Attachment 11 - Drawings Vol 2 Part4.pdf
PDF 36 MB Posted
- Solicitation number
- 36C77625R0092-RFP
About this file
This file is a set of architectural and engineering drawings for a construction project.
The document contains detailed construction drawings for the James A. Haley Veterans Hospital in Tampa, Florida, specifically for Building 41 infrastructure upgrades under VA Project Number 673-20-107. The project is titled "EHRM Infrastructure Upgrades" and is issued for construction as of April 4, 2025. The drawings cover both the first and second floors of Building 41 and include multiple disciplines: architectural, mechanical, and reflected ceiling plans. The architect of record is CB Design Group (Alexandria, VA), with consultants including Compass (Novelty, