Attachment 5 - Drawings Vol 1 Part3.pdf
PDF 38 MB Posted
- Solicitation number
- 36C77625R0092-RFP
About this file
This file contains architectural drawings and construction documents for the EHRM Infrastructure Upgrades project at James A. Haley Veterans Hospital in Tampa, Florida (Project 673-20-107). The drawings include floor plans, ICRA (Infection Control Risk Assessment) plans, reflected ceiling plans (RCP), life safety plans, and detailed sections covering basement through seventh floor levels of Building 01. The documents show comprehensive demolition and new construction work with detailed room-by-room layouts, including operating rooms, patient rooms, support spaces, mechanical systems, and utility infrastructure. Key construction elements include new temporary construction rooms (TRs), ICRA barriers with specific infection control protocols, 2-hour fire-rated floor infills, and extensive mechanical, electrical, and plumbing modifications throughout the facility.
The architectural documentation specifies detailed ICRA (Infection Control Risk Assessment) requirements for construction activities in an active hospital environment, with classifications for patient risk groups and corresponding control measures ranging from Class I (minimal precautions) through Class IV (maximum containment with negative air pressure and extensive decontamination). Construction specifications mandate HEPA filtration, negative air pressure maintenance, anteroom requirements, protective equipment protocols, and daily waste removal outside patient care hours (0800-1630). The drawings identify specific demolition areas and new construction zones across multiple floors, with construction details showing wall types, door specifications, fire-rated assemblies, and mechanical/electrical system modifications necessary to support upgraded healthcare facility operations.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HEAD
HEAD
HEAD
ROOM
DIVIDER
ELECTRICAL
CLOSET
2D-232 m m
A R M
0m m
A
RM
0 0 m m
A R M90 0m m
AR
M
1300mm ARM
0m m
A R M
0m m
A R M
H E A D
00m m
ARM
m m
A R M
0 00 m m
A R M
00m m
A
RM
0m m
A R M
1 3 0 0 m m A R M
0m m
A R M
H E A D
H E A D
00m m
ARM
10 0 0m m
ARM
mm
AR
M
900mm ARM
1000mm
ARM
1 3 0 0 m m A R M
0m m
AR
M
0m m
AR
M mm AR M
900mmARM
1000mm
ARM
0 0 m m
A R M
1000mm ARM
1300mm ARM
H E A D
3 4 5
1 2
14151617
CR
IN EXIST. WALL
BELOW
5"x 3" T.S.
COL.
ANESTHESIA
BOOM
5 4
WEST
DUCT
SHAFT
ANESTHESIA
STORAGE
MED ALCOVE
UP
DN
UP
DN
DN
UP
U P
D N
DN
U P
D N
UP
UP
D O W N
CANOPY ROOF LEVEL
HOOD
SMOKE
BARRIERABOVE
CLG.
42" WALL w/18"ETCHEDGLASS
TOP
MECH
CHASE
MECH.
CHASE
TRANSPORT
TEAM
TRANSPORT
TEAM
SOILED CART
STORAGE
BREAK ROOM
RESTROOMOFFICEOFFICE
CORRIDOR
C O R R
ID
O R
C O R R
ID
O R C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
ST
A
IR
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
ST
A
IR
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
ST
A
IR
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
ST
A
IR
7C O R R
ID
O R
C O R R
ID
O R
GAS STORAGE SOIL HOLDING H.A.C.
EQUIPMENT
STORAGE
ALCOVE
EQUIPMENT
STORAGE
CORRIDOR
O.R. "B"
STERIS
SUB-STERILE
O.R. "A"
CLEAN CORE
O.R. "C"
SUB-STERILE
ANESTHESIA
LAB
O.R. "D"
CORRIDORH.A.C.
ANESTHESIA
WORKROOM
COMMUNICATIONS
EQUIPMENT
STORAGE
ELECTRICAL
FROZEN
SECTION
VESTIBULE
STAIR #22CORRIDOR
STORAGE
H.A.C.
OPERATING ROOM #4
STORAGE#######
OPERATING ROOM #5
OPERATING ROOM #6
OPERATING ROOM #3
OPERATING ROOM #7
STERILE CORE AREA
OPERATING ROOM #2
CORRIDORCORRIDOR
ELEVATOR LOBBY
ELEVATOR LOBBY
CORRIDOR
H.A.C.
GENERAL
STORAGE EMS
SURGERY
STORAGE
CARDIAC CATH. LAB #1
PATIENT ROOM #4
ISOLATION
CORRIDOR
PATIENT ROOM #5
ISOLATION
PATIENT ROOM #6 PATIENT ROOM #7 PATIENT ROOM #8 HEAD NURSE
PATIENT ROOM #9
CORRIDOR
NURSE STATION
CORRIDOR
NURSE STATION
RESTROOMON CALL
PATIENT ROOM #2 PATIENT ROOM #1 SOILED LINEN
CONSULT
SICU & SURGERY
WAITING ROOM
COMMUNICATIONSRESTROOM
LOUNGE
CLEAN LINEN
ELECTRICAL
EQUIPMENT
STORAGE
COMMUNICATION
PATIENT ROOM #15
ISOLATION
PATIENT ROOM #14
ISOLATION
ELECTRICAL
RESTROOM
RT WORK ROOM
PATIENT ROOM #13
H.A.C.
STORAGE
PATIENT ROOM #12
PATIENT ROOM #11
PATIENT ROOM #10
MENS
LOCKER ROOM
RESTROOM
WOMENS
LOCKER ROOM
RESTROOM
OFFICE
WOMENS
VESTIBULE
MENS
VESTIBULE
RECEPTION
CORRIDORFIRE
CORRIDORSIGNAL
TELEPHONE
PATIENT HOLDING
CONTROL ROOM
CARDIAC CATH. LAB #2
RESTROOM
SCRUB
SINK AREA
CONTROL ROOM
FIRE
ANESTHOLOGY
CARDIAC
CATH.
SURGERY
OFFICE
CARDIAC CATH.
SECRETARY
ANESTHOLOGY
ELECTRICAL
AUDITORIUM
CANTEEN
GENERAL STORAGE
CHAIR STORAGE
SWING SPACE
OFFICE
STAGE
STORAGE STORAGE
PROJECTION BOOTH
OFFICE
RESTROOM
H.A.C.
RESTROOM
OFFICE FIRE
CPAP
ELEVATOR LOBBY
PATIENT
REPRESENATIVE
STORAGE
CANTEEN STORAGE
CANTEEN RECEIVING
PATIENT REP
SUPERVISOR
PATIENT
REPPATIENT
REP
STAIR #3
FIRE
SIGNAL
TELEPHONE
ELECTRICAL
THERAPY
STORAGE
PERIOPERATIVE
OFFICE
PERIOPERATIVE
OFFICE
PERIOPERATIVE
OFFICE
ELECTRICALPICC NURSES/
HOSPITALIST
PROSTHETICS
DISPENSARY
CORRIDOR
ELEVATOR LOBBY
PATIENT
EDUCATION
ELECTRICAL
OFFICEOFFICEOFFICE
CORRIDOR
CLOSET
PROCEDURE ROOM
FIRE
STAIR #5
CONTROL ROOM
EQUIPMENT
MAIN COMPUTER
UPS EQUIP
ELECTRONICS
ELECTRICAL
SURGERY
CONFERENCE
OFFICE
BREAKROOM
SUPPLIES
SURGERY OFFICE
SURGERY OFFICEANESTHOLOGY MD
ANESTHOLOGY MD
SURGERY OFFICE
SURGERY OFFICE
ANESTHOLOGY MD
PHARMACY
SATELLITE
ANESTHOLOGY MD
ANESTHOLOGY MD
ANESTHOLOGY MD
ANESTHOLOGY
CHIEF
ANESTHOLOGY
SECRETARY
WOMENS
RESTROOM
MENS
RESTROOM
ANESTHOLOGY
CRNA
SURGERY OFFICE
SURGERY OFFICEANESTHOLOGY
PROGRAM
ASSISTANT
FIRE
CORRIDOR
VOLUNTARY
SERVICE WOMENS
RESTROOM
MENS
RESTROOM
D.A.V. OFFICE
D.A.V. OFFICE
VOLUNTARY
SERVICE
SECRETARY
VOLUNTARY
SERVICE
VOLUNTARY
SERVICEVOLUNTARY
SERVICE
ELECTRICAL
ELECTRICAL FLEA MARKET
VOLUNTARY
SERVICE COMMUNICATIONS
CORRIDOR
CANTEEN DINING
KITCHEN
FOOD COURT
PIZZA SHOP
RETAIL STOREKITCHEN STORAGE
LOCKER ROOM
GENERAL STORAGE
GENERAL STORAGE
OFFICE
REFRIGERATOR FREEZER
COMPUTER ROOM
FIRE
SIGNAL
TELEPHONE
H.A.C.WOMENS STAFF
RESTROOM
MENS STAFF
RESTROOM
CANTEEN OFFICE
KITCHEN
READING ROOM
REC. SERVICE
CHIEF
WORK ROOM
& STORAGE
PATIENT LIBRARY
LIBRARY OFFICE
FIRE CORRIDOR
MEDICAL LIBRARY
STORAGE
CHAPELCHANCEL
CONFERENCE ROOM
SACRISTY
CORRIDOR
CHAPLAIN CHAPLAIN
CORRIDOR
CHAPLAIN SECRETARY
AUDIOLOGY CHIEF
AUDIOLOGY
STORAGE
FIRE?CORRIDOR
WAITING
TRAINEES
TRAINEES
TREATMENT ROOMEUCH. PRAYER
AUDIOLOGY
STAIR #9
SECRETARY
SPEECH PATHOLOGY
CONTROL ROOM
BREAK ROOM
LAB
EXAM ROOM
EXAM ROOM
CONTROL ROOM
EXAM ROOM
CONTROL ROOM
CORRIDOR
1 BED ROOM 1 BED ROOM
RESTROOM
1 BED ROOM
1 BED ROOM
RESTROOM
1 BED ROOM
TELEPHONECORRIDOR
MEDICATION
SOILED UTILITY
CORRIDOR
CLEAN UTILITY
OFFICE CARITAS
CORRIDOR
NURSE STATION
RESTROOM
MEDICATION
NURSE STATION
SIGNAL
ELECTRICAL
STORAGE
RESTROOM
1 BED ROOM
OFFICE
CLEAN
STORAGE
CLASSROOM 4 BED ROOM 4 BED ROOM 4 BED ROOM
GI PROCEDURE
ROOM
GI PROCEDURE
ROOM
4 BED ROOM
FIRE
ADC/PAT
BLOOD DRAW
PRE-OP
EVALUATION ----
OFFICE MECHANICAL
OFFICE
OFFICETELEPHONE
SHOWER ROOM
TELEPHONE
TUB ROOM
RESTROOM
H.A.C.
OFFICE
CORRIDOR FIRE
STAIR #6
WAITING
ROOM
PAT ADMINFLOW CENTER
CLEAN LINEN
ADC/PAT
ADC/PAT
RESTROOM
ADC/PAT
ADC/PAT
RESTROOM
ADC/PAT
ADC/PAT
TELEPHONECORRIDOR
STORAGE
SIGNALCORRIDOR
FIRE
FIRE
RESTROOM
CLEAN
SUPPLY/MED
EQUIPMENT
STORAGE
SOILED UTILITY
PACU
POSITIVE
PRESSURE
ROOM 1
NEGATIVE
PRESSURE
ROOM 1
NEGATIVE
PRESSURE
ROOM 2
OFFICE
PACU
AORESIDENT
COORDINATOR
PROGRAM
SPECIALIST
PI/COMPLIANCE
3 PERSON
OFFICE
BREAK ROOM
CONFERENCE
SICUPLASTIC
SURGEON
2 PERSON
OFFICE
H.A.C. CHIEF
GENERAL
SURGERY
MENS
RESTROOM
SURGICAL SERVICE
CHIEF
RESIDENTS
ORTHO PA'S (6)
ORTHO
SURGERY
DOCTORS (2) GENERAL
SURGERY
DOCTORS (2)
WOMENS RESTROOM
CHIEF
ORTHO
SECRETARY
TO CHIEF
ORTHO
SURGERY
DOCTORS (3)
GENERAL
SURGERY
DOCTORS (2)
RESIDENTS NSQIP
SURGERY
ADMIN OFFICES
LOCKERS
RESTROOM
RECOVERY
OFFICE
OFFICE
OFFICE LOCKERS
BREAK ROOM
STAFF RESTROOM
CORRIDOR
CLEAN SUPPLY OFFICE
OFFICE OFFICE
WORKROOM
DIALYSIS
TRAINING
FAMILY
WAITING
PATIENT
RESTROOM
OFFICE
OFFICE EXAM
CORRIDOR
HAS CLERK
OFFICE
SCOOTER
ALCOVE
FAC
PERITONEAL
PERITONEAL
MEDS
OFFICE
TELECOM
H.A.C.
OFFICESOILED
HOLDING
R.O. TANKS
CLEAN SUPPLY
ISOL RESTROOM ISOL ANTE
ISOLATION
EQUIPMENT
WORKROOM
SIGNAL
EQUIPMENT
REPAIR
NURSE STATION
CORRIDORFAC
PATIENT
CUBICLES
PATIENT
CUBICLES
C O R R
ID
O R
C O R R
ID
O R
CORRIDOR
C O R R
ID
O R
C O R R
ID
O R
SCALE ALCOVE
CHARTING
ALCOVE
CRASH CART
ALCOVE
COMM
OFFICEOFFICE
OFFICE
SWING SPACE
CORRIDOR
ASSISTANT
NURSE MGR.
OFFICE
CONTROL
ROOM
STORAGE
ROOM
PROCEDURE
ROOM
EQUIPMENT
ROOM
STORAGE
RECEPTION
/CLERK
CHECK-IN &
WAITING
PATIENT
REP
PATIENT
REP
CORRIDOR
SCRUB
VESTIBULE
NURSE
MANAGER
ELEVATOR
CONTROL
CLOSET
MECHANICAL
OFFICE
2C-202a2C-202
2D-2892D-288
2D-2872D-2862D-285
C2-50-1
C 9-
C 0-
1 C 2-
C 7-
C 7-
S2 1-
C 5-
C 6-
C 9-
C 4-
C 2-a-
S2 2-
C 2-
C 9-
C
C 8-
C
C 1-
C 6-
C
C
S2 4-
C 2-a-
C 3-
C 0-
C 9-
C 7-
S2 7-
1C 4-
C 2-
2D-284 2D-283 2D-282 2D-281 2D-280
C2-51-1
2D-279
2D-278
2D-277
2D-275
2D-274
2D-273
2D-276
2D-272
2D-271
C2-53-12D-267
2D-265
2D-266
2D-268
2D-269
2D-270
V2-01-1
S2-22-1C2-41-1
2D-237a
2D-238
2D-236
2D-235######
2D-239
2D-240
2D-234
2D-241
2D-237
2D-233
C2-38-1C2-34-1
2D-202
2D-201
C2-35-1
2D-217
2D-203
2D-217b
2D-220
2D-252l
C2-44-1
2D-252k 2D-252j 2D-252i 2D-252h 2D-252g
2D-252f
C2-43-1
2D-252
C2-44-1
2D-252
2D-252p2D-288
2D-252q 2D-252r 2D-260
2D-257
2D-256
2D-256a 2D-256b
2D-253
2D-259
2D-258
2D-252t
2D-252s
2D-252u 2D-252v
Space
2D-253a
2D-252w
2D-252b
2D-252a
2D-252
2D-252c
2D-252d
2D-252e
2D-250 2D-249
2D-247
2D-248
2D-245
V2-03-01
V2-04-01
2D-246
C2-42-12D-255a C2-48-12D-255b
2D-255c
2D-221 2D-213c
2D-213
2D-221b
2D-221a
2D-212
2D-217a
2D-219
2D-219a
2D-219b
2D-209b
2D-209a
2D-204
2A-215
2A-244a
2A-215m
2B-201e
2B-202a
2A-215a
2A-215? 2A-215?
