Attachment 7 - Drawings Vol 1 Part5.pdf

PDF 33 MB Posted

Attached to
Z2DA--673-20-107 EHRM Infrastructure Upgrades Construction Tampa, FL
Solicitation number
36C77625R0092-RFP
Issued by

About this file

This file is a set of architectural drawings for the James A. Haley Veterans Hospital infrastructure upgrade project. The document contains detailed floor plans for the sixth and seventh floors with plumbing and fire protection systems, basement demolition plans for technology installation across multiple areas, and ground floor demolition plans for technology systems. The drawings are dated April 4, 2025, and are marked "Issued for Construction."

The project, identified as VA Project Number 673-20-107, is located at James A. Haley Veterans Hospital, 13000 Bruce B. Downs Boulevard, Tampa, Florida 33612. The architect of record is CB Design Group (Alexandria, VA), with consulting firms including Compass (Novelty, OH), and individual consultants Scott Przybysz (St. Louis, MO), Mark Dyck (Martinsburg, WV), and Clare Kramer (Orlando, FL). The drawings indicate that the work involves modification of existing fire protection systems to match new floor plans, including sprinkler piping, hangers, brackets, and accessories in accordance with NFPA 13 guidelines. Key requirements include providing adequate sprinkler coverage, installing drain pans with water sensors below sanitary and fire protection pipes, coordinating with new layout and other trades, and notifying the owner 96 hours prior to commencing work that will affect areas outside renovation spaces. The facility is designated as fully sprinklered. The drawings depict various patient rooms, medical facilities, clinical spaces, staff areas, storage, mechanical systems, electrical systems, and technology infrastructure across multiple building sections.

View the file

Other files

File Type Posted
4-15 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Final.pdf PDF
Tampa EHRM Addendum 2 Narrative.pdf PDF
673-107.32.Tech.pdf PDF
673-107.53.Tech.pdf PDF
673-107. 0-TN002.pdf PDF
673-107.01.Tech.pdf PDF
673-107.36.Tech.pdf PDF
673-107.41.Tech.pdf PDF
673-107.68.Tech.pdf PDF
673-107.30.Tech.pdf PDF
673-107.38.Tech.pdf PDF
673-107.39.Tech.pdf PDF
673-107.52.Tech.pdf PDF
673-107.54.Tech.pdf PDF
4-8 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 7.pdf PDF
Roof - As Built.pdf PDF
Amendment 6 - 36C77625R0092 0006.pdf PDF
4-7 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 6.pdf PDF
Question 161 - Lay down area.pdf PDF
Amendment 5 - 36C77625R0092 0005.pdf PDF
Revised 2.8 and 2.9 Tampa.pdf PDF
01 32 16.15- Project Schedules-Small Projects.pdf PDF
Amendment 4 - 36C77625R0092 0004.pdf PDF
03-27-2026 Addendum 1 Combined Drawings.pdf PDF
3-30 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 4.pdf PDF
Amendment 3 - 36C77625R0092 0003.pdf PDF
3-27 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 3.pdf PDF
Amendment 2 - 36C77625R0092 0002.pdf PDF
Amendment 1 - 36C77625R0092 0001.pdf PDF
Site Visit Attendance - Tampa EHRM.pdf PDF
Attachment 1 - Spec Vol 1 - R1.pdf PDF
Attachment 6 - Drawings Vol 1 Part4.pdf PDF
Attachment 9 - Drawings Vol 2 Part2.pdf PDF
Attachment 11 - Drawings Vol 2 Part4.pdf PDF
Attachment 12 - Drawings Vol 3.pdf PDF
Attachment 19 - Division Cost Breakdown.xlsx XLSX spreadsheet
RFP - 36C77625R0092.pdf PDF
Attachment 2 - Spec Vol 2 - R1.pdf PDF
Attachment 15 - Limitations on Subcontracting Clause.docx DOCX document
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 20 - RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Project 673-20-107.xlsx XLSX spreadsheet
Attachment 4 - Drawings Vol 1 Part2.pdf PDF
Attachment 8 - Drawings Vol 2 Part1.pdf PDF
Attachment 13 - Brand Name Justification - Tampa_Redacted.pdf PDF
Attachment 17 - PPQ.docx DOCX document
Attachment 18 - Project Information Sheet for Contractors.docx DOCX document
Attachment 3 - Drawings Vol 1 Part1.pdf PDF
Attachment 5 - Drawings Vol 1 Part3.pdf PDF
Attachment 10 - Drawings Vol 2 Part3.pdf PDF
Attachment 14 - Construction Wage Rates - Hillsborough 1-2-2025.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D W

#1

D W

#2

PATIENT

ROOM #2

ISOLATION

PATIENT

ROOM #3

ISOLATION

PATIENT

ROOM #4

PATIENT

ROOM #5

PATIENT

ROOM #6

PATIENT

ROOM #7

PATIENT

ROOM #8

CORRIDOR

NURSE STATION

PATIENT

ROOM #1

ELECTRICAL

MECHANICAL

STAIR #3

PATIENT

ROOM #9

PATIENT

ROOM #10

PATIENT

ROOM #11

PATIENT

ROOM #12

CORRIDORCORRIDOR

MENS

LOCKERS

STAFF LOUNGE

WOMENS

LOCKERS

RESTROOM

RESTROOM

ON CALL

H.A.C. SHOWER

CLEAN UTILITY

STORAGE

ELECTRICAL

WORKROOM

EQUIPMENT

STORAGE

ELEVATOR

LOBBY CLEAN UTILITY

RESTROOM

WAITING

NURSE

MANAGER

BLOOD GAS

CORRIDOR

FAMILY

CONSULT

FIRE

STORAGE

FIRE

SIGNAL

TELEPHONE

ELECTRICAL

H.A.C.

BATH/SHOWER

BATH

FIRE

SIGNAL

TELEPHONE

MEDICAL PREP

NURSE STATION

MEDICAL

RESIDENT

CORRIDOR

CORRIDIOR

CLASSROOM----

PHARMACY

PROTOCOL TECH

PROTOCOL

OFFICE

STORAGESTORAGE

ELEVATOR

LOBBY

ELEVATOR

LOBBY

CORRIDOR

CORRIDIOR FIRE

SECONDARY

MEDICATION

ROOM

WAITING ROOM OFFICE

TELEMETRY

NURSE

MANAGER

FIRE

SIGNAL

TELEPHONE

NURSE STATION

MULTI PURPOSE

ELECTRICAL

WOMENS

RESTROOM

PATIENT

SHOWER

H.A.C.

PT PREP/

INTERVIEW

ICE MACHINE

EXAM/

TREATMENT

CHIEF

CARDIOLOGY

SECRETARY

CARDIOLOGY

CONFERENCE/

OFFICE FELLOWS

CARDIOLOGY

CARDIOLOGY

CARDIOLOGY

CARDIOLOGYCARDIOLOGY

HEM/ONC

ELECTRICAL

EKG

RESTROOM

HOLTER MONITOR

ICE MACHINE

RESTROOM

2 BED ROOM

1 BED ROOM

1 BED ROOM

BREAK ROOM

2 BED ROOM

4 BED ROOM

STORAGE/MAIN

MEDICATION

ROOM

1 BED ROOM

RESTROOM

1 BED ROOM

ELECTRICAL

RESTROOM

2 BED ROOM

RESTROOM

2 BED ROOM

RESTROOM

2 BED ROOM EQUIPMENT

ROOM

ACUTE CARE

NURSE EDUCATORS

TELEMETRY OFFICE

RESTROOM

RESTROOM

SHARED WAITING

CARDIO

PACEMAKER

ECHO STRESS

RESTROOM

TREADMILLECHO/TEE

CARDIO EXAM/

TREATMENT

CARDIO EXAM/

TREATMENT

CARDIO EXAM/

TREATMENT

CARDIO EXAM/

TREATMENT

1 BED ROOM1 BED ROOM1 BED ROOM1 BED ROOM

2 BED ROOM2 BED ROOM

C O R R

ID

O R

S

TA

IR

C O R R

ID

O R

C O R R

ID

IO

RS

TA

IR

C O R R

ID

IO

R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

EKG

EKG

6B-616d 6B-616e 6B-616f 6B-616g 6B-616h 6B-616i

6B-616k

C6-13-1

6B-616

6B-616b

6B-615

6B-610

S6-03-1

6B-616l

6B-616m

6B-616n

6B-616o

C6-16-1C6-15-1

6B-609a

6B-609

6B-609b

6B-607

6B-606

6B-608

6B-605 6B-608a

6B-620

6B-621

6B-601

6B-602

6B-604

6B-600 6B-625

6B-623

6B-622

6B-618 6B-619

C6-17-1 6B-617

6B-624

6B-614

6B-613

6B-612

6B-611

6A-661

6A-656

6A-652

6A-652a

6A-648c 6A-648d

6A-648e

6A-644a

6A-644

6A-664

C6-05-1

C6-07-1

6A-6416A-639

6A-642b

6A-642a

6A-642

6A-6696A-602

6A-636

6A-635

C6-03-1

C6-01-1 6A-602a

6A-607

6A-630 6A-632

6A-633 6A-607a

6A-625c

6A-625d

6A-625e

6A-608

6A-608a 6A-612

6A-62?

6A-621

6A-616

6A-657

6A-658

6A-655 6A-654b

6A-654a

6A-653

6A-651a

6A-651

6A-650b

6A-650a6A-649 6A-648

6A-648b

6A-647a

6A-646

6A-645

6A-615

6A-611

6A-613

6A-617 6A-618

6A-619

6A-620

6A-622

6A-623

6A-624

6A-624a

6A-625

6A-625b

6A-626a

6A-626

6A-627

6A-628

6A-628a

6A-629 6A-631

6A-634

6A-634a 6A-640a

6A-638

6A-637

6A-640 6A-643

6A-660

6A-662

6A-6636A-665 6A-6666A-6676A-6686A-6706A-6016A-6036A-6046A-605

6A-6066A-610

C

S 1-

C

C 1S

C

C

C

C

C

C

6A-647b

6A-647

SOUTH

DUCT

SHAFT SHAFT

DUCT

NORTH

CENTRAL DUCT

SHAFTS

SERVICE

LOBBY

DUCT

SHAFT

MECH.

CHASE

BOILER

STACK

WEST

DUCT

SHAFT

UP

DN DN

UP

D N

U P

01-PL107

ROUTE 3/4" D DOWN

TO MOP BASIN.

NEW TR

6B-621

V

V

S A

N

V

SAN

V

SAN

H W

C W

NEW WORK SCOPE FOR FP:

CONTRACTOR TO MODIFY EXISTING FIRE PROTECTION SYSTEM.

MODIFY SPRINKLER, PIPING, HANGERS, BRACKETS, ACCESSORIES

ETC. AS PER THE NEW FLOOR PLAN. COORDINATE ROUTING WITH

NEW LAYOUT AND OTHER TRADES. PROVIDE ADEQUATE

SPRINKLER COVERAGE PER NFPA 13 GUIDELINES.

PROVIDE DRAIN PAN WITH WATER SENSOR

BELOW SAN PIPE. REFER TO MECHANICAL PLANS

FOR MORE INFORMATION ON DRAIN PAN

SENSORS.

3/4"D

FP

REFER TO 1/01-PL107 SHEET

FOR CONTINUATION

STV

SAN

CW

HW

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

DRAWINGS NOT INTENDED FOR

CONSTRUCTION.

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BHAACHRUSARN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - OVERALL SIXTH FLOOR

PLAN - PLUMBING AND FIRE

PROTECTION

01-PL107

-2

-1

-P

L

/0

/2

.p d f

N O R

HT

1" = 22'-0"

BUILDING 01 - OVERALL SIXTH FLOOR PLAN - PLUMBING AND FIRE PROTECTION

N O R

HT

1/4" = 1'-0"

BLDG 01 - 6TH FLOOR PLAN - PL &

FP - TR-6B621

GENERAL NOTES :

1. REFER TO SHEETS 00-P000 AND P400 FOR ADDITIONAL

INFORMATION.

2. NOTIFY OWNER OF ALL WORK THAT WILL AFFECT AREAS

OUTSIDE RENOVATION SPACES 96 HOURS PRIOR TO

COMMENCING WORK.

3. COORDINATE INSTALLATION OF ALL NEW WORK WITH

EXISTING STRUCTURE, PIPING, ELECTRICAL AND ALLOTTED

SPACE.

4. CONDITIONS SHOWN ARE BASED ON INFORMATION

AVAILABLE FROM EXISTING DRAWINGS AND NON-

DESTRUCTIVE MEANS OF SITE INVESTIGATION.

CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO BEGINNING WORK.

5. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL

DESCRIPTION OF PHASES. REFER TO ARCHITECT'S

INSTRUCTIONS FOR MORE DETAILS AND PHASING

SCHEDULES AND FOR CONCURRENT WORK. MECHANICAL,

ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT THE

INTENT OF THE FINAL DESIGN. THE MECHANICAL,

ELECTRICAL, AND TECHNOLOGY DRAWINGS DO NOT DEPICT

THE MEANS AND METHODS TO MEET THE REQUIREMENTS

OF THE PHASING CRITERIA. REFER TO MECHANICAL

PHASING NOTES ON SHEET P000 FOR ADDITIONAL

INFORMATION.

6. DRIP PANS TO BE PROVIDED UNDER ALL EXISTING

HYDRONIC, PLUMBING AND FIRE PROTECTION PIPING

OVERHEAD IN TR SPACES. REFER TO CONSTRUCTION

DETAIL ON SHEET P400.

7. DRIP PANS ARE LAID OUT BASED ON INFORMATION OF

EXISTING PIPING DETERMINED FROM EXISTING DRAWINGS

AND LIMITED FIELD INVESTIGATIONS. CONTRACTOR IS

RESPONSIBLE FOR IDENTIFYING THE LOCATION OF ALL

EXISTING PIPING ROUTED ABOVE TR SPACES AND

PROVIDING ANY ADDITIONAL DRIP PANS AS REQUIRED.

STAIR #3

S7-03-01

SF

TELE

7B-709C

12 SF

SIGNAL

7B-709B

10 SF

TOILET

7B-710

70 SF

SECRETARY

7B-732

89 SF

TOILET

7B-703B

57 SF

ANTEROOM

7B-703

66 SF

TOILET

7B-704B

45 SF

ANTEROOM

7B-704

71 SF

ANTEROOM

7B-705

65 SF

TOILET

7B-705B

54 SF

ANTEROOM

7B-707

65 SF

TOILET

7B-707B

57 SF

TOILET7B-708B54 SF

ANTEROOM

7B-708

65 SF

ANTEROOM

7B-721

59 SF

TOILET

7B-721B

51 SF

ANTEROOM

7B-718

59 SF

TOILET

7B-718B

57 SF

TOILET

7B-716B

54 SF

ANTEROOM

7B-716

58 SF

TOILET

7B-714B

52 SF

ANTEROOM

7B-714

60 SF

TOILET

7B-713B

55 SF

ANTEROOM

7B-713

64 SF

TOILET

7B-712B

55 SF

ANTEROOM

7B-712

64 SF

TOILET7B-711B55 SF

ANTEROOM

7B-71159 SF

CORRIDOR

C7-14-1

SF

CORRIDOR

C7-11-1

SF

CHIEF OFFICE

7B-730

SF

EMG

7B-731

SF

TECH

7B-727

SF

READING

7B-726

SF

HAC

7B-725

39 SF

EEG

7B-724

SF

EEG

7B-723

SF

WORK

NURSE/ADMIN

7B-728

SF

MULTIPURPOSE

7B-729

SF

SOILED

7B-701

SF

ISOLATION

7B-718A

SF

CORRIDOR

C7-12-1

SF

CARE STATION

7B-706

SF

CORRIDOR

C7-10-1

SF

CORRIDOR

C7-13-1

SF

ELEC

7B-702

SF

ISOLATION

7B-708A

SF

ISOLATION

7B-707A

SF

ISOLATION

7B-713A

SF

ISOLATION

7B-712A

SF

ISOLATION

7B-703A

SF

OIT

7B-709

63 SF

MEDS

7B-722

SF

EQUIP

7B-717

SF

ISOLATION

7B-721A

SF

ISOLATION

7B-711A

SF

CLEAN

7B-720

SF

ISOLATION

7B-716A

SF

ISOLATION

7B-704A

SF

ISOLATION

7B-705A

SF

ISOLATION

7B-714A

SF

NOURISH

7B-719

SF

CARE STATION

7B-715

SF

SLEEP LAB

VASCULAR

VASCULAR VASCULAR

VASCULAR

VASCULAR VASCULAR

VASCULAR

CLINIC/EXAM

1 BED

ROOM

1 BED

ROOM

1 BED

ROOM

1 BED

ROOM CLEAN EQUIPMENT

4 BED ROOM

1 BED ROOM

1 BED ROOM OFFICE

OFFICE

1 BED ROOM

1 BED ROOM

1 BED ROOM

1 BED ROOM

1 BED ROOM

1 BED ROOM1 BED ROOM1 BED ROOM1 BED ROOM1 BED ROOM1 BED ROOM

BREAK ROOM

VASCULAR

NURSE

MANAGER

FAMILY ROOM NURSE STATION

MEDICAITON

ROOM

OFFICEOFFICE

RESP. OFFICECLINICAL NURSE

VASCULAR

ADMIN

VERTICAL

STAIRWELL

ELEVATOR

LOBBY

VASCULAR

DR OFFICE

VASCULAR

DR OFFICE

VASCULAR

ADMIN

VASCULAR

ADMIN

CORRIDOR

RECEPTION

VASCULAR

STORAGE

VASCULAR

ADMIN

ELECTRICAL

BATH

SLEEP LAB

SLEEP LAB

SLEEP LAB

CPRS

TRAINING ROOM

RESIDENTS

QUARTERS

RESIDENTS

QUARTERS RESIDENTS

LOUNGE

RESIDENTS

QUARTERS

RESIDENTS

QUARTERS RESIDENTS

QUARTERS

RESIDENTS

QUARTERS

CPRS

SATELLITE

PHARMACY

ELEVATOR

LOBBY

H.A.C.

CORRIDOR

C O R R

ID

O R

CORRIDOR

C O R R

ID

O R

CORRIDOR

C O R R

ID

O R

C O R R

ID

O R

MEDICAL PREP

H.A.C.

BATH/SHOWER

CORRIDORFIRE

C O R R

ID

O R

ELEVATOR

LOBBY

S

TA

IR

S

TA

IR

TELEPHONE

SIGNAL

FIRE

RESTROOM

ELECTRICAL

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

MENS

RESTROOM

WOMENS

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

ICE MACHINE

RESTROOM

RESTROOMRESTROOMRESTROOMRESTROOMRESTROOMRESTROOM

VASCULAR

RESTROOMRESTROOM

RESTROOM

SLEEP LAB

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESIDENTS

QUARTERS

ENTRYWAY

RESTROOM

RESTROOM

ELECTRICAL

RESTROOM

RESIDENTS

QUARTERS

ENTRYWAY

FIRE

SIGNAL

TELEPHONE

RESTROOM

RESTROOM

RESTROOM

ELECTRICAL

SLEEP LAB

SLEEP LAB

7A-716 7A-712

7A-709c 7A-709b

7A-707 7A-704 7A-703

7A-701 7A-769 7A-767 7A-765 7A-763 7A-761

7A-758

7A-754

7A-753 7A-752

7A-751

7A-750

7A-749

7A-748

7A-746

7A-745

7A-7447A-7437A-7417A-7407A-7397A-738 7A-735

7A-735a

7A-734 7A-736 7A-737

7A-762 7A-7647A-766

7A-7687A-702

7A-702b

7A-729

7A-730

7A-728

7A-705

7A-705a

C7-01-1

7A-708 7A-710

7A-708a

7A-708b

7A-711

7A-714

7A-718

7A-717c

7A-717b

7A-719

7A-720b

7A-722

7A-720c 7A-721 7A-723b 7A-723c

7A-724 7A-725 7A-727

7A-731a

7A-731

7A-726

C1-03-1

C

C7-14-1

C

C7-05-1

C

C

7A-737a

7A-755

7A-747

C7-07-17A-702a

C

7B-701

S

S 1-

7A-747d

7A-747c 7A-747b

7A-741a

7A-742

7A-740a

7A-744a 7A-743a

7A-739a 7A-738a

7A-733

7A-732

7A-745a

7A-746a

7A-748a

7A-749a

7A-750a

7A-754a

7A-756

7A-758a

7A-7607A-761a7A-763a7A-767a7A-701a7A-704a 7A-709

7A-709a7A-712a 7A-715

7A-717

7A-717a

7A-716a

7A-718c

7A-719a

7A-720

7A-720a

7A-721a

7A-722a 7A-723a

7A-723

7A-722b

7A-722c 7A-722d

7A-724a

7A-707a

7A-753a

7A-759

7A-747a

7A-718a

7A-718b

SOUTH

SHAFT SHAFT

DUCT

NORTH

CENTRAL DUCT

SHAFTS

MECH.

CHASE

BOILER

STACK

SERVICE

LOBBY

DUCT

SHAFT

DUCT

UP

DN DN

UP

01-PL108

3/4"D DOWN INTO CHASE

AND CONNECT WITH THE

LAVATORY P-TRAP.

NEW TR

7B-701

FP NEW WORK SCOPE FOR FP:

CONTRACTOR TO MODIFY EXISTING FIRE PROTECTION

SYSTEM. MODIFY SPRINKLER, PIPING, HANGERS,

BRACKETS, ACCESSORIES ETC. AS PER THE NEW FLOOR

PLAN. COORDINATE ROUTING WITH NEW LAYOUT AND

OTHER TRADES. PROVIDE ADEQUATE SPRINKLER

COVERAGE PER NFPA 13 GUIDELINES.

FP

PROVIDE DRAIN PAN WITH WATER SENSOR BELOW FP

PIPE. REFER TO MECHANICAL PLANS FOR MORE

INFORMATION ON DRAIN PAN SENSORS.

3/4"D

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

DRAWINGS NOT INTENDED FOR

CONSTRUCTION.

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BHAACHRUSARN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - OVERALL SEVENTH

FLOOR PLAN - PLUMBING AND FIRE

PROTECTION

01-PL108

-2

-1

-P

L

/0

/2

.p d f

N O R

HT

1" = 22'-0"

BUILDING 01 - OVERALL SEVENTH FLOOR PLAN - PLUMBING AND FIRE PROTECTION

N O R

HT

1/4" = 1'-0"

BLDG 01 - 7TH FLOOR PLAN - PL &

FP - TR-7A727

GENERAL NOTES :

1. REFER TO SHEETS 00-P000 AND P400 FOR ADDITIONAL

INFORMATION.

2. NOTIFY OWNER OF ALL WORK THAT WILL AFFECT AREAS

OUTSIDE RENOVATION SPACES 96 HOURS PRIOR TO

COMMENCING WORK.

3. COORDINATE INSTALLATION OF ALL NEW WORK WITH

EXISTING STRUCTURE, PIPING, ELECTRICAL AND ALLOTTED

SPACE.

4. CONDITIONS SHOWN ARE BASED ON INFORMATION

AVAILABLE FROM EXISTING DRAWINGS AND NON-

DESTRUCTIVE MEANS OF SITE INVESTIGATION.

CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO BEGINNING WORK.

5. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL

DESCRIPTION OF PHASES. REFER TO ARCHITECT'S

INSTRUCTIONS FOR MORE DETAILS AND PHASING

SCHEDULES AND FOR CONCURRENT WORK. MECHANICAL,

ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT THE

INTENT OF THE FINAL DESIGN. THE MECHANICAL,

ELECTRICAL, AND TECHNOLOGY DRAWINGS DO NOT DEPICT

THE MEANS AND METHODS TO MEET THE REQUIREMENTS

OF THE PHASING CRITERIA. REFER TO MECHANICAL

PHASING NOTES ON SHEET P000 FOR ADDITIONAL

INFORMATION.

6. DRIP PANS TO BE PROVIDED UNDER ALL EXISTING

HYDRONIC, PLUMBING AND FIRE PROTECTION PIPING

OVERHEAD IN TR SPACES. REFER TO CONSTRUCTION

DETAIL ON SHEET P400.

7. DRIP PANS ARE LAID OUT BASED ON INFORMATION OF

EXISTING PIPING DETERMINED FROM EXISTING DRAWINGS

AND LIMITED FIELD INVESTIGATIONS. CONTRACTOR IS

RESPONSIBLE FOR IDENTIFYING THE LOCATION OF ALL

EXISTING PIPING ROUTED ABOVE TR SPACES AND

PROVIDING ANY ADDITIONAL DRIP PANS AS REQUIRED.

10128

E

LE

V

.6

168 SF

299 SF291 SF

9,750 SF

640 SF

3,740 SF

2,317 SF

119 SF

116 SF

303 SF

470 SF

169 SF

655 SF

724 SF

551 SF956 SF

1,003 SF

49,581 SF

2,807 SF

77 SF

61 SF

163 SF

279 SF

5,186 SF

1,119 SF

1,089 SF

121 SF

58 SF

467 SF

412 SF

596 SF

79 SF

851 SF

1,062 SF

882 SF

238 SF

411 SF

1,540 SF

319 SF 383 SF

727 SF

1,617 SF

676 SF

201 SF

261 SF

446 SF

2,565 SF

288 SF

378 SF

166 SF

398 SF

196 SF

57 SF110 SF

2,336 SF

293 SF

120 SF120 SF

1,425 SF

183 SF

220 SF213 SF

156 SF

401 SF

427 SF

46 SF 46 SF

145 SF

145 SF

1,105 SF

159 SF

649 SF61 SF

49,581 SF

49,581 SF

284 SF

114 SF

97 SF

1,176 SF

109 SF

37 SF

STAIR #22

ELECTRICALCOMMUNICATIONS

MECHANICAL

MECHANICAL

MECHANICAL

OFFICE

CONFERENCE

ROOM

FILE ROOM

SAFE TV

STORAGE

STORAGE

STORAGE

RECORDS STORAGERECORDS STORAGE

RECORDS STORAGE

MECHANICAL

M.A.S. WORK ROOM

RECORDS STORAGE

LOBBY

ELEVATOR

EQUIPMENT

STAIR #9

MISC ELECTRICAL

STORAGE

STORAGE

CARPENTRY

SHOP STORAGE

CARPENTRY

SHOP STORAGE

STAIR #20

TOILET

SIGN SHOP

PAINT STORAGE

AND MIX

PLUMBING

STORAGE

ELECTRICAL

PLANS

STORAGE MECH AREA

A/C REFRIGERANT

STORAGE ELECTRONIC

STORAGE

ELECTRONIC

STORAGE

BIOMED

BULK MOTOR

STORAGE PROJECT

WORK ROOM

MECHANICAL

STORAGE

CONSTRUCTION

CREW

FAN BELT

STORAGE

EMS

MISC A/C

ICE MACHINE

REPAIR

SUPERVISOR 138M1SUPERVISOR 138M2

CARPENTRY SHOP

A/C STORAGE

LIGHT BULB

STORAGE

UPS

---- OFFICE

WORK LEADER

ELECTRICAL &

STRUCTURAL

WORK LEADER

A/C & PLUMBING

WORK BENCHES

AND TOOL CARTS

WELDING

BEDS/MECH REPAIREMERGENCY

SUPPLIES

MECHANICAL

MECHANICAL

LOCKSHOP

CORRIDOR

SB-22-1

BD-12BD-11

BD-10

BD-09

DB-xx

DB-xx

DB-36b

DB-7a DB-7c

DB-7

DB-6

DB-5

DB-3

DB-8DB-2

AB-5

AB-1

AB-2

AB-4

AB-3

SB-09-1

CB-3b

CB-3a

CB-3c

CB-3d

SB-20-1

CB-6b

CB-6c

CB-6d

CB-6a

CB-6e

CB-6f

CB-6g

CB-6h

CB-1

CB-1c

CB-1h

CB-1b CB-2

CB-1a CB-1e

CB-1e

CB-1g

CB-1p

CB-4b

CB-4

DB-9

CB-5c

CB-5a

BB-4

BB-2b

BB-5BB-2h

BB-2j

BB-2d

BB-8BB-9

BB-2

BB-2l

BB-2iBB-3

BB-2k

BB-1d

BB-2e

BB-7 BB-6

BB-10

BB-11

BB-1d

BB-1g

BB-1BB-1p

AB-1

AB-1

CB-10

BB-20

BB-21

CB-??

Space

Space

A S

-1

E T-1

HX-1

HX-2

P H

W P

-1 S

H W

P -1

A C

ID

TA

N K

A H

U -203

H E

A

TIN

G C

O

IL

C O

O

LIN

G

CO

IL

B O

O

STE

R C O

O

LING

CO

IL

FA

N S

EC

TIO

N

A H

U -204

C

LG

CO

IL

H

TG

CO

IL

E-11

L dP

H

L dP

H

H dP

L

L dP

H

B

A 1S

B

A 1S

B

A 1S

B

A 1S

Y

UP

UP

S T A

IR

UP

STAIR

#2

UP

UP

U P

DN

UP

UP

STAIR NO.

OPEN

RISER

UP

UP

UP

UP

UP

UP

U P

T

T T

T

T

TT

T

T

T

T

RETAINING

WALL

RAMP

PLENUM

TRENCH

TRENCH

PIT

UP

UP

H

NEW TR

AB-5A

NEW TR

DB-5A

A12/01-TD100A

A12/01-TD100B

A /0

-T

D D

A /0

-T

D A

A12/01-TD100B

A12/01-TD100C

A12/01-TD100E

A12/01-TD100F

A12/01-TD100E

A12/01-TD100F

A12/01-TD100H

A12/01-TD100J

A12/01-TD100D

A12/01-TD100E

A12/01-TD100G

A12/01-TD100H

A12/01-TD100D

A12/01-TD100E

A /0

-T

D D

A /0

-T

D G

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - OVERALL

BASEMENT DEMO PLAN -

TECHNOLOGY

01-TD100

-2

-1

-T

D

/0

/2

.p d f

3/64" = 1'-0"

BUILDING 01 - OVERALL BASEMENT DEMO PLAN - TECHNOLOGY

A13

279 SF

5,186 SF

238 SF

411 SF

1,540 SF

319 SF 383 SF

727 SF

1,617 SF

676 SF

201 SF

261 SF

446 SF

2,565 SF

284 SF

MISC ELECTRICAL

STORAGE

STORAGE

PAINT STORAGE

AND MIX

PLUMBING

STORAGE

ELECTRICAL

PLANS

STORAGE MECH AREA

A/C REFRIGERANT

STORAGE ELECTRONIC

STORAGE

ELECTRONIC

STORAGE

BIOMED

BULK MOTOR

STORAGE PROJECT

WORK ROOM

MECHANICAL

LOCKSHOP

CB-3b

CB-3a

CB-1

CB-1c

CB-1h

CB-1b CB-2

CB-1a CB-1e

CB-1e

CB-1g

CB-1p

CB-4b

CB-4

CB-10

UP

UP

UP

1D-CAM

2D

2D

2D2D

D

1D-GWAP

1D-WAP

1D-WAP

D

1D-CAM

2D

2D 2D

1D-WAP

D

V

2D2D 2D

1D-GWAP

D

2D

2D

2D

2D

2D

1D-WAP

A12/01-TD100B

A12/01-TD100D

A12/01-TD100E

A /0

-T

D D

A12/01-TD100B

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - BASEMENT DEMO

PLAN - AREA A - TECHNOLOGY

01-TD100A

-2

-1

-T

D A

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 01 - BASEMENT DEMO PLAN - AREA A - TECHNOLOGY

A12

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR SYMBOL LIST.

2. REFER TO INSTALLATION NOTES ON SHEET TN000 FOR MORE INFORMATION ON EXISTING CONDUITS.

3. EXISTING CABLING TO BE REMOVED FROM END TO END AND REPLACED WITH NEW DATA CABLES.

640 SF

3,740 SF

279 SF

MECHANICAL

MISC ELECTRICAL

STORAGE

BD-09

DB-xx

CB-3b

B

A

B

A 1S

Y

U P

DN

PLENUM

TRENCH

TRENCH

PIT

V

1D-CAM

1D-CAM

1D-WAP

A12/01-TD100D

A12/01-TD100E

A12/01-TD100E

A12/01-TD100F A12/01-TD100C A12/01-TD100C

A12/01-TD100A A12/01-TD100A

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - BASEMENT DEMO

PLAN - AREA B - TECHNOLOGY

01-TD100B

-2

-1

-T

D B

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 01 - BASEMENT DEMO PLAN - AREA B - TECHNOLOGY

A12

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR SYMBOL LIST.

10128

E L E V

.6

168 SF

299 SF291 SF

9,750 SF

2,317 SF

119 SF

116 SF

303 SF

470 SF

169 SF

655 SF

724 SF

551 SF

49,581 SF

109 SF

37 SF

STAIR #22

ELECTRICALCOMMUNICATIONS

MECHANICAL

MECHANICAL

OFFICE

CONFERENCE

ROOM

FILE ROOM

SAFE TV

STORAGE

STORAGE

STORAGE

RECORDS STORAGE

MECHANICAL

SB-22-1

BD-12BD-11

BD-10

DB-xx

DB-36b

DB-7a DB-7c

DB-7

DB-6

DB-5

DB-3

DB-8

AB-1

Space

Space

A S

-1

E T-1

HX-1

HX-2

P H

W P

-1 S

H W

P -1

A C

ID

TA

N K

A H

U -203

H E

A

TIN

G C

O

IL

C O

O

LIN

G C

O

IL

B O

O S

TE

R

C O

O

LIN

G C

O

IL

FA

N

S E

C

TIO

N

A H

U -204

C

LG

C O

IL

H

TG

C O

IL

L dP

H

L dP

H

H dP

L

L dP

H

B

A 1S

B

A 1S

B

A 1S

UP

UP

DN

UP

STAIR NO.

OPEN

RISER

U P

RETAINING

WALL

H

1D-WAP

1D-WAP

1D-WAP

3D 2V

1D-WAP

1V

1D-WAP

1D-CAM

1D-WAP

NEW TR

DB-5A

A12/01-TD100E

A12/01-TD100F

A /0

-T

D F

A12/01-TD100B A12/01-TD100B

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - BASEMENT DEMO

PLAN - AREA C - TECHNOLOGY

01-TD100C

-2

-1

-T

D C

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 01 - BASEMENT DEMO PLAN - AREA C - TECHNOLOGY

A12

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR SYMBOL LIST.

5,186 SF

1,119 SF

1,089 SF

121 SF

58 SF

467 SF

412 SF

596 SF

79 SF

851 SF

1,062 SF

882 SF

238 SF

1,540 SF

166 SF

398 SF

196 SF

57 SF110 SF

2,336 SF

293 SF

120 SF120 SF

1,425 SF

183 SF

220 SF213 SF

156 SF

401 SF

427 SF

46 SF 46 SF

284 SF

114 SF

97 SF

1,176 SF

MISC ELECTRICAL

STORAGE

STORAGE

CARPENTRY

CARPENTRY

SHOP STORAGE

STAIR #20

TOILET

SIGN SHOP

PAINT STORAGE

AND MIX

ELECTRICAL

PLANS

FAN BELT

STORAGE

EMS

MISC A/C

ICE MACHINE

REPAIR

SUPERVISOR 138M1SUPERVISOR 138M2

CARPENTRY SHOP

A/C STORAGE

LIGHT BULB

STORAGE

UPS

---- OFFICE

LOCKSHOP

CORRIDOR

CB-3b

CB-3a

CB-3c

CB-3d

SB-20-1

CB-6b

CB-6c

CB-6d

CB-6a

CB-6e

CB-6f

CB-6g

CB-6h

CB-1

CB-1h

CB-5a

BB-4

BB-2b

BB-5BB-2h

BB-2j

BB-2d

BB-8BB-9

BB-2

BB-2l

BB-2iBB-3

BB-2k

BB-1d

BB-2e

BB-7 BB-6

CB-10

BB-20

BB-21

CB-??

E-11

UP

UP

UP

T

TT

T

T

T

2D 2D

1D-WAP

D

V

V

1D-WAP

1D-WAP 1

D

-C A

M

D

V

D

1D-WAP

D

V

1D-WAP

1D-CAM

1D-CAM

1D-WAP

3D

D

V

1D 2V

1D-CAM

1D-WAP

1D-WAP

D

D

V

1D-WAP

2D

1D-GWAP

D

D

V

2D

D

V

D

V

D

V

V

2D

1D-GWAP

1D-WAP

1D-WAP

2D 1V

D

V

1D-WAP

D

A12/01-TD100E

A12/01-TD100A

A /0

-T

D A

A12/01-TD100B

A12/01-TD100EA12/01-TD100H

A12/01-TD100G

A /0

-T

D G

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - BASEMENT DEMO

PLAN - AREA D - TECHNOLOGY

01-TD100D

-2

-1

-T

D D

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 01 - BASEMENT DEMO PLAN - AREA D - TECHNOLOGY

A12

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR SYMBOL LIST.

1,119 SF

378 SF

166 SF

49,581 SF

MISC ELECTRICAL

STORAGECARPENTRY

SHOP STORAGE

CONSTRUCTION

CREW

FAN BELT

STORAGE

MECHANICAL

CB-3b CB-3c

CB-5c

CB-5a

AB-1

S T A

IR

UP

UP

T

D

A12/01-TD100D

A12/01-TD100F A12/01-TD100C

A12/01-TD100A

A12/01-TD100B

A12/01-TD100B

A12/01-TD100H

A12/01-TD100G A12/01-TD100D

A12/01-TD100H

A12/01-TD100FA12/01-TD100J

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - BASEMENT DEMO

PLAN - AREA E - TECHNOLOGY

01-TD100E

-2

-1

-T

D E

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 01 - BASEMENT DEMO PLAN - AREA E - TECHNOLOGY

A12

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR SYMBOL LIST.

724 SF

956 SF

1,003 SF

49,581 SF

288 SF

STORAGE

RECORDS STORAGE

RECORDS STORAGE

MECHANICAL

STORAGE

DB-3

DB-2

AB-5

AB-1

DB-9

UP

UP

STAIR

#2

UP

STAIR NO.

OPEN

RISER

1V2D

1D-WAP

1D-CAM

1V 1D

1D-CAM

1D-WAP

NEW TR

AB-5A

A12/01-TD100E

A12/01-TD100C

A12/01-TD100BA12/01-TD100H

A12/01-TD100J

A /0

-T

D C

A /0

-T

D J

A12/01-TD100E

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - BASEMENT DEMO

PLAN - AREA F - TECHNOLOGY

01-TD100F

-2

-1

-T

D F

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 01 - BASEMENT DEMO PLAN - AREA F - TECHNOLOGY

A12

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR SYMBOL LIST.

401 SF

145 SF

145 SF

1,105 SF

159 SF

649 SF61 SF

WORK LEADER

ELECTRICAL &

STRUCTURAL

WORK LEADER

A/C & PLUMBING

WORK BENCHES

AND TOOL CARTS

WELDING

BEDS/MECH REPAIREMERGENCY

SUPPLIES

BB-1d

BB-10

BB-11

BB-1d

BB-1g

BB-1BB-1p

E-11

UP

T T

T

T

RAMP

UP

2D 2V

D

V

D

V

D

D

V

D

1V1D

D

V

D

V

1D-CAM1D-WAP

D

V

1D-WAP

1D 1V

3D

1D-GWAP

1V

1D

1D-WAP

1D-WAP

D

A12/01-TD100EA12/01-TD100H

A12/01-TD100D

A12/01-TD100H

A /0

-T

D D

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - BASEMENT DEMO

PLAN - AREA G - TECHNOLOGY

01-TD100G

-2

-1

-T

D G

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 01 - BASEMENT DEMO PLAN - AREA G - TECHNOLOGY

A12

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR SYMBOL LIST.

UP

A12/01-TD100E

A12/01-TD100G A12/01-TD100D

A12/01-TD100FA12/01-TD100J

A12/01-TD100E

A12/01-TD100J

A12/01-TD100G

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - BASEMENT DEMO

PLAN - AREA H - TECHNOLOGY

01-TD100H

-2

-1

-T

D H

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 01 - BASEMENT DEMO PLAN - AREA H - TECHNOLOGY

A12

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR SYMBOL LIST.

2,807 SF

77 SF

61 SF

163 SF

M.A.S. WORK ROOM

RECORDS STORAGE

LOBBY

ELEVATOR

EQUIPMENT

STAIR #9

AB-2

AB-4

AB-3

SB-09-1

A /0

-T

D F

A /0

-T

D F

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - BASEMENT DEMO

PLAN - AREA J - TECHNOLOGY

01-TD100J

-2

-1

-T

D J

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 01 - BASEMENT DEMO PLAN - AREA J - TECHNOLOGY

A12

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR SYMBOL LIST.

IN

TERC

OM

IN

TERC

OM

INTERCOMINTERCOM

AC-12

AC-14

AC-20

AC-13

HANDRAIL

E.W.C.

SINK

K-2006KING

STO

N

C_LAVATO

RY

VITREO

US CHINA

K-4330KING

STO

N

C_TO

ILETS

VITREO

US CHINA

K-4330KINGSTON C_TOILETS VITREOUS CHINA

K-2006KING STO NC_LAVATO RYVITREO US CHINA

K-2006KINGSTON C_LAVATORY VITREOUS CHINA

K-4330KINGSTON C_TOILETS VITREOUS CHINA

PASS-THRU

COOLING

TOWER

AHU

480V. SWITCHGEAR

A/C-13

MCC-MG3

CGC-41

P-16

P-17

P-18

CH-1

D O W N

STL.

RAILING

STL.

RAIL

UP

DOWN

DOWNTO

PIPE

BASEMENT

DOWN

DOWN UP

DOWN

UP

U P

U P

WHEEL CHAIR

RAMP

WHEEL CHAIR

RAMP

U P

D N

UP

STEPS

CONC.

DOWN

STEEL

RAIL

D N

UP

DN

DN

@ 5%

SLOPE

S L O P E

SLOPE

@ 5%

STAIRS

D O W N

U P

D N

UP

SELECTIVE

VERTICAL

SVC-1

DUMBWAITERS

D W

#1

D W

#2

GVC-3

GVC-4

1 2 3

1 2 3

FD FD

SLOPE

AREA

DRAIN

F.D.

F.D.

AREA

DRAIN

AREA

DRAIN

PITCH 2

3/4"

SUMP SEE

DETAILTHIS

SHEET

PITCH

F.D.

PITCH

F.D.

FD

FD FD

FD

FD

FD

FD

FD

FD

FD FD

FD

FD

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

PITCH

2"

PITCH

2"F.D.

F.D.

F.D.

F.D.F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.F.D.

F.D.

F.D. F.D.

F.D.

F.D.

CENTRAL DUCT

SHAFT

LOADING

DOCK

RTU

CORRIDOR

PIPE/ELECT

CHASE

MATERIALS LIFT

TELE CLOSET

TELE CLOSET

ELECTRICAL

STAIR #22

BIOMED SHOP

BIOMED SHOP

BIOMED SHOP

ELECTRONICS SHOP

ELECTRONICS

SHOP

ELECTRONICS

SHOP

ELECTRONICS

SHOP

STAIR #8

ELECTRONICS SHOP

SAFETY

SAFETY

SAFETY

SAFETY

SAFETY

SAFETY

CORRIDOR

H.A.C.

FIRE CORRIDOR

LAB SPECTOMETER

LAB SPECTOMETER

MORGUE

MORGUE

MECHANICAL

STAIR #13

BARBER SHOP

MEZZANINE

ELECTRICAL

MORGUE

H.A.C.

MENS RESTROOM

WOMENS RESTROOM

SAFETY

MORGUE

WOMENS LOCKERS

WOMENS RESTROOM

AND SHOWERS

MENS LOCKERS

WOMENS LOCKERS

MENS RESTROOM

AND SHOWERS

AMMS ----

MENS LOUNGE

WOMENS LOUNGE--------

TELEPHONE

LOGISTICS STORAGE

FIRE

MH TEAM

GROUP ROOM

EMPLOYEE GYM

MH ADMIN

(SWING)

CONFERENCE/

TRAINING

POOL SERVICE ROOM

OFFICE

MH INTERN

EDUCATION

OFFICE

MULTI-PURPOSE

TRAINING

CENTER

CONFERENCE/

TRAINING

MENS RESTROOM

SHOWERS AND LOCKERS

WOMENS RESTROOM

SHOWERS AND LOCKERS

FIRE

CHIEF

NURSE MH

M.A.T. ADMIN

POLICE

CORRIDOR

FIRE

WOMENS RESTROOM

MENS RESTROOM

PATIENT RECORD

FILE ROOM

LOBBY

STORAGE

STAIR #9

ELECTRICAL

MECHANICAL

EMERGENCY ELECTRICAL

TELECOMMUNICATIONS

SIGNAL

DOCTORS

WORKROOM

DOCTORS

WORKROOM

RELEASE OF INFORMATION

ELECTRICAL

RESTROOM

FIRE CORRIDOR

ELECTRICAL

OLD GRAPHIC CONTROL

A/C & REFRIGERATION

/SHEET METAL SHOP

ATS ROOM

SERVICE ROOM

---- ELECTRICAL

FIRE

SIGNAL

TELEPHONE

MHBS

IT CLOSETCORRIDOR

EDUCATION

EQUIPMENT

STORAGE

PSA MH CONFERENCE ROOM

MHBS

MHBS

MHBS MHBS MHBS

WOMENS RESTROOM

CORRIDOR

MHBSMHBS

WAITING

CORRIDOR

MECHANICAL

TEMPORARY STORAGE

MECHANICAL

MECHANICAL

TELEPHONE ELECTRICALOFFICE EMSSTORAGE

UNIFORM EXCHANGE

STORAGECORRIDOR

IMS IMS

IMS

OFFICE STAFF EMSOFFICE STAFF

EMS NIGHT

OFFICE EMS

N&FSN&FS

UNION OFFICE

LINEN ROOM

CORRIDOR STORAGE

WOMENS RESTROOM

ELECTRICAL

CORRIDOR

UNION OFFICE

UNION OFFICE

IMS

MECHANICAL

IMSIMS CHIEF OFFICE

SYSTEMS MANAGER

OFFICE IMS

ASST. SYSTEM MANAGER

OFFICE IMS

PC REPAIR----

OFFICE IMS

OFFICE

CORRIDOR

OFFICE IMS

SIGNAL

POWERSTAIR #5

COMPUTER ROOM

TELEPHONE

ELECTRICAL

MECHANICAL

MECHANICAL ----

SPD AMMS

ELEVATOR LOBBY

FIRE

SPD AMMS

SIGNAL

TELEPHONE

STAIR #3

CORRIDOR

RESEARCH

ELECTRICAL

ELEVATOR LOBBY

OFFICE

VAULT

ELEVATOR LOBBY

STERILE HAZ BUFFER

HAZ ANTE

HAZ

STORAGE

MAIN KITCHEN

FAMILY RESTROOM

TELEPHONE

SIGNAL

MECHANICAL

3T MRI

EQUIPMENT ROOM

CONTROL ROOM

OFFICE

OFFICE

CONTROL

ROOM

MRI

GURNEY STAGE

MECHANICAL

WAITING

RESTROOM

BREAK ROOM

OFFICE

OFFICE

WORK ROOM

OFFICE

OFFICE

RESTROOM

EXAM

DRESSINGDRESSING

RECEPTION

MAGNETIC TAPE

STAIR #21 MECHANICAL

LOCKERS

REPRODUCTION

MAIL ROOM

OFFICE PHARMACY

PHARMACY OUT PATIENT

OFFICE PHARMACY

ELECTRICALOFFICE PHARMACY

OFFICE PHARMACY

---- CORRIDOR CORRIDOR FIRE

MAIL

SUPERVISOR

REFRIGERATION

EQUIPMENT

PROCESS STORES

OFFICE WAREHOUSE

MEDICAL GASES

MEDICAL GASES

CLOSET

TRASH COLLECTION

BREAK AREA

STAIR #12

WAREHOUSE ADDITION

EMS SUPPLIES

STAIR #6

WAREHOUSE

N&FS OFFICE

N&FS OFFICE

FOOD PRODUCTION

OFFICE

DIETETIC

CLASSROOM

OFFICE N&FS

OFFICE N&FS OFFICE N&FS

WOMENS RESTROOM

TELEPHONE

MENS RESTROOM

FIRE ELECTRICAL

SIGNALELECTRICAL

CONSTRUCTION

LAYDOWN

CANTEEN VENDING

CORRIDOR

PEST CONTROL

SPS OFFICES

DISHWASHER

CART WASH

H.A.C.

FREEZER REFRIGERATOR

COOKS REFRIGERATOR

VEGETABLE

REFRIGERATOR

MEAT REFRIGERATOR

GENERAL STORAGE

KITCHEN ENTRY

REFRIGERATOR

DAIRY & EGG

REFRIGERATOR

PATIENT LAUNDRY

KITCHEN STORAGEELECTRICAL

FREEZER

ELECTRICAL

DIETETICS OFFICE

DIETETICS OFFICE

DIETETICS OFFICE

FROZEN FOOD HOLDING

INGREDENT CONTROL

CORRIDOR

C O R R

ID

O R

S

TA

IR

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

S

TA

IR

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

S

TA

IR

#2

C O R R

ID

O R

C O R R

ID

O R

S

TA

IR

C O R R

ID

O R

ELEVATOR LOBBY

S

TA

IR

C O R R

ID

O R

S

TA

IR

ELECTRICAL

IMS

OFFICE IMS

RESTROOM

WORKSTATIONS

BULK BREAKDOWN AREA

STORAGE

STORAGE

OFFICE

STERILE

STORAGE

STERILIZER

UNLOADING

STERILIZERS

ETO STERILIZERS/

AERATOR ROOM

CART

STORAGE

PREP. ASSEMBLY

STERILIZATION

H.A.C.

RESTROOM

LOCKER

ROOM

LOCKER

ROOM

RESTROOM

ANTE ROOM

ANTE ROOM

DECON

ANTE ROOM

MANUAL

WASH

SOILED RECEIVING/

DECON AREA

DECON

TOILET

H.A.C.

MECH.

PHARMACY

STORAGE

PREP HOLD

ELECTRICAL

RESTROOM

OFFICE

NON-HAZ

ANTE

STERILE NON-HAZ BUFFER

CREDIT UNION

CREDIT UNION

CREDIT UNION

CREDIT UNION

CORRIDOR

CREDIT UNION

GD-040

S0-22-1

GD-024

GD-022

GD-022a

GD-0??

GD-023d

GD-023c GD-023b GD-023a

GD-023

S0-08-1

GD-023e

GD-017b GD-017c

GD-017d

GD-017e

GD-017f

GD-017

C0-17-1

GD-018

GD-018a C0-16-1

GD-020a

GD-020

GD-027

GD-026a

GD-036

S0-13-1

GD-036a

GD-036b

GD-031a

GD-031

GD-025

GD-029

GD-030

GD-017a

GD-026

GD-013a

GD-013c

GD-015a

GD-013b

GD-015b

GD-014a GD-014

GD-015

GD-013GD-012lGD-010d

GD-010a

GD-010c

GD-010

GD-010b

GA-004b

GA-004b

GA-004

GA-004c

GA-004d

GA-012

GA-011a

GA-012aGA-013aGA-027n

GA-027o

GA-013

GA-013a

GA-009

GA-011b

GA-009a

GA-014

GA-004a

GA-007

C0-05c-1

GA-027l

GA-027m

GA-027h

GA-027h

GA-027

GA-027t

GA-027w

S0-09-1

GE-002

GE-001

GE-003

GE-004

GE-005

GA-027s GA-027r

GA-024

GA-023d

GA-025

GA-024a C0-05a-1

GA-023c

GA-023

BA-023a

AB-6b

AB-6c

BA-023b

GA-022 GA-021

GA-016a

GA-016c GA-016b

GA-006a

GA-016dC0-05-1

GA-015

GA-010 GA-008

GA-005a

GA-005

GA-006 GA-018 GA-017

GD-009

C0-09-1

GA-002GA-003

GA-027a

C0-05-1

BB-001a

AB-6d

BB-001b

BB-001

GB-017 GB-015GB-039aGB-038

GB-039

GB-027dC0-01-1

GB-029 GB-027f

GB-027

GB-030aGB-030GB-034

GB-031GB-033

GB-035

GB-036

C0-01b-1 GB-020b

GB-014

GB-013

C0-01c-1

GB-020

GB-020a

GB-020c

GB-021e

GB-027aGB-027b

GB-025a

GB-022

GB-025

GB-021a

GB-021GB-022a

GB-023b

GB-024f

C0-03-1

GB-024b

GB-024

GB-024c

GB-024dS0-05-1

GB-026

GB-026a

GB-026b

GB-027c

GB-011 GB-010

GC-003

GC-002

GD-003?

GD-003s

GC-003

GD-003t

GD-003e

S0-03-1

C0-xx-1

GA-029k

GD-003e?

GA-030

GA-029

GA-029a

GA-029j

GD-002

GA-029f

GA-029e GA-029d

GD-007o

GD-007

GD-011

GC-051

GC-052

GC-028b

GC-027

GC-028a

GC-028

GC-030

GC-031

GC-035

GC-034

GC-024

GC-032

GC-036

GC-020

GC-025

GC-026a

GC-043

GC-045

GC-026

GC-046

GC-047

GC-044

GC-023

GC-022bGC-022a

C0-18-1

GC-021

GC-049

S0-21-1 GC-050

GC-048

GC-008g

GC-008h

GC-008f

GC-008

GC-008b

GC-008dGC-008a

GC-008c

GC-006l C0-07a-1 C0-07b-1 GC-004g

GC-008i

GC-004b

GC-004a

GC-004c

GC-009

GC-010

GC-011

GC-004d

GC-0xx

GC-012

GC-012a

GC-004j

S0-12-1

GC-004f

GC-004e

S0-06-1

GC-004

GD-007t

GD-007u

GD-007j

GB-037b

GD-037a GD-037c GD-037

GD-035

GD-039b

GD-034

GD-038d

GD-039a GD-039

GD-039cGD-0xx

GD-038c

GD-038

GD-038f

GD-008

GD-038a

GD-038e

C0-09a-1

GD-012a

GD-012b

GD-012c

GD-012d

GD-012

GD-038g

GD-007m

GD-007a

GC-006

GC-007w GC-007v

GD-007b

GD-007c

GD-007d

GD-007p GD-007r

GD-007n

GD-007s

GD-007g

GC-007

GC-007bGC-007a

GD-007q

GC-005

GC-001a

GC-001b

GD-005

GD-007e

GD-007f

C0-14-1C 5b

S

C 5d

C 1a

C 6a

S

C

C

C

C 1-

C

C

C 6a

C

C

S

C

C

C 1b

S

C

GD-001

S xx

C

S

GB-020d

GA-0xx

GC-004i

GC-004h

GA-008a

GD-054

GD-053

GD-051a

GD-052

GD-050

GD-051

GD-051b

GD-043b

GD-043

GD-042

GD-042b

GD-041

GD-045

GD-046

GD-049

GD-047

GD-047a

GD-047b

GD-047c

GC-004k

GC-024

GC-033

GA-016

GA-029c GA-029b

GA-029e

G-029g

GA-029

GA-029

GD-032

GD-033b

GD-033

GD-033a

C0-11a-1

GD-033c

CHAIN

P L E N U M

PASS-THRU

WINDOW

ABOVE

METAL

DECK

TO

CLG

CLOSED

OFF

CLOSED

OFF

4" WASTE

PIPE

9' CEILINGS

7'11" CEILINGS

EXISTING TR

EXISITNG TR

EXISTING TR

EXISTING TR

EXISTING TR

A12/01-TD101A

A /0

-T

D A

A12/01-TD101B

A12/01-TD101B

A12/01-TD101C

A /0

-T

D D

A12/01-TD101D

A12/01-TD101E

A12/01-TD101E

A12/01-TD101F

A /0

-T

D D

A12/01-TD101D

A12/01-TD101E

A12/01-TD101E

A12/01-TD101F

A /0

-T

D G

A12/01-TD101G

A12/01-TD101H

A12/01-TD101H

A12/01-TD101J

EXISTING TR

EXISTING TR

EXISTING TR

EXISTING TR

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - OVERALL

GROUND FLOOR DEMO PLAN -

TECHNOLOGY

01-TD101

-2

-1

-T

D

/0

/2

.p d f

3/64" = 1'-0"

BUILDING 01 - OVERALL GROUND FLOOR DEMO PLAN - TECHNOLOGY

A13

N

BUILDING

NORTH

N

TRUE

NORTH

HANDRAIL

U P

D N

UP

STEPS

CONC.

DOWN

STEEL

RAIL

D N

F.D.

PITCH

2"

PITCH

2"F.D.

F.D.

F.D.

F.D.F.D.

LOADING

DOCK

REPRODUCTION

MAIL ROOM

MAIL

SUPERVISOR

REFRIGERATION

EQUIPMENT

PROCESS STORES

OFFICE WAREHOUSE

MEDICAL GASES

MEDICAL GASES

CLOSET

TRASH COLLECTION

BREAK AREA

STAIR #12

WAREHOUSE ADDITION

EMS SUPPLIES

STAIR #6

WAREHOUSE

S

TA

IR

S

TA

IR

RESTROOM

WORKSTATIONS

BULK BREAKDOWN AREA

STORAGE

STORAGE

PHARMACY

STORAGE

GC-008g

GC-008h

C0-07b-1 GC-004g

GC-008i

GC-004b

GC-004a

GC-004c

GC-009

GC-010

GC-011

GC-004d

GC-0xx

GC-012

GC-012a

GC-004j

S0-12-1

GC-004f

GC-004e

S0-06-1

GC-004

S xx

S

GC-004i

GC-004h

GC-004k

1D-WAP

1D-WAP

1D-GWAP

1D-WAP

D

V

3D 2V

D

2D 2V

D

V

1D-WAP

1D-GWAP

2D 1V 2D 2D

2D 4V

D2D2D

2D

2D

2D2D

2D2D2D

D

D

D

D

D 2 D

D

D

D

V

1D-GWAP

D

V2 D

V

2D 2V 2D 2V 2D 2V 2D 2V

2D 2D 2V4D 2V

2D 2D 1V

1D-WAP

1D

D

V

D

D

V

D

V

D

V

4V

2D

1D-GWAP

V

V

1D-WAP

V

D 2 D2 D

D

-C A

M

2D

4D

V

D

4V3D

1V

V

1D-GWAP

1D-CAM

EXISTING SECURITY PANEL

A12/01-TD101BA12/01-TD101E

A12/01-TD101D

A /0

-T

D D

A12/01-TD101B

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - GROUND FLOOR

DEMO PLAN - AREA A -

TECHNOLOGY

01-TD101A

-2

-1

-T

D A

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 01 - GROUND FLOOR DEMO PLAN - AREA A - TECHNOLOGY

A12

N

BUILDING

NORTH

N

TRUE

NORTH

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR SYMBOL LIST.

K-2006KING

STO

N

C_LAVATO

RY

VITREO

US CHINA

K-4330KING

STO

N

C_TO

ILETS

VITREO

US CHINA

K-4330KINGSTON C_TOILETS VITREOUS CHINA

K-2006KING STO NC_LAVATO RYVITREO US CHINA

D O W N

STL.

RAILING

STL.

RAIL

STEPS

CONC.

STEEL

RAIL

FD

SLOPE

F.D.

ELECTRICAL

BARBER SHOP

MEZZANINE

ELECTRICAL

CORRIDOR FIRE

MAIL

SUPERVISOR

MEDICAL GASES

N&FS OFFICE

N&FS OFFICE

FOOD PRODUCTION

OFFICE

GENERAL STORAGE

KITCHEN ENTRY

REFRIGERATOR

DAIRY & EGG

REFRIGERATOR

PATIENT LAUNDRY

KITCHEN STORAGE

INGREDENT CONTROL

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

RESTROOM

ANTE ROOM

DECON

ANTE ROOM

SOILED RECEIVING/

DECON AREA

DECON

TOILET

H.A.C.

MECH.

GD-040

GD-027

GD-036a

GD-036b

C0-07b-1 GC-004g

GC-008i

GC-010

GD-007t

GD-007u

GD-007j

GD-037c GD-037

GD-007p GD-007r

GD-007n

GD-007s

GD-007g

GC-007

GC-007b

GD-007f

C

C 1-

C

GD-042b

GD-041

GD-046

GD-047

GD-047a

GD-047b

GD-047c

CHAIN

1D-GWAP

1D-CAM

2D 2V

V

1D-WAP

1D-GWAP

1D-WAP

1D-CAM

1D-CAM

1D-CAM

1D-GWAP

2D 2V2D 2V1 V

V

3D 2V 2V 1V

2D 2V 1D

1D-CAM

1V

1D-CAM

1V

V

1D

V

1D-WAP

D

D

A12/01-TD101E

A12/01-TD101D A12/01-TD101AA12/01-TD101A

A12/01-TD101E

A12/01-TD101F A12/01-TD101C A12/01-TD101C

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - GROUND FLOOR

DEMO PLAN - AREA B -

TECHNOLOGY

01-TD101B

-2

-1

-T

D B

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 01 - GROUND FLOOR DEMO PLAN - AREA B - TECHNOLOGY

A12

N

BUILDING

NORTH

N

TRUE

NORTH

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR SYMBOL LIST.

K-2006KINGSTON C_LAVATORY VITREOUS CHINA

K-4330KINGSTON C_TOILETS VITREOUS CHINA

STAIRS

D O W N

U P

GVC-3

GVC-4

FD FD

AREA

DRAIN

MATERIALS LIFT

TELE CLOSET

STAIR #22

BIOMED SHOP

BIOMED SHOP

BIOMED SHOP

ELECTRONICS SHOP

ELECTRONICS

SHOP

ELECTRONICS

SHOP

ELECTRONICS

SHOP

STAIR #8

ELECTRONICS SHOP

SAFETY

SAFETY

SAFETY

SAFETY

SAFETY

SAFETY

CORRIDOR

H.A.C.

FIRE CORRIDOR

LAB SPECTOMETER

LAB SPECTOMETER

MORGUE

MORGUE

MECHANICAL

STAIR #13

MORGUE

H.A.C.

MENS RESTROOM

WOMENS RESTROOM

SAFETY

MORGUE

WOMENS LOCKERS

WOMENS RESTROOM

AND SHOWERS

MENS LOCKERS

WOMENS LOCKERS

MENS RESTROOM

AND SHOWERS

AMMS ----

MENS LOUNGE

WOMENS LOUNGE

OFFICE N&FS

OFFICE N&FS OFFICE N&FS

WOMENS RESTROOM

TELEPHONE

MENS RESTROOM

FIRE ELECTRICAL

SIGNAL

CORRIDOR

S

TA

IR

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

STERILE

STORAGE

STERILIZER

UNLOADING

STERILIZERS

ETO STERILIZERS/

AERATOR ROOM

CART

STORAGE

PREP. ASSEMBLY

STERILIZATION

H.A.C.

RESTROOM

LOCKER

ROOM

LOCKER

ROOM

RESTROOM

ANTE ROOM

DECON

ANTE ROOM

MANUAL

WASH

CREDIT UNION

CREDIT UNION

CREDIT UNION

CREDIT UNION

CORRIDOR

CREDIT UNION

S0-22-1

GD-024

GD-022

GD-022a

GD-0??

GD-023d

GD-023c GD-023b GD-023a

GD-023

S0-08-1

GD-023e

GD-017b GD-017c

GD-017d

GD-017e

GD-017f

GD-017

C0-17-1

GD-018

GD-018a C0-16-1

GD-020a

GD-020

GD-027

GD-026a

GD-036

S0-13-1

GD-031a

GD-031

GD-025

GD-029

GD-030

GD-017a

GD-026

GD-013a

GD-013c

GD-015a

GD-013b

GD-015b

GD-014a GD-014

GD-015

GD-013

GD-037a GD-037c GD-037

GD-035

GD-039b

GD-034

GD-038d

GD-039a GD-039

GD-039c

GD-038g

C0-14-1

S 1-

C

C

C

GD-054

GD-053

GD-051a

GD-052

GD-050

GD-051

GD-051b

GD-043b

GD-043

GD-042

GD-045

GD-049

GD-032

GD-033b

GD-033

GD-033a

C0-11a-1

GD-033c

2D 2V2D 2V1 V

D

1D-WAP

2D 1V

D

D

D

D

V

V

D

V

D

D

-C A

M

D

-W A

P

1D-WAP

1D-WAP

3D2V

1V

1D-GWAP

1D-WAP

1D-GWAP

D

V

2D 2V 3D 2 V

D

1D-CAM

1D-GWAP

D

V

1D 2V

D

V

1D-WAP

3D 2V

D

V

3D2V

1D-GWAP

D

1D-WAP 1D-CAM

D

2D2V

D

V

D

V

1D-GWAP

1D-WAP

D

V

V4D

1D 1V

3D2V

2D2 V

D

3D 4V

1D-WAP

1D-CAM

1D-CAM

1D-WAP

3D 2V

2D1V 2D1V

2D 1V

4V

D

1D-GWAP

D

1D-WAP

D

V

D

V

D

V 2V 2D 2V 1V 1V

1D-GWAP 1D-WAP

D

D

D

4D 1D

4D

4D

D

D

D

D

D

D

D

4D

4D

4D

2D2V

D

D

D 4D

4D

4D

4D

D

D

D

A12/01-TD101E

A12/01-TD101F

A /0

-T

D F

A12/01-TD101B A12/01-TD101B

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - GROUND FLOOR

DEMO PLAN - AREA C -

TECHNOLOGY

01-TD101C

-2

-1

-T

D C

/1

/2

.p d f

1/8" = 1'-0"

BUILDING 01 - GROUND FLOOR DEMO PLAN - AREA C - TECHNOLOGY

A12

N

BUILDING

NORTH

N

TRUE

NORTH

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR SYMBOL LIST.

AC-14 SINK

CGC-41

P-18

CH-1

U P

U P

WHEEL CHAIR

RAMP

WHEEL CHAIR

RAMP

D N

UP

DN

S

LO

P E

F.D.

F.D.

F.D.

F.D.

F.D.

F.D. F.D.

F.D.

F.D.

F.D.

F.D.F.D.

RTU

CORRIDOR

TELE CLOSET

MECHANICAL

TELEPHONE ELECTRICALOFFICE EMSSTORAGE

UNIFORM EXCHANGE

STORAGE

IMS IMS

IMS

CORRIDOR STORAGE

WOMENS RESTROOM

ELECTRICAL

CORRIDOR

UNION OFFICE

UNION OFFICE

IMS

MECHANICAL

IMSIMS CHIEF OFFICE

SYSTEMS MANAGER

OFFICE IMS

ASST. SYSTEM MANAGER

OFFICE IMS

PC REPAIR----

OFFICE IMS

OFFICE

CORRIDOR

OFFICE IMS

SIGNAL

POWERSTAIR #5

ELECTRICAL

MECHANICAL

MECHANICAL ----

SPD AMMS

TELEPHONE

SIGNAL

MECHANICAL

3T MRI

EQUIPMENT ROOM

CONTROL ROOM

OFFICE

OFFICE

CONTROL

ROOM

MRI

GURNEY STAGE

MECHANICAL

WAITING

RESTROOM

BREAK ROOM

OFFICE

OFFICE

WORK ROOM

OFFICE

OFFICE

RESTROOM

EXAM

DRESSINGDRESSING

RECEPTION

MAGNETIC TAPE

STAIR #21 MECHANICAL

LOCKERS

REPRODUCTION

MAIL ROOM

OFFICE PHARMACY

PHARMACY OUT PATIENT

OFFICE PHARMACY

ELECTRICALOFFICE PHARMACY

OFFICE PHARMACY

MAIL

SUPERVISOR

C O R R

ID

O R

S

TA

IR

C O R R

ID

O R

C O R R

ID

O R

IMS

OFFICE IMS

STORAGE

STORAGE

PREP HOLD

BB-001b

GB-017 GB-015GB-039aGB-038

GB-039

GB-027d

GB-029 GB-027f

GB-027

C0-01b-1 GB-020b

GB-014

GB-013

C0-01c-1

GB-020

GB-020a

GB-020c

GB-021e

GB-027aGB-027b

GB-025a

GB-022

GB-025

GB-021a

GB-021GB-022a

GB-023b

GB-024f

C0-03-1

GB-024b

GB-024

GB-024c

GB-024dS0-05-1

GB-026b

GB-027c

GB-011 GB-010

GC-003

GC-002

GC-051

GC-052

GC-028b

GC-027

GC-028a

GC-028

GC-030

GC-031

GC-035

GC-034

GC-024

GC-032

GC-036

GC-020

GC-025

GC-026a

GC-043

GC-045

GC-026

GC-046

GC-047

GC-044

GC-023

GC-022bGC-022a

C0-18-1

GC-021

GC-049

S0-21-1 GC-050

GC-048

GC-008g

GC-008h

GC-008f

GC-008

GC-008b

GC-008dGC-008a

GC-008c

GC-006l C0-07a-1 C0-07b-1

GC-008i

C

S

C

C

C 1b

GB-020d

GC-024

GC-033

PASS-THRU

WINDOW

ABOVE

METAL

DECK

V

D

2D

4D 2V 2D 4V 2D 3V

1D-WAP

D

3D 3D2V

2D 2V

V

D

4D 4D

D

V

D

V

D3

D V

V

4D2V 4D2V

D

V

1D-WAP

2D 2V

D

V

D

D

V

D

V

D

V

D

2D 3D

D

2D2V

V

1D-GWAP

1D-CAM

3D 2V3D 2V3D

D

D

V

D

D

D

D

V

V

D

D

D

D

V

1D-WAP

1D-GWAP

4D

4D2D2D

2D

2D 2V

D

V

D

3D 2V

D

2D 2D 2 D

D

D

D

3D2V1D

2D4D

2D4V

1D-CAM

D

D

V

3D 4V

1D-WAP

3D

3D 2V 1V1D-CAM

1D-WAP

1D-GWAP

4D2V

1D-CAM 1D-WAP

D

-C A

M

D

-C A

M

1D-GWAP

1V 1V 3D 3D 1V 2V

1D-WAP

1D-CAM

3D

1D-GWAP 1D-CAM

1D-CAM

1D-WAP

2V

2V

2V

4D

2D 2V

3D

3D

D

D

D

V

4V 3D2D2D2D2D

V

V

V

D

V

2D1V

1D-CAM1D-CAM

2D

D

1D-CAM

D

V

1D

2D

2D

D

1D 1V

3D 2V

D

2D2V

2D 2V

3D2V 3D2V

4D 2V 4D 2V

D

V

D

V

3D2V

3D2V3D2V 3 D

V

1D-CAM

1D-CAM

1D-WAP

V

1D-WAP

D

V

3D2V 3D 2V

3D 2V3D 2V

1D-GWAP

2V

3D 2V

D

V

D

V

1V

1D-GWAP

3D 2V

V

1V 1D

A12/01-TD101E

A12/01-TD101A

A12/01-TD101B

A /0

-T

D A

A12/01-TD101EA12/01-TD101H

A12/01-TD101G

A /0

-T

D G

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

950 N. WASHINGTON ST

SUITE 334

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

BARPDN

EHRM INFRASTRUCTURE UPGRADE

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 - GROUND FLOOR

DEMO PLAN - AREA D -

TECHNOLOGY

01-TD101D

-2

-1

-T

D D

/0

/2

.p d f

N

BUILDING

NORTH

N

TRUE

NORTH

N

BUILDING

NORTH

N

TRUE

NORTH

1/8" = 1'-0"

BUILDING 01 - GROUND FLOOR DEMO PLAN - AREA D - TECHNOLOGY

A12

NOTES:

1. REFER TO TN000 TECHNOLOGY COVERSHEET FOR SYMBOL LIST.

IN

TERC

O M

IN

TERC

O M

INTERCOMINTERCOM

AC-12

AC-14

AC-20

AC-13

SINK

AHU

480V. SWITCHGEAR

A/C-13

MCC-MG3

P-16

P-17

P-18

CH-1

DOWNTO

PIPE

BASEMENT

DOWN

SELECTIVE

VERTICAL

SVC-1

D W

#1

D W

#2

1 2 3

F.D.

F.D.

FD

FD

FD

FD

FD

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D. F.D.

F.D.F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .