Attachment 5 - Drawings Vol 1 Part3.pdf

PDF 38 MB Posted

Attached to
Z2DA--673-20-107 EHRM Infrastructure Upgrades Construction Tampa, FL
Solicitation number
36C77625R0092-RFP
Issued by

About this file

This file contains architectural drawings and construction documents for the EHRM Infrastructure Upgrades project at James A. Haley Veterans Hospital in Tampa, Florida (Project 673-20-107). The drawings include floor plans, ICRA (Infection Control Risk Assessment) plans, reflected ceiling plans (RCP), life safety plans, and detailed sections covering basement through seventh floor levels of Building 01. The documents show comprehensive demolition and new construction work with detailed room-by-room layouts, including operating rooms, patient rooms, support spaces, mechanical systems, and utility infrastructure. Key construction elements include new temporary construction rooms (TRs), ICRA barriers with specific infection control protocols, 2-hour fire-rated floor infills, and extensive mechanical, electrical, and plumbing modifications throughout the facility.

The architectural documentation specifies detailed ICRA (Infection Control Risk Assessment) requirements for construction activities in an active hospital environment, with classifications for patient risk groups and corresponding control measures ranging from Class I (minimal precautions) through Class IV (maximum containment with negative air pressure and extensive decontamination). Construction specifications mandate HEPA filtration, negative air pressure maintenance, anteroom requirements, protective equipment protocols, and daily waste removal outside patient care hours (0800-1630). The drawings identify specific demolition areas and new construction zones across multiple floors, with construction details showing wall types, door specifications, fire-rated assemblies, and mechanical/electrical system modifications necessary to support upgraded healthcare facility operations.

View the file

Other files

File Type Posted
4-15 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Final.pdf PDF
Tampa EHRM Addendum 2 Narrative.pdf PDF
673-107.32.Tech.pdf PDF
673-107.53.Tech.pdf PDF
Amendment 9 - 36C77625R0092 0009.pdf PDF
673-107.Trailer.pdf PDF
673-107. 0-TN002.pdf PDF
673-107.01.Tech.pdf PDF
673-107.36.Tech.pdf PDF
673-107.41.Tech.pdf PDF
673-107.68.Tech.pdf PDF
Amendment 8 - 36C77625R0092 0008.pdf PDF
Amendment 7 - 36C77625R0092 0007.pdf PDF
4-8 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 7.pdf PDF
Amendment 6 - 36C77625R0092 0006.pdf PDF
Calculations based on geo report_Sealed.pdf PDF
Amendment 5 - 36C77625R0092 0005.pdf PDF
Revised 2.8 and 2.9 Tampa.pdf PDF
3-31 RFI TRACKING SHEET No.14 - SOLICITATION 36C77625R0092 Amend 5.pdf PDF
01 32 16.15- Project Schedules-Small Projects.pdf PDF
010000 TIL General Specification - Tampa Specific.pdf PDF
Tampa EHRM Addendum 1 Narrative.pdf PDF
Amendment 4 - 36C77625R0092 0004.pdf PDF
03-27-2026 Addendum 1 Combined Drawings.pdf PDF
Amendment 3 - 36C77625R0092 0003.pdf PDF
PKI Readers.pdf PDF
3-27 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 3.pdf PDF
Amendment 2 - 36C77625R0092 0002.pdf PDF
Amendment 1 - 36C77625R0092 0001.pdf PDF
Site Visit Attendance - Tampa EHRM.pdf PDF
Attachment 1 - Spec Vol 1 - R1.pdf PDF
Attachment 6 - Drawings Vol 1 Part4.pdf PDF
Attachment 9 - Drawings Vol 2 Part2.pdf PDF
Attachment 11 - Drawings Vol 2 Part4.pdf PDF
Attachment 12 - Drawings Vol 3.pdf PDF
Attachment 19 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 3 - Drawings Vol 1 Part1.pdf PDF
Attachment 7 - Drawings Vol 1 Part5.pdf PDF
Attachment 10 - Drawings Vol 2 Part3.pdf PDF
Attachment 14 - Construction Wage Rates - Hillsborough 1-2-2025.pdf PDF
RFP - 36C77625R0092.pdf PDF
Attachment 2 - Spec Vol 2 - R1.pdf PDF
Attachment 15 - Limitations on Subcontracting Clause.docx DOCX document
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 20 - RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Project 673-20-107.xlsx XLSX spreadsheet
Attachment 4 - Drawings Vol 1 Part2.pdf PDF
Attachment 8 - Drawings Vol 2 Part1.pdf PDF
Attachment 13 - Brand Name Justification - Tampa_Redacted.pdf PDF
Attachment 17 - PPQ.docx DOCX document
Attachment 18 - Project Information Sheet for Contractors.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HEAD

HEAD

HEAD

ROOM

DIVIDER

ELECTRICAL

CLOSET

2D-232 m m

A R M

0m m

A

RM

0 0 m m

A R M90 0m m

AR

M

1300mm ARM

0m m

A R M

0m m

A R M

H E A D

00m m

ARM

m m

A R M

0 00 m m

A R M

00m m

A

RM

0m m

A R M

1 3 0 0 m m A R M

0m m

A R M

H E A D

H E A D

00m m

ARM

10 0 0m m

ARM

mm

AR

M

900mm ARM

1000mm

ARM

1 3 0 0 m m A R M

0m m

AR

M

0m m

AR

M mm AR M

900mmARM

1000mm

ARM

0 0 m m

A R M

1000mm ARM

1300mm ARM

H E A D

3 4 5

1 2

14151617

CR

IN EXIST. WALL

BELOW

5"x 3" T.S.

COL.

ANESTHESIA

BOOM

5 4

WEST

DUCT

SHAFT

ANESTHESIA

STORAGE

MED ALCOVE

UP

DN

UP

DN

DN

UP

U P

D N

DN

U P

D N

UP

UP

D O W N

CANOPY ROOF LEVEL

HOOD

SMOKE

BARRIERABOVE

CLG.

42" WALL w/18"ETCHEDGLASS

TOP

MECH

CHASE

MECH.

CHASE

TRANSPORT

TEAM

TRANSPORT

TEAM

SOILED CART

STORAGE

BREAK ROOM

RESTROOMOFFICEOFFICE

CORRIDOR

C O R R

ID

O R

C O R R

ID

O R C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

ST

A

IR

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

ST

A

IR

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

ST

A

IR

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

ST

A

IR

7C O R R

ID

O R

C O R R

ID

O R

GAS STORAGE SOIL HOLDING H.A.C.

EQUIPMENT

STORAGE

ALCOVE

EQUIPMENT

STORAGE

CORRIDOR

O.R. "B"

STERIS

SUB-STERILE

O.R. "A"

CLEAN CORE

O.R. "C"

SUB-STERILE

ANESTHESIA

LAB

O.R. "D"

CORRIDORH.A.C.

ANESTHESIA

WORKROOM

COMMUNICATIONS

EQUIPMENT

STORAGE

ELECTRICAL

FROZEN

SECTION

VESTIBULE

STAIR #22CORRIDOR

STORAGE

H.A.C.

OPERATING ROOM #4

STORAGE#######

OPERATING ROOM #5

OPERATING ROOM #6

OPERATING ROOM #3

OPERATING ROOM #7

STERILE CORE AREA

OPERATING ROOM #2

CORRIDORCORRIDOR

ELEVATOR LOBBY

ELEVATOR LOBBY

CORRIDOR

H.A.C.

GENERAL

STORAGE EMS

SURGERY

STORAGE

CARDIAC CATH. LAB #1

PATIENT ROOM #4

ISOLATION

CORRIDOR

PATIENT ROOM #5

ISOLATION

PATIENT ROOM #6 PATIENT ROOM #7 PATIENT ROOM #8 HEAD NURSE

PATIENT ROOM #9

CORRIDOR

NURSE STATION

CORRIDOR

NURSE STATION

RESTROOMON CALL

PATIENT ROOM #2 PATIENT ROOM #1 SOILED LINEN

CONSULT

SICU & SURGERY

WAITING ROOM

COMMUNICATIONSRESTROOM

LOUNGE

CLEAN LINEN

ELECTRICAL

EQUIPMENT

STORAGE

COMMUNICATION

PATIENT ROOM #15

ISOLATION

PATIENT ROOM #14

ISOLATION

ELECTRICAL

RESTROOM

RT WORK ROOM

PATIENT ROOM #13

H.A.C.

STORAGE

PATIENT ROOM #12

PATIENT ROOM #11

PATIENT ROOM #10

MENS

LOCKER ROOM

RESTROOM

WOMENS

LOCKER ROOM

RESTROOM

OFFICE

WOMENS

VESTIBULE

MENS

VESTIBULE

RECEPTION

CORRIDORFIRE

CORRIDORSIGNAL

TELEPHONE

PATIENT HOLDING

CONTROL ROOM

CARDIAC CATH. LAB #2

RESTROOM

SCRUB

SINK AREA

CONTROL ROOM

FIRE

ANESTHOLOGY

CARDIAC

CATH.

SURGERY

OFFICE

CARDIAC CATH.

SECRETARY

ANESTHOLOGY

ELECTRICAL

AUDITORIUM

CANTEEN

GENERAL STORAGE

CHAIR STORAGE

SWING SPACE

OFFICE

STAGE

STORAGE STORAGE

PROJECTION BOOTH

OFFICE

RESTROOM

H.A.C.

RESTROOM

OFFICE FIRE

CPAP

ELEVATOR LOBBY

PATIENT

REPRESENATIVE

STORAGE

CANTEEN STORAGE

CANTEEN RECEIVING

PATIENT REP

SUPERVISOR

PATIENT

REPPATIENT

REP

STAIR #3

FIRE

SIGNAL

TELEPHONE

ELECTRICAL

THERAPY

STORAGE

PERIOPERATIVE

OFFICE

PERIOPERATIVE

OFFICE

PERIOPERATIVE

OFFICE

ELECTRICALPICC NURSES/

HOSPITALIST

PROSTHETICS

DISPENSARY

CORRIDOR

ELEVATOR LOBBY

PATIENT

EDUCATION

ELECTRICAL

OFFICEOFFICEOFFICE

CORRIDOR

CLOSET

PROCEDURE ROOM

FIRE

STAIR #5

CONTROL ROOM

EQUIPMENT

MAIN COMPUTER

UPS EQUIP

ELECTRONICS

ELECTRICAL

SURGERY

CONFERENCE

OFFICE

BREAKROOM

SUPPLIES

SURGERY OFFICE

SURGERY OFFICEANESTHOLOGY MD

ANESTHOLOGY MD

SURGERY OFFICE

SURGERY OFFICE

ANESTHOLOGY MD

PHARMACY

SATELLITE

ANESTHOLOGY MD

ANESTHOLOGY MD

ANESTHOLOGY MD

ANESTHOLOGY

CHIEF

ANESTHOLOGY

SECRETARY

WOMENS

RESTROOM

MENS

RESTROOM

ANESTHOLOGY

CRNA

SURGERY OFFICE

SURGERY OFFICEANESTHOLOGY

PROGRAM

ASSISTANT

FIRE

CORRIDOR

VOLUNTARY

SERVICE WOMENS

RESTROOM

MENS

RESTROOM

D.A.V. OFFICE

D.A.V. OFFICE

VOLUNTARY

SERVICE

SECRETARY

VOLUNTARY

SERVICE

VOLUNTARY

SERVICEVOLUNTARY

SERVICE

ELECTRICAL

ELECTRICAL FLEA MARKET

VOLUNTARY

SERVICE COMMUNICATIONS

CORRIDOR

CANTEEN DINING

KITCHEN

FOOD COURT

PIZZA SHOP

RETAIL STOREKITCHEN STORAGE

LOCKER ROOM

GENERAL STORAGE

GENERAL STORAGE

OFFICE

REFRIGERATOR FREEZER

COMPUTER ROOM

FIRE

SIGNAL

TELEPHONE

H.A.C.WOMENS STAFF

RESTROOM

MENS STAFF

RESTROOM

CANTEEN OFFICE

KITCHEN

READING ROOM

REC. SERVICE

CHIEF

WORK ROOM

& STORAGE

PATIENT LIBRARY

LIBRARY OFFICE

FIRE CORRIDOR

MEDICAL LIBRARY

STORAGE

CHAPELCHANCEL

CONFERENCE ROOM

SACRISTY

CORRIDOR

CHAPLAIN CHAPLAIN

CORRIDOR

CHAPLAIN SECRETARY

AUDIOLOGY CHIEF

AUDIOLOGY

STORAGE

FIRE?CORRIDOR

WAITING

TRAINEES

TRAINEES

TREATMENT ROOMEUCH. PRAYER

AUDIOLOGY

STAIR #9

SECRETARY

SPEECH PATHOLOGY

CONTROL ROOM

BREAK ROOM

LAB

EXAM ROOM

EXAM ROOM

CONTROL ROOM

EXAM ROOM

CONTROL ROOM

CORRIDOR

1 BED ROOM 1 BED ROOM

RESTROOM

1 BED ROOM

1 BED ROOM

RESTROOM

1 BED ROOM

TELEPHONECORRIDOR

MEDICATION

SOILED UTILITY

CORRIDOR

CLEAN UTILITY

OFFICE CARITAS

CORRIDOR

NURSE STATION

RESTROOM

MEDICATION

NURSE STATION

SIGNAL

ELECTRICAL

STORAGE

RESTROOM

1 BED ROOM

OFFICE

CLEAN

STORAGE

CLASSROOM 4 BED ROOM 4 BED ROOM 4 BED ROOM

GI PROCEDURE

ROOM

GI PROCEDURE

ROOM

4 BED ROOM

FIRE

ADC/PAT

BLOOD DRAW

PRE-OP

EVALUATION ----

OFFICE MECHANICAL

OFFICE

OFFICETELEPHONE

SHOWER ROOM

TELEPHONE

TUB ROOM

RESTROOM

H.A.C.

OFFICE

CORRIDOR FIRE

STAIR #6

WAITING

ROOM

PAT ADMINFLOW CENTER

CLEAN LINEN

ADC/PAT

ADC/PAT

RESTROOM

ADC/PAT

ADC/PAT

RESTROOM

ADC/PAT

ADC/PAT

TELEPHONECORRIDOR

STORAGE

SIGNALCORRIDOR

FIRE

FIRE

RESTROOM

CLEAN

SUPPLY/MED

EQUIPMENT

STORAGE

SOILED UTILITY

PACU

POSITIVE

PRESSURE

ROOM 1

NEGATIVE

PRESSURE

ROOM 1

NEGATIVE

PRESSURE

ROOM 2

OFFICE

PACU

AORESIDENT

COORDINATOR

PROGRAM

SPECIALIST

PI/COMPLIANCE

3 PERSON

OFFICE

BREAK ROOM

CONFERENCE

SICUPLASTIC

SURGEON

2 PERSON

OFFICE

H.A.C. CHIEF

GENERAL

SURGERY

MENS

RESTROOM

SURGICAL SERVICE

CHIEF

RESIDENTS

ORTHO PA'S (6)

ORTHO

SURGERY

DOCTORS (2) GENERAL

SURGERY

DOCTORS (2)

WOMENS RESTROOM

CHIEF

ORTHO

SECRETARY

TO CHIEF

ORTHO

SURGERY

DOCTORS (3)

GENERAL

SURGERY

DOCTORS (2)

RESIDENTS NSQIP

SURGERY

ADMIN OFFICES

LOCKERS

RESTROOM

RECOVERY

OFFICE

OFFICE

OFFICE LOCKERS

BREAK ROOM

STAFF RESTROOM

CORRIDOR

CLEAN SUPPLY OFFICE

OFFICE OFFICE

WORKROOM

DIALYSIS

TRAINING

FAMILY

WAITING

PATIENT

RESTROOM

OFFICE

OFFICE EXAM

CORRIDOR

HAS CLERK

OFFICE

SCOOTER

ALCOVE

FAC

PERITONEAL

PERITONEAL

MEDS

OFFICE

TELECOM

H.A.C.

OFFICESOILED

HOLDING

R.O. TANKS

CLEAN SUPPLY

ISOL RESTROOM ISOL ANTE

ISOLATION

EQUIPMENT

WORKROOM

SIGNAL

EQUIPMENT

REPAIR

NURSE STATION

CORRIDORFAC

PATIENT

CUBICLES

PATIENT

CUBICLES

C O R R

ID

O R

C O R R

ID

O R

CORRIDOR

C O R R

ID

O R

C O R R

ID

O R

SCALE ALCOVE

CHARTING

ALCOVE

CRASH CART

ALCOVE

COMM

OFFICEOFFICE

OFFICE

SWING SPACE

CORRIDOR

ASSISTANT

NURSE MGR.

OFFICE

CONTROL

ROOM

STORAGE

ROOM

PROCEDURE

ROOM

EQUIPMENT

ROOM

STORAGE

RECEPTION

/CLERK

CHECK-IN &

WAITING

PATIENT

REP

PATIENT

REP

CORRIDOR

SCRUB

VESTIBULE

NURSE

MANAGER

ELEVATOR

CONTROL

CLOSET

MECHANICAL

OFFICE

2C-202a2C-202

2D-2892D-288

2D-2872D-2862D-285

C2-50-1

C 9-

C 0-

1 C 2-

C 7-

C 7-

S2 1-

C 5-

C 6-

C 9-

C 4-

C 2-a-

S2 2-

C 2-

C 9-

C

C 8-

C

C 1-

C 6-

C

C

S2 4-

C 2-a-

C 3-

C 0-

C 9-

C 7-

S2 7-

1C 4-

C 2-

2D-284 2D-283 2D-282 2D-281 2D-280

C2-51-1

2D-279

2D-278

2D-277

2D-275

2D-274

2D-273

2D-276

2D-272

2D-271

C2-53-12D-267

2D-265

2D-266

2D-268

2D-269

2D-270

V2-01-1

S2-22-1C2-41-1

2D-237a

2D-238

2D-236

2D-235######

2D-239

2D-240

2D-234

2D-241

2D-237

2D-233

C2-38-1C2-34-1

2D-202

2D-201

C2-35-1

2D-217

2D-203

2D-217b

2D-220

2D-252l

C2-44-1

2D-252k 2D-252j 2D-252i 2D-252h 2D-252g

2D-252f

C2-43-1

2D-252

C2-44-1

2D-252

2D-252p2D-288

2D-252q 2D-252r 2D-260

2D-257

2D-256

2D-256a 2D-256b

2D-253

2D-259

2D-258

2D-252t

2D-252s

2D-252u 2D-252v

Space

2D-253a

2D-252w

2D-252b

2D-252a

2D-252

2D-252c

2D-252d

2D-252e

2D-250 2D-249

2D-247

2D-248

2D-245

V2-03-01

V2-04-01

2D-246

C2-42-12D-255a C2-48-12D-255b

2D-255c

2D-221 2D-213c

2D-213

2D-221b

2D-221a

2D-212

2D-217a

2D-219

2D-219a

2D-219b

2D-209b

2D-209a

2D-204

2A-215

2A-244a

2A-215m

2B-201e

2B-202a

2A-215a

2A-215? 2A-215?

2A-215f

2B-205

2B-205a

2B-204

2B-203a

2B-203 2B-203b

2B-202

2A-242

2A-2432A-244c

2A-244

2A-245a 2A-245

2A-246 2A-246a

S2-03-1

2C-201b

2C-201c

2C-201d

2C-201a

2C-222

2C-222a

2C-222b2C-222c2C-222d

2C-222e2C-204a

2C-204b

C2-21-1

2C-201

2B-258

2B-257

2B-257b2B-257c2B-257d

C2-12-1

2C-276e

2C-276

2C-276c

S2-05-1

2C-276d

2C-276c

2C-276b

2D-215

2D-213a

2D-213b

2C-215

2C-213a

2C-213

2C-213b

2C-205a

2C-205b2C-205

2C-207

2C-214

2C-216

2C-209

2C-203

2C-206

2C-208

2C-210

2C-212

2D-207

2D-206

2D-205

2C-211

2C-218

2D-2102D-208

2D-209c C2-32-1

2A-215d

2A-203 2A-202

2A-240

2A-241

2A-215m

2A-215n

2A-215l

2A-215k

2A-215j

2A-213

2A-213a 2A-211

2A-215e 2A-215g

C2-01-1

2A-214

2A-205

2A-214a

2A-210

2A-2012A-209

2A-208

2A-207

2A-206

2A-205a

2A-205c 2A-205d

2A-205b

2A-213b

2A-213c 2A-213d

2A-2162A-2172A-218

2A-215a

2A-215b

2A-239b

2A-215c

2A-238a

2A-237

2A-238

2A-239a C2-03-1

2A-239

2A-237a

2A-2192A-219a

2A-224a

2A-224

C2-06-1

2A-223 2A-222

C2-05-1

2A-221 2A-220

2A-232a

2A-232

2A-232b 2A-231bC2-07-1

2A-230

2A-231

2A-231a 2A-2252A-228

2A-229

S2-09-1

2A-233

2A-234

2A-236b

2A-235 2A-236

2A-236a

2A-236c

2A-236d

2A-236e

2A-236f

C2-06-1

2C-275 2C-273

2C-271a

2C-271 2C-269

2C-267a

2C-267

2C-268aC2-28-1

2C-270

2C-255

C2-26-1

2C-253

2C-274 2C-272

C2-20-1

2C-250

2C-223c

2C-250a

2C-223

2C-255b 2C-255a

2C-257

2C-259

2C-265

2C-264

2C-249

2C-251

2C-252 2C-254 2C-256 2C-258

2C-260

2C-261

2C-263

2C-260a

2C-225

2C-224

2C-229

2C-248

2C-246

2C-231 2C-244a

2C-247

2C-2452C-244b

2C-244

2C-231a

2C-234

2C-241

2C-240

2C-243

C2-23-1 2C-242a

S2-06-1 2C-2422C-2392C-238

2C-237

2C-236

2C-235

2C-233

2C-232

2C-230

2C-228

2C-227

2C-226

2B-215aC2-13-1

2B-227b

2B-227aC2-15-1 2B-225a

2B-207c

2D-225j

2D-225h

2D-225e2D-225g

2D-225

2D-225a2D-225b2D-225c

2D-225d

2D-225

2B-2182B-219 2B-216 2B-214 2B-212 2B-209

2B-207

2B-2102B-2132B-215

2B-224a 2B-229

2B-217

2B-221

2B-222

2B-225

2B-226a

2B-228a

2B-224 2B-227

2B-220

2B-226 2B-228

2B-222a 2B-223

2B-207b

2B-207a

2C-219

2C-220

2D-211

2B-230a 2B-230

2B-231 2B-238a

2B-238

2B-238b

C2-15-1

2B-232 2B-233

2B-211 2B-234 2B-255a

2B-256

2B-254

2B-254c 2B-237

2B-236 2B-253

C2-13-1

2B-255 2B-235

2B-225

2B-254b

2B-251a

2B-251

2B-249 2B-248

2B-242

2B-240

2B-2502B-239

2B-241

2B-243

2B-245b 2B-245a

2B-245

2B-244a

2B-242b

2B-244b

2B-246

C2-18-12B-247a

2B-247

2B-247

C

C

C2-21-1

C

C

C2-21a-1

2B-251b

2B-246a

2B-201d

2C-243b2C-243a

2C-247a

2C-260a

2C-204

C2-42a-1

2D-228

2D-227

2D-227a

2D-226

2D-226a

2C-268

2B-201c 2B-201

2B-201B 2B-201a

C1-10a-01

2B-227b

V2-02-01

2C-250b

2D-290

2C-260b

2B-202b

2B-202c

REFLECTED

ACCESS

PANEL

PANEL

ACCESS

REFLECTED

REFLECTEDACCESS

PANEL

203 SF188 SF

379 SF606 SF

119 SF127 SF219 SF

1 SQ. FT.

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SQ

FT

SF

1, SF

SF

SF35

SF

SF

SF

S

F

SF

SF

SF

SF

SF

SF

SF

101 SF 230 SF 77 SF

223 SF

161 SF

542 SF

663 SF

94 SF

108 SF

662 SF

1,106 SF

667 SF

110 SF

115 SF

666 SF

656 SF35 SF

573 SF

73 SF

482 SF

82 SF

274 SF

70 SF

165 SF599 SF

74 SF

33 SF

480 SF

112 SF######

582 SF

585 SF

351 SF

569 SF

1,194 SF

504 SF

579 SF954 SF

336 SF

526 SF

407 SF

98 SF

272 SF

179 SF

676 SF

217 SF

1,511 SF

216 SF

214 SF 213 SF 212 SF 125 SF

210 SF

731 SF

545 SF

1,511 SF

545 SF

61 SF94 SF

214 SF 214 SF 117 SF

123 SF

369 SF

31 SF 42 SF

324 SF

288 SF

104 SF

286 SF

26 SF

211 SF 215 SF

209 SF

43 SF

80 SF

243 SF

64 SF

257 SF

216 SF

215 SF

251 SF

294 SF

112 SF

300 SF

112 SF

141 SF

55 SF

55 SF

140 SF

534 SF3 SF

364 SF17 SF

15 SF

397 SF

167 SF

548 SF

30 SF

50 SF

213 SF

3 SF

66 SF

60 SF

69 SF

80 SF

120 SF

297 SF

2,942 SF

562 SF

183 SF

275 SF

165 SF

507 SF

100 SF 111 SF

184 SF

90 SF

24 SF

37 SF

24 SF

107 SF 1 SF

702 SF

2 SQ. FT.

73 SF103 SF

131 SF

134 SF

85 SF

115 SF

132 SF

171 SF

2 SF

14 SF

12 SF

14 SF

453 SF

21 SF

112 SF115 SF112 SF

294 SF489 SF

696 SF

677 SF

484 SF

422 SF

305 SF

107 SF106 SF99 SF

587 SF

18 SF

691 SF

3 SF

167 SF

202 SF

110 SF

104 SF

117 SF

63 SF

103 SF

301 SF

121 SF

167 SF

338 SF

95 SF

98 SF102 SF

127 SF

129 SF

151 SF

129 SF

121 SF

116 SF

115 SF

119 SF

142 SF

150 SF

45 SF

66 SF

157 SF

134 SF

124 SF128 SF

3 SF

790 SF

229 SF

88 SF 111 SF

71 SF

139 SF

118 SF

128 SF

160 SF

201 SF

285 SF

250 SF

61 SF 247 SF

144 SF

12 SF

912 SF

2,589 SF

1,174 SF

1,521 SF

311 SF

1,375 SF150 SF

106 SF

213 SF

169 SF

81 SF

103 SF 128 SF

47 SF

2 SF

15 SF

13 SF

38 SF40 SF43 SF

218 SF

187 SF

243 SF

124 SF

402 SF

930 SF

182 SF

4 SF 611 SF

1,311 SF

99 SF

1,497 SF370 SF

150 SF

213 SF

396 SF

124 SF 124 SF

184 SF

124 SF 124 SF

156 SF

120 SF

61 SF

3 SF572 SF

124 SF

132 SF

99 SF

117 SF121 SF

117 SF

168 SF

120 SF

116 SF

115 SF

119 SF

96 SF

89 SF

92 SF

143 SF

90 SF

141 SF

396 SF

94 SF 102 SF

49 SF

102 SF

102 SF

49 SF

102 SF

17 SF802 SF

102 SF

105 SF

599 SF

123 SF

107 SF 111 SF

227 SF

180 SF

29 SF

50 SF

176 SF

15 SF

47 SF

102 SF

254 SF

98 SF

50 SF

82 SF

77 SF

171 SF 340 SF 340 SF 347 SF

263 SF

265 SF

342 SF

3 SF

118 SF

142 SF

115 SF

109 SF

118 SF

112 SF 47 SF

194 SF

340 SF15 SF

126 SF

17 SF

89 SF

239 SF

38 SF

185 SF

384 SF 4 SF

200 SF

342 SF343 SF342 SF

50 SF

90 SF

104 SF

29 SF

82 SF

99 SF

29 SF

87 SF

96 SF

13 SF659 SF

48 SF

15 SF377 SF

4 SF

4 SF

42 SF

230 SF

96 SF100 SF

2,934 SF

97 SF104 SF104 SF

101 SF

2,934 SF

122 SF95 SF 126 SF 117 SF

123 SF 128 SF

501 SF

105 SF102 SF104 SF

37 SF 98 SF

81 SF

276 SF

164 SF

335 SF

160 SF

155 SF

116 SF

132 SF

114 SF

155 SF 155 SF

172 SF 110 SF

334 SF

70 SF

122 SF

40 SF

789 SF

176 SF

146 SF

98 SF 89 SF

242 SF

56 SF

227 SF

122 SF 91 SF

90 SF 78 SF

60 SF

235 SF

261 SF

41 SF

79 SF

79 SF 74 SF

364 SF

92 SF

79 SF

77 SF

2 SF

111 SF

97 SF

82 SF

129 SF

47 SF

83 SF

78 SF89 SF

307 SF

192 SF

45 SF 43 SF

243 SF

158 SF

42 SF

66 SF

333 SF

189 SF3 SF

1,650 SF

1,650 SF

SF

SF

168 SF

SF

SF

30 SF

33 SF

26 SF

32 SF

74 SF76 SF

145 SF

69 SF

683 SF

488 SF

98 SF

143 SF

304 SF

822 SF

96 SF

112 SF

68 SF 140 SF

101 SF 82 SF

55 SF

16 SF

143 SF

93 SF

7 SF

75 SF

104 SF

159 SF

O W A

STAGECL

tile area tile area closer

H e a d

E n d

STAGE

CR

P

PC

R

PP

AUTO

P P

C R

1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

5. WET MOP AREA WITH DISINFECTANT. VA COR SHALL APPROVE DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

ICRA NOTES - REMOVAL

1. PROVIDE TEMPORARY / PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY INDICATED ON PLANS. CONTRACTOR

SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.

2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS

SHALL AUTOMATICALLY LOCK UPON CLOSURE.

3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL

ICRA DOORS.

4. ALL ICRA PARTITIONS SHALL BE WALL TYPE "T.1". REFER TO AE300 FOR MORE INFORMATION.

5. CONTRACTOR SHALL COMPLY WITH NFPA 241 FOR DURATION OF DEMOLITION AND CONSTRUCTION.

ICRA NOTES - GENERAL

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD & PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR

IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. THE CONTRACTOR SHALL USE TEMPORARY PRESSURE SENSORS CONNECTED TO THE BUILDING AUTOMATION SYSTEM (BAS)- REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. THE CONTRACTOR SHALL TRACK, TREND, AND ALARM PROJECT AREA PRESSURE TO ENSURE PROOF OF NEGATIVE PRESSURE

ENVIRONMENT AT ALL TIMES UNTIL APPROVED BY VA COR TO REMOVE.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING

A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE

REMOVED EACH TIME THEY LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH

TIME THE WORKER EXITS THE WORK AREA.

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S

ENVIRONMENTAL SERVICES DEPARTMENT.

8. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630. CONTRACTOR SHALL REMOVE CONSTRUCTION WASTE IN CONTAINERS SMALL ENOUGH TO MAINTAIN CORRIDOR EGRESS FOR DAILY VA HOSPITAL

FUNCTIONS.

9. CONTRATOR SHALL USE THE EXISTING SERVICE ELEVATORS FOR MATERIAL LOADING AND WASTE REMOVAL. CONTRACTOR SHALL COORDINATE AND USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS

THROUGH THE FACILITY.

10. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.

ICRA NOTES - CONSTRUCTION

TO

B

LD

G

100TO BLDG 100

4'

0"

8' - 6"

ICRA MATRIX

CONSTRUCTION PROJECT TYPE

A B C D

LOW I II II III

MEDIUM I II III IV

HIGH I II III IV

HIGHEST II III III IV

PATIENT

RISK GROUP

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

PRIOR TO START OF WORK IN THESE AREAS, GC

SHALL CONSULT WITH VA COR TO ENSURE

PERMITS ARE OBTAINED AND ICRA

REQUIREMENTS ARE MET AND MAINTAINED

DURING CONSTRUCTION.

ICRA LEGEND

ICRA BARRIER

ICRA KEYNOTE

TAG

F

CONSTRUCTION

FENCE

1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.

2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON

COMPLETION OF WORK.

3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE

FREE OF CONTAMINANTS AND LOOSE MATERIAL.

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

3. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

4. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN

SPECIFICATIONS.

5. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL

CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

C

LA

S

I

ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:

1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO

OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G.,

MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).

2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE

LEAVING THE WORK AREA.

3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE

HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM

TO ADDRESS DIFFUSER ISOLATION.

4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING

STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A

WEEK OR ISOLATED FROM THE MAIN SYSTEM.

5. SEAL DOORS TO PREVENT DUST MIGRATION.

6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY

CLEANING AND DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN

IDENTIFIED EXIT ROUTE.

7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA

MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS

PRIOR TO REMOVAL FROM THE AREA.

8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST

BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION

AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF

VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.

9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK

AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY

AND WHEN VISIBLY SOILED.

MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP

MOPPING OR HEPA VACUUMING SURFACES AT LEAST DAILY.

C

LA

II

ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:

1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.

2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241

REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS

REMOVED, TO THE DECK ABOVE.

3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE

COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS

MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK

ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.

4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND

CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE

FOR BARRIER TYPE).

5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE

ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED

OUTDOORS, OR COMPLY WITH THE ALTERNATIVE METHOD OUTLINED IN

APPENDIX A OF THIS DOCUMENT. THESE CONTROL MEASURES MUST BE

MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. HEPA

FILTERED EXHAUST IF DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE AT

A DISTANCE OF 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND

OPERABLE WINDOWS. EXHAUSTING DISCHARGED AIR INTO SHARED OR

RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.,

BATHROOM EXHAUST) IS PROHIBITED.

INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC,

MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO

CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN

THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND

ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR

FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND

CONTROL MEASURES.

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

3. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL

REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE

BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN

PERFORMED. ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.

4. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A

MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN

REMOVING HARD BARRIERS:

1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA

VACUUM.

3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD

BARRIER.

5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.

5. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE

WORK AREA.

6. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION

EQUIPMENT) MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD

AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM

THE WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.

7. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

8. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

9. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL

AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.

10. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL

CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

C

LA

III

ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:

1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL

BARRIER.

2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE

CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING,

CART CLEANING, WORKERS’ PPE AND CLEANING.

3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF

VISIBLE DUST BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA

VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.

WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN

ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM

TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE

CHANGED IMMEDIATELY.

C

LA

IV

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

421 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

AuthorChecker

EHRM INFRASTRUCTURE UPGRADES

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 2ND FLOOR ICRA PLAN

01-GC403

-2

-1

-G

C

/2

/2

.p d f

1" = 30'-0"A13

BUILDING 01 - OVERALL ICRA PLAN - 2ND FLOOR

N

PLAN

NORTH

N

TRUE

NORTH

EF-PACU

EQ

U

IP

M E N T

SU

P P O R T R

AILS

SU

P P O R T R

AILS

EQ

U

IP

M E N T

M

AT

C H

LI

N E

2" PTR

2" PTR

PTR

PTR

EV

EV

3" PTR 2" PTR 2" PTR

EC

PMM

40' H

EC

SC

PMM

10' H

SC

SC

LOW

HOOD

SC

CONDUIT

SKYLIGHT

LOW

ROOF

EC

ED

ED

ED

OPEN

EC

ED

M

M

CANOPY

VTR

VTR

VTR VTR

VTR

VTRVTR

VTR

VTR

VTR VTR

VTR

VTR

VTR

VTR

VTR

VTR

VTR

VTR

VTR

VTR

VTR

VTR

VTR

VTR

VTR

VTR

VTR

VTR

VTR

W

ALK

W

AY

P

AD

S

WALK PADS

SLOPE DOWN SLOPE DOWN

SLOPE DN.

SLOPE DN.

SLOPE DN.

SLOPE DN.

SLOPE DN.

SLOPE DN.

SLOPE DN.

SLOPE DN.

SLOPE DN.

SLOPE DN.

1/4"/FT

1/4"/FT

1/4"/FT

1/4"/FT

1/4"/FT

1/4"/FT

1/4"/FT

1/4"/FT

1/4"/FT

1/4"/FT

1/4"/FT

SLOPE DN.

1/4"/FT

SLOPE DN.

SLOPE DN.

1/4"/FT

SLOPE DN.1/4"/FT

1/4"/FT SLOPE DN.

SLOPE DN.

1/4"/FT

SLOPE DOWN SLOPE DOWN

SLOPE DOWN SLOPE DOWN

SL

O P E D O W N

1/

4"

FT

SL

OP

E

DN

1/ 4" /F T

SLOPE DN.

1/4"/FT

1/ 4" /F T

SL

OP

E

DN

1/4"/FT

SLOPE DN.

R .D

S.R .D

S.R .D

R .D

R .D

S.R .D

R .D

S.R .D

R .D

S.R .D

R .D

S.R .D

S.R .D

R .D

S.R .D

R .D

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RDRD

RD

RD

RD

RD

RD

RD

RD

RD

RD RD RD

RD

RD

RD RD

RD RD

RDRDRD

RD

RD

RD

RD RD

RD RD

RD RD

RD

RD RD

RD

RD

RD

S.R.D.

R.D.

S.R.D.

R.D.

R .D

R .D

ROOF

HATCH

EF-OR1

EF-LAB3EF-LAB2

EF-OR2

EF-LAB-1

30"

EF

EF

EF

EF

30"EV

AHU-40

EF

10'H

EF

10'H

EF

EV

AHU-ED

EF

RF-7

STAIR

FE

FE

FE

FE

G

SAFETY

GLASS

UP

DN

UP

DN

D N

U P

MECHANICAL

ELECTRICAL

FIRE

SIGNAL

TELEPHONE

3 HEAD GAMMA

CAMERA

NUCLEAR

SCANNER

RECEPTION

LEAD

TECHNICIAN

CHIEF

CHIEF

TECHNOLOGIST

ELEVATOR LOBBY

ELECTRICAL

FIRE

CLEAN UTILITY

H.A.C.

OFFICE

AUTO CNTRS

RADIO IMMUNO.

ASST.

ELEVATOR LOBBY

NUCLEAR

MEDICINE

ELEVATOR LOBBY

NUCLEAR

MEDICINE

RESTROOM

RESTROOM

NUCLEAR

MEDICINE

FIRE

BREAK ROOM CLEAN LINEN

NUCLEAR

MEDICINE

CHIEF

GI CARE

OFFICE

DOCTOR

WORK ROOM

RESTROOM

EQUIPMENT

STORAGE

NURSE

MANAGER

DIRTY

UTILITY

RESTROOMRESTROOM

CLEAN AND

EQUIPMENT

ROOM

ELECTRICAL

FIRE

SIGNAL

TELEPHONE

STERIS MACHINE

H.A.C.

ELECTRICAL

FORMS STORAGE

RECEPTION/

CHARTING

MED. PREP.

DRESSING ROOM

TELEPHONE

SIGNAL

FIRE

STORAGE

BRONCH

GI PROCEDURE

ROOM #2

STORAGE

GI PROCEDURE

ROOM #3

PT POST

PROCEDURE

ICE MACHINE

RESTROOM

RECOVERY ROOM

RESTROOMRESTROOM

PRE PROCEDURE

PRE PROCEDURE

CATH RECOVERY

STORAGE RESTROOM RESTROOM RESTROOM

ELECTRICAL

STORAGE

STORAGE

GI PROCEDURE

ROOM #4

GI PROCEDURE

ROOM #1

PODIATRY

SURGERY/GU

CLEAN STORAGE

MECHANICALSURGICAL

PROCEDURE

ROOM 3

SHARED

CONFERENCEWAITING ROOM

CORRIDOR

C O R R

ID

O R

CORRIDORCORRIDOR

C O R R

ID

O R

RECOVERY

RR/CHNG

RR/CHNG

NURSE SUP.

OFFICE

MECHANICAL

STORAGE

DIRTY

FAMILY WAITING

COPIER

OFFICE

NURSING

STATION

OFFICE

WOMEN'S

RR/CHNG

STORAGE

MEN'S

RR/CHNG

STORAGE

TELECOMRESTROOM

ANESTHES.

STORAGE H.A.C.

RESTROOM

EXAM ROOM

EXAM ROOMEXAM ROOM

EXAM ROOMEXAM ROOMEXAM ROOMEXAM ROOM

PROCEDURE

ROOM

PROCEDURE

ROOM

PROCEDURE

ROOM

STERILE

STORAGE

PROCEDURE

ROOM

PROCEDURE

ROOM

GI WORK ROOM

3B-313

3B-312a

3B-312b

3B-312c

3B-312d

3B-312

3B-308

3B-314

3B-316 3B-307a

3B-306

3B-306b

3B-306a

3B-305

3A-3xx

3B-304

3B-319

3B-320a

3B-301

3B-322 3B-321

3B-320

####### 3B-318

3B-317

3B-315

3A-336 3A-334

3A-335

3A-340a

3A-338

3A-337

3A-333

3A-302a

3A-302 3A-369

3A-339

3A-341

3A-342a

3A-366a

3A-3673A-3683A-370

3A-368a3A-301a

3A-301

3A-314

3A-325c 3A-325d

3A-325e

3A-351a

3A-356

3A-359

3A-344a

3A-344

3A-344b

3A-364

3A-348e

3A-348a

3A-348c

3A-353a

3A-353

3A-354

3A-355a 3A-355

3A-357

3A-358

3A-361a

3A-361

3A-3623A-363a

3A-365 3A-366

3A-363

3A-343 3A-345a 3A-346 3A-347a

3A-348b

3A-351a

3A-352a

3A-352

3A-351

3A-350

3A-349

3A-3483A-347 3A-345

3A-340

C3-01-1

C 3-

4a

C3-04-1C3-03-1

C 3-

3A-328a

3A-328d

3A-328e

3A-335

3A-326

3A-328b

3A-325

3A-332

3A-331

3A-330

3A-311

3A-300

3A-329 3A-322a

3A-320

3A-322b

3A-310a 3A-310b3A-315

3A-316

3A-307

3A-305

3A-303

3A-3043A-306

3A-3083A-3093A-3123A-313 3A-317

3A-318

3A-319

3A-321

3A-323

3A-324

3A-342

NURSING

60 SF

B D

W

- H

E

AT

IN

G

B D

W

- CO

O

LIN

G

B D

W

- CO

O

LIN

G

OA

OA

SL

1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

5. WET MOP AREA WITH DISINFECTANT. VA COR SHALL APPROVE DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

ICRA NOTES - REMOVAL

1. PROVIDE TEMPORARY / PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY INDICATED ON PLANS. CONTRACTOR

SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.

2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS

SHALL AUTOMATICALLY LOCK UPON CLOSURE.

3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL

ICRA DOORS.

4. ALL ICRA PARTITIONS SHALL BE WALL TYPE "T.1". REFER TO AE300 FOR MORE INFORMATION.

5. CONTRACTOR SHALL COMPLY WITH NFPA 241 FOR DURATION OF DEMOLITION AND CONSTRUCTION.

ICRA NOTES - GENERAL

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD & PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR

IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. THE CONTRACTOR SHALL USE TEMPORARY PRESSURE SENSORS CONNECTED TO THE BUILDING AUTOMATION SYSTEM (BAS)- REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. THE CONTRACTOR SHALL TRACK, TREND, AND ALARM PROJECT AREA PRESSURE TO ENSURE PROOF OF NEGATIVE PRESSURE

ENVIRONMENT AT ALL TIMES UNTIL APPROVED BY VA COR TO REMOVE.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING

A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE

REMOVED EACH TIME THEY LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH

TIME THE WORKER EXITS THE WORK AREA.