2A-215f
2B-205
2B-205a
2B-204
2B-203a
2B-203 2B-203b
2B-202
2A-242
2A-2432A-244c
2A-244
2A-245a 2A-245
2A-246 2A-246a
S2-03-1
2C-201b
2C-201c
2C-201d
2C-201a
2C-222
2C-222a
2C-222b2C-222c2C-222d
2C-222e2C-204a
2C-204b
C2-21-1
2C-201
2B-258
2B-257
2B-257b2B-257c2B-257d
C2-12-1
2C-276e
2C-276
2C-276c
S2-05-1
2C-276d
2C-276c
2C-276b
2D-215
2D-213a
2D-213b
2C-215
2C-213a
2C-213
2C-213b
2C-205a
2C-205b2C-205
2C-207
2C-214
2C-216
2C-209
2C-203
2C-206
2C-208
2C-210
2C-212
2D-207
2D-206
2D-205
2C-211
2C-218
2D-2102D-208
2D-209c C2-32-1
2A-215d
2A-203 2A-202
2A-240
2A-241
2A-215m
2A-215n
2A-215l
2A-215k
2A-215j
2A-213
2A-213a 2A-211
2A-215e 2A-215g
C2-01-1
2A-214
2A-205
2A-214a
2A-210
2A-2012A-209
2A-208
2A-207
2A-206
2A-205a
2A-205c 2A-205d
2A-205b
2A-213b
2A-213c 2A-213d
2A-2162A-2172A-218
2A-215a
2A-215b
2A-239b
2A-215c
2A-238a
2A-237
2A-238
2A-239a C2-03-1
2A-239
2A-237a
2A-2192A-219a
2A-224a
2A-224
C2-06-1
2A-223 2A-222
C2-05-1
2A-221 2A-220
2A-232a
2A-232
2A-232b 2A-231bC2-07-1
2A-230
2A-231
2A-231a 2A-2252A-228
2A-229
S2-09-1
2A-233
2A-234
2A-236b
2A-235 2A-236
2A-236a
2A-236c
2A-236d
2A-236e
2A-236f
C2-06-1
2C-275 2C-273
2C-271a
2C-271 2C-269
2C-267a
2C-267
2C-268aC2-28-1
2C-270
2C-255
C2-26-1
2C-253
2C-274 2C-272
C2-20-1
2C-250
2C-223c
2C-250a
2C-223
2C-255b 2C-255a
2C-257
2C-259
2C-265
2C-264
2C-249
2C-251
2C-252 2C-254 2C-256 2C-258
2C-260
2C-261
2C-263
2C-260a
2C-225
2C-224
2C-229
2C-248
2C-246
2C-231 2C-244a
2C-247
2C-2452C-244b
2C-244
2C-231a
2C-234
2C-241
2C-240
2C-243
C2-23-1 2C-242a
S2-06-1 2C-2422C-2392C-238
2C-237
2C-236
2C-235
2C-233
2C-232
2C-230
2C-228
2C-227
2C-226
2B-215aC2-13-1
2B-227b
2B-227aC2-15-1 2B-225a
2B-207c
2D-225j
2D-225h
2D-225e2D-225g
2D-225
2D-225a2D-225b2D-225c
2D-225d
2D-225
2B-2182B-219 2B-216 2B-214 2B-212 2B-209
2B-207
2B-2102B-2132B-215
2B-224a 2B-229
2B-217
2B-221
2B-222
2B-225
2B-226a
2B-228a
2B-224 2B-227
2B-220
2B-226 2B-228
2B-222a 2B-223
2B-207b
2B-207a
2C-219
2C-220
2D-211
2B-230a 2B-230
2B-231 2B-238a
2B-238
2B-238b
C2-15-1
2B-232 2B-233
2B-211 2B-234 2B-255a
2B-256
2B-254
2B-254c 2B-237
2B-236 2B-253
C2-13-1
2B-255 2B-235
2B-225
2B-254b
2B-251a
2B-251
2B-249 2B-248
2B-242
2B-240
2B-2502B-239
2B-241
2B-243
2B-245b 2B-245a
2B-245
2B-244a
2B-242b
2B-244b
2B-246
C2-18-12B-247a
2B-247
2B-247
C
C
C2-21-1
C
C
C2-21a-1
2B-251b
2B-246a
2B-201d
2C-243b2C-243a
2C-247a
2C-260a
2C-204
C2-42a-1
2D-228
2D-227
2D-227a
2D-226
2D-226a
2C-268
2B-201c 2B-201
2B-201B 2B-201a
C1-10a-01
2B-227b
V2-02-01
2C-250b
2D-290
2C-260b
2B-202b
2B-202c
REFLECTED
ACCESS
PANEL
PANEL
ACCESS
REFLECTED
REFLECTEDACCESS
PANEL
203 SF188 SF
379 SF606 SF
119 SF127 SF219 SF
1 SQ. FT.
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SQ
FT
SF
1, SF
SF
SF35
SF
SF
SF
S
F
SF
SF
SF
SF
SF
SF
SF
101 SF 230 SF 77 SF
223 SF
161 SF
542 SF
663 SF
94 SF
108 SF
662 SF
1,106 SF
667 SF
110 SF
115 SF
666 SF
656 SF35 SF
573 SF
73 SF
482 SF
82 SF
274 SF
70 SF
165 SF599 SF
74 SF
33 SF
480 SF
112 SF######
582 SF
585 SF
351 SF
569 SF
1,194 SF
504 SF
579 SF954 SF
336 SF
526 SF
407 SF
98 SF
272 SF
179 SF
676 SF
217 SF
1,511 SF
216 SF
214 SF 213 SF 212 SF 125 SF
210 SF
731 SF
545 SF
1,511 SF
545 SF
61 SF94 SF
214 SF 214 SF 117 SF
123 SF
369 SF
31 SF 42 SF
324 SF
288 SF
104 SF
286 SF
26 SF
211 SF 215 SF
209 SF
43 SF
80 SF
243 SF
64 SF
257 SF
216 SF
215 SF
251 SF
294 SF
112 SF
300 SF
112 SF
141 SF
55 SF
55 SF
140 SF
534 SF3 SF
364 SF17 SF
15 SF
397 SF
167 SF
548 SF
30 SF
50 SF
213 SF
3 SF
66 SF
60 SF
69 SF
80 SF
120 SF
297 SF
2,942 SF
562 SF
183 SF
275 SF
165 SF
507 SF
100 SF 111 SF
184 SF
90 SF
24 SF
37 SF
24 SF
107 SF 1 SF
702 SF
2 SQ. FT.
73 SF103 SF
131 SF
134 SF
85 SF
115 SF
132 SF
171 SF
2 SF
14 SF
12 SF
14 SF
453 SF
21 SF
112 SF115 SF112 SF
294 SF489 SF
696 SF
677 SF
484 SF
422 SF
305 SF
107 SF106 SF99 SF
587 SF
18 SF
691 SF
3 SF
167 SF
202 SF
110 SF
104 SF
117 SF
63 SF
103 SF
301 SF
121 SF
167 SF
338 SF
95 SF
98 SF102 SF
127 SF
129 SF
151 SF
129 SF
121 SF
116 SF
115 SF
119 SF
142 SF
150 SF
45 SF
66 SF
157 SF
134 SF
124 SF128 SF
3 SF
790 SF
229 SF
88 SF 111 SF
71 SF
139 SF
118 SF
128 SF
160 SF
201 SF
285 SF
250 SF
61 SF 247 SF
144 SF
12 SF
912 SF
2,589 SF
1,174 SF
1,521 SF
311 SF
1,375 SF150 SF
106 SF
213 SF
169 SF
81 SF
103 SF 128 SF
47 SF
2 SF
15 SF
13 SF
38 SF40 SF43 SF
218 SF
187 SF
243 SF
124 SF
402 SF
930 SF
182 SF
4 SF 611 SF
1,311 SF
99 SF
1,497 SF370 SF
150 SF
213 SF
396 SF
124 SF 124 SF
184 SF
124 SF 124 SF
156 SF
120 SF
61 SF
3 SF572 SF
124 SF
132 SF
99 SF
117 SF121 SF
117 SF
168 SF
120 SF
116 SF
115 SF
119 SF
96 SF
89 SF
92 SF
143 SF
90 SF
141 SF
396 SF
94 SF 102 SF
49 SF
102 SF
102 SF
49 SF
102 SF
17 SF802 SF
102 SF
105 SF
599 SF
123 SF
107 SF 111 SF
227 SF
180 SF
29 SF
50 SF
176 SF
15 SF
47 SF
102 SF
254 SF
98 SF
50 SF
82 SF
77 SF
171 SF 340 SF 340 SF 347 SF
263 SF
265 SF
342 SF
3 SF
118 SF
142 SF
115 SF
109 SF
118 SF
112 SF 47 SF
194 SF
340 SF15 SF
126 SF
17 SF
89 SF
239 SF
38 SF
185 SF
384 SF 4 SF
200 SF
342 SF343 SF342 SF
50 SF
90 SF
104 SF
29 SF
82 SF
99 SF
29 SF
87 SF
96 SF
13 SF659 SF
48 SF
15 SF377 SF
4 SF
4 SF
42 SF
230 SF
96 SF100 SF
2,934 SF
97 SF104 SF104 SF
101 SF
2,934 SF
122 SF95 SF 126 SF 117 SF
123 SF 128 SF
501 SF
105 SF102 SF104 SF
37 SF 98 SF
81 SF
276 SF
164 SF
335 SF
160 SF
155 SF
116 SF
132 SF
114 SF
155 SF 155 SF
172 SF 110 SF
334 SF
70 SF
122 SF
40 SF
789 SF
176 SF
146 SF
98 SF 89 SF
242 SF
56 SF
227 SF
122 SF 91 SF
90 SF 78 SF
60 SF
235 SF
261 SF
41 SF
79 SF
79 SF 74 SF
364 SF
92 SF
79 SF
77 SF
2 SF
111 SF
97 SF
82 SF
129 SF
47 SF
83 SF
78 SF89 SF
307 SF
192 SF
45 SF 43 SF
243 SF
158 SF
42 SF
66 SF
333 SF
189 SF3 SF
1,650 SF
1,650 SF
SF
SF
168 SF
SF
SF
30 SF
33 SF
26 SF
32 SF
74 SF76 SF
145 SF
69 SF
683 SF
488 SF
98 SF
143 SF
304 SF
822 SF
96 SF
112 SF
68 SF 140 SF
101 SF 82 SF
55 SF
16 SF
143 SF
93 SF
7 SF
75 SF
104 SF
159 SF
O W A
STAGECL
tile area tile area closer
H e a d
E n d
STAGE
CR
P
PC
R
PP
AUTO
P P
C R
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT. VA COR SHALL APPROVE DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
ICRA NOTES - REMOVAL
1. PROVIDE TEMPORARY / PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY INDICATED ON PLANS. CONTRACTOR
SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.
2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS
SHALL AUTOMATICALLY LOCK UPON CLOSURE.
3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL
ICRA DOORS.
4. ALL ICRA PARTITIONS SHALL BE WALL TYPE "T.1". REFER TO AE300 FOR MORE INFORMATION.
5. CONTRACTOR SHALL COMPLY WITH NFPA 241 FOR DURATION OF DEMOLITION AND CONSTRUCTION.
ICRA NOTES - GENERAL
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD & PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR
IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. THE CONTRACTOR SHALL USE TEMPORARY PRESSURE SENSORS CONNECTED TO THE BUILDING AUTOMATION SYSTEM (BAS)- REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. THE CONTRACTOR SHALL TRACK, TREND, AND ALARM PROJECT AREA PRESSURE TO ENSURE PROOF OF NEGATIVE PRESSURE
ENVIRONMENT AT ALL TIMES UNTIL APPROVED BY VA COR TO REMOVE.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING
A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH
TIME THE WORKER EXITS THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
8. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630. CONTRACTOR SHALL REMOVE CONSTRUCTION WASTE IN CONTAINERS SMALL ENOUGH TO MAINTAIN CORRIDOR EGRESS FOR DAILY VA HOSPITAL
FUNCTIONS.
9. CONTRATOR SHALL USE THE EXISTING SERVICE ELEVATORS FOR MATERIAL LOADING AND WASTE REMOVAL. CONTRACTOR SHALL COORDINATE AND USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS
THROUGH THE FACILITY.
10. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
ICRA NOTES - CONSTRUCTION
TO
B
LD
G
100TO BLDG 100
4'
0"
8' - 6"
ICRA MATRIX
CONSTRUCTION PROJECT TYPE
A B C D
LOW I II II III
MEDIUM I II III IV
HIGH I II III IV
HIGHEST II III III IV
PATIENT
RISK GROUP
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
PRIOR TO START OF WORK IN THESE AREAS, GC
SHALL CONSULT WITH VA COR TO ENSURE
PERMITS ARE OBTAINED AND ICRA
REQUIREMENTS ARE MET AND MAINTAINED
DURING CONSTRUCTION.
ICRA LEGEND
ICRA BARRIER
ICRA KEYNOTE
TAG
F
CONSTRUCTION
FENCE
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON
COMPLETION OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE
FREE OF CONTAMINANTS AND LOOSE MATERIAL.
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
3. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
4. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN
SPECIFICATIONS.
5. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
C
LA
S
I
ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO
OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G.,
MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).
2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE
LEAVING THE WORK AREA.
3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE
HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM
TO ADDRESS DIFFUSER ISOLATION.
4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING
STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A
WEEK OR ISOLATED FROM THE MAIN SYSTEM.
5. SEAL DOORS TO PREVENT DUST MIGRATION.
6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY
CLEANING AND DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN
IDENTIFIED EXIT ROUTE.
7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA
MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS
PRIOR TO REMOVAL FROM THE AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST
BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION
AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF
VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK
AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY
AND WHEN VISIBLY SOILED.
MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP
MOPPING OR HEPA VACUUMING SURFACES AT LEAST DAILY.
C
LA
II
ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241
REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS
REMOVED, TO THE DECK ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE
COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS
MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK
ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND
CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE
FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE
ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED
OUTDOORS, OR COMPLY WITH THE ALTERNATIVE METHOD OUTLINED IN
APPENDIX A OF THIS DOCUMENT. THESE CONTROL MEASURES MUST BE
MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. HEPA
FILTERED EXHAUST IF DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE AT
A DISTANCE OF 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND
OPERABLE WINDOWS. EXHAUSTING DISCHARGED AIR INTO SHARED OR
RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.,
BATHROOM EXHAUST) IS PROHIBITED.
INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC,
MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO
CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN
THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND
ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR
FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND
CONTROL MEASURES.
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
3. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL
REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE
BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN
PERFORMED. ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.
4. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A
MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN
REMOVING HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA
VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD
BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
5. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE
WORK AREA.
6. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION
EQUIPMENT) MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD
AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM
THE WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.
7. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
8. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
9. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL
AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.
10. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
C
LA
III
ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL
BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE
CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS’ PPE AND CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF
VISIBLE DUST BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA
VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.
WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN
ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM
TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE
CHANGED IMMEDIATELY.
C
LA
IV
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
AuthorChecker
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 01 2ND FLOOR ICRA PLAN
01-GC403
-2
-1
-G
C
/2
/2
.p d f
1" = 30'-0"A13
BUILDING 01 - OVERALL ICRA PLAN - 2ND FLOOR
N
PLAN
NORTH
N
TRUE
NORTH
EF-PACU
EQ
U
IP
M E N T
SU
P P O R T R
AILS
SU
P P O R T R
AILS
EQ
U
IP
M E N T
M
AT
C H
LI
N E
2" PTR
2" PTR
PTR
PTR
EV
EV
3" PTR 2" PTR 2" PTR
EC
PMM
40' H
EC
SC
PMM
10' H
SC
SC
LOW
HOOD
SC
CONDUIT
SKYLIGHT
LOW
ROOF
EC
ED
ED
ED
OPEN
EC
ED
M
M
CANOPY
VTR
VTR
VTR VTR
VTR
VTRVTR
VTR
VTR
VTR VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
W
ALK
W
AY
P
AD
S
WALK PADS
SLOPE DOWN SLOPE DOWN
SLOPE DN.
SLOPE DN.
SLOPE DN.
SLOPE DN.
SLOPE DN.
SLOPE DN.
SLOPE DN.
SLOPE DN.
SLOPE DN.
SLOPE DN.
1/4"/FT
1/4"/FT
1/4"/FT
1/4"/FT
1/4"/FT
1/4"/FT
1/4"/FT
1/4"/FT
1/4"/FT
1/4"/FT
1/4"/FT
SLOPE DN.
1/4"/FT
SLOPE DN.
SLOPE DN.
1/4"/FT
SLOPE DN.1/4"/FT
1/4"/FT SLOPE DN.
SLOPE DN.
1/4"/FT
SLOPE DOWN SLOPE DOWN
SLOPE DOWN SLOPE DOWN
SL
O P E D O W N
1/
4"
FT
SL
OP
E
DN
1/ 4" /F T
SLOPE DN.
1/4"/FT
1/ 4" /F T
SL
OP
E
DN
1/4"/FT
SLOPE DN.
R .D
S.R .D
S.R .D
R .D
R .D
S.R .D
R .D
S.R .D
R .D
S.R .D
R .D
S.R .D
S.R .D
R .D
S.R .D
R .D
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RDRD
RD
RD
RD
RD
RD
RD
RD
RD
RD RD RD
RD
RD
RD RD
RD RD
RDRDRD
RD
RD
RD
RD RD
RD RD
RD RD
RD
RD RD
RD
RD
RD
S.R.D.
R.D.
S.R.D.
R.D.
R .D
R .D
ROOF
HATCH
EF-OR1
EF-LAB3EF-LAB2
EF-OR2
EF-LAB-1
30"
EF
EF
EF
EF
30"EV
AHU-40
EF
10'H
EF
10'H
EF
EV
AHU-ED
EF
RF-7
STAIR
FE
FE
FE
FE
G
SAFETY
GLASS
UP
DN
UP
DN
D N
U P
MECHANICAL
ELECTRICAL
FIRE
SIGNAL
TELEPHONE
3 HEAD GAMMA
CAMERA
NUCLEAR
SCANNER
RECEPTION
LEAD
TECHNICIAN
CHIEF
CHIEF
TECHNOLOGIST
ELEVATOR LOBBY
ELECTRICAL
FIRE
CLEAN UTILITY
H.A.C.
OFFICE
AUTO CNTRS
RADIO IMMUNO.
ASST.
ELEVATOR LOBBY
NUCLEAR
MEDICINE
ELEVATOR LOBBY
NUCLEAR
MEDICINE
RESTROOM
RESTROOM
NUCLEAR
MEDICINE
FIRE
BREAK ROOM CLEAN LINEN
NUCLEAR
MEDICINE
CHIEF
GI CARE
OFFICE
DOCTOR
WORK ROOM
RESTROOM
EQUIPMENT
STORAGE
NURSE
MANAGER
DIRTY
UTILITY
RESTROOMRESTROOM
CLEAN AND
EQUIPMENT
ROOM
ELECTRICAL
FIRE
SIGNAL
TELEPHONE
STERIS MACHINE
H.A.C.
ELECTRICAL
FORMS STORAGE
RECEPTION/
CHARTING
MED. PREP.
DRESSING ROOM
TELEPHONE
SIGNAL
FIRE
STORAGE
BRONCH
GI PROCEDURE
ROOM #2
STORAGE
GI PROCEDURE
ROOM #3
PT POST
PROCEDURE
ICE MACHINE
RESTROOM
RECOVERY ROOM
RESTROOMRESTROOM
PRE PROCEDURE
PRE PROCEDURE
CATH RECOVERY
STORAGE RESTROOM RESTROOM RESTROOM
ELECTRICAL
STORAGE
STORAGE
GI PROCEDURE
ROOM #4
GI PROCEDURE
ROOM #1
PODIATRY
SURGERY/GU
CLEAN STORAGE
MECHANICALSURGICAL
PROCEDURE
ROOM 3
SHARED
CONFERENCEWAITING ROOM
CORRIDOR
C O R R
ID
O R
CORRIDORCORRIDOR
C O R R
ID
O R
RECOVERY
RR/CHNG
RR/CHNG
NURSE SUP.
OFFICE
MECHANICAL
STORAGE
DIRTY
FAMILY WAITING
COPIER
OFFICE
NURSING
STATION
OFFICE
WOMEN'S
RR/CHNG
STORAGE
MEN'S
RR/CHNG
STORAGE
TELECOMRESTROOM
ANESTHES.
STORAGE H.A.C.
RESTROOM
EXAM ROOM
EXAM ROOMEXAM ROOM
EXAM ROOMEXAM ROOMEXAM ROOMEXAM ROOM
PROCEDURE
ROOM
PROCEDURE
ROOM
PROCEDURE
ROOM
STERILE
STORAGE
PROCEDURE
ROOM
PROCEDURE
ROOM
GI WORK ROOM
3B-313
3B-312a
3B-312b
3B-312c
3B-312d
3B-312
3B-308
3B-314
3B-316 3B-307a
3B-306
3B-306b
3B-306a
3B-305
3A-3xx
3B-304
3B-319
3B-320a
3B-301
3B-322 3B-321
3B-320
####### 3B-318
3B-317
3B-315
3A-336 3A-334
3A-335
3A-340a
3A-338
3A-337
3A-333
3A-302a
3A-302 3A-369
3A-339
3A-341
3A-342a
3A-366a
3A-3673A-3683A-370
3A-368a3A-301a
3A-301
3A-314
3A-325c 3A-325d
3A-325e
3A-351a
3A-356
3A-359
3A-344a
3A-344
3A-344b
3A-364
3A-348e
3A-348a
3A-348c
3A-353a
3A-353
3A-354
3A-355a 3A-355
3A-357
3A-358
3A-361a
3A-361
3A-3623A-363a
3A-365 3A-366
3A-363
3A-343 3A-345a 3A-346 3A-347a
3A-348b
3A-351a
3A-352a
3A-352
3A-351
3A-350
3A-349
3A-3483A-347 3A-345
3A-340
C3-01-1
C 3-
4a
C3-04-1C3-03-1
C 3-
3A-328a
3A-328d
3A-328e
3A-335
3A-326
3A-328b
3A-325
3A-332
3A-331
3A-330
3A-311
3A-300
3A-329 3A-322a
3A-320
3A-322b
3A-310a 3A-310b3A-315
3A-316
3A-307
3A-305
3A-303
3A-3043A-306
3A-3083A-3093A-3123A-313 3A-317
3A-318
3A-319
3A-321
3A-323
3A-324
3A-342
NURSING
60 SF
B D
W
- H
E
AT
IN
G
B D
W
- CO
O
LIN
G
B D
W
- CO
O
LIN
G
OA
OA
SL
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT. VA COR SHALL APPROVE DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
ICRA NOTES - REMOVAL
1. PROVIDE TEMPORARY / PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY INDICATED ON PLANS. CONTRACTOR
SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.
2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS
SHALL AUTOMATICALLY LOCK UPON CLOSURE.
3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL
ICRA DOORS.
4. ALL ICRA PARTITIONS SHALL BE WALL TYPE "T.1". REFER TO AE300 FOR MORE INFORMATION.
5. CONTRACTOR SHALL COMPLY WITH NFPA 241 FOR DURATION OF DEMOLITION AND CONSTRUCTION.
ICRA NOTES - GENERAL
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD & PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR
IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. THE CONTRACTOR SHALL USE TEMPORARY PRESSURE SENSORS CONNECTED TO THE BUILDING AUTOMATION SYSTEM (BAS)- REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. THE CONTRACTOR SHALL TRACK, TREND, AND ALARM PROJECT AREA PRESSURE TO ENSURE PROOF OF NEGATIVE PRESSURE
ENVIRONMENT AT ALL TIMES UNTIL APPROVED BY VA COR TO REMOVE.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING
A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH
TIME THE WORKER EXITS THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
8. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630. CONTRACTOR SHALL REMOVE CONSTRUCTION WASTE IN CONTAINERS SMALL ENOUGH TO MAINTAIN CORRIDOR EGRESS FOR DAILY VA HOSPITAL
FUNCTIONS.
9. CONTRATOR SHALL USE THE EXISTING SERVICE ELEVATORS FOR MATERIAL LOADING AND WASTE REMOVAL. CONTRACTOR SHALL COORDINATE AND USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS
THROUGH THE FACILITY.
10. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
ICRA NOTES - CONSTRUCTION
ICRA MATRIX
CONSTRUCTION PROJECT TYPE
A B C D
LOW I II II III
MEDIUM I II III IV
HIGH I II III IV
HIGHEST II III III IV
PATIENT
RISK GROUP
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
PRIOR TO START OF WORK IN THESE AREAS, GC
SHALL CONSULT WITH VA COR TO ENSURE
PERMITS ARE OBTAINED AND ICRA
REQUIREMENTS ARE MET AND MAINTAINED
DURING CONSTRUCTION.
ICRA LEGEND
ICRA BARRIER
ICRA KEYNOTE
TAG
F
CONSTRUCTION
FENCE
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON
COMPLETION OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE
FREE OF CONTAMINANTS AND LOOSE MATERIAL.
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
3. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
4. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN
SPECIFICATIONS.
5. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
C
LA
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO
OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G.,
MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).
2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE
LEAVING THE WORK AREA.
3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE
HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM
TO ADDRESS DIFFUSER ISOLATION.
4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING
STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A
WEEK OR ISOLATED FROM THE MAIN SYSTEM.
5. SEAL DOORS TO PREVENT DUST MIGRATION.
6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY
CLEANING AND DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN
IDENTIFIED EXIT ROUTE.
7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA
MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS
PRIOR TO REMOVAL FROM THE AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST
BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION
AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF
VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK
AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY
AND WHEN VISIBLY SOILED.
MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP
MOPPING OR HEPA VACUUMING SURFACES AT LEAST DAILY.
C
LA
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241
REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS
REMOVED, TO THE DECK ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE
COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS
MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK
ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND
CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE
FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE
ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED
OUTDOORS, OR COMPLY WITH THE ALTERNATIVE METHOD OUTLINED IN
APPENDIX A OF THIS DOCUMENT. THESE CONTROL MEASURES MUST BE
MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. HEPA
FILTERED EXHAUST IF DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE AT
A DISTANCE OF 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND
OPERABLE WINDOWS. EXHAUSTING DISCHARGED AIR INTO SHARED OR
RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.,
BATHROOM EXHAUST) IS PROHIBITED.
INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC,
MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO
CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN
THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND
ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR
FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND
CONTROL MEASURES.
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
3. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL
REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE
BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN
PERFORMED. ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.
4. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A
MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN
REMOVING HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA
VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD
BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
5. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE
WORK AREA.
6. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION
EQUIPMENT) MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD
AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM
THE WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.
7. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
8. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
9. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL
AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.
10. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
C
LA
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL
BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE
CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS’ PPE AND CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF
VISIBLE DUST BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA
VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.
WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN
ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM
TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE
CHANGED IMMEDIATELY.
C
LA
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
AuthorChecker
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 01 3RD FLOOR ICRA PLAN
01-GC404
-2
-1
-G
C
/2
/2
.p d f
1" = 30'-0"A13
BUILDING 01 - OVERALL ICRA PLAN - 3RD FLOOR
N
PLAN
NORTH
N
D W
#1
D W
#2
UP
DN DN
UP
D N
U P tub
C O R R
ID
O R
ST
A
IR
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O
RST
A
IR
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
BREAK ROOM 2 BED ROOM
2 BED ROOM 4 BED ROOM MED ROOM
RESTROOM
SOCIAL WORK
CLEAN SUPPLY
RESTROOMFIRE
TELEPHONE
SIGNAL
RESTROOMRESTROOM
RESTROOM
SOILED UTILITY
RESTROOM
RESTROOM
4 BED ROOM
RESTROOM
ICE MACHINE
H.A.C.
RESTROOM
NUTRITION
ELECTRICAL
NURSE STATION
CORRIDOR
4 BED ROOM
1 BED ROOM
RESTROOM
1 BED ROOM
RESTROOM
RESTROOM
4 BED ROOM
RESTROOM
ELECTRICAL
RESTROOM
RESTROOM
RESTROOM
SOCIAL WORK
OFFICE
SUPPLY
TELEMETRYWAITING
ASSIST. CHIEF
NURSE ACUTE CARE
ELEVATOR LOBBY
OFFICE
RESTROOM
CORRIDOR
RESTROOM RESTROOM
MED ROOM
NURSE
MANAGER
2 BED ROOM
1 BED ROOM1 BED ROOM1 BED ROOMCHIEF ACUTE
CARE NURSING
SOILED
UTILITY
RESTROOMRESTROOMRESTROOMRESTROOMRESTROOM
ICE MACHINE
H.A.C.
ELECTRICAL DRUG STORAGE
NURSE STATION
MENS SHOWER
WOMENS SHOWER
PYXIS SOCIAL
WORKER
CORRIDOR
BREAK ROOM DECEDANT
AFFAIRS
FIRE
CORRIDOR
ELEVATOR LOBBY
RESTROOM
RESTROOM
RESTROOM
RESTROOM
1 BED ROOM
RESTROOM
RESTROOM RESTROOM RESTROOM
ELECTRICAL
1 BED ROOM
RESTROOM
1 BED ROOM
1 BED ROOM
RESTROOM
1 BED ROOM1 BED ROOM1 BED ROOM
2 BED ROOM
CLEAN
NURSE MANAGER
4 BED ROOM
4 BED ROOM
4 BED ROOM
4 BED ROOM
4 BED ROOM
4 BED ROOM
2 BED ROOM
ACUTE CARE
MED SURG
CASE WORKER
PHYSICIAN
OFFICE
SURGICAL
CARE
NUTRITIONAL
SUPPORT
FIRE
SIGNAL
TELEPHONE
RESTROOM COFFEE NOOK
WAITINGFIRE
CLEAN UTILITY
DIETETIC CLOSET
ELECTRICAL
ELEVATOR LOBBY
EQUIPMENT
STORAGE
MEDICAL
DIRECTOR
ON CALL#######
SOILED UTILITY
CLEAN UTILITY
H.A.C.
CORRIDOR CORRIDORKITCHEN
STAFF LOUNGE
BLOOD GAS
CONSULTING ROOM
NURSE MANAGER
STAIR #3
MECHANICAL
CORRIDOR
RESTROOM
RESTROOM
FIRE
SIGNAL
TELEPHONE
ELECTRICAL
PATIENT
ROOM #12
PATIENT
ROOM #11
PATIENT
ROOM #10
ISOLATION
PATIENT
ROOM #9
ISOLATION
PATIENT
ROOM #8
ISOLATION
PATIENT
ROOM #7
ISOLATION
PATIENT
ROOM #6
PATIENT
ROOM #5
NURSE STATION
CORRIDOR
PATIENT
ROOM #4
PATIENT
ROOM #3
PATIENT
ROOM #2
PATIENT
ROOM #1
CLEAN SUPPLY
DECEDANT
AFFAIRS
C 6-
S4 1-
C 8-
C
C 4-
1S4 2-
C 2-
C 9-
C
C
C
4A-440 4A-443 4A-446 4A-447 4A-448
4A-449a
4A-449
4A-450
4A-450a4A-448c 4A-448e
4A-448d
4A-446a4A-443a
4A-452a
4A-451
4A-451a
4A-453a
4A-453
4A-454a 4A-458
4A-456
4A-452
4A-464
4A-459
4A-444
C4-05-1
4A-454
4A-455
4A-455a
4A-457
4A-457a
4A-460a
4A-460
4A-462
4A-448b
4A-447a
4A-437
4A-438
4A-440a
4A-439 4A-441
4A-442b4A-442a
4A-469
4A-435
4A-402
4A-468a
C4-07-1
4A-466a 4A-465a
4A-463a
4A-463
4A-465 4A-4664A-4674A-4684A-4704A-401
4A-401a4A-404a4A-406a4A-4114A-413a
4A-415
4A-416
4A-414 4A-408a
4A-408
4A-421
4A-421a 4A-430 4A-432
C4-03-1
4A-407 4A-402b
4A-402a C4-01-1
4A-436
4A-419a
4A-420a
4A-422a
4A-423a
4A-424
4A-424a
4A-426a 4A-427 4A-428a
4A-426b
4A-425
4A-418a
4A-418
4A-417
4A-417a
4A-4034A-4044A-405
4A-406
4A-410b
4A-410 4A-413
4A-419
4A-420
4A-422
4A-423
4A-426 4A-428
4A-431
4A-434
4A-434a
4A-425c 4A-425d
4A-425e
4B-424 4B-423b
4B-4234B-421
4B-425
4B-422
4B-402
4B-401
4B-403
4B-404
4B-406#######
4B-407 4B-418
4B-408
C4-15-1 C4-16-14B-411b
4B-411
4B-420 4B-423a
4B-419
S4-03-1
4B-412
C4-12-1
4B-410 4B-409
4B-415
4B-414
4B-413
4B-416
4B-417l
4B-417k
4B-417j
4B-417i
4B-417h
4B-417g 4B-417f4B-417e
4B-417
C4-13-1
4B-417d4B-417c 4B-417b
4B-417a
4A-429
4A-433
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT. VA COR SHALL APPROVE DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
ICRA NOTES - REMOVAL
1. PROVIDE TEMPORARY / PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY INDICATED ON PLANS. CONTRACTOR
SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.
2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS
SHALL AUTOMATICALLY LOCK UPON CLOSURE.
3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL
ICRA DOORS.
4. ALL ICRA PARTITIONS SHALL BE WALL TYPE "T.1". REFER TO AE300 FOR MORE INFORMATION.
5. CONTRACTOR SHALL COMPLY WITH NFPA 241 FOR DURATION OF DEMOLITION AND CONSTRUCTION.
ICRA NOTES - GENERAL
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD & PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR
IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. THE CONTRACTOR SHALL USE TEMPORARY PRESSURE SENSORS CONNECTED TO THE BUILDING AUTOMATION SYSTEM (BAS)- REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. THE CONTRACTOR SHALL TRACK, TREND, AND ALARM PROJECT AREA PRESSURE TO ENSURE PROOF OF NEGATIVE PRESSURE
ENVIRONMENT AT ALL TIMES UNTIL APPROVED BY VA COR TO REMOVE.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING
A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH
TIME THE WORKER EXITS THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
8. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630. CONTRACTOR SHALL REMOVE CONSTRUCTION WASTE IN CONTAINERS SMALL ENOUGH TO MAINTAIN CORRIDOR EGRESS FOR DAILY VA HOSPITAL
FUNCTIONS.
9. CONTRATOR SHALL USE THE EXISTING SERVICE ELEVATORS FOR MATERIAL LOADING AND WASTE REMOVAL. CONTRACTOR SHALL COORDINATE AND USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS
THROUGH THE FACILITY.
10. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
ICRA NOTES - CONSTRUCTION
ICRA MATRIX
CONSTRUCTION PROJECT TYPE
A B C D
LOW I II II III
MEDIUM I II III IV
HIGH I II III IV
HIGHEST II III III IV
PATIENT
RISK GROUP
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
PRIOR TO START OF WORK IN THESE AREAS, GC
SHALL CONSULT WITH VA COR TO ENSURE
PERMITS ARE OBTAINED AND ICRA
REQUIREMENTS ARE MET AND MAINTAINED
DURING CONSTRUCTION.
ICRA LEGEND
ICRA BARRIER
ICRA KEYNOTE
TAG
F
CONSTRUCTION
FENCE
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON
COMPLETION OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE
FREE OF CONTAMINANTS AND LOOSE MATERIAL.
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
3. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
4. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN
SPECIFICATIONS.
5. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
C
LA
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO
OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G.,
MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).
2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE
LEAVING THE WORK AREA.
3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE
HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM
TO ADDRESS DIFFUSER ISOLATION.
4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING
STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A
WEEK OR ISOLATED FROM THE MAIN SYSTEM.
5. SEAL DOORS TO PREVENT DUST MIGRATION.
6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY
CLEANING AND DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN
IDENTIFIED EXIT ROUTE.
7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA
MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS
PRIOR TO REMOVAL FROM THE AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST
BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION
AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF
VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK
AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY
AND WHEN VISIBLY SOILED.
MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP
MOPPING OR HEPA VACUUMING SURFACES AT LEAST DAILY.
C
LA
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241
REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS
REMOVED, TO THE DECK ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE
COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS
MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK
ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND
CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE
FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE
ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED
OUTDOORS, OR COMPLY WITH THE ALTERNATIVE METHOD OUTLINED IN
APPENDIX A OF THIS DOCUMENT. THESE CONTROL MEASURES MUST BE
MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. HEPA
FILTERED EXHAUST IF DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE AT
A DISTANCE OF 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND
OPERABLE WINDOWS. EXHAUSTING DISCHARGED AIR INTO SHARED OR
RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.,
BATHROOM EXHAUST) IS PROHIBITED.
INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC,
MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO
CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN
THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND
ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR
FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND
CONTROL MEASURES.
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
3. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL
REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE
BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN
PERFORMED. ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.
4. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A
MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN
REMOVING HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA
VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD
BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
5. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE
WORK AREA.
6. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION
EQUIPMENT) MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD
AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM
THE WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.
7. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
8. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
9. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL
AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.
10. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
C
LA
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL
BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE
CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS’ PPE AND CLEANING.
This is the start of the file's text. The full file is on GovTribe.