673-107.53.Tech.pdf
PDF 527 KB Posted
- Solicitation number
- 36C77625R0092-RFP
About this file
This document is an architectural drawing set for a technology infrastructure upgrade project at James A. Haley Veterans Hospital in Tampa, Florida. The drawings are labeled as "Building 53 - Overall First Floor Plan - Technology" (53-TN101) and "Building 53 - Overall Second Floor Plan - Technology" (53-TN102), issued for construction on 04/04/2025 under VA Project Number 673-20-107.
The project, titled "EHRM Infrastructure Upgrade," involves the installation of low-voltage cabling and information technology outlets throughout Building 53. Key requirements include routing all new cabling to TR 119-53 (the technology termination room), field verification of conduit riser routes with the owner prior to installation, and coordination with owner staff and patients during scheduled cabling work. The contractor must provide an allowance for ten additional 2-port CAT 6A information outlets per floor, with future locations to be determined by the VA. New J-hook routes are required for all cabling, sized per manufacturer recommendations, with provisions to utilize existing cable tray if accessible with spare capacity. The drawings reference a Technology Coversheet (TN000) for general notes and symbol definitions, and a Technology Equipment Schedule (TN700). The project team includes architect CB Design Group (Alexandria, VA), consultant Compass (Novelty, OH), and additional consultants Scott Przybysz, Mark Dyck, and Clare Kramer. The facility is fully sprinklered and houses multiple bedroom, restroom, office, and common areas across both floors.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
LO
S E T
O F F
IC
E
H A
LL
H A
LL
H A
LL
R E S T R O O M
R E S T R O O M
B E D R O O M
B E D R O O
MR
E S T R O O M
R E S T R O O M
B E D R O O M
B E D R O O M
R E S T R O O M
R E S T R O O M
B E D R O O M
B E D R O O M
HALL
O F F
IC
E
E
LE
V A T O R
E Q U
IP
M E N T
M E C H A N
IC
A L
R E S T R O O
MS
T O R A G E
R E S T R O O M
LA
U N D R Y
K
IT
C H E N
F A M
IL
Y
R O O M
B E D R O O M
R E S T R O O M
R E S T R O O M
B E D R O O M
R E S T R O O M
R E S T R O O M
B E D R O O M
B E D R O O M
R E S T R O O M
R E S T R O O M
B E D R O O M
B E D R O O M
HALL
D
IN
IN
G
R O O M
FOYER
LI
V
IN
G
R O O M
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
288 SF
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
267 SF
S F
259 SF
S F a b a a a a a a a a
123-53 a a a a a a a a
122-53
100-53
F D
F D
F D F D
F D
F D
F D
F D
F D
F D
F D
F D
F D
F D
F D
U P
U P 2
C
LO
C
LO
C
LO
C
LO
C O
N C
S
ID
E W
A
LK
C
LO
C
LO
C
LO
C
LO
O O
W W
W W
W W
W W
W
W W
W W
W W
W W
2D 2D
2D
D
1D-GWAP
1D-CAM
1D-GWAP
1D-CAM
1D-CAM
2D 2D
2D 2D
2D 2D
D
2D
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
2D
2D
2D 2D
2D
2D
1D-CAM
1D-CAM
1D-CAM
53-TN200
F161 "x
PW-CPW-1
TR 119-53
(TYP. OF 4)
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 53 - OVERALL FIRST
FLOOR PLAN - TECHNOLOGY
53-TN101
-2
-1
-T
N
/0
/2
.p d f
1/8" = 1'-0"
BUILDING 53 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
A12
N
BUILDING
NORTH
N
TRUE
NORTH
NOTES:
1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL ROUTE TO TR 119-53.
2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
A-LEG FIBER
B-LEG FIBER
D N
D N
D N
S T O R A G E
LI
N E N
C
LO
S E T
B E D R O O M
R E S T R O O M
R E S T R O O M
B E D R O O M
B E D R O O M
R E S T R O O M
R E S T R O O M
B E D R O O M
R E S T R O O M
B E D R O O M S T O R A G E
B E D R O O M
R E S T R O O M
R E S T R O O M
R E S T R O O M
B E D R O O M
B E D R O O M
HALL HALL
H A
LL
a c a a a a a
3 2 b a a a
200b-53 200a-53
F D
F D
F D
F D
F D
F D
F D
F D
MIN.
M
IN
M
IN
C L O
S
CLOS.
CLOS.
CLOS.
CLOS.
CLOS.
CLOS.
C L O
S
C L O
C L O
A T T
IC
A C
C E S
S
LIN
E N C
LO
S
W W W W
W W W
W
D
D
D
D
D
D
D
2D
1D-CAM
1D-GWAP
1D-GWAP
1D-CAM
NAC
(4) 4" CONDUIT
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 53 - OVERALL SECOND
FLOOR PLAN - TECHNOLOGY
53-TN102
-2
-1
-T
N
/0
/2
.p d f
1/8" = 1'-0"
BUILDING 53 - OVERALL SECOND FLOOR PLAN - TECHNOLOGY
A12
N
BUILDING
NORTH
N
TRUE
NORTH
NOTES:
1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL ROUTE TO TR 119-53 ON THE LEVEL BELOW.
2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.
6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE
OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.
7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO
BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH
SPARE CAPACITY.
| Sheets |
| 53-TN101 - BUILDING 53 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY |
| 53-TN102 - BUILDING 53 - OVERALL SECOND FLOOR PLAN - TECHNOLOGY |
File details come from the government source that posted it. Updated .