673-107.32.Tech.pdf
PDF 763 KB Posted
- Solicitation number
- 36C77625R0092-RFP
About this file
These are architectural technology infrastructure upgrade drawings for Building 32 at James A. Haley Veterans Hospital in Tampa, Florida, prepared by CB Design Group Architects with consultant support from Compass, Scott Przybysz, Mark Dyck, and Clare Kramer. The drawings are issued for construction under VA Project Number 673-20-107 and are dated April 4, 2025. The plans depict ground floor, first floor, and second floor technology layouts showing the routing and placement of low-voltage cabling infrastructure, information outlets, and related telecommunications systems throughout the facility. Multiple building rooms are identified by function including medical imaging areas (radiation oncology, bone scan, CT, ultrasound, MRI), clinical examination and consultation spaces, administrative offices, and support areas.
The technology plans specify CAT 6A information outlets throughout the building with cabling routed to designated technology rooms (TR 024-32, TR 048DN, TR 048D-32, and TR 147-32) via conduit systems and wire basket trays. A-leg and B-leg fiber optic connections extend from Building 1 and route to Building 38 via conduit stubs and pathway systems. Sheet notes require contractors to include allowances for ten additional 2-port CAT 6A information outlets per floor with future locations to be determined by the VA, field verify conduit riser routes prior to installation, coordinate cabling work on a scheduled basis while the facility remains occupied with staff and patients, and provide J-hook cable support systems per manufacturer recommendations or utilize existing accessible cable tray with spare capacity.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
TS
PROSTETICS
STORAGE
ENGINEERING
A/C MECHANICAL &
FILTER STORAGE
ENGINEERING
MECHANICAL AREA
HUMAN
RESOURCES
STORAGE
HUMAN
RESOURCES
STORAGE
STORAGE
EMS
STORAGE
EMS STORAGE
& WORK AREA
EMS
STORAGE
EMS
STORAGE
STORAGE
MISC.
EMS STORAGE
& WORK AREA
UNIFORM
STORAGE
IMS COMPUTER
STORAGE
EMS
STORAGE
EMS SUPPLIES
STORAGE
BIOMED
STORAGE
EMS SUPPLIES
STORAGE
C O R R
ID
O R
RECREATION
STORAGE
RADIATION
THERAPY &
DR. del REGATO
CORRIDOR
CORRIDOR
TO BLDG.TUNNEL
B-09
B-23
B-24
B-14 B-16
B-18
B-19
B-21 B-22
B-12
B-13
B-11
B-08
B-18a
B-20 B-06
B-03
B-07
B-04
CORRIDOR
RAMP
D N
DR RH
DR RH 3668
DR RH
1D-WAP
1D-WAP
1D-CAM
1D-WAP
1D-CAM
W
1D-WAP
1D-WAP
1D-WAP
1D-CAM
PW-CPW-1
(TYP. OF 4)
A LEG FIBER
FROM BUILDING 1
CONDUITS TO STUB
UP TO FIRST LEVEL
B LEG FIBER
FROM BUILDING 1
PATHWAY TO BUILDING 38
A LEG FIBER
A-LEG FIBER UP TO
FIRST LEVEL TR.
B-LEG FIBER UP
TO LEVEL 1
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 32 - OVERALL
GROUND FLOOR PLAN -
TECHNOLOGY
32-TN101
-2
-1
-T
N
/2
/2
.p d f
1/8" = 1'-0"
BUILDING 32 - OVERALL GROUND FLOOR PLAN - TECHNOLOGY
A12
N
BUILDING
NORTH
N
TRUE
NORTH
N
BUILDING
NORTH
SHEET NOTES:
1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL
ROUTE TO TR 024-32 ON THE FLOOR ABOVE.
2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR
TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT
SCHEDULE.
4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10
ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE
INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE
WITH OWNER PRIOR TO INSTALLATION.
6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED
ON A SCHEDULED BASIS WITH OWNER WHILE OCCUPIED
WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE
REPLACEMENT WITH OWNER.
7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL
NEW CABLING. J-HOOK SIZE AND QUANTITY TO BE PER
MANUFACTURER RECOMMENDATIONS. EXISTING CABLE
TRAY MAY BE USED IF ACCESSIBLE WITH SPARE CAPACITY.
ZONE 4
ZONE 3
Z O
N E
S
TA
IR
S
TA
IR
WAITING
ROOM
DOSIMETRIST
OFFICE
PHYSICIST
OFFICE
PHYSICIST
OFFICE
COMPUTER
PLANNING
STAFF
THERAPIST
OFFICE
ELECTRIC
FEMALE
RESTROOM
MALE
RESTROOM
EXAM
ROOM
EXAM
ROOM
EXAM/
CONSULTANT
ROOM
ELEVATOR
MACHINE
ROOM
UNDER
CONSTRUCTION
UNDER
CONSTRUCTION
BONE SCAN
RADIATION
ONCOLOGY
RADIATION
ONCOLOGY
CHIEF
RADIATION
ONCOLOGY
MULTI PURPOSE
ROOM
A.A./CHIEF
THERAPIST
FEMALE LOCKERS
MALE LOCKERS
---- EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
HANIDCAP
RESTROOM
STAFF
THERAPIST
OFFICE
EXAM
ROOM
OFFICE
FILE ROOM
STAFF
THERAPIST
OFFICE
ULTRASOUND
ROOM
SIMULATOR
ROOM
CONTROL
AREA
WAITING ROOM
6-10 MEV
LINEAR
ACCELERATOR
HANIDCAP
RESTROOM
STORAGE
SOILED
UTILITY
VITALS
STAFF
LOUNGE
C.T. ROOM
CLEAN
LINEN
CONTROL
ROOM
CONTROL
ROOM
ELECTRIC
23 MEV
LINEAR
ACCELERATOR
IMPLANTS
ROOM
23 MEV
LINEAR
ACCELERATOR
GENERAL
STORAGE
C O R R
ID
O R
CHECK IN/
CHECK OUT
DIETICIAN
OFFICE
STORAGE
SOCIAL
WORKER
C O R R
ID
O R
CONTROL ROOM
MRI
DRESSING
ROOM
EQUIPMENT
HOLDING
AREA
OFFICE
C O R R
ID
O R
CONNECTING
CORRIDOR
CORRIDOR
CORRIDOR
C O R R
ID
O R
SIGNAL/
TELEPHONE
UNEXPOSED
FILM & CHEMICAL
STORAGE
CORRIDOR
CORRIDOR
CHIEF
THERAPIST
MENS
RESTROOM
WOMENS
RESTROOM
H.A.C.
C O R R
ID
O R
CORRIDOR
C O R R
ID
O R
C O R R
ID
O R
GURNEY
HOLDING
WAITING
DRESSING
ROOM
DRESSING
ROOM
SERVER
034b-32
034a-32
035a-32 035b-32
035c-32
034c-32 034-32
035-32
032-32
036-32
049-32
026c-32
027-32
030-32
025-32
025a-32
026-32
026a-32
047-32048-32 046-32
037-32
023-32
024-32
022-32 020-32
019-32
020a-32
018-32
018a-32
018c-32
018b-32
018d-32
009-32
009a-32
041-32
042-32
015-32
014-32
043-32
056-32
055-32
053-32
054-32
044-32
040-32
017-32
045-32
052-32
051-32
049c-32
049d-32
038-32
001-32
033-32
031-32
S 1-
S
C
001-32
002-32
003-32
C a-
2 005-32
006-32
007-32
008-32
011-32
012-32
013-32
013a-32
013c-32
013b-32
C
C0-01-CC
C0-01-32
C0-02-32
C
039-32
021-32
C0-09-32
C0-08-32
048d-32
049a-32
049b-32
050-32
C
C0-05-32
C
C
026b-32
048a-32
048b-32
048c-32
048e-32
DN.16R
UP
24R
W
W
2D
2D
2D
2D
2D
2D
2D
D
2D 2D
2D
D
D
2D
D
2D2D 2D
D
2D
D
D
2D
2D 2D
D
D
D
2D
W
2D 2D
1D-WAP
1D-WAP
1D-CAM
1D-CAM
1D-CAM
1D-GWAP
1D-WAP
1D-WAP
1D-GWAP
1D-CAM
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-CAM
1D-CAM
1D-WAP
1D-GWAP
1D-GWAP
1D-WAP
1D-WAP
2D
D
D
D
D
2D 2D
D
D
2D
2D
D
2D
W
W
D 2D
2D
2D
2D
D
D
2D
2D
2D 2D
2D
W
2D
W
D2D2
D
2D
D
D
2D
2D
D
2D
D
D
2D
D
D
D
W
W
W
2D
2D
2D
2D
2D
2D W
W
W
W
W
W
W W
W
2D 2D 2D
D
2D
D
2D
W
W
2D 2D 2D
D
2D
D
D
D
D
D
D
2D 2 D
W
D
D
D
D
2D 2D
D
D
2D 2D 2D
2D
D
D
2D
W
D
D
D
D
D
D
2D
2D
W
2D 2D
D 2D
2D
2D
2D
2D
D
2D
2D
2D
2D
D
D
2D
CSS
EXISTING TR
32-TN302
G15
TR 048D-32
(4) 4" CONDUITS
(4) 4" CONDUITS
PW-CPW-1
(TYP. OF 4)
WIRE BASKET
WIRE BASKET
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 32 - OVERALL FIRST
FLOOR PLAN - TECHNOLOGY
32-TN102
-2
-1
-T
N
/2
/2
.p d f
N
TRUE
NORTH
N
BUILDING
NORTH
1/8" = 1'-0"
BUILDING 32 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY
A12
SHEET NOTES:
1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL
ROUTE TO TR 048DN.
2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR
TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT
SCHEDULE.
4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10
ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE
INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE
WITH OWNER PRIOR TO INSTALLATION.
6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED
ON A SCHEDULED BASIS WITH OWNER WHILE OCCUPIED
WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE
REPLACEMENT WITH OWNER.
7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL
NEW CABLING. J-HOOK SIZE AND QUANTITY TO BE PER
MANUFACTURER RECOMMENDATIONS. EXISTING CABLE
TRAY MAY BE USED IF ACCESSIBLE WITH SPARE CAPACITY.
B-LEG FIBER
A-LEG FIBER
FROM BELOW
B-LEG FIBER UP
TO TR ABOVE
C O R R
ID
O R
S
TA
IR
S
TA
IR
C O R R
ID
O R
CORRIDOR
CORRIDOR
C O R R
ID
O R
C O R R
ID
O R
MECHANICAL
FIRE CORRIDOR
CORRIDORFIRE
CHIEF OF
STAFF
ASSOCIATE
DIRECTOR
SECRETARY
ASSOCIATE QM
COORDINATOR
QM/UM
SPECIALIST
COPY ROOM
UM COORDINATOR
CORRIDOR
QM/UM
SPECIALIST
ASSOCIATE QM
COORDINATOR
QM COORDINATOR
MEDIA/
STORAGE
PUBLIC
AFFAIRS
DIRECTOR
COPY ROOM
QM/UM
SPECIALIST
CORRIDOR
SECRETARIESDIRECTOR
DIRECTORS
RESTROOM
VESTIBULE
H.A.C.
MCCF QM/UM
SPECIALIST
CHIEF
MCCF
BUSINESS
OFFICE
TRAVEL
CLERK
BUSINESS
OFFICE (2) MEDICAL STAFF
CREDENTIALING &
PRIVACY
PROGRAM ASSISTANT
UM/MCCF (4) MECHANICAL
QM CONFERENCE
ROOM CQI
WOMENS
RESTROOM
MENS
RESTROOM
CQI SUPPORT HEALTH
SYSTEM
SPECIALIST
EEO
11J SECRETARY/
STUDENT
EEO
SECRETARIES
ADMINISTRATIVE
ASSISTANT
CHIEF OF
STAFF
OFFICE
ACOS
EDUCATION
CORRIDOR
11J ASSISTANT
EDUCATIONOFFICE
STAFF
A/V
STORAGE
ELECTRICAL
COMMUNICATIONS
CORRIDOR
STORAGE KITCHEN
MULTI PURPOSE
ROOM (DIRECTOR)
NUTRITION &
FOOD SERVICE
CONFERENCE
ROOM
ADMINISTRATIVE
ASSISTANT
NURSING
ASSISTANT
CHIEF
NURSING
SECRETARY
& CLERK
CHIEF
NURSING
NURSINGCHIEF
FISCAL
SECRETARY
FISCAL
ASSISTANT
CHIEF
FISCAL
STORAGE
PUBLIC
AFFAIRS
BUDGET (4)
36" high
CH
D
H W R
H W S
P R
H P S (1
C H R
C H
H W S
H W R
D
C H
PUMP
H/X
VFD's
WATER HEATER
ELECTRIC
AIR DRYER
WALL MOUNTED
COMPRESSOR
AIR
PROJECTOR
OVERHEAD
BUILT-IN BOOKSHELVES
ALONG SOUTH WALL
C 1-a-
S 1-
1-
S 1-
C 1-
2 C1-01-CC
C1-05-32
C 1-
C 1-
138a-32
103-32 C1-05-32
C1-02-32123-32
134-32135-32
106-32
106f-32
106d-32 106b-32
106a-32
C1-04-32
107-32 106h-32 106g-32
120-32119-32118-32117-32
C1-02-32
136-32137-32
137a-32
138-32
139-32
140-32
141-32
142-32
143-32
144-32
106c-32 105-32 104-32
106e-32
125a-32
125-32
124-32
121-32 122-32 129-32 131-32130-32
133-32 133a-32 132-32
153-32
C1-01-32 131c-32
131b-32131a-32126b-32 128-32
127-32
C1-08-32
102a-32 126-32
101-32
102-32
152-32151b-32151-32151a-32 150-32149a-32149-32148-32
147-32 146-32
145-32
S
F
S
F
S
F S F
1,049 SF
710 SF
S
F
S
F
128 SF
1,670 SF 28 SF
712 SF
395 SF 392 SF 234 SF 322 SF 274 SF
136 SF 137 SF
137 SF
712 SF3 SF
120 SF 120 SF 209 SF
573 SF
112 SF
149 SF124 SF60 SF
83 SF
76 SF
111 SF
1,131 SF
111 SF38 SF
531 SF
236 SF 111 SF152 SF
710 SF3 SF
480 SF
87 SF
364 SF
118 SF
92 SF 130 SF 142 SF 173 SF 99 SF
173 SF
80 SF
105 SF
104 SF
104 SF
104 SF
104 SF
293 SF281 SF
124 SF
97 SF
72 SF
275 SF
122 SF
72 SF
100 SF 125 SF 170 SF
116 SF
87 SF 95 SF 118 SF 118 SF 126 SF 119 SF
171 SF
218 SF
1D-CAM
1D-CAM
1D-CAM
1D-GWAP
1D-WAP
1D-WAP
1D-CAM
1D-GWAP
1D-GWAP
1D-CAM
1D-WAP
1D-WAP
1D-CAM
1D-WAP
1D-CAM 1D-CAM1D-GWAP
1D-CAM
1D-WAP
1D-WAP
1D-GWAP
1D-WAP
1D-CAM 1D-CAM
1D-CAM
1D-WAP1D-WAP
D
2D
D
2D 2D
D
D
D
2D
D
2D
D
W 2 D
D
D
D
2D
D
D 2 D
D
D
2D
2D
D
D
2D
2D
2D 2D2D
D
D
2D
2D
D
D
2D
D
D
2D
2D
D
D
2D
2D
D
2D
2D
D
D
2D
D
D
D
2D
D
D
D
2D
D
W
W
W
D
D
D 2
D
2D
D
2D
2D
2D
D
D
2D
D 2 D
W
W 2D 2D2D
D
D
D
D
2D
D
W
D
D
D
D
D
D
D
D 2 D
D
2D
D
D 2
D
D
EXISTING TR
32-TN303
G15
PW-CPW-1
TR 147-32
(TYP. OF 4)
WIRE BASKET
WIRE BASKET
(4) 4" CONDUITS
PW-CPW-1
(TYP. OF 4)
A-LEG FIBER
A-LEG FIBER TO GARAGE B-LEG FIBER TO GARAGE
FIBER TO ROUTE TO
INTERSTITIAL SPACE OF
BUILDING 38
FIBER TO ROUTE TO
INTERSTITIAL SPACE
OF BUILDING 38
1/8" = 1'-0"
BUILDING 32 - OVERALL SECOND FLOOR PLAN - TECHNOLOGY
A12
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
950 N. WASHINGTON ST
SUITE 334
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
BARPDN
EHRM INFRASTRUCTURE UPGRADE
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 32 - OVERALL SECOND
FLOOR PLAN - TECHNOLOGY
32-TN103
-2
-1
-T
N
/2
/2
.p d f
N
TRUE
NORTH
N
BUILDING
NORTH
SHEET NOTES:
1. ALL NEW LOW VOLTAGE CABLING ON THIS SHEET WILL
ROUTE TO TR 32-147 ON THE FLOOR ABOVE.
2. REFER TO TN000 TECHNOLOGY COVERSHEET FOR
TECHNOLOGY GENERAL NOTES, TECHNOLOGY
INSTALLATION NOTES AND SYMBOL LIST.
3. REFER TO TN700 FOR GENERAL TECHNOLOGY EQUIPMENT
SCHEDULE.
4. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10
ADDITIONAL 2-PORTS CAT 6A INFORMATION OUTLETS
IN THEIR PROPOSAL FOR THIS SHEET. FUTURE
INFORMATION OUTLET LOCATIONS WILL BE DETERMINED BY
THE VA AT A LATER DATE.
5. CONTRACTOR TO FIELD VERIFY CONDUIT RISER ROUTE
WITH OWNER PRIOR TO INSTALLATION.
6. ALL INFORMATION OUTLETS ON THIS SHEET TO BE CABLED
ON A SCHEDULED BASIS WITH OWNER WHILE OCCUPIED
WITH STAFF AND PATIENTS. COORDINATE DEMO AND CABLE
REPLACEMENT WITH OWNER.
7. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL
NEW CABLING. J-HOOK SIZE AND QUANTITY TO BE PER
MANUFACTURER RECOMMENDATIONS. EXISTING CABLE
TRAY MAY BE USED IF ACCESSIBLE WITH SPARE CAPACITY.
A & B-LEG FIBER
FROM BELOW
| Sheets |
| 32-TN101 - BUILDING 32 - OVERALL GROUND FLOOR PLAN - TECHNOLOGY |
| 32-TN102 - BUILDING 32 - OVERALL FIRST FLOOR PLAN - TECHNOLOGY |
| 32-TN103 - BUILDING 32 - OVERALL SECOND FLOOR PLAN - TECHNOLOGY |
| 32-TN104 - BUILDING 32 - OVERALL ROOF PLAN - TECHNOLOGY |
File details come from the government source that posted it. Updated .