Attachment 11 - Drawings Vol 2 Part4.pdf

PDF 36 MB Posted

Attached to
Z2DA--673-20-107 EHRM Infrastructure Upgrades Construction Tampa, FL
Solicitation number
36C77625R0092-RFP
Issued by

About this file

This file is a set of architectural and engineering drawings for a construction project.

The document contains detailed construction drawings for the James A. Haley Veterans Hospital in Tampa, Florida, specifically for Building 41 infrastructure upgrades under VA Project Number 673-20-107. The project is titled "EHRM Infrastructure Upgrades" and is issued for construction as of April 4, 2025. The drawings cover both the first and second floors of Building 41 and include multiple disciplines: architectural, mechanical, and reflected ceiling plans. The architect of record is CB Design Group (Alexandria, VA), with consultants including Compass (Novelty, OH), Scott Przybysz (St. Louis, MO), Mark Dyck (Martinsburg, WV), and Clare Kramer (Orlando, FL).

The drawings include comprehensive ICRA (Infection Control Risk Assessment) plans with detailed containment and dust control requirements organized by classification levels (I through IV). Key requirements include isolation of HVAC systems, installation of critical barriers meeting NFPA 241 standards, maintenance of negative air pressure using HEPA-equipped filtration units, and implementation of antechambers for personnel decontamination. The renovation includes demolition of existing partitions, doors, and fixtures, along with new partition installation, flooring, ceiling systems, and MEP (mechanical, electrical, plumbing) work. Specific areas addressed include offices, conference rooms, restrooms, storage areas, and testing facilities throughout both floors. The facility is fully sprinklered, and all work must comply with fire-rated assembly requirements and OSHA silica dust control regulations.

View the file

Other files

File Type Posted
673-107.30.Tech.pdf PDF
673-107.38.Tech.pdf PDF
673-107.39.Tech.pdf PDF
673-107.52.Tech.pdf PDF
673-107.54.Tech.pdf PDF
4-15 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Final.pdf PDF
Tampa EHRM Addendum 2 Narrative.pdf PDF
673-107.32.Tech.pdf PDF
673-107.53.Tech.pdf PDF
673-107. 0-TN002.pdf PDF
673-107.01.Tech.pdf PDF
673-107.36.Tech.pdf PDF
673-107.41.Tech.pdf PDF
673-107.68.Tech.pdf PDF
Roof - As Built.pdf PDF
4-8 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 7.pdf PDF
4-7 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Amend 6.pdf PDF
Question 161 - Lay down area.pdf PDF
Amendment 6 - 36C77625R0092 0006.pdf PDF
Amendment 5 - 36C77625R0092 0005.pdf PDF
Revised 2.8 and 2.9 Tampa.pdf PDF
3-30 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 4.pdf PDF
01 32 16.15- Project Schedules-Small Projects.pdf PDF
Amendment 4 - 36C77625R0092 0004.pdf PDF
03-27-2026 Addendum 1 Combined Drawings.pdf PDF
3-27 RFI TRACKING SHEET - SOLICITATION 36C77625R0092 Amend 3.pdf PDF
Amendment 3 - 36C77625R0092 0003.pdf PDF
Amendment 2 - 36C77625R0092 0002.pdf PDF
Amendment 1 - 36C77625R0092 0001.pdf PDF
Site Visit Attendance - Tampa EHRM.pdf PDF
Attachment 4 - Drawings Vol 1 Part2.pdf PDF
Attachment 8 - Drawings Vol 2 Part1.pdf PDF
Attachment 13 - Brand Name Justification - Tampa_Redacted.pdf PDF
Attachment 17 - PPQ.docx DOCX document
Attachment 18 - Project Information Sheet for Contractors.docx DOCX document
Attachment 1 - Spec Vol 1 - R1.pdf PDF
Attachment 6 - Drawings Vol 1 Part4.pdf PDF
Attachment 9 - Drawings Vol 2 Part2.pdf PDF
Attachment 12 - Drawings Vol 3.pdf PDF
Attachment 19 - Division Cost Breakdown.xlsx XLSX spreadsheet
RFP - 36C77625R0092.pdf PDF
Attachment 2 - Spec Vol 2 - R1.pdf PDF
Attachment 15 - Limitations on Subcontracting Clause.docx DOCX document
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 20 - RFI TRACKING SHEET - SOLICITATION 36C77625R0092 - Project 673-20-107.xlsx XLSX spreadsheet
Attachment 3 - Drawings Vol 1 Part1.pdf PDF
Attachment 5 - Drawings Vol 1 Part3.pdf PDF
Attachment 7 - Drawings Vol 1 Part5.pdf PDF
Attachment 10 - Drawings Vol 2 Part3.pdf PDF
Attachment 14 - Construction Wage Rates - Hillsborough 1-2-2025.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

METAL CANOPY

2500# Capacity:

CORRIDOR

OFFICE

FILE ROOMCONFERENCE

ROOM

CHIEF

ASSISTANT

HR CHIEF

OFFICE

OFFICEOFFICEVESTIBULE/

WAITING

OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE OFFICEOFFICE

OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE

OFFICE

OFFICE

AREA

OFFICE

OFFICE

TELEPHONE

STAIR #1

OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE

CORRIDOR

OFFICEOFFICE

HR OFFICEHAS CHIEF

LOUNGEPSYCH.

NURSE

PATIENT

EDUCATOR

CLINICAL

EDUCATOR

CORRIDOR

ACIPACIPADMIN

SUPPORT

CLERK

ASSOCIATE

CHIEF EDUCATOR

CHIEF NURSE

STORAGE

CLASSROOM

STAIR #2

INFOMATICS

STAFF

RELATIONS

DIRECTOR

NURSE

RECRUITER

CONFERENCE

ROOM

CLOSET

H.A.C.

FIRE

ELEVATOR

MACHINE

ROOM

CORRIDOR

TIMEKEEPERS

STORAGE

NURSE

EDUCATION (2)

STORAGE

WOMENS

RESTROOM

VESTIBULE

MENS

RESTROOM

TESTING

OFFICE

TESTING

OFFICE

NURSE

RECRUITMENT (3)

INFOMATICS

STORAGE

CORRIDOR

RECEPTION/

WAITING

VESTIBULE/

WAITING

C O R R

ID

O R

C O R R

ID

O

RC

O R R

ID

O R

C O R R

ID

O R

CORRIDOR

C1-02-41

41-118a?

41-11841-114

41-113

41-111

41-10841-107V1-01-41

41-106 41-109 41-110 41-112 41-115 41-116 41-117

41-121 41-11941-123 41-12541-12741-12941-13141-13341-105

41-138a

41-138

41-104

41-138b

41-135

S1-1-41

41-12041-12241-12441-12641-12841-130

C1-05-41

41-13241-134 41-13641-137

V1-04-4141-139 41-14041-141

C1-09-41

41-14341-14541-146 41-147

41-148

41-149

S1-2-41

41-151 41-153 41-155

41-158

41-155a

41-103

41-101

41-102

C1-06-41

41-142

41-144 41-150

41-159a

41-160

V1-03-41

41-159

41-15741-15641-15441-152

C1-11-41

V1-02-41

V1-01-41

C 1-

C 1-

1C 1-

C 1-

C1-01-41

W/H

ICRA MATRIX- TABLE 04

CONSTRUCTION PROJECT TYPE

A B C D

LOW I II II III

MEDIUM I II III IV

HIGH I II IV IV

HIGHEST II III IV IV

PATIENT

RISK GROUP

1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.

2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON

COMPLETION OF WORK.

3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE

FREE OF CONTAMINANTS AND LOOSE MATERIAL.

TABLE 05- DURING CONSTRUCTION PROJECT TABLE 6- UPON COMPLETION OF PROJECT

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

3. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

4. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN

SPECIFICATIONS.

5. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL

CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

C

LA

S

I

ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:

1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO

OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G.,

MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).

2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE

LEAVING THE WORK AREA.

3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE

HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM

TO ADDRESS DIFFUSER ISOLATION.

4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING

STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A

WEEK OR ISOLATED FROM THE MAIN SYSTEM.

5. SEAL DOORS TO PREVENT DUST MIGRATION.

6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY

CLEANING AND DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN

IDENTIFIED EXIT ROUTE.

7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA

MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS

PRIOR TO REMOVAL FROM THE AREA.

8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST

BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION

AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF

VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.

9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK

AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY

AND WHEN VISIBLY SOILED.

MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP

MOPPING OR HEPA VACUUMING SURFACES AT LEAST DAILY.

C

LA

II

ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:

1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.

2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241

REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS

REMOVED, TO THE DECK ABOVE.

3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE

COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS

MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK

ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.

4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND

CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE

FOR BARRIER TYPE).

5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE

ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED

OUTDOORS, OR COMPLY WITH THE ALTERNATIVE METHOD OUTLINED IN

APPENDIX A OF THIS DOCUMENT. THESE CONTROL MEASURES MUST BE

MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. HEPA

FILTERED EXHAUST IF DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE AT

A DISTANCE OF 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND

OPERABLE WINDOWS. EXHAUSTING DISCHARGED AIR INTO SHARED OR

RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.,

BATHROOM EXHAUST) IS PROHIBITED.

INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC,

MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO

CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN

THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND

ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR

FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND

CONTROL MEASURES.

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

3. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL

REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE

BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN

PERFORMED. ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.

4. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A

MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN

REMOVING HARD BARRIERS:

1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA

VACUUM.

3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD

BARRIER.

5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.

5. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE

WORK AREA.

6. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION

EQUIPMENT) MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD

AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM

THE WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.

7. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

8. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

9. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL

AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.

10. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL

CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

C

LA

III

ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:

1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL

BARRIER.

2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE

CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING,

CART CLEANING, WORKERS’ PPE AND CLEANING.

3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF

VISIBLE DUST BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA

VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.

WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN

ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM

TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE

CHANGED IMMEDIATELY.

C

LA

IV

PRIOR TO START OF WORK IN THESE AREAS, GC

SHALL CONSULT WITH VA COR TO ENSURE

PERMITS ARE OBTAINED AND ICRA

REQUIREMENTS ARE MET AND MAINTAINED

DURING CONSTRUCTION.

ICRA LEGEND

ICRA BARRIER

ICRA KEYNOTE

TAG

F

CONSTRUCTION

FENCE

1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

5. WET MOP AREA WITH DISINFECTANT. VA COR SHALL APPROVE DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

ICRA NOTES - REMOVAL

1. PROVIDE TEMPORARY / PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY INDICATED ON PLANS. CONTRACTOR

SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.

2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS

SHALL AUTOMATICALLY LOCK UPON CLOSURE.

3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL

ICRA DOORS.

4. ALL ICRA PARTITIONS SHALL BE WALL TYPE "T.1". REFER TO AE300 FOR MORE INFORMATION.

5. CONTRACTOR SHALL COMPLY WITH NFPA 241 FOR DURATION OF DEMOLITION AND CONSTRUCTION.

ICRA NOTES - GENERAL

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD & PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR

IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. THE CONTRACTOR SHALL USE TEMPORARY PRESSURE SENSORS CONNECTED TO THE BUILDING AUTOMATION SYSTEM (BAS)- REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. THE CONTRACTOR SHALL TRACK, TREND, AND ALARM PROJECT AREA PRESSURE TO ENSURE PROOF OF NEGATIVE PRESSURE

ENVIRONMENT AT ALL TIMES UNTIL APPROVED BY VA COR TO REMOVE.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING

A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE

REMOVED EACH TIME THEY LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH

TIME THE WORKER EXITS THE WORK AREA.

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S

ENVIRONMENTAL SERVICES DEPARTMENT.

8. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630. CONTRACTOR SHALL REMOVE CONSTRUCTION WASTE IN CONTAINERS SMALL ENOUGH TO MAINTAIN CORRIDOR EGRESS FOR DAILY VA HOSPITAL

FUNCTIONS.

9. CONTRATOR SHALL USE THE EXISTING SERVICE ELEVATORS FOR MATERIAL LOADING AND WASTE REMOVAL. CONTRACTOR SHALL COORDINATE AND USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS

THROUGH THE FACILITY.

10. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.

ICRA NOTES - CONSTRUCTION

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

421 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

AuthorChecker

EHRM INFRASTRUCTURE UPGRADES

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 41 1ST FLOOR ICRA PLAN

41-GC400

-2

-1

-G

C

/2

/2

.p d f

N

PLAN

NORTH

N

TRUE

NORTH

1" = 10'-0"A14

BUILDING 41 - OVERALL ICRA PLAN - 1ST FLOOR

BCS

N

E

AREA

COPY

HIMS

ROOF

HATCH/

LADDER

COPY

AREA

23 ----

STORAGE

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O

R MENS

RESTROOM

VESTIBULE

WOMENS

RESTROOM

TRANSCRIPTION

CORRIDOR

PROGRAM

SUPPORT

TRANSCRIPTION

SUPERVISOR

ASSISTANT

TRANSCRIPTION

SUPERVISOR

CHIEF

HIMS

SECRETARY

CONFERENCE

ROOM

EDUCATION\

CORRIDOR

STAIR #2

STORAGE

PROCESS

IMPROVEMENT

ASSISTANT

CODING

SUPERVISOR

ASSISTANT

CORRIDOR

CODING

SUPERVISOR

PHARMACIST

OFFICE

DOCTOR

OFFICE

H.A.C.

CORRIDOR

LOBBY

LOUNGE HAS

CORRIDOR

NEUROLOGY

PHY. OFFICE

COMPUTER ROOM

INFOMATICS

QA/MS

CORRIDOR

CONFERENCE

ROOM

PHARMACY

ASSISTANT

CHIEF

PHARMACY

CHIEF

STAIR #1

TELEPHONE

MULTI PURPOSE

FILE ROOM

OFFICE- SW OFFICE OFFICE

RESIDENTS (6)

INPATIENT

CONSULT

LIASON

DOCTORAL

INTERN

ISO

PSYCHOLOGIST

PSYCHOLOGIST

PSYCHOLOGIST

ISO

COMPLAINCE

COMPLAINCE

COMPLAINCE

COMPLAINCE

INTERNS

OFFICE- SW

CORRIDOR

OFFICE- SW

RESTROOM

CODING AND

PROCESS

IMPROVEMENT

---- OFFICE- SW

MED/DIGESTIVE

DISEASE

OFFICE- SW

OFFICE- SWOFFICE- SW

OFFICE- SW

104 SF

24 SF

S

F

S

F

S

F

146 SF

32 SF

142 SF

260 SF

290 SF

121 SF126 SF115 SF

136 SF

90 SF

251 SF

123 SF

29 SF

197 SF

123 SF

130 SF 130 SF

247 SF

131 SF 130 SF

130 SF

103 SF

376 SF

146 SF

120 SF

174 SF 147 SF

184 SF

202 SF 141 SF 118 SF

445 SF

386 SF 115 SF 157 SF

170 SF

47 SF

120 SF

100 SF 100 SF 100 SF

407 SF

100 SF 100 SF

118 SF

118 SF

118 SF

110 SF

110 SF

110 SF

67 SF

148 SF

225 SF

374 SF

100 SF

91 SF

67 SF

98 SF

104 SF

144 SF140 SF

136 SF

306 SF

67 SF

93 SF

82 SF

79 SF 79 SF

164 SF

164 SF

151 SF

125 SF

121 SF124 SF

91 SF

41-213a

41-246a

C

C

C

41-246

V2-03-41

41-247

41-230

C2-07-41

41-23141-23241-234

41-235

41-236

41-237

41-238

C1-09-41

S2-2-41

41-239

41-240 41-241

C2-10-41

41-243 41-244 41-245

41-201

C2-02-41

V2-01-41

41-202

V2-04-41 41-229

C2-05-41

41-228 41-227 41-224

C2-04-41

41-222 41-221 41-220

S2-1-41

41-226

41-225

41-205 41-206 41-208

41-223

41-209 41-210

41-215

41-218

41-219

41-217

41-216

41-214

41-212

41-213

41-211

41-207

41-204

C2-01-41

41-242b

41-203c

41-233c

41-233b41-233a 41-233

41-242

41-242a

41-238b

41-238a

41-203 41-203a

41-226c 41-226b

41-226a

41-202c 41-202b41-202a

41-203b

2500# Capacity:

2500# Capacity:

F E C

W/H

FEC

FEC

F E C

ICRA MATRIX- TABLE 04

CONSTRUCTION PROJECT TYPE

A B C D

LOW I II II III

MEDIUM I II III IV

HIGH I II IV IV

HIGHEST II III IV IV

PATIENT

RISK GROUP

1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.

2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON

COMPLETION OF WORK.

3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE

FREE OF CONTAMINANTS AND LOOSE MATERIAL.

TABLE 05- DURING CONSTRUCTION PROJECT TABLE 6- UPON COMPLETION OF PROJECT

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

3. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

4. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN

SPECIFICATIONS.

5. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL

CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

C

LA

I

ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:

1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO

OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G.,

MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).

2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE

LEAVING THE WORK AREA.

3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE

HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM

TO ADDRESS DIFFUSER ISOLATION.

4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING

STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A

WEEK OR ISOLATED FROM THE MAIN SYSTEM.

5. SEAL DOORS TO PREVENT DUST MIGRATION.

6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY

CLEANING AND DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN

IDENTIFIED EXIT ROUTE.

7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA

MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS

PRIOR TO REMOVAL FROM THE AREA.

8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST

BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION

AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF

VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.

9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK

AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY

AND WHEN VISIBLY SOILED.

MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP

MOPPING OR HEPA VACUUMING SURFACES AT LEAST DAILY.

C

LA

II

ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:

1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.

2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241

REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS

REMOVED, TO THE DECK ABOVE.

3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE

COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS

MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK

ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.

4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND

CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE

FOR BARRIER TYPE).

5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE

ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED

OUTDOORS, OR COMPLY WITH THE ALTERNATIVE METHOD OUTLINED IN

APPENDIX A OF THIS DOCUMENT. THESE CONTROL MEASURES MUST BE

MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. HEPA

FILTERED EXHAUST IF DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE AT

A DISTANCE OF 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND

OPERABLE WINDOWS. EXHAUSTING DISCHARGED AIR INTO SHARED OR

RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.,

BATHROOM EXHAUST) IS PROHIBITED.

INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC,

MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO

CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN

THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND

ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR

FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND

CONTROL MEASURES.

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

3. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL

REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE

BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN

PERFORMED. ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.

4. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A

MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN

REMOVING HARD BARRIERS:

1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA

VACUUM.

3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD

BARRIER.

5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.

5. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE

WORK AREA.

6. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION

EQUIPMENT) MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD

AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM

THE WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.

7. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

8. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

9. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL

AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.

10. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL

CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

C

LA

III

ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:

1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL

BARRIER.

2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE

CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING,

CART CLEANING, WORKERS’ PPE AND CLEANING.

3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF

VISIBLE DUST BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA

VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.

WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN

ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM

TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE

CHANGED IMMEDIATELY.

C

LA

IV

PRIOR TO START OF WORK IN THESE AREAS, GC

SHALL CONSULT WITH VA COR TO ENSURE

PERMITS ARE OBTAINED AND ICRA

REQUIREMENTS ARE MET AND MAINTAINED

DURING CONSTRUCTION.

ICRA LEGEND

ICRA BARRIER

ICRA KEYNOTE

TAG

F

CONSTRUCTION

FENCE

1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

5. WET MOP AREA WITH DISINFECTANT. VA COR SHALL APPROVE DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

ICRA NOTES - REMOVAL

1. PROVIDE TEMPORARY / PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY INDICATED ON PLANS. CONTRACTOR

SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.

2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS

SHALL AUTOMATICALLY LOCK UPON CLOSURE.

3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL

ICRA DOORS.

4. ALL ICRA PARTITIONS SHALL BE WALL TYPE "T.1". REFER TO AE300 FOR MORE INFORMATION.

5. CONTRACTOR SHALL COMPLY WITH NFPA 241 FOR DURATION OF DEMOLITION AND CONSTRUCTION.

ICRA NOTES - GENERAL

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD & PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR

IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. THE CONTRACTOR SHALL USE TEMPORARY PRESSURE SENSORS CONNECTED TO THE BUILDING AUTOMATION SYSTEM (BAS)- REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. THE CONTRACTOR SHALL TRACK, TREND, AND ALARM PROJECT AREA PRESSURE TO ENSURE PROOF OF NEGATIVE PRESSURE

ENVIRONMENT AT ALL TIMES UNTIL APPROVED BY VA COR TO REMOVE.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING

A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE

REMOVED EACH TIME THEY LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH

TIME THE WORKER EXITS THE WORK AREA.

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S

ENVIRONMENTAL SERVICES DEPARTMENT.

8. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630. CONTRACTOR SHALL REMOVE CONSTRUCTION WASTE IN CONTAINERS SMALL ENOUGH TO MAINTAIN CORRIDOR EGRESS FOR DAILY VA HOSPITAL

FUNCTIONS.

9. CONTRATOR SHALL USE THE EXISTING SERVICE ELEVATORS FOR MATERIAL LOADING AND WASTE REMOVAL. CONTRACTOR SHALL COORDINATE AND USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS

THROUGH THE FACILITY.

10. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.

ICRA NOTES - CONSTRUCTION

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

421 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

AuthorChecker

EHRM INFRASTRUCTURE UPGRADES

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 41 2ND FLOOR ICRA PLAN

41-GC401

-2

-1

-G

C

/2

/2

.p d f

N

PLAN

NORTH

N

TRUE

NORTH

1" = 10'-0"A13

BUILDING 41 - OVERALL ICRA PLAN - 2ND FLOOR

Capacity:

CORRIDOR

OFFICE

FILE ROOMCONFERENCE

ROOM

CHIEF

ASSISTANT

HR CHIEF

OFFICE

OFFICEOFFICEVESTIBULE/

WAITING

OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE OFFICEOFFICE

OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE

OFFICE

OFFICE

AREA

OFFICE

OFFICE

TELEPHONE

STAIR #1

OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE

CORRIDOR

OFFICEOFFICE

HR OFFICEHAS CHIEF

LOUNGEPSYCH.

NURSE

PATIENT

EDUCATOR

CLINICAL

EDUCATOR

CORRIDOR

ACIPACIPADMIN

SUPPORT

CLERK

ASSOCIATE

CHIEF EDUCATOR

CHIEF NURSE

STORAGE

CLASSROOM

STAIR #2

INFOMATICS

STAFF

RELATIONS

DIRECTOR

NURSE

RECRUITER

CONFERENCE

ROOM

CLOSET

H.A.C.

FIRE

ELEVATOR

MACHINE

ROOM

CORRIDOR

TIMEKEEPERS

STORAGE

NURSE

EDUCATION (2)

STORAGE

WOMENS

RESTROOM

VESTIBULE

MENS

RESTROOM

TESTING

OFFICE

TESTING

OFFICE

NURSE

RECRUITMENT (3)

INFOMATICS

STORAGE

CORRIDOR

RECEPTION/

WAITING

VESTIBULE/

WAITING

C O R R

ID

O R

C O R R

ID

O

RC

O R R

ID

O R

C O R R

ID

O R

CORRIDOR

C1-02-41

41-118a?

41-11841-114

41-113

41-111

41-10841-107V1-01-41

41-106 41-109 41-110 41-112 41-115 41-116 41-117

41-121 41-11941-123 41-12541-12741-12941-13141-13341-105

41-138a

41-138

41-104

41-138b

41-135

S1-1-41

41-12041-12241-12441-12641-12841-130

C1-05-41

41-13241-134 41-13641-137

V1-04-4141-139 41-14041-141

C1-09-41

41-14341-14541-146 41-147

41-148

41-149

S1-2-41

41-151 41-153 41-155

41-158

41-155a

41-103

41-101

41-102

C1-06-41

41-142

41-144 41-150

41-159a

41-160

V1-03-41

41-159

41-15741-15641-15441-152

C1-11-41

V1-02-41

V1-01-41

C 1-

C 1-

1C 1-

C 1-

C1-01-41

W/H

41-AE401

E9

41-AE401

E13

D9

D2D4

D1

D3

NEW TR

41-110

6 7

41-110

8' - 0" 5" 10' - 0"

E X

IS

TI

N G

V .I.

F.

FEC3

3 2

PLYWD-01 PLYWD-01

PLYWD-01

A3

41-109

FLOOR PLAN LEGEND

A3WALL AND DOOR TO REMAIN /

EXISTING CONDITION

WALL AND DOOR TO BE

DEMOLISHED

NEW WORK PARTITION /

NEW WORK DOOR

NEW PARTITION TAG

DEMO PARTITION

NEW PARTITION

NEW PARTITION INFILL

TO MATCH EXISTING

ADJACENT

CONSTRUCTION

PLYWD-01 3/4" AC GRADE FRT

PLYWOOD- SEE

KEYNOTE 8 & FINISH

SCHEDULE

FEC SEMI-RECESSED FIRE

EXTINGUISHER

CABINET- SEE AE-502

FOR DETAILS

ICRA PARTITION- SEE

GC SHEETS FOR ICRA

DETAILS

NOTE: NOT ALL DEMOLITION AND PLAN KEYNOTES APPLY

TO THE FLOOR PLANS ON THIS SHEET

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

421 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

LTCAL

EHRM INFRASTRUCTURE UPGRADES

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 41- 1ST FLOOR- ENLARGED

PLANS- DEMO AND NEW WORK

41-AE401

-2

-1

-A

E

/0

/2

.p d f

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

N

PLAN

NORTH

N

TRUE

NORTH

1" = 10'-0"A13

BUILDING 41 - OVERALL 1ST FLOOR PLAN

1/4" = 1'-0"E13

41 BUILDING - 1ST FLOOR - DEMO WORK PLAN

1/4" = 1'-0"E9

41 BUILDING - 1ST FLOOR - NEW WORK PLAN

KEYNOTES - DEMOLITION

D1 REMOVE EXISTING DOOR, FRAME, AND HARDWARE IN THEIR ENTIRETY.

D2 REMOVE EXISTING FLOOR FINISH AND BASE WHERE REQUIRED. PREP SUBSURFACE, AS

REQUIRED, TO RECEIVE NEW FLOOR FINISH- SEE FINISH SCHEDULE

D3 REMOVE PORTION OF EXISTING WALL, AS REQUIRED, AND PREP OPENING TO RECEIVE NEW

DOOR AND DOOR FRAME- SEE DOOR SCHEDULE

D4 REMOVE EXISTING WALL IN ITS ENTIRETY TO EXTENTS SHOWN ON FLOOR PLAN.

D5 REMOVE ALL EXISTING PLUMBING FIXTURES IN THEIR ENTIRETY. CAP ALL PIPES AND VALVES

PRIOR TO START OF NEW WORK- SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

PATCH/REPAIR WALL AND PREP, AS REQUIRED, TO RECEIVE NEW FINISH

D6 REMOVE PORTION OF EXISTING WALL TO EXTENTS SHOWN ON FLOOR PLAN.

D7 EXISTING COLUMN SHALL REMAIN. CONTRACTOR SHALL COVER AND PROTECT EXISTING

COLUMNS DURING DEMO AND NEW WORK PHASES.

D8 REMOVE EXISTING CASEWORK AND COUNTERTOPS IN THEIR ENTIRETY. REMOVE ALL EXISTING

APPLIANCES, AS REQUIRED, AND RETURN TO VA.

D9 REMOVE EXISTING DOOR, FRAME, AND HARDWARE IN THEIR ENTIRETY. PREP EXISTING

OPENING TO RECEIVE NEW DOOR AND DOOR FRAME- SEE DOOR SCHEDULE FOR NEW DOOR

SIZE.

D10 REMOVE EXISTING WINDOW IN ITS ENTIRETY. PREP OPENING TO RECEIVE NEW WALL INFILL-

SEE NEW WORK FLOOR PLAN

D11 REMOVE EXISTING SLIDING DOOR STOREFRONT SYSTEM IN ITS ENTIRETY. PREP EXISTING

OPENING TO RECEIVE NEW DOORS AND NEW WALL INFILL- SEE NEW WORK FLOOR PLAN

D12 REMOVE EXISTING CONCRETE CURB IN ITS ENTIRETY. PREP SUBFLOOR TO RECEIVE NEW

FLOOR FINISH- SEE NEW WORK FLOOR PLAN

D13 REMOVE EXISTING FENCE, FENCE STRUCTURE, GATE AND HARDWARE IN THEIR ENTIRETY.

KEYNOTES - PLAN

1 PROVIDE AND INSTALL NEW DOOR, DOOR FRAME, AND HARDWARE- SEE DOOR SCHEDULE

2 NEW PARTITION- SEE WALL TYPE. PREP NEW PARTITION, AS REQUIRED, TO SEE NEW

FINISHES- SEE FINISH SCHEDULE

3 PROVIDE AND INSTALL NEW FLOORING AND WALL BASE, AS REQUIRED, FLOORING AND WALL

BASE SHALL MATCH EXISTING ADJACENT FLOORING AND WALL BASE. PREP WALL TO RECEIVE

NEW FINISHES ON EXISTING SIDE OF WALL. NEW FINISHES SHALL MATCH EXISTING.

4 PROVIDE AND INSTALL STAINLESS STEEL SECURITY MESH AT ALL WINDOWS. APPLY BLACK

OUT FILM (BF-01) TO WINDOW GLAZING PRIOR TO INSTALLATION OF SECURITY MESH. SEE

DETAIL

5 RE-FRAME OPENING TO RECEIVE NEW WALL INFILL. WALL INFILL SHALL MATCH EXISTING

WALL CONSTRUCTION. NEW WALL INFILL SHALL BE FLUSH WITH ADJACENT WALL

CONSTRUCTION, TAPE, MUD, AND FLOAT, AS REQUIRED, AND PREP TO RECEIVE NEW PAINT.

6 PROVIDE & INSTALL NEW 3/4" AC GRADE FRT PLYWOOD ON WALLS TO EXTENTS SHOWN ON

PLANS. BOTTOM EDGE OF PLYWOOD SHALL BE INSTALLED 12" AFF- SEE FINISH SCHEDULE

7 PROVIDE & INSTALL NEW FLOOR FINISH AND WALL BASE- SEE FINISH SCHEDULE. REFER TO

ELECTRICAL DRAWINGS FOR GROUND OF STATIC DISSIPATING FLOOR.

8 INFILL EXISTING OPENING IN FLOOR ASSEMBLY WHERE EXISTING CHASE WAS REMOVED. NEW

CONCRETE INFILL SHALL MATCH THE EXISTING ADJACENT FLOOR/ROOF ASSEMBLY

CONSTRUCTION TO MAINTAIN THE EXISTING RATING OF THE FIRE RATED ASSEMBLY. TOP OF

INFILL FINISH SHALL BE ALIGNED WITH AND BE FLUSH WITH ADJACENT TOP OF SLAB

ELEVATION. REFER TO STRUCTURAL DRAWINGS FOR ADDITONAL INFORMATION. PREP NEW

CONCRETE INFILL, AS REQUIRED, TO RECEIVE NEW FLOOR FINISH- SEE FINISH SCHEDULE

9 FRAME OPENING IN EXISTING WALL TO PROVIDE ACCESS TO NEW DOOR AND NEW TR ROOM

10 PROVIDE AND INSTALL NEW BLACK OUT FILM ON INTERIOR SIDE OF EXISTING WINDOW. SEE

BF-01 IN FINISH SCHEDULE.

D#

N

E

AREA

COPY

HIMS

ROOF

HATCH/

LADDER

COPY

AREA

23 ----

STORAGE

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O

R MENS

RESTROOM

VESTIBULE

WOMENS

RESTROOM

TRANSCRIPTION

CORRIDOR

PROGRAM

SUPPORT

TRANSCRIPTION

SUPERVISOR

ASSISTANT

TRANSCRIPTION

SUPERVISOR

CHIEF

HIMS

SECRETARY

CONFERENCE

ROOM

EDUCATION\

CORRIDOR

STAIR #2

STORAGE

PROCESS

IMPROVEMENT

ASSISTANT

CODING

SUPERVISOR

ASSISTANT

CORRIDOR

CODING

SUPERVISOR

PHARMACIST

OFFICE

DOCTOR

OFFICE

H.A.C.

CORRIDOR

LOBBY

LOUNGE HAS

CORRIDOR

NEUROLOGY

PHY. OFFICE

COMPUTER ROOM

INFOMATICS

QA/MS

CORRIDOR

CONFERENCE

ROOM

PHARMACY

ASSISTANT

CHIEF

PHARMACY

CHIEF

STAIR #1

TELEPHONE

MULTI PURPOSE

FILE ROOM

OFFICE- SW OFFICE OFFICE

RESIDENTS (6)

INPATIENT

CONSULT

LIASON

DOCTORAL

INTERN

ISO

PSYCHOLOGIST

PSYCHOLOGIST

PSYCHOLOGIST

ISO

COMPLAINCE

COMPLAINCE

COMPLAINCE

COMPLAINCE

INTERNS

OFFICE- SW

CORRIDOR

OFFICE- SW

RESTROOM

CODING AND

PROCESS

IMPROVEMENT

---- OFFICE- SW

MED/DIGESTIVE

DISEASE

OFFICE- SW

OFFICE- SWOFFICE- SW

OFFICE- SW

104 SF

24 SF

S

F

S

F

S

F

146 SF

32 SF

142 SF

260 SF

290 SF

121 SF126 SF115 SF

136 SF

90 SF

251 SF

123 SF

29 SF

197 SF

123 SF

130 SF 130 SF

247 SF

131 SF 130 SF

130 SF

103 SF

376 SF

146 SF

120 SF

174 SF 147 SF

184 SF

202 SF 141 SF 118 SF

445 SF

386 SF 115 SF 157 SF

170 SF

47 SF

120 SF

100 SF 100 SF 100 SF

407 SF

100 SF 100 SF

118 SF

118 SF

118 SF

110 SF

110 SF

110 SF

67 SF

148 SF

225 SF

374 SF

100 SF

91 SF

67 SF

98 SF

104 SF

144 SF140 SF

136 SF

306 SF

67 SF

93 SF

82 SF

79 SF 79 SF

164 SF

164 SF

151 SF

125 SF

121 SF124 SF

91 SF

41-213a

41-246a

C

C

C

41-246

V2-03-41

41-247

41-230

C2-07-41

41-23141-23241-234

41-235

41-236

41-237

41-238

C1-09-41

S2-2-41

41-239

41-240 41-241

C2-10-41

41-243 41-244 41-245

41-201

C2-02-41

V2-01-41

41-202

V2-04-41 41-229

C2-05-41

41-228 41-227 41-224

C2-04-41

41-222 41-221 41-220

S2-1-41

41-226

41-225

41-205 41-206 41-208

41-223

41-209 41-210

41-215

41-218

41-219

41-217

41-216

41-214

41-212

41-213

41-211

41-207

41-204

C2-01-41

41-242b

41-203c

41-233c

41-233b41-233a 41-233

41-242

41-242a

41-238b

41-238a

41-203 41-203a

41-226c 41-226b

41-226a

41-202c 41-202b41-202a

41-203b

2500# Capacity:

2500# Capacity:

F E C

W/H

FEC

FEC

F E C

41-AE402

E10

41-AE402

E13

D2

D9

NEW TR

41-225

EXISTING V.I.F.

13' - 2" ±

E X

IS

TI

N G

V .I.

F.

9'

2"

PLYWD-01

PLYWD-01 PLYWD-01

6 7

FEC

FLOOR PLAN LEGEND

A3WALL AND DOOR TO REMAIN /

EXISTING CONDITION

WALL AND DOOR TO BE

DEMOLISHED

NEW WORK PARTITION /

NEW WORK DOOR

NEW PARTITION TAG

DEMO PARTITION

NEW PARTITION

NEW PARTITION INFILL

TO MATCH EXISTING

ADJACENT

CONSTRUCTION

PLYWD-01 3/4" AC GRADE FRT

PLYWOOD- SEE

KEYNOTE 8 & FINISH

SCHEDULE

FEC SEMI-RECESSED FIRE

EXTINGUISHER

CABINET- SEE AE-502

FOR DETAILS

ICRA PARTITION- SEE

GC SHEETS FOR ICRA

DETAILS

NOTE: NOT ALL DEMOLITION AND PLAN KEYNOTES APPLY

TO THE FLOOR PLANS ON THIS SHEET

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

421 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

LTCAL

EHRM INFRASTRUCTURE UPGRADES

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 41- 2ND FLOOR-

ENLARGED PLANS- DEMO AND NEW

WORK

41-AE402

-2

-1

-A

E

/2

/2

.p d f

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

N

PLAN

NORTH

N

TRUE

NORTH

1" = 10'-0"A13

BUILDING 41 - OVERALL 2ND FLOOR PLAN

1/4" = 1'-0"E13

41 BUILDING - 2ND FLOOR - DEMO WORK PLAN

1/4" = 1'-0"E10

41 BUILDING - 2ND FLOOR - NEW WORK PLAN

KEYNOTES - DEMOLITION

D1 REMOVE EXISTING DOOR, FRAME, AND HARDWARE IN THEIR ENTIRETY.

D2 REMOVE EXISTING FLOOR FINISH AND BASE WHERE REQUIRED. PREP SUBSURFACE, AS

REQUIRED, TO RECEIVE NEW FLOOR FINISH- SEE FINISH SCHEDULE

D3 REMOVE PORTION OF EXISTING WALL, AS REQUIRED, AND PREP OPENING TO RECEIVE NEW

DOOR AND DOOR FRAME- SEE DOOR SCHEDULE

D4 REMOVE EXISTING WALL IN ITS ENTIRETY TO EXTENTS SHOWN ON FLOOR PLAN.

D5 REMOVE ALL EXISTING PLUMBING FIXTURES IN THEIR ENTIRETY. CAP ALL PIPES AND VALVES

PRIOR TO START OF NEW WORK- SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

PATCH/REPAIR WALL AND PREP, AS REQUIRED, TO RECEIVE NEW FINISH

D6 REMOVE PORTION OF EXISTING WALL TO EXTENTS SHOWN ON FLOOR PLAN.

D7 EXISTING COLUMN SHALL REMAIN. CONTRACTOR SHALL COVER AND PROTECT EXISTING

COLUMNS DURING DEMO AND NEW WORK PHASES.

D8 REMOVE EXISTING CASEWORK AND COUNTERTOPS IN THEIR ENTIRETY. REMOVE ALL EXISTING

APPLIANCES, AS REQUIRED, AND RETURN TO VA.

D9 REMOVE EXISTING DOOR, FRAME, AND HARDWARE IN THEIR ENTIRETY. PREP EXISTING

OPENING TO RECEIVE NEW DOOR AND DOOR FRAME- SEE DOOR SCHEDULE FOR NEW DOOR

SIZE.

D10 REMOVE EXISTING WINDOW IN ITS ENTIRETY. PREP OPENING TO RECEIVE NEW WALL INFILL-

SEE NEW WORK FLOOR PLAN

D11 REMOVE EXISTING SLIDING DOOR STOREFRONT SYSTEM IN ITS ENTIRETY. PREP EXISTING

OPENING TO RECEIVE NEW DOORS AND NEW WALL INFILL- SEE NEW WORK FLOOR PLAN

D12 REMOVE EXISTING CONCRETE CURB IN ITS ENTIRETY. PREP SUBFLOOR TO RECEIVE NEW

FLOOR FINISH- SEE NEW WORK FLOOR PLAN

D13 REMOVE EXISTING FENCE, FENCE STRUCTURE, GATE AND HARDWARE IN THEIR ENTIRETY.

KEYNOTES - PLAN

1 PROVIDE AND INSTALL NEW DOOR, DOOR FRAME, AND HARDWARE- SEE DOOR SCHEDULE

2 NEW PARTITION- SEE WALL TYPE. PREP NEW PARTITION, AS REQUIRED, TO SEE NEW

FINISHES- SEE FINISH SCHEDULE

3 PROVIDE AND INSTALL NEW FLOORING AND WALL BASE, AS REQUIRED, FLOORING AND WALL

BASE SHALL MATCH EXISTING ADJACENT FLOORING AND WALL BASE. PREP WALL TO RECEIVE

NEW FINISHES ON EXISTING SIDE OF WALL. NEW FINISHES SHALL MATCH EXISTING.

4 PROVIDE AND INSTALL STAINLESS STEEL SECURITY MESH AT ALL WINDOWS. APPLY BLACK

OUT FILM (BF-01) TO WINDOW GLAZING PRIOR TO INSTALLATION OF SECURITY MESH. SEE

DETAIL

5 RE-FRAME OPENING TO RECEIVE NEW WALL INFILL. WALL INFILL SHALL MATCH EXISTING

WALL CONSTRUCTION. NEW WALL INFILL SHALL BE FLUSH WITH ADJACENT WALL

CONSTRUCTION, TAPE, MUD, AND FLOAT, AS REQUIRED, AND PREP TO RECEIVE NEW PAINT.

6 PROVIDE & INSTALL NEW 3/4" AC GRADE FRT PLYWOOD ON WALLS TO EXTENTS SHOWN ON

PLANS. BOTTOM EDGE OF PLYWOOD SHALL BE INSTALLED 12" AFF- SEE FINISH SCHEDULE

7 PROVIDE & INSTALL NEW FLOOR FINISH AND WALL BASE- SEE FINISH SCHEDULE. REFER TO

ELECTRICAL DRAWINGS FOR GROUND OF STATIC DISSIPATING FLOOR.

8 INFILL EXISTING OPENING IN FLOOR ASSEMBLY WHERE EXISTING CHASE WAS REMOVED. NEW

CONCRETE INFILL SHALL MATCH THE EXISTING ADJACENT FLOOR/ROOF ASSEMBLY

CONSTRUCTION TO MAINTAIN THE EXISTING RATING OF THE FIRE RATED ASSEMBLY. TOP OF

INFILL FINISH SHALL BE ALIGNED WITH AND BE FLUSH WITH ADJACENT TOP OF SLAB

ELEVATION. REFER TO STRUCTURAL DRAWINGS FOR ADDITONAL INFORMATION. PREP NEW

CONCRETE INFILL, AS REQUIRED, TO RECEIVE NEW FLOOR FINISH- SEE FINISH SCHEDULE

9 FRAME OPENING IN EXISTING WALL TO PROVIDE ACCESS TO NEW DOOR AND NEW TR ROOM

10 PROVIDE AND INSTALL NEW BLACK OUT FILM ON INTERIOR SIDE OF EXISTING WINDOW. SEE

BF-01 IN FINISH SCHEDULE.

T

MOP RACK

2500# Capacity:

OFFICE

FILE ROOMCONFERENCE

ROOM

CHIEF

ASSISTANT

HR CHIEF

OFFICE

OFFICEOFFICEVESTIBULE/

WAITING

OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE OFFICEOFFICE

OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE

OFFICE

OFFICE

AREA

OFFICE

OFFICE

TELEPHONE

STAIR #1

OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE

CORRIDOR

OFFICEOFFICE

HR OFFICEHAS CHIEF

LOUNGEPSYCH.

NURSE

PATIENT

EDUCATOR

CLINICAL

EDUCATOR

CORRIDOR

ACIPACIPADMIN

SUPPORT

CLERK

ASSOCIATE

CHIEF EDUCATOR

CHIEF NURSE

STORAGE

CLASSROOM

STAIR #2

INFOMATICS

STAFF

RELATIONS

DIRECTOR

NURSE

RECRUITER

CONFERENCE

ROOM

CLOSET

H.A.C.

FIRE

ELEVATOR

MACHINE

ROOM

CORRIDOR

TIMEKEEPERS

STORAGE

NURSE

EDUCATION (2)

STORAGE

WOMENS

RESTROOM

VESTIBULE

MENS

RESTROOM

TESTING

OFFICE

TESTING

OFFICE

NURSE

RECRUITMENT (3)

INFOMATICS

STORAGE

CORRIDOR

RECEPTION/

WAITING

VESTIBULE/

WAITING

C O R R

ID

O R

C O R R

ID

O

RC

O R R

ID

O R

C O R R

ID

O R

CORRIDOR

C1-02-41

41-118a?

41-11841-114

41-113

41-111

41-10841-107V1-01-41

41-106 41-109 41-110 41-112 41-115 41-116 41-117

41-121 41-11941-123 41-12541-12741-12941-13141-13341-105

41-138a

41-138

41-104

41-138b

41-135

S1-1-41

41-12041-12241-12441-12641-12841-13041-13241-134 41-13641-137

V1-04-4141-139 41-14041-141

C1-09-41

41-14341-14541-146 41-147

41-148

41-149

S1-2-41

41-151 41-153 41-155

41-158

41-155a

41-103

41-101

41-102

C1-06-41

41-142

41-144 41-150

41-159a

41-160

V1-03-41

41-159

41-15741-15641-15441-152

V1-02-41

V1-01-41

C 1-

C 1-

1C 1-

C1-01-41

FEC

F E C

F E C

FEC

W/H

2D

D

41-AE701

F12

41-AE701

F9

NEW TR

41-110

1 2

2'

7" 6'

9"

RACK RACK

4' - 6"

D30

D31

GENERAL NOTE APPLICABLE TO ALL DRAWINGS - ITEMS AND CONDITIONS DETAILED NOTED OR

OTHERWISE IDENTIFIED ON ONE OF THE SECTIONS OR DETAILS ARE APPLICABLE AND BINDING

TO ALL OTHER SECTIONS AND DETAILS FOR IDENTICAL OR SIMILAR CONDITIONS.

1. CONTRACTOR SHALL REFERENCE ICRA, HAZARDOUS MATERIALS, DEMOLITION AND NEW

WORK SHEETS FOR ALL DISCIPLINES IN COORDINATING AND CONFIRMING DEMOLITION

SCOPE, REQUIREMENTS, PROCEDURES, AND WASTE REMOVAL.

2. CONTRACTOR SHALL COMPLY WITH APPLICABLE REGULATIONS, AS DEFINED ELSEWHERE

IN THE SPECIFICATIONS AND DRAWINGS, TO INCLUDE OSHA SILICA DUST CONTROL

REGULATIONS 29 CFR 1926.1153, 29 CFR 1910.134.

3. GENERAL CONTRACTOR SHALL FILL OUT ATTACHMENT C OF 138-022HV LOCATED IN SPEC

SECTION 01 35 26.19 FOR ALL DEMOLISHED EQUIPMENT INSTALLED IN THIS SCOPE OF

WORK.

FIRE PROTECTION DEVICES, EXIT SIGNS, AND TELECOMMUNICATION EQUIPMENT WITHIN THE

SCOPE OF WORK IS TO BE DEMOLISHED.

GENERAL DEMOLITION RCP NOTES

DEMO PLASTER /

GYPSUM BOARD CEILING

RCP LEGEND

NOTE: SPOT ELEVATION SUFFIX "C.H." INDICATES FLAT CEILING HEIGHT ABOVE FINISH FLOOR.

SUFFIX "L.P." AND "H.P." INDICATE LOW POINT AND HIGH POINT OF SLOPED CEILING. WHERE ADJACENT, TRANSITION BETWEEN FLAT AND SLOPED CEILINGS SHALL UTILIZE APPROVED PRE-

FINISHED ALUMINUM TRANSITION STRIP. REFER TO SPECIFICATIONS.

DEMO 2X4 ACT CEILING

TILE & GRID

DEMO 2X2 ACT CEILING

TILE & GRID

DEMO 2X4 LIGHT

FIXTURE

DEMO SUPPLY

DIFFUSER

DEMO RETURN

DIFFUSER

NEW 2X2 ACT CEILING

TILE & GRID

NEW 2X4 LIGHT

FIXTURE - SEE ELEC

NEW SUPPLY

DIFFUSER - SEE MECH

NEW RETURN

DIFFUSER - SEE MECH

NEW 6" X 4'-0 LIGHT

FIXTURE - SEE ELEC

NEW 6" DIA. DOWN LIGHT

FIXTURE - SEE ELEC

GENERAL NOTE APPLICABLE TO ALL DRAWINGS - ITEMS AND CONDITIONS DETAILED NOTED OR

OTHERWISE IDENTIFIED ON ONE OF THE SECTIONS OR DETAILS ARE APPLICABLE AND BINDING

TO ALL OTHER SECTIONS AND DETAILS FOR IDENTICAL OR SIMILAR CONDITIONS.

1. ALL NEW TRS SHALL BE OPEN TO DECK ABOVE.

2. REFER TO ELECTRICAL DRAWINGS FOR LIGHT PATTERN AND EXIT LIGHT LOCATIONS.

NOTIFY ARCHITECT OF DISCREPANCIES PRIOR TO SHOP DRAWINGS.

3. ALL WALLS SHOWN SHALL EXTEND TO THE STRUCTURAL DECK (SEE WALL TYPES).

CORRIDOR CHASE WALLS AND LOCKER WING WALLS SHALL EXTEND 4" MINIMUM ABOVE

THE CEILING.

4. WHERE CEILING TILES ARE SCHEDULED, REFER TO MECHANICAL, PLUMBING AND

ELECTRICAL DRAWINGS FOR ITEMS NOT SHOWN ON CEILING PLAN. GRILLES, SPEAKERS,

SPRINKLERS, HEAT & SMOKE DETECTORS, SHALL BE CENTERED IN TILES (WHERE

SCHEDULED) UNLESS NOTED OTHERWISE.

5. IN AREAS OF EXPOSED STRUCTURE, PAINT EXPOSED STRUCTURE, UNDERSIDE OF DECK,

SPRINKLER PIPING, CONDUIT AND ALL MISCELLANEOUS OVERHEAD ITEMS. COLORS SHALL

BE SELECTED BY ARCHITECT.

GENERAL RCP NOTES

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

COMPASS

8734 GALLOWAY TRAIL

NOVELTY, OH. 44072

619-925-1647

ARCHITECT:

CB DESIGN GROUP

421 KING ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CONSULTANT:

SCOTT PRZYBYSZ

15 SUNNEN DR. SUITE 104

ST. LOUIS, MO 63143

314-951-2535

CONSULTANT:

MARK DYCK

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV. 25401

304-266-3115

CONSULTANT:

CLARE KRAMER

2815 DIRECTORS ROW

SUITE 500

ORLANDO, FL. 32809

407-917-2430

04/04/2025

673-20-107

LTCAL

EHRM INFRASTRUCTURE UPGRADES

TAMPA, FL.

ISSUED FOR CONSTRUCTION

BUILDING 41- 1ST FLOOR-

REFLECTED CEILING PLANS- DEMO

AND NEW WORK

41-AE701

-2

-1

-A

E

/2

/2

.p d f

N

TRUE NORTH

SITE KEY PLAN

SCALE: NOT TO SCALE

N

PLAN

NORTH

N

TRUE

NORTH

1" = 10'-0"A12

TRAILER 41- 1ST FLOOR REFLECTED CEILING PLAN

1/4" = 1'-0"F12

TRAILER 41- 41-110 NEW WORK RCP

1/4" = 1'-0"F9

TRAILER 41- 41-110 DEMO WORK RCP

KEYNOTES - DEMOLITION RCP

D30 REMOVE EXISTING CEILING TILE, GRID, SUPPORTS, AND FRAMING IN THEIR ENTIRETY.

D31 REMOVE EXISTING LIGHT FIXTURES, DIFFUSERS,GRILLES AND ALL CEILING MOUNTED

ACCESORRIES LOCATED WITHIN EXISTING CEILING BEING DEMOLISHED.

D32 REMOVE EXISTING GYPSUM BOARD CEILING AND SUPPORTS IN THEIR ENTIRETY TO EXTENTS

SHOWN ON REFLECTED CEILING PLAN.

D33 EXISTING CEILING SHALL REMAIN. CONTRACTOR SHALL REWORK EXISTING CEILING GRID, TILE, LIGHTING, AND AIR REGISTERS, AS REQUIRED.

D36 EXISTING PLASTER CEILING, AIR TERMINALS, LIGHT FIXTURES, AND CEILING FAN SHALL

REMAIN

D37 EXISTING PLASTER CEILING SHALL REMAIN. CONTRACTOR SHALL REMOVE EXISTING AIR

TERMINALS, LIGHTS FIXTURES, AND CEILING FAN IN THEIR ENTIRETY FROM EXISTING PLASTER

CEILING.

D38 EXISTING CEILING OPEN TO STRUCTURE ABOVE. CONTRACTOR SHALL REMOVE EXISTING

LIGHT FIXTURES AND AIR TERMINALS, AS REQUIRED.

D39 REMOVE EXISTING SOFFIT AND SUPPORTS, IN THEIR ENTIRETY, TO EXTENTS SHOWN ON

REFLECTED CEILING PLAN

D40 REMOVE EXISTING MINISPLIT IN ITS ENTIRETY- SEE MECHANICAL DRAWINGS

D41 EXISTING CEILING AND SUPPORTS SHALL REMAIN

D42 REMOVE EXISTING CEILING MOUNTED CURTAIN TRACK IN ITS ENTIRETY.

D43 EXISTING LIGHT FIXTURE SHALL REMAIN. CONTRACTOR SHALL PROTECT EXISTING ITEMS TO

REMAIN, AS REQUIRED, THROUGHOUT DEMOLITION AND NEW CONSTRUCTION WORK

KEYNOTES - RCP

1 NEW TR SHALL BE EXPOSED TO STRUCTURE ABOVE. ALL EXPOSED STRUCTURE AND DECK

SHALL BE SPRAYED WITH 2HR FIRE RESISTIVE MATERIAL PER UL N759

2 NEW SUSPENDED LIGHTING FIXTURE- SEE ELECTRICAL. NEW LIGHT FIXTURE SHALL BE HUNG

FROM UNDERSIDE OF EXISTING DECK ABOVE

3 NEW LAY IN CEILING TILE AND GRID SHALL MATCH EXISTING ADJACENT CEILING TILE AND GRID IN SIZE, TYPE, AND COLOR. PROVIDE AND INSTALL NEW LIGHT FIXTURES CENTERED IN

NEW CEILING TILE.

4 EXISTING CEILING, SOFFIT, MOLDING, TRIM AND CEILING FIXTURES SHALL REMAIN.

CONTRACTOR SHALL REWORK EXISTING CEILING AND SOFFIT TO REMAIN, AS REQUIRED.

5 RELOCATED LIGHT FIXTURE IN EXISTING CEILING GRID

6 RELOCATED AIR TERMINAL. CONTRACTOR SHALL TEST AND BALANCE AS REQUIRED- SEE

MECHANICAL FOR DETAILS

7 EXISTING LAY-IN CEILING TILE, CEILING GRID, LIGHT FIXTURES AND ALL CEILING MOUNTED

EQUIPMENT SHALL REMAIN. CONTRACTOR SHALL REWORK EXISTING CEILING, AS REQUIRED,

FOR DEMOLITION AND NEW WORK

8 PROVIDE AND INSTALL NEW LAY IN CEILING TILE AND GRID. NEW TILE AND GRID SHALL MATCH

EXISTING ADJACENT CEILING TILE AND GRID IN SIZE, TYPE, AND COLOR.

9 PROVIDE AND INSTALL NEW DRYWALL CEILING AND SUPPORTS, AS REQUIRED, TO EXTEND

EXISTING DRYWALL CEILING TO NEW WALL. NEW DRYWALL CEILING SHALL MATCH EXISTING

CEILING HEIGHT ABOVE FINISH FLOOR. TAPE, MUD, AND FLOAT, AS REQUIRED, TO PROVIDE

SMOOTH TRANSITION BETWEEN EXISTING AND NEW. PREP TO RECEIVE NEW PAINT.

N

E

AREA

COPY

HIMS

ROOF

HATCH/

LADDER

COPY

AREA

23 ----

STORAGE

C O R R

ID

O R

C O R R

ID

O R

C O R R

ID

O

R MENS

RESTROOM

VESTIBULE

WOMENS

RESTROOM

TRANSCRIPTION

CORRIDOR

PROGRAM

SUPPORT

TRANSCRIPTION

SUPERVISOR

ASSISTANT

TRANSCRIPTION

SUPERVISOR

CHIEF

HIMS

SECRETARY

CONFERENCE

ROOM

EDUCATION\

CORRIDOR

STAIR #2

STORAGE

PROCESS

IMPROVEMENT

ASSISTANT

CODING

SUPERVISOR

ASSISTANT

CORRIDOR

CODING

SUPERVISOR

PHARMACIST

OFFICE

DOCTOR

OFFICE

H.A.C.

CORRIDOR

LOBBY

LOUNGE HAS

CORRIDOR

NEUROLOGY

PHY. OFFICE

COMPUTER ROOM

INFOMATICS

QA/MS

CORRIDOR

CONFERENCE

ROOM

PHARMACY

ASSISTANT

CHIEF

PHARMACY

CHIEF

STAIR #1

TELEPHONE

MULTI PURPOSE

FILE ROOM

OFFICE- SW OFFICE OFFICE

RESIDENTS (6)

INPATIENT

CONSULT

LIASON

DOCTORAL

INTERN

ISO

PSYCHOLOGIST

PSYCHOLOGIST

PSYCHOLOGIST

ISO

COMPLAINCE

COMPLAINCE

COMPLAINCE

COMPLAINCE

INTERNS

OFFICE- SW

CORRIDOR

OFFICE- SW

RESTROOM

CODING AND

PROCESS

IMPROVEMENT

---- OFFICE- SW

MED/DIGESTIVE

DISEASE

OFFICE- SW

OFFICE- SWOFFICE- SW

OFFICE- SW

41-213a

41-246a

C

C

C

41-246

V2-03-41

41-247

41-230

C2-07-41

41-23141-23241-234

41-235

41-236

41-237

41-238

C1-09-41

S2-2-41

41-239

41-240 41-241

C2-10-41

41-243 41-244 41-245

41-201

C2-02-41

V2-01-41

41-202

V2-04-41 41-229

C2-05-41

41-228 41-227 41-224

C2-04-41

41-222 41-221 41-220

S2-1-41

41-226

41-225

41-205 41-206 41-208

41-223

41-209 41-210

41-215

41-218

41-219

41-217

41-216

41-214

41-212

41-213

41-211

41-207

41-204

C2-01-41

41-242b

41-203c

41-233c

41-233b41-233a 41-233

41-242

41-242a

41-238b

41-238a

41-203 41-203a

41-226c 41-226b

41-226a

41-202c 41-202b41-202a

41-203b

2500# Capacity:

2500# Capacity:

F E C

W/H

FEC

FEC

F E C

41-AE702

E9

41-AE702

E12

D31 D30

NEW TR

41-225

RACK

5'

3" 2'

0"

7' - 0"

GENERAL NOTE APPLICABLE TO ALL DRAWINGS - ITEMS AND CONDITIONS DETAILED NOTED OR

OTHERWISE IDENTIFIED ON ONE OF THE SECTIONS OR DETAILS ARE APPLICABLE AND BINDING

TO ALL OTHER SECTIONS AND DETAILS FOR IDENTICAL OR SIMILAR CONDITIONS.

1. CONTRACTOR SHALL REFERENCE ICRA, HAZARDOUS MATERIALS, DEMOLITION AND NEW

WORK SHEETS FOR ALL DISCIPLINES IN COORDINATING AND CONFIRMING DEMOLITION

SCOPE, REQUIREMENTS, PROCEDURES, AND WASTE REMOVAL.

2. CONTRACTOR SHALL COMPLY WITH APPLICABLE REGULATIONS, AS DEFINED ELSEWHERE

IN THE SPECIFICATIONS AND DRAWINGS, TO INCLUDE OSHA SILICA DUST CONTROL

REGULATIONS 29 CFR 1926.1153, 29 CFR 1910.134.

3. GENERAL CONTRACTOR SHALL FILL OUT ATTACHMENT C OF 138-022HV LOCATED IN SPEC

SECTION 01 35 26.19 FOR ALL DEMOLISHED EQUIPMENT INSTALLED IN THIS SCOPE OF

WORK.

FIRE PROTECTION DEVICES, EXIT SIGNS, AND TELECOMMUNICATION EQUIPMENT WITHIN THE

SCOPE OF WORK IS TO BE DEMOLISHED.

GENERAL DEMOLITION RCP NOTES

DEMO PLASTER /

GYPSUM BOARD CEILING

RCP LEGEND

NOTE: SPOT ELEVATION SUFFIX "C.H." INDICATES FLAT CEILING HEIGHT ABOVE FINISH FLOOR.

SUFFIX "L.P." AND "H.P." INDICATE LOW POINT AND HIGH POINT OF SLOPED CEILING. WHERE ADJACENT, TRANSITION BETWEEN FLAT AND SLOPED CEILINGS SHALL UTILIZE APPROVED PRE-

FINISHED ALUMINUM TRANSITION STRIP. REFER TO SPECIFICATIONS.

DEMO 2X4 ACT CEILING

TILE & GRID

DEMO 2X2 ACT CEILING

TILE & GRID

DEMO 2X4 LIGHT

FIXTURE

DEMO SUPPLY

DIFFUSER

DEMO RETURN

DIFFUSER

NEW 2X2 ACT CEILING

TILE & GRID

NEW 2X4 LIGHT

FIXTURE -…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .