This document is an architectural drawing set for a technology infrastructure upgrade project at James A. Haley Veterans Hospital in Tampa, Florida. The drawings are labeled as "Building 53 - Overall First Floor Plan - Technology" (53-TN101) and "Building 53 - Overall Second Floor Plan - Technology" (53-TN102), issued for construction on 04/04/2025 under VA Project Number 673-20-107.

The project, titled "EHRM Infrastructure Upgrade," involves the installation of low-voltage cabling and information technology outlets throughout Building 53. Key requirements include routing all new cabling to TR 119-53 (the technology termination room), field verification of conduit riser routes with the owner prior to installation, and coordination with owner staff and patients during scheduled cabling work. The contractor must provide an allowance for ten additional 2-port CAT 6A information outlets per floor, with future locations to be determined by the VA. New J-hook routes are required for all cabling, sized per manufacturer recommendations, with provisions to utilize existing cable tray if accessible with spare capacity. The drawings reference a Technology Coversheet (TN000) for general notes and symbol definitions, and a Technology Equipment Schedule (TN700). The project team includes architect CB Design Group (Alexandria, VA), consultant Compass (Novelty, OH), and additional consultants Scott Przybysz, Mark Dyck, and Clare Kramer. The facility is fully sprinklered and houses multiple bedroom, restroom, office, and common areas across both floors.

View the file

Other files

File Type Posted
4-15 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Final.pdf PDF
Tampa EHRM Addendum 2 Narrative.pdf PDF
673-107.32.Tech.pdf PDF
673-107. 0-TN002.pdf PDF
673-107.01.Tech.pdf PDF
673-107.36.Tech.pdf PDF
673-107.41.Tech.pdf PDF
673-107.68.Tech.pdf PDF
673-107.30.Tech.pdf PDF
673-107.38.Tech.pdf PDF
673-107.39.Tech.pdf PDF
673-107.52.Tech.pdf PDF
673-107.54.Tech.pdf PDF
4-8 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 7.pdf PDF
Roof - As Built.pdf PDF
Amendment 6 - 36C77625R0092 0006.pdf PDF
4-7 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 6.pdf PDF
Question 161 - Lay down area.pdf PDF
Amendment 5 - 36C77625R0092 0005.pdf PDF
Revised 2.8 and 2.9 Tampa.pdf PDF
01 32 16.15- Project Schedules-Small Projects.pdf PDF
Amendment 4 - 36C77625R0092 0004.pdf PDF
03-27-2026 Addendum 1 Combined Drawings.pdf PDF
3-30 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 4.pdf PDF
Amendment 3 - 36C77625R0092 0003.pdf PDF
3-27 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 3.pdf PDF
Amendment 2 - 36C77625R0092 0002.pdf PDF
Amendment 1 - 36C77625R0092 0001.pdf PDF
Site Visit Attendance - Tampa EHRM.pdf PDF
Attachment 1 - Spec Vol 1 - R1.pdf PDF
Attachment 6 - Drawings Vol 1 Part4.pdf PDF
Attachment 9 - Drawings Vol 2 Part2.pdf PDF
Attachment 11 - Drawings Vol 2 Part4.pdf PDF
Attachment 12 - Drawings Vol 3.pdf PDF
Attachment 19 - Division Cost Breakdown.xlsx XLSX spreadsheet
RFP - 36C77625R0092.pdf PDF
Attachment 2 - Spec Vol 2 - R1.pdf PDF
Attachment 15 - Limitations on Subcontracting Clause.docx DOCX document
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 20 - RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Project 673-20-107.xlsx XLSX spreadsheet
Attachment 4 - Drawings Vol 1 Part2.pdf PDF
Attachment 8 - Drawings Vol 2 Part1.pdf PDF
Attachment 13 - Brand Name Justification - Tampa_Redacted.pdf PDF
Attachment 17 - PPQ.docx DOCX document
Attachment 18 - Project Information Sheet for Contractors.docx DOCX document
Attachment 3 - Drawings Vol 1 Part1.pdf PDF
Attachment 5 - Drawings Vol 1 Part3.pdf PDF
Attachment 7 - Drawings Vol 1 Part5.pdf PDF
Attachment 10 - Drawings Vol 2 Part3.pdf PDF
Attachment 14 - Construction Wage Rates - Hillsborough 1-2-2025.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

LO

S E T

O F F

IC

E

H A

LL

H A

LL

H A

LL

R E S T R O O M

R E S T R O O M

B E D R O O M

B E D R O O

MR

E S T R O O M

R E S T R O O M

B E D R O O M

B E D R O O M

R E S T R O O M

R E S T R O O M

B E D R O O M

B E D R O O M

HALL

O F F

IC

E

E

LE

V A T O R

E Q U

IP

M E N T

M E C H A N

IC

A L

R E S T R O O

MS

T O R A G E

R E S T R O O M

LA

U N D R Y

K

IT

C H E N

F A M

IL

Y

R O O M

B E D R O O M

R E S T R O O M

R E S T R O O M

B E D R O O M

R E S T R O O M

R E S T R O O M

B E D R O O M

B E D R O O M

R E S T R O O M

R E S T R O O M

B E D R O O M

B E D R O O M

HALL

D

IN

IN

G

R O O M

FOYER

LI

V

IN

G

R O O M

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

288 SF

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

S F

267 SF

S F

259 SF

S F a b a a a a a a a a

123-53 a a a a a a a a

122-53

100-53

F D

F D

F D F D

F D

F D

F D

F D

F D

F D

F D

F D

F D

F D

F D

U P

U P 2

C

LO

C

LO

C

LO

C

LO

C O

N C

S

ID

E W

A

LK

C

LO

C

LO

C

LO

C

LO

O O

W W

W W

W W

W W

W

W W

W W

W W

W W

2D 2D

2D

D

1D-GWAP

1D-CAM

1D-GWAP

1D-CAM

1D-CAM

2D 2D

2D 2D

2D 2D

D

2D

1D-CAM

1D-CAM

1D-CAM

1D-CAM

1D-CAM

2D

2D

2D 2D

2D

2D

1D-CAM

1D-CAM

1D-CAM

53-TN200

F161 "x

PW-CPW-1

TR 119-53

(TYP. OF 4)

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 53 - OVERALL FIRST

FLOOR PLAN - TECHNOLOGY

53-TN101

-2

-1

-T

N

/0

/2

.p d f

1/8" = 1'-0"

BUILDING 53 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

A12

N

BUILDING

NORTH

N

TRUE

NORTH

NOTES:

1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL ROUTE TO TR 119-53.

2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY

INSTALLATION NOTES AND SYMBOL LIST.

3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.

4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS

IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY

THE VA AT A LATER DATE.

5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.

6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE

OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.

7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO

BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH

SPARE CAPACITY.

A-LEG FIBER

B-LEG FIBER

D N

D N

D N

S T O R A G E

LI

N E N

C

LO

S E T

B E D R O O M

R E S T R O O M

R E S T R O O M

B E D R O O M

B E D R O O M

R E S T R O O M

R E S T R O O M

B E D R O O M

R E S T R O O M

B E D R O O M S T O R A G E

B E D R O O M

R E S T R O O M

R E S T R O O M

R E S T R O O M

B E D R O O M

B E D R O O M

HALL HALL

H A

LL

a c a a a a a

3 2 b a a a

200b-53 200a-53

F D

F D

F D

F D

F D

F D

F D

F D

MIN.

M

IN

M

IN

C L O

S

CLOS.

CLOS.

CLOS.

CLOS.

CLOS.

CLOS.

C L O

S

C L O

C L O

A T T

IC

A C

C E S

S

LIN

E N C

LO

S

W W W W

W W W

W

D

D

D

D

D

D

D

2D

1D-CAM

1D-GWAP

1D-GWAP

1D-CAM

NAC

(4) 4" CONDUIT

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 53 - OVERALL SECOND

FLOOR PLAN - TECHNOLOGY

53-TN102

-2

-1

-T

N

/0

/2

.p d f

1/8" = 1'-0"

BUILDING 53 - OVERALL SECOND FLOOR PLAN - TECHNOLOGY

A12

N

BUILDING

NORTH

N

TRUE

NORTH

NOTES:

1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL ROUTE TO TR 119-53 ON THE LEVEL BELOW.

2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES, TECHNOLOGY

INSTALLATION NOTES AND SYMBOL LIST.

3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.

4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS

IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY

THE VA AT A LATER DATE.

5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.

6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH OWNER WHILE

OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE REPLACEMENT WITH OWNER.

7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND QUANTITY TO

BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE USED IF ACCESSIBLE WITH

SPARE CAPACITY.

Sheets
53-TN101 - BUILDING 53 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
53-TN102 - BUILDING 53 - OVERALL SECOND FLOOR PLAN - TECHNOLOGY