf PDF
Attachment 11 - Drawings Vol 2 Part4.pdf PDF
Attachment 12 - Drawings Vol 3.pdf PDF
Attachment 19 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 4 - Drawings Vol 1 Part2.pdf PDF
Attachment 8 - Drawings Vol 2 Part1.pdf PDF
Attachment 13 - Brand Name Justification - Tampa_Redacted.pdf PDF
Attachment 17 - PPQ.docx DOCX document
Attachment 18 - Project Information Sheet for Contractors.docx DOCX document
RFP - 36C77625R0092.pdf PDF
Attachment 2 - Spec Vol 2 - R1.pdf PDF
Attachment 15 - Limitations on Subcontracting Clause.docx DOCX document
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 20 - RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Project 673-20-107.xlsx XLSX spreadsheet
Attachment 3 - Drawings Vol 1 Part1.pdf PDF
Attachment 5 - Drawings Vol 1 Part3.pdf PDF
Attachment 7 - Drawings Vol 1 Part5.pdf PDF
Attachment 10 - Drawings Vol 2 Part3.pdf PDF
Attachment 14 - Construction Wage Rates - Hillsborough 1-2-2025.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WP

GFCI

WP

GFCI

WP

GFCI

WP

GFCI

WP

GFCI

WP

GFCI

513 SF

811 SF

2,028 SF

5,093 SF

112 SF

500 SF

102 SF

1,081 SF1,081 SF1,081 SF1,081 SF

9,666 SF

450 SF

39-A106

39-A105

39-A110

39-A112

39-A108

39-A107

S1-01-39

39-A10439-A10339-A10239-A101

39-A111

39-A113

ABCC.1DEFGH

3'-0" HIGH

CONC. PAD

75"x213"

6" HIGH PAD,

4.16KW SWGR.

13KV PRIMARY SWGR.

STARTER

SECONDARY SWGR. 4.16KV

M C C B

M C C A

39-NSW-A

39-NSW-B

C H

C H

C H

C H

39-B-1 39-B-2 39-B-3

39-FP-1

39-FP-2

39-SP-139-SP-2

39-PP-139-PP-4

39-PP-5 39-PP-3 39-PP-2

39-CTP-1 39-BFP-1

39-CTP-2

39-BFP-2

39-BFP-3

480V SWGR.

39-NSW-C

C H

STARTER

INTER. SW.

CNTLR.

(VFD)(VFD)

AIR DRYER

PRIMARY PULLBOX

4'x3'x18"

39-MCC-C 39-MCC-D

CNTLR.

INTER. SW.

INTER. SW.

CNTLR.

CNTLR.

INTER. SW.

INTER. SW.

CNTLR.

(EMERG.)

SUMP PUMP

WATER SOFTENER

CONTROL PANEL

GAS SHUTOFF

VALVE

39-SP-3

MEDICAL

VACUUM PUMP

3 H.P.

SUMP PUMP

FUTURE

CHEMICAL FEED

CONTROL PANEL

39-SA-1

39-VAC-1

CONTROL PANEL

(FWE), (TYP.)

BATCH TANK

50"x53"

63"x105" SOFTENING TANK

W/WATER CONDITIONING

CONTROL VALVE.

10' DIA.x17'-3"

FRP BRINE TANK,

44 TONS OPERATING

WEIGHT.

TANK

TANK

RECIEVER

FUTURE

RECIEVER

SUMP PUMP W/2'

PIT DEPTH 1/3 HP

120V/1PH

LOCATE BOILER TREATMENT

CHEMICALS HERE.

4" FLOW CONTROL FILL

VALVE AND KAMLOCK

COUPLING IN S.S. LOCKING

PANEL (16"x16"x12")

MOUNT 4' AFF.

LOCATE 350 GAL. CORROSION

INHIBITOR TANK AND PUMPS

HERE. MOUNT PUMPS ON WALL

SEE SHEET 39 H-14 FOR CHEMICAL

FEED SCHEMATIC.

39-CWP-5 39-CWP-6

CT-5

CT-6

39-CWP-439-CWP-339-CWP-239-CWP-1

2 HR RATED WALL (REF)

OVERHEAD DOOR

OVERHEAD DOOR

GRILLE

GRILLE

UTILITY TUNNEL (BELOW GRADE)

CONDENSATE PIT

BELOW GRADE,

TUNNEL

ELECTRICAL

ROOM #1

ELECTRICAL

ROOM #2

BOILER

ROOM

INSTRUMENT

CLOSET

ENGINEERING

CONTROL

CENTER

STAIR #1

COLD WATER

BASIN

COLD WATER

BASIN

COLD WATER

BASIN

COLD WATER

BASIN

CHILLER

ROOM

AIR

COMPRESSOR

ABANDONED U/G

FUEL TANK

2D2D

2D

2D

D

W

W

2D

1D-GWAP

1D-WAP

1D-CAM

1D-CAM

W W

1D-CAM

1D-CAM

1D-CAM

1D-CAM

1D-CAM

1D-CAM

1D-CAM

W

1D-CAM

1D-CAM

1D-CAM

W

1D-CAM 1D-CAM

39-TN301

F15

(4) 4" CONDUIT

TR-39-A108

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 39 - OVERALL FIRST

FLOOR PLAN - TECHNOLOGY

39-TN101

-2

-1

-T

N

/0

/2

.p d f

1/8" = 1'-0"

BUILDING 39 - OVERALL FIRST FLOOR PLAN - MAIN BUILDING - TECHNOLOGY

A13

N

BUILDING

NORTH

N

TRUE

NORTH

NOTES:

1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL ROUTE TO TR 39-A108.

2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY

INSTALLATION NOTES AND SYMBOL LIST.

3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.

4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS

IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY

THE VA AT A LATER DATE.

5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.

6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE

OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.

7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO

BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH

SPARE CAPACITY.

B

A

AS102 AS301

A S

A

S

GRILLE OVERHEAD DOOR

476 SF

S F

60 SF

38 SF

106 SF

135 SF

212 SF

132 SF

315 SF

158 SF

2,551 SF

N SF-

39-CP-4

39-CP-3

39-CP-2

39-CP-1

39-MAC-239-MAC-1

AIR PURIFIER

BREATHING

TANK

RECEIVER

39-EDH-1

39-AH-2

39-DWP-2

39-DWP-339-DWP-1

39-AH-1

DEAERATOR

H G F

E D C.1 C B A

D N

39-A210

C 1-

S2-01-39

39-A206

39-A207

39-A203

39-A201

39-A202

39-A205

39-A204

39-A209

MEZZANINE #2

C O R R

ID

O R

STAIR #1

H.A.C.

OFFICE

EATING

AREA

MENS

LOCKER

ROOM

WOMENS

LOCKER

ROOM

SECURE

STORAGE

MECHANICAL

ROOM

MEZZANINE #1

OPEN TO LOWER LEVEL

OPEN TO LOWER LEVEL

CORRIDOR

LINE OF HATCH

ABOVE

OPEN TO BOILER

ROOM BELOW

PREFABRICATED

METAL CATWALK

SUSPENDED FROM

STRUCTURAL SLAB

ABOVE

METAL RAILING

GLASS BELOW

METAL RAILING

CATWALK

2 HR RATED WALL (REF)

MCC-D

TO 39-

4KW EWH

3 0 X

NF

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 39 - OVERALL SECOND

FLOOR PLAN - TECHNOLOGY

39-TN102

-2

-1

-T

N

/0

/2

.p d f

1/8" = 1'-0"

BUILDING 39 - OVERALL SECOND FLOOR PLAN - MAIN BUILDING - TECHNOLOGY

A13

N

BUILDING

NORTH

N

TRUE

NORTH

NOTES:

1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL ROUTE TO TR 39-A108 ON THE LEVEL BELOW.

2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY

INSTALLATION NOTES AND SYMBOL LIST.

3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.

4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS

IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY

THE VA AT A LATER DATE.

5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.

6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE

OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.

7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO

BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH

SPARE CAPACITY.

Sheets
39-TN101 - BUILDING 39 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
39-TN102 - BUILDING 39 - OVERALL SECOND FLOOR PLAN - TECHNOLOGY

File details come from the government source that posted it. Updated .