This document consists of architectural/engineering drawings for Building 39 at James A. Haley Veterans Hospital in Tampa, Florida, specifically depicting technology infrastructure plans for the first and second floors as part of the EHRM Infrastructure Upgrade project (VA Project Number 673-20-107).
The first floor plan (39-TN101) illustrates the main building technology layout at 1/8" = 1'-0" scale, identifying multiple rooms totaling 9,666 SF including electrical rooms, boiler room, instrument closet, engineering control center, chiller room, air compressor room, and various support spaces. The plan designates technology routing to termination point TR 39-A108, indicates locations for Cat 6A information outlets (with an allowance for 10 additional future outlets), and specifies conduit riser routes requiring owner field verification. The second floor plan (39-TN102) at the same scale shows 2,551 SF across mezzanine levels with office, locker rooms, and mechanical spaces, with cabling routing to TR 39-A108 on the level below. Both drawings include notes requiring contractor coordination with owner during occupied facility operations, provision of new J-hook cable routes per manufacturer specifications, and utilization of existing cable tray where accessible. The documents are issued for construction dated 04/04/2025 and were prepared by CB Design Group (architect), Compass (consultant), with additional consulting by Scott Przybysz, Mark Dyck, and Clare Kramer.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WP
GFCI
WP
GFCI
WP
GFCI
WP
GFCI
WP
GFCI
WP
GFCI
513 SF
811 SF
2,028 SF
5,093 SF
112 SF
500 SF
102 SF
1,081 SF1,081 SF1,081 SF1,081 SF
9,666 SF
450 SF
39-A106
39-A105
39-A110
39-A112
39-A108
39-A107
S1-01-39
39-A10439-A10339-A10239-A101
39-A111
39-A113
ABCC.1DEFGH
3'-0" HIGH
CONC. PAD
75"x213"
6" HIGH PAD,
4.16KW SWGR.
13KV PRIMARY SWGR.
STARTER
SECONDARY SWGR. 4.16KV
M C C B
M C C A
39-NSW-A
39-NSW-B
C H
C H
C H
C H
39-B-1 39-B-2 39-B-3
39-FP-1
39-FP-2
39-SP-139-SP-2
39-PP-139-PP-4
39-PP-5 39-PP-3 39-PP-2
39-CTP-1 39-BFP-1
39-CTP-2
39-BFP-2
39-BFP-3
480V SWGR.
39-NSW-C
C H
STARTER
INTER. SW.
CNTLR.
(VFD)(VFD)
AIR DRYER
PRIMARY PULLBOX
4'x3'x18"
39-MCC-C 39-MCC-D
CNTLR.
INTER. SW.
INTER. SW.
CNTLR.
CNTLR.
INTER. SW.
INTER. SW.
CNTLR.
(EMERG.)
SUMP PUMP
WATER SOFTENER
CONTROL PANEL
GAS SHUTOFF
VALVE
39-SP-3
MEDICAL
VACUUM PUMP
3 H.P.
SUMP PUMP
FUTURE
CHEMICAL FEED
CONTROL PANEL
39-SA-1
39-VAC-1
CONTROL PANEL
(FWE), (TYP.)
BATCH TANK
50"x53"
63"x105" SOFTENING TANK
W/WATER CONDITIONING
CONTROL VALVE.
10' DIA.x17'-3"
FRP BRINE TANK,
44 TONS OPERATING
WEIGHT.
TANK
TANK
RECIEVER
FUTURE
RECIEVER
SUMP PUMP W/2'
PIT DEPTH 1/3 HP
120V/1PH
LOCATE BOILER TREATMENT
CHEMICALS HERE.
4" FLOW CONTROL FILL
VALVE AND KAMLOCK
COUPLING IN S.S. LOCKING
PANEL (16"x16"x12")
MOUNT 4' AFF.
LOCATE 350 GAL. CORROSION
INHIBITOR TANK AND PUMPS
HERE. MOUNT PUMPS ON WALL
SEE SHEET 39 H-14 FOR CHEMICAL
FEED SCHEMATIC.
39-CWP-5 39-CWP-6
CT-5
CT-6
39-CWP-439-CWP-339-CWP-239-CWP-1
2 HR RATED WALL (REF)
OVERHEAD DOOR
OVERHEAD DOOR
GRILLE
GRILLE
UTILITY TUNNEL (BELOW GRADE)
CONDENSATE PIT
BELOW GRADE,
TUNNEL
ELECTRICAL
ROOM #1
ELECTRICAL
ROOM #2
BOILER
ROOM
INSTRUMENT
CLOSET
ENGINEERING
CONTROL
CENTER
STAIR #1
COLD WATER
BASIN
COLD WATER
BASIN
COLD WATER
BASIN
COLD WATER
BASIN
CHILLER
ROOM
AIR
COMPRESSOR
ABANDONED U/G
FUEL TANK
2D2D
2D
2D
D
W
W
2D
1D-GWAP
1D-WAP
1D-CAM
1D-CAM
W W
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
W
1D-CAM
1D-CAM
1D-CAM
W
1D-CAM 1D-CAM
39-TN301
F15
(4) 4" CONDUIT
TR-39-A108
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 39 - OVERALL FIRST
FLOOR PLAN - TECHNOLOGY
39-TN101
-2
-1
-T
N
/0
/2
.p d f
1/8" = 1'-0"
BUILDING 39 - OVERALL FIRST FLOOR PLAN - MAIN BUILDING - TECHNOLOGY
A13
N
BUILDING
NORTH
N
TRUE
NORTH
NOTES:
1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL ROUTE TO TR 39-A108.
2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
B
A
AS102 AS301
A S
A
S
GRILLE OVERHEAD DOOR
476 SF
S F
60 SF
38 SF
106 SF
135 SF
212 SF
132 SF
315 SF
158 SF
2,551 SF
N SF-
39-CP-4
39-CP-3
39-CP-2
39-CP-1
39-MAC-239-MAC-1
AIR PURIFIER
BREATHING
TANK
RECEIVER
39-EDH-1
39-AH-2
39-DWP-2
39-DWP-339-DWP-1
39-AH-1
DEAERATOR
H G F
E D C.1 C B A
D N
39-A210
C 1-
S2-01-39
39-A206
39-A207
39-A203
39-A201
39-A202
39-A205
39-A204
39-A209
MEZZANINE #2
C O R R
ID
O R
STAIR #1
H.A.C.
OFFICE
EATING
AREA
MENS
LOCKER
ROOM
WOMENS
LOCKER
ROOM
SECURE
STORAGE
MECHANICAL
ROOM
MEZZANINE #1
OPEN TO LOWER LEVEL
OPEN TO LOWER LEVEL
CORRIDOR
LINE OF HATCH
ABOVE
OPEN TO BOILER
ROOM BELOW
PREFABRICATED
METAL CATWALK
SUSPENDED FROM
STRUCTURAL SLAB
ABOVE
METAL RAILING
GLASS BELOW
METAL RAILING
CATWALK
2 HR RATED WALL (REF)
MCC-D
TO 39-
4KW EWH
3 0 X
NF
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 39 - OVERALL SECOND
FLOOR PLAN - TECHNOLOGY
39-TN102
-2
-1
-T
N
/0
/2
.p d f
1/8" = 1'-0"
BUILDING 39 - OVERALL SECOND FLOOR PLAN - MAIN BUILDING - TECHNOLOGY
A13
N
BUILDING
NORTH
N
TRUE
NORTH
NOTES:
1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL ROUTE TO TR 39-A108 ON THE LEVEL BELOW.
2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
| Sheets |
| 39-TN101 - BUILDING 39 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY |
| 39-TN102 - BUILDING 39 - OVERALL SECOND FLOOR PLAN - TECHNOLOGY |
File details come from the government source that posted it. Updated .