673-107.54.Tech.pdf

PDF 365 KB Posted

Attached to
Z2DA--673-20-107 EHRM Infrastructure Upgrades Construction Tampa, FL
Solicitation number
36C77625R0092-RFP
Issued by

About this file

This document is an architectural drawing for Building 54 at James A. Haley Veterans Hospital in Tampa, Florida, showing the overall first floor plan with technology infrastructure upgrades. The drawing is part of VA Project Number 673-20-107, titled "EHRM Infrastructure Upgrade," and was issued for construction on April 4, 2025. The drawing number is 54-TN101 and depicts low-voltage cabling routing, information outlet locations, and technology system components for the facility's first floor.

The plan specifies that all new low-voltage cabling will route to TR 009-54 (technology room), with multiple 2D (Category 6A) information outlets distributed throughout the building's various spaces including offices, mechanical/electrical rooms, corridors, restrooms, and generator areas. Key requirements noted in the drawing specifications include: the contractor must field-verify conduit riser routes with the owner prior to installation; all information outlets must be cabled on a scheduled basis while the facility remains occupied with staff and patients, requiring coordination of demo and cable replacement activities; the contractor must provide new J-hook routes for all new cabling per manufacturer recommendations, with existing cable tray available for use if accessible with spare capacity; and the contractor must include an allowance for 10 additional 2-port CAT 6A information outlets in their proposal, with future locations to be determined by the VA at a later date. The architectural team includes CB Design Group (architect), Compass (consultant), and additional consultants Scott Przybysz, Mark Dyck, and Clare Kramer.

View the file

Other files

File Type Posted
673-107.30.Tech.pdf PDF
673-107.38.Tech.pdf PDF
673-107.39.Tech.pdf PDF
673-107.52.Tech.pdf PDF
673-107. 0-TN002.pdf PDF
673-107.01.Tech.pdf PDF
673-107.36.Tech.pdf PDF
673-107.41.Tech.pdf PDF
673-107.68.Tech.pdf PDF
4-15 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Final.pdf PDF
Tampa EHRM Addendum 2 Narrative.pdf PDF
673-107.32.Tech.pdf PDF
673-107.53.Tech.pdf PDF
Roof - As Built.pdf PDF
4-8 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 7.pdf PDF
4-7 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 6.pdf PDF
Question 161 - Lay down area.pdf PDF
Amendment 6 - 36C77625R0092 0006.pdf PDF
Amendment 5 - 36C77625R0092 0005.pdf PDF
Revised 2.8 and 2.9 Tampa.pdf PDF
3-30 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 4.pdf PDF
Amendment 4 - 36C77625R0092 0004.pdf PDF
03-27-2026 Addendum 1 Combined Drawings.pdf PDF
01 32 16.15- Project Schedules-Small Projects.pdf PDF
3-27 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 3.pdf PDF
Amendment 3 - 36C77625R0092 0003.pdf PDF
Amendment 2 - 36C77625R0092 0002.pdf PDF
Amendment 1 - 36C77625R0092 0001.pdf PDF
Site Visit Attendance - Tampa EHRM.pdf PDF
Attachment 4 - Drawings Vol 1 Part2.pdf PDF
Attachment 8 - Drawings Vol 2 Part1.pdf PDF
Attachment 13 - Brand Name Justification - Tampa_Redacted.pdf PDF
Attachment 17 - PPQ.docx DOCX document
Attachment 18 - Project Information Sheet for Contractors.docx DOCX document
RFP - 36C77625R0092.pdf PDF
Attachment 2 - Spec Vol 2 - R1.pdf PDF
Attachment 15 - Limitations on Subcontracting Clause.docx DOCX document
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 20 - RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Project 673-20-107.xlsx XLSX spreadsheet
Attachment 1 - Spec Vol 1 - R1.pdf PDF
Attachment 6 - Drawings Vol 1 Part4.pdf PDF
Attachment 9 - Drawings Vol 2 Part2.pdf PDF
Attachment 11 - Drawings Vol 2 Part4.pdf PDF
Attachment 12 - Drawings Vol 3.pdf PDF
Attachment 19 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 3 - Drawings Vol 1 Part1.pdf PDF
Attachment 5 - Drawings Vol 1 Part3.pdf PDF
Attachment 7 - Drawings Vol 1 Part5.pdf PDF
Attachment 10 - Drawings Vol 2 Part3.pdf PDF
Attachment 14 - Construction Wage Rates - Hillsborough 1-2-2025.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FE

FE

FE

FE FE FE FE FE FE FE FE

CU

AH

T

TT

001-54

017-54 016-54 015-54 014-54 013-54 012-54 011-54 010-54

002-54003-54004-54

008-54

009-54

005-54

007-54

006-54

COURTYARD

GENERATOR

GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR

SWITCHGEAR

ROOM #1

SWITCHGEAR

ROOM #2

PLANT OFFICES

MECHANICAL

ELECTRICAL

CORRIDOR

RESTROOM

H.A.C.

TLT/SHWR

L

54-007

W

2D

D

D

D

D

D

D

2D 2D 2D 2D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

2D

D

2D

D

2D

2D2D 2D

D

D

2D

D

D

D

D

2D

D

2D 2D

2D

2D

2D

D

D

2D 2D

1D-GWAP

1D-WAP

1D-CAM

1D-CAM

NOTE: FIELD MADE CABLE DROP(NO JACK)

FOR PC

ENERNOC

SYSTEM

POLE MOUNT CAMERA IN PARKING LOT

NAC

PANEL

GATE

CNH

54-TN200

F15

TR 009-54

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 54 - OVERALL FIRST

FLOOR PLAN - TECHNOLOGY

54-TN101

-2

-1

-T

N

/0

/2

.p d f

1/8" = 1'-0"

BUILDING 54 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

C12

N

BUILDING

NORTH

N

TRUE

NORTH

NOTES:

1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL ROUTE TO TR 009-54.

2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR TECHNOLOGY GENERAL NOTES,

TECHNOLOGY INSTALLATION NOTES AND SYMBOL LIST.

3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.

4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION

OUTLETS

IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE

DETERMINED BY THE VA AT A LATER DATE.

5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE WITH OWNER PRIOR TO INSTALLATION.

6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED ON A SCHEDULED BASIS WITH

OWNER WHILE OCCUPIED WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE

REPLACEMENT WITH OWNER.

7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW CABLING. J-HOOK SIZE AND

QUANTITY TO BE PER MANUFACTURER RECOMMENDATIONS. EXISTING CABLE TRAY MAY BE

USED IF ACCESSIBLE WITH SPARE CAPACITY.

Sheets
54-TN101 - BUILDING 54 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY

File details come from the government source that posted it. Updated .