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S

ENVIRONMENTAL SERVICES DEPARTMENT.

8. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630. CONTRACTOR SHALL REMOVE CONSTRUCTION WASTE IN CONTAINERS SMALL ENOUGH TO MAINTAIN CORRIDOR EGRESS FOR DAILY VA HOSPITAL

FUNCTIONS.

9. CONTRATOR SHALL USE THE EXISTING SERVICE ELEVATORS FOR MATERIAL LOADING AND WASTE REMOVAL. CONTRACTOR SHALL COORDINATE AND USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS

THROUGH THE FACILITY.

10. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.

ICRA NOTES - CONSTRUCTION

ICRA MATRIX

CONSTRUCTION PROJECT TYPE

A B C D

LOW I II II III

MEDIUM I II III IV

HIGH I II III IV

HIGHEST II III III IV

PATIENT

RISK GROUP

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

PRIOR TO START OF WORK IN THESE AREAS, GC

SHALL CONSULT WITH VA COR TO ENSURE

PERMITS ARE OBTAINED AND ICRA

REQUIREMENTS ARE MET AND MAINTAINED

DURING CONSTRUCTION.

ICRA LEGEND

ICRA BARRIER

ICRA KEYNOTE

TAG

F

CONSTRUCTION

FENCE

1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.

2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON

COMPLETION OF WORK.

3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE

FREE OF CONTAMINANTS AND LOOSE MATERIAL.

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

3. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

4. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN

SPECIFICATIONS.

5. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL

CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

C

LA

1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO

OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G.,

MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).

2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE

LEAVING THE WORK AREA.

3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE

HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM

TO ADDRESS DIFFUSER ISOLATION.

4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING

STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A

WEEK OR ISOLATED FROM THE MAIN SYSTEM.

5. SEAL DOORS TO PREVENT DUST MIGRATION.

6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY

CLEANING AND DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN

IDENTIFIED EXIT ROUTE.

7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA

MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS

PRIOR TO REMOVAL FROM THE AREA.

8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST

BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION

AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF

VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.

9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK

AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY

AND WHEN VISIBLY SOILED.

MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP

MOPPING OR HEPA VACUUMING SURFACES AT LEAST DAILY.

C

LA

1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.

2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241

REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS

REMOVED, TO THE DECK ABOVE.

3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE

COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS

MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK

ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.

4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND

CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE

FOR BARRIER TYPE).

5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE

ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED

OUTDOORS, OR COMPLY WITH THE ALTERNATIVE METHOD OUTLINED IN

APPENDIX A OF THIS DOCUMENT. THESE CONTROL MEASURES MUST BE

MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. HEPA

FILTERED EXHAUST IF DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE AT

A DISTANCE OF 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND

OPERABLE WINDOWS. EXHAUSTING DISCHARGED AIR INTO SHARED OR

RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.,

BATHROOM EXHAUST) IS PROHIBITED.

INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC,

MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO

CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN

THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND

ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR

FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND

CONTROL MEASURES.

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

3. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL

REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE

BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN

PERFORMED. ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.

4. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A

MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN

REMOVING HARD BARRIERS:

1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA

VACUUM.

3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD

BARRIER.

5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.

5. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE

WORK AREA.

6. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION

EQUIPMENT) MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD

AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM

THE WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.

7. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

8. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

9. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL

AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.

10. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL

CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

C

LA

1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL

BARRIER.

2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE

CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING,

CART CLEANING, WORKERS’ PPE AND CLEANING.

3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF

VISIBLE DUST BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA

VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.

WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN

ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM

TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE

CHANGED IMMEDIATELY.

C

LA

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

421 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

AuthorChecker

EHRM INFRASTRUCTURE UPGRADES

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 01 3RD FLOOR ICRA PLAN

01-GC404

-2

-1

-G

C

/2

/2

.p d f

1" = 30'-0"A13

BUILDING 01 - OVERALL ICRA PLAN - 3RD FLOOR

N

PLAN

NORTH

N

D W

#1

D W

#2

UP

DN DN

UP

D N

U P tub

C O R R

ID

O R

ST

A

IR

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O

RST

A

IR

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O R

BREAK ROOM 2 BED ROOM

2 BED ROOM 4 BED ROOM MED ROOM

RESTROOM

SOCIAL WORK

CLEAN SUPPLY

RESTROOMFIRE

TELEPHONE

SIGNAL

RESTROOMRESTROOM

RESTROOM

SOILED UTILITY

RESTROOM

RESTROOM

4 BED ROOM

RESTROOM

ICE MACHINE

H.A.C.

RESTROOM

NUTRITION

ELECTRICAL

NURSE STATION

CORRIDOR

4 BED ROOM

1 BED ROOM

RESTROOM

1 BED ROOM

RESTROOM

RESTROOM

4 BED ROOM

RESTROOM

ELECTRICAL

RESTROOM

RESTROOM

RESTROOM

SOCIAL WORK

OFFICE

SUPPLY

TELEMETRYWAITING

ASSIST. CHIEF

NURSE ACUTE CARE

ELEVATOR LOBBY

OFFICE

RESTROOM

CORRIDOR

RESTROOM RESTROOM

MED ROOM

NURSE

MANAGER

2 BED ROOM

1 BED ROOM1 BED ROOM1 BED ROOMCHIEF ACUTE

CARE NURSING

SOILED

UTILITY

RESTROOMRESTROOMRESTROOMRESTROOMRESTROOM

ICE MACHINE

H.A.C.

ELECTRICAL DRUG STORAGE

NURSE STATION

MENS SHOWER

WOMENS SHOWER

PYXIS SOCIAL

WORKER

CORRIDOR

BREAK ROOM DECEDANT

AFFAIRS

FIRE

CORRIDOR

ELEVATOR LOBBY

RESTROOM

RESTROOM

RESTROOM

RESTROOM

1 BED ROOM

RESTROOM

RESTROOM RESTROOM RESTROOM

ELECTRICAL

1 BED ROOM

RESTROOM

1 BED ROOM

1 BED ROOM

RESTROOM

1 BED ROOM1 BED ROOM1 BED ROOM

2 BED ROOM

CLEAN

NURSE MANAGER

4 BED ROOM

4 BED ROOM

4 BED ROOM

4 BED ROOM

4 BED ROOM

4 BED ROOM

2 BED ROOM

ACUTE CARE

MED SURG

CASE WORKER

PHYSICIAN

OFFICE

SURGICAL

CARE

NUTRITIONAL

SUPPORT

FIRE

SIGNAL

TELEPHONE

RESTROOM COFFEE NOOK

WAITINGFIRE

CLEAN UTILITY

DIETETIC CLOSET

ELECTRICAL

ELEVATOR LOBBY

EQUIPMENT

STORAGE

MEDICAL

DIRECTOR

ON CALL#######

SOILED UTILITY

CLEAN UTILITY

H.A.C.

CORRIDOR CORRIDORKITCHEN

STAFF LOUNGE

BLOOD GAS

CONSULTING ROOM

NURSE MANAGER

STAIR #3

MECHANICAL

CORRIDOR

RESTROOM

RESTROOM

FIRE

SIGNAL

TELEPHONE

ELECTRICAL

PATIENT

ROOM #12

PATIENT

ROOM #11

PATIENT

ROOM #10

ISOLATION

PATIENT

ROOM #9

ISOLATION

PATIENT

ROOM #8

ISOLATION

PATIENT

ROOM #7

ISOLATION

PATIENT

ROOM #6

PATIENT

ROOM #5

NURSE STATION

CORRIDOR

PATIENT

ROOM #4

PATIENT

ROOM #3

PATIENT

ROOM #2

PATIENT

ROOM #1

CLEAN SUPPLY

DECEDANT

AFFAIRS

C 6-

S4 1-

C 8-

C

C 4-

1S4 2-

C 2-

C 9-

C

C

C

4A-440 4A-443 4A-446 4A-447 4A-448

4A-449a

4A-449

4A-450

4A-450a4A-448c 4A-448e

4A-448d

4A-446a4A-443a

4A-452a

4A-451

4A-451a

4A-453a

4A-453

4A-454a 4A-458

4A-456

4A-452

4A-464

4A-459

4A-444

C4-05-1

4A-454

4A-455

4A-455a

4A-457

4A-457a

4A-460a

4A-460

4A-462

4A-448b

4A-447a

4A-437

4A-438

4A-440a

4A-439 4A-441

4A-442b4A-442a

4A-469

4A-435

4A-402

4A-468a

C4-07-1

4A-466a 4A-465a

4A-463a

4A-463

4A-465 4A-4664A-4674A-4684A-4704A-401

4A-401a4A-404a4A-406a4A-4114A-413a

4A-415

4A-416

4A-414 4A-408a

4A-408

4A-421

4A-421a 4A-430 4A-432

C4-03-1

4A-407 4A-402b

4A-402a C4-01-1

4A-436

4A-419a

4A-420a

4A-422a

4A-423a

4A-424

4A-424a

4A-426a 4A-427 4A-428a

4A-426b

4A-425

4A-418a

4A-418

4A-417

4A-417a

4A-4034A-4044A-405

4A-406

4A-410b

4A-410 4A-413

4A-419

4A-420

4A-422

4A-423

4A-426 4A-428

4A-431

4A-434

4A-434a

4A-425c 4A-425d

4A-425e

4B-424 4B-423b

4B-4234B-421

4B-425

4B-422

4B-402

4B-401

4B-403

4B-404

4B-406#######

4B-407 4B-418

4B-408

C4-15-1 C4-16-14B-411b

4B-411

4B-420 4B-423a

4B-419

S4-03-1

4B-412

C4-12-1

4B-410 4B-409

4B-415

4B-414

4B-413

4B-416

4B-417l

4B-417k

4B-417j

4B-417i

4B-417h

4B-417g 4B-417f4B-417e

4B-417

C4-13-1

4B-417d4B-417c 4B-417b

4B-417a

4A-429

4A-433

1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

5. WET MOP AREA WITH DISINFECTANT. VA COR SHALL APPROVE DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

ICRA NOTES - REMOVAL

1. PROVIDE TEMPORARY / PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY INDICATED ON PLANS. CONTRACTOR

SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.

2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS

SHALL AUTOMATICALLY LOCK UPON CLOSURE.

3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL

ICRA DOORS.

4. ALL ICRA PARTITIONS SHALL BE WALL TYPE "T.1". REFER TO AE300 FOR MORE INFORMATION.

5. CONTRACTOR SHALL COMPLY WITH NFPA 241 FOR DURATION OF DEMOLITION AND CONSTRUCTION.

ICRA NOTES - GENERAL

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD & PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR

IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. THE CONTRACTOR SHALL USE TEMPORARY PRESSURE SENSORS CONNECTED TO THE BUILDING AUTOMATION SYSTEM (BAS)- REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. THE CONTRACTOR SHALL TRACK, TREND, AND ALARM PROJECT AREA PRESSURE TO ENSURE PROOF OF NEGATIVE PRESSURE

ENVIRONMENT AT ALL TIMES UNTIL APPROVED BY VA COR TO REMOVE.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING

A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE

REMOVED EACH TIME THEY LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH

TIME THE WORKER EXITS THE WORK AREA.

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S

ENVIRONMENTAL SERVICES DEPARTMENT.

8. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630. CONTRACTOR SHALL REMOVE CONSTRUCTION WASTE IN CONTAINERS SMALL ENOUGH TO MAINTAIN CORRIDOR EGRESS FOR DAILY VA HOSPITAL

FUNCTIONS.

9. CONTRATOR SHALL USE THE EXISTING SERVICE ELEVATORS FOR MATERIAL LOADING AND WASTE REMOVAL. CONTRACTOR SHALL COORDINATE AND USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS

THROUGH THE FACILITY.

10. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.

ICRA NOTES - CONSTRUCTION

ICRA MATRIX

CONSTRUCTION PROJECT TYPE

A B C D

LOW I II II III

MEDIUM I II III IV

HIGH I II III IV

HIGHEST II III III IV

PATIENT

RISK GROUP

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

PRIOR TO START OF WORK IN THESE AREAS, GC

SHALL CONSULT WITH VA COR TO ENSURE

PERMITS ARE OBTAINED AND ICRA

REQUIREMENTS ARE MET AND MAINTAINED

DURING CONSTRUCTION.

ICRA LEGEND

ICRA BARRIER

ICRA KEYNOTE

TAG

F

CONSTRUCTION

FENCE

1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.

2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON

COMPLETION OF WORK.

3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE

FREE OF CONTAMINANTS AND LOOSE MATERIAL.

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

3. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

4. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN

SPECIFICATIONS.

5. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL

CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

C

LA

1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO

OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G.,

MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).

2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE

LEAVING THE WORK AREA.

3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE

HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM

TO ADDRESS DIFFUSER ISOLATION.

4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING

STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A

WEEK OR ISOLATED FROM THE MAIN SYSTEM.

5. SEAL DOORS TO PREVENT DUST MIGRATION.

6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY

CLEANING AND DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN

IDENTIFIED EXIT ROUTE.

7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA

MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS

PRIOR TO REMOVAL FROM THE AREA.

8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST

BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION

AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF

VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.

9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK

AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY

AND WHEN VISIBLY SOILED.

MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP

MOPPING OR HEPA VACUUMING SURFACES AT LEAST DAILY.

C

LA

1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.

2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241

REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS

REMOVED, TO THE DECK ABOVE.

3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE

COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS

MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK

ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.

4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND

CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE

FOR BARRIER TYPE).

5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE

ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED

OUTDOORS, OR COMPLY WITH THE ALTERNATIVE METHOD OUTLINED IN

APPENDIX A OF THIS DOCUMENT. THESE CONTROL MEASURES MUST BE

MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. HEPA

FILTERED EXHAUST IF DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE AT

A DISTANCE OF 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND

OPERABLE WINDOWS. EXHAUSTING DISCHARGED AIR INTO SHARED OR

RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.,

BATHROOM EXHAUST) IS PROHIBITED.

INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC,

MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO

CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN

THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND

ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR

FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND

CONTROL MEASURES.

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

3. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL

REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE

BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN

PERFORMED. ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.

4. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A

MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN

REMOVING HARD BARRIERS:

1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA

VACUUM.

3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD

BARRIER.

5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.

5. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE

WORK AREA.

6. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION

EQUIPMENT) MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD

AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM

THE WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.

7. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

8. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

9. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL

AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.

10. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL

CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

C

LA

1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL

BARRIER.

2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE

CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING,

CART CLEANING, WORKERS’ PPE AND CLEANING.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .