673-107.41.Tech.pdf

PDF 492 KB Posted

Attached to
Z2DA--673-20-107 EHRM Infrastructure Upgrades Construction Tampa, FL
Solicitation number
36C77625R0092-RFP
Issued by

About this file

This document consists of technology infrastructure floor plans for Building 41 at James A. Haley Veterans Hospital in Tampa, Florida, as part of the EHRM Infrastructure Upgrade project (VA Project Number 673-20-107). The plans depict the first and second floors of the main building with detailed layout of information outlets, cabling routes, and telecommunications infrastructure.

The drawings specify the installation of low-voltage cabling and Cat 6A information outlets throughout the facility, with routing to designated terminal rooms (TR 41-110 on the first floor and TR 41-201 on the second floor). Key requirements include contractor provisions for new J-hook cable support routes per manufacturer recommendations, field verification of conduit riser routes with the VA prior to installation, and coordination of all cabling work on a scheduled basis with building occupants including staff and patients. The specifications note that 10 additional 2-port Cat 6A information outlets per floor should be included as an allowance in contractor proposals for future locations to be determined by the VA. The plans also indicate the use of existing cable tray infrastructure where accessible with spare capacity, and reference a technology cover sheet (TN000) and equipment schedule (TN700) for additional installation notes and specifications. The document was issued for construction on 04/04/2025 and includes professional seals from CB Design Group (architect) and Compass (consultant).

View the file

Other files

File Type Posted
673-107.30.Tech.pdf PDF
673-107.38.Tech.pdf PDF
673-107.39.Tech.pdf PDF
673-107.52.Tech.pdf PDF
673-107.54.Tech.pdf PDF
4-15 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Final.pdf PDF
Tampa EHRM Addendum 2 Narrative.pdf PDF
673-107.32.Tech.pdf PDF
673-107.53.Tech.pdf PDF
Amendment 9 - 36C77625R0092 0009.pdf PDF
673-107.Trailer.pdf PDF
Amendment 8 - 36C77625R0092 0008.pdf PDF
Roof - As Built.pdf PDF
Amendment 7 - 36C77625R0092 0007.pdf PDF
4-7 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 6.pdf PDF
Question 161 - Lay down area.pdf PDF
Amendment 6 - 36C77625R0092 0006.pdf PDF
Calculations based on geo report_Sealed.pdf PDF
Amendment 5 - 36C77625R0092 0005.pdf PDF
Revised 2.8 and 2.9 Tampa.pdf PDF
3-31 RFI TRACKING SHEET No.14 - SOLICITATION 36C77625R0092 Amend 5.pdf PDF
3-30 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 4.pdf PDF
01 32 16.15- Project Schedules-Small Projects.pdf PDF
010000 TIL General Specification - Tampa Specific.pdf PDF
Tampa EHRM Addendum 1 Narrative.pdf PDF
3-27 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 3.pdf PDF
Amendment 3 - 36C77625R0092 0003.pdf PDF
PKI Readers.pdf PDF
Amendment 2 - 36C77625R0092 0002.pdf PDF
Attachment 4 - Drawings Vol 1 Part2.pdf PDF
Attachment 8 - Drawings Vol 2 Part1.pdf PDF
Attachment 13 - Brand Name Justification - Tampa_Redacted.pdf PDF
Attachment 17 - PPQ.docx DOCX document
Attachment 18 - Project Information Sheet for Contractors.docx DOCX document
Attachment 1 - Spec Vol 1 - R1.pdf PDF
Attachment 6 - Drawings Vol 1 Part4.pdf PDF
Attachment 9 - Drawings Vol 2 Part2.pdf PDF
Attachment 11 - Drawings Vol 2 Part4.pdf PDF
Attachment 12 - Drawings Vol 3.pdf PDF
Attachment 19 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 3 - Drawings Vol 1 Part1.pdf PDF
Attachment 5 - Drawings Vol 1 Part3.pdf PDF
Attachment 7 - Drawings Vol 1 Part5.pdf PDF
Attachment 10 - Drawings Vol 2 Part3.pdf PDF
Attachment 14 - Construction Wage Rates - Hillsborough 1-2-2025.pdf PDF
RFP - 36C77625R0092.pdf PDF
Attachment 2 - Spec Vol 2 - R1.pdf PDF
Attachment 15 - Limitations on Subcontracting Clause.docx DOCX document
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 20 - RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Project 673-20-107.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2500# Capacity:

CORRIDOR

OFFICE

FILE ROOMCONFERENCE

ROOM

CHIEF

ASSISTANT

HR CHIEF

OFFICE

OFFICEOFFICEVESTIBULE/

WAITING

OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE OFFICEOFFICE

OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE

OFFICE

OFFICE

AREA

OFFICE

OFFICE

TELEPHONE

STAIR #1

OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE

CORRIDOR

OFFICEOFFICE

HR OFFICEHAS CHIEF

LOUNGEPSYCH.

NURSE

PATIENT

EDUCATOR

CLINICAL

EDUCATOR

CORRIDOR

ACIPACIPADMIN

SUPPORT

CLERK

ASSOCIATE

CHIEF EDUCATOR

CHIEF NURSE

STORAGE

CLASSROOM

STAIR #2

INFOMATICS

STAFF

RELATIONS

DIRECTOR

NURSE

RECRUITER

CONFERENCE

ROOM

CLOSET

H.A.C.

FIRE

CORRIDOR

TIMEKEEPERS

STORAGE

NURSE

EDUCATION (2)

STORAGE

WOMENS

RESTROOM

VESTIBULE

MENS

RESTROOM

TESTING

OFFICE

TESTING

OFFICE

NURSE

RECRUITMENT (3)

INFOMATICS

STORAGE

CORRIDOR

RECEPTION/

WAITING

VESTIBULE/

WAITING

C O R R

ID

O R

C O R R

ID

O

RC

O R R

ID

O R

C O R R

ID

O R

CORRIDOR

C1-02-41

41-118a?

41-11841-114

41-113

41-111

41-10841-107V1-01-41

41-106 41-109 41-110 41-112 41-115 41-116 41-117

41-121 41-11941-123 41-12541-12741-12941-13141-13341-105

41-138a

41-138

41-104

41-138b

41-135

S1-1-41

41-12041-12241-12441-12641-12841-130

C1-05-41

41-13241-134 41-13641-137

V1-04-4141-139 41-14041-141

C1-09-41

41-14341-14541-146 41-147

41-148

41-149

S1-2-41

41-151 41-153 41-155

41-158

41-155a

41-103

C1-06-41

41-142

41-144 41-150

41-159a

41-160

V1-03-41

41-159

41-15741-15641-15441-152

C1-11-41

V1-02-41

V1-01-41

C 1-

C 1-

1C 1-

C 1-

C1-01-41

W/H

1D-GWAP

1D-WAP

1D-GWAP

1D-WAP

1D-WAP

1D-GWAP

1D-WAP

1D-GWAP

1D-GWAP

1D-WAP

1D-GWAP

1D-WAP

1D-WAP

1D-GWAP

1D-WAP

2D 2D

2D 2D

2D 2D

2D 2D

2D 2D

W

D

D

2D

D

D

D

2D D

D 2 D

2D

D

D

D

D

D

2D

D

D

D

D

2D

2D

D

D

2D

D

D

2D

D2D

D

D

2D 2D

2D

D

D

2D 2D

D

D

2D2D

2D

D

2D

2D

D

D

2D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D2 D2 D

D

D

D

D

D

D

2D

2D 2D 2D 2D 2D 2D 2D 2D

D

D

D

D

2D

2D

D

2D2D

D

D

D

D

D

D

D

D

2D

D

EXISTING TR

41-TN200

G15

12"x4"

12"x4"

12"x4"12"x4"

"x

12"x4"

"x

PW-CPW-1

(4) 4" CONDUIT TR 41-110

(TYP. OF 4)

WIRE BASKET

PW-CPW-1

(TYP. OF 4)

WIRE BASKET

WIRE BASKET

A-LEG FIBER

B-LEG FIBER

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 41 - OVERALL FIRST

FLOOR PLAN - TECHNOLOGY

41-TN101

-2

-1

-T

N

/0

/2

.p d f

1/8" = 1'-0"

BUILDING 41 - OVERALL FIRST FLOOR PLAN - MAIN BUILDING - TECHNOLOGY

C12

N

BUILDING

NORTH

N

TRUE

NORTH

SHEET NOTES:

1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL

ROUTE TO TR 41-110 ON THE FLOOR ABOVE.

2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR

TECHNOLOGY GENERAL NOTES, TECHNOLOGY

INSTALLATION NOTES AND SYMBOL LIST.

3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT

SCHEDULE.

4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10

ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS

IN THEIR PROPOSAL FOR THIS SHEET. FUTURE

INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY

THE VA AT A LATER DATE.

5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE

WITH OWNER PRIOR TO INSTALLATION.

6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED

ON A SCHEDULED BASIS WITH OWNER WHILE OCCUPIED

WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE

REPLACEMENT WITH OWNER.

7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL

NEW CABLING. J-HOOK SIZE AND QUANTITY TO BE PER

MANUFACTURER RECOMMENDATIONS. EXISTING CABLE

TRAY MAY BE USED IF ACCESSIBLE WITH SPARE CAPACITY.

BCS

BCS

N

E

AREA

COPY

HIMS

ROOF

HATCH/

LADDER

COPY

AREA

23 ----

STORAGE

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O

R MENS

RESTROOM

VESTIBULE

WOMENS

RESTROOM

TRANSCRIPTION

CORRIDOR

PROGRAM

SUPPORT

TRANSCRIPTION

SUPERVISOR

ASSISTANT

TRANSCRIPTION

SUPERVISOR

CHIEF

HIMS

SECRETARY

CONFERENCE

ROOM

EDUCATION\

CORRIDOR

STAIR #2

STORAGE

PROCESS

IMPROVEMENT

ASSISTANT

CODING

SUPERVISOR

ASSISTANT

CORRIDOR

CODING

SUPERVISOR

PHARMACIST

OFFICE

DOCTOR

OFFICE

H.A.C.

CORRIDOR

LOBBY

LOUNGE HAS

CORRIDOR

NEUROLOGY

PHY. OFFICE

COMPUTER ROOM

INFOMATICS

QA/MS

CORRIDOR

CONFERENCE

ROOM

PHARMACY

ASSISTANT

CHIEF

PHARMACY

CHIEF

STAIR #1

TELEPHONE

MULTI PURPOSE

FILE ROOM

OFFICE- SW OFFICE OFFICE

RESIDENTS (6)

INPATIENT

CONSULT

LIASON

DOCTORAL

INTERN

ISO

PSYCHOLOGIST

PSYCHOLOGIST

PSYCHOLOGIST

ISO

COMPLAINCE

COMPLAINCE

COMPLAINCE

COMPLAINCE

INTERNS

OFFICE- SW

CORRIDOR

OFFICE- SW

RESTROOM

CODING AND

PROCESS

IMPROVEMENT

---- OFFICE- SW

MED/DIGESTIVE

DISEASE

OFFICE- SW

OFFICE- SWOFFICE- SW

OFFICE- SW

104 SF

24 SF

S

F

S

F

S

F

146 SF

32 SF

142 SF

260 SF

290 SF

121 SF126 SF115 SF

136 SF

90 SF

251 SF

123 SF

29 SF

197 SF

123 SF

130 SF 130 SF 131 SF 130 SF

130 SF

103 SF

376 SF

146 SF

120 SF

174 SF 147 SF 202 SF 141 SF 118 SF

445 SF

386 SF 115 SF 157 SF

170 SF

47 SF

120 SF

100 SF 100 SF 100 SF

407 SF

100 SF 100 SF

118 SF

118 SF

118 SF

110 SF

110 SF

110 SF

67 SF

148 SF

225 SF

374 SF

100 SF

91 SF

67 SF

98 SF

104 SF

144 SF140 SF

136 SF

306 SF

67 SF

93 SF

82 SF

79 SF 79 SF

164 SF

164 SF

151 SF

125 SF

121 SF124 SF

91 SF

41-213a

41-246a

C

41-246

V2-03-41

41-247

41-230

C2-07-41

41-23141-23241-234

41-235

41-236

41-237

41-238

C1-09-41

S2-2-41

41-239

41-240 41-241

C2-10-41

41-243 41-244 41-245

41-201

C2-02-41

V2-01-41

41-202

V2-04-41 41-229

C2-05-41

41-228 41-227 41-224

C2-04-41

41-222 41-221 41-220

S2-1-41

41-226

41-225

41-205 41-206 41-208

41-223

41-209 41-210

41-215

41-218

41-219

41-217

41-216

41-214

41-212

41-213

41-211

41-207

41-204

41-242b

41-203c

41-233c

41-233b41-233a 41-233

41-242

41-242a

41-238b

41-238a

41-203 41-203a

41-226c 41-226b

41-226a

41-202c 41-202b41-202a

41-203b

2500# Capacity:

2500# Capacity:

F E C

W/H

FEC

FEC

F E C

1D-WAP

1D-GWAP

1D-GWAP

1D-GWAP

1D-WAP

1D-WAP

1D-WAP

1D-GWAP

1D-WAP

2D

D

D

D

D

D

D

D

D

D

D 2 D

D 2 D

2D

D

D

2D

D

D 2

D

D

D

2D

2D

D

D

D

2D

D

D

D

D

D

D

D

D

D

2D

D

D

D

D

2D

D

2D 2D

D

2D

2D 2D

2D 2D 2D

D

2D

D

2D2D

D

D

D

D

2D2D 2D 2D2D

D

2D

2D 2D 2D 2D

D

D

2D

2D 2D

2D 2D

2D2D2D

D

D

2D

2D 2D 2D

2D2D

2D

D

2D

2D

2D 2D

1D

D

D

1D-WAP

D

2D

1D-GWAP

D

1D-WAP

EXISTING TR

12"x4"

"x

12"x4"

"x

12"x4"

12"x4"

"x

TR 41-225

WIRE BASKET

PW-CPW-1

(TYP. OF 4)

PW-CPW-1

(TYP. OF 4)WIRE BASKET

WIRE BASKET

WIRE BASKET

41-TN201

F15

A & B-LEG FIBER

FROM BELOW

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 41 - OVERALL SECOND

FLOOR PLAN - TECHNOLOGY

41-TN102

-2

-1

-T

N

/0

/2

.p d f

1/8" = 1'-0"

BUILDING 41 - OVERALL SECOND FLOOR PLAN - MAIN BUILDING - TECHNOLOGY

C12

N

BUILDING

NORTH

N

TRUE

NORTH

SHEET NOTES:

1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL

ROUTE TO TR 41-201 ON THE FLOOR ABOVE.

2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR

TECHNOLOGY GENERAL NOTES, TECHNOLOGY

INSTALLATION NOTES AND SYMBOL LIST.

3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT

SCHEDULE.

4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10

ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS

IN THEIR PROPOSAL FOR THIS SHEET. FUTURE

INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY

THE VA AT A LATER DATE.

5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE

WITH OWNER PRIOR TO INSTALLATION.

6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED

ON A SCHEDULED BASIS WITH OWNER WHILE OCCUPIED

WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE

REPLACEMENT WITH OWNER.

7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL

NEW CABLING. J-HOOK SIZE AND QUANTITY TO BE PER

MANUFACTURER RECOMMENDATIONS. EXISTING CABLE

TRAY MAY BE USED IF ACCESSIBLE WITH SPARE CAPACITY.

Sheets
41-TN101 - BUILDING 41 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
41-TN102 - BUILDING 41 - OVERALL SECOND FLOOR PLAN - TECHNOLOGY

File details come from the government source that posted it. Updated .