This is a Technical Questions and VA Response Tracking Sheet for Solicitation #36C77625R0092, associated with the EHRM Project 673-20-107 in Tampa. The document records government responses to five technical inquiries submitted by contractors regarding missing or unclear contract documentation.
Question 34 addressed missing ductbank specifications and details referenced on drawing CS101. The government confirmed that ductbank specifications, details, manholes, and handhole information are provided in Addendum 1 (Sheet 0-TN505) and Amendment 0004. Question 36 clarified that Telecommunications Manholes shown on detail A15 of drawing 0-TN502 are identical to JB structures (junction boxes or manholes) numbered 31, 32, 33, and 37 adjacent to Building 1 on page CS103, with details provided in Addendum 1 per Amendment 0004. Questions 68, 83, and 206 all addressed the missing Technology Equipment Schedule on Sheet 0-TN700, which is repeatedly referenced throughout Building 1 drawings and Attachment 4. The government's responses indicated that Sheet 0-TN700 is included in the contract set and will be issued as part of Addendum 1 via Amendment 0004. These responses indicate that critical technical documentation was consolidated into Amendment 0004 to address gaps in the original solicitation package.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. Question Government Response
34 CS101 red line denotes a new ductbank. The legend references to detail 000 on page TN401 for additional information for ductbank. This page appears to be missing. Moreover, the detail for ductbank appears to be missing as well. Please provide ductbank details including all applicable specs like ductbank conduit specs, ductbank conduit elbow specs, ductbank concrete specs, and ductbank rebar specs.
Ductbank specifications, details, manholes, and handholes are technology items and should be located on their common details pages. Additional details are provided in Addendum 1 (Sheet 0-TN505). See Amendment 0004.
36 Please confirm that the Telecommunications Manhole shown on detail A15 on 0-TN502 is the same as JB structure (no legend) shown on page CS103 (JB structures number 31, 32, 33, and 37 next to Building 1).
Confirmed, JB structures (Junction boxes or manholes) are defined by detail A15 on 0-TN502. See Addendum 1 posted in Amendment 0004.
68 Technology Equipment Schedule is being referred on Sheet TN-700. But that sheet is missing. Please provide sheet TN-700.
0-TN-700 is in the set. See Addendum 1 posted in Amendment 0004.
83 Multiple drawing page numbers on Attachment 4 mention “refer to 0- TN700 for additional information”. Please provide 0-TN700.
0-TN-700 is in the set. See Addendum 1 posted in Amendment 0004.
206 On sheet 0-TN001 under the first column of Technology Sheet Index’s it shows a sheet 0-TN700. Also, almost all of the bldg. 1 sheets have a note 2 that states “Refer to TN700 for general technology equipment schedule”. However; sheet 0-TN700 is not included nor is it listed in the Sheet Indexes. Please advise.
Sheet 0-TN700 will be issued as part of Addendum 1. See Addendum 1 posted in Amendment 0004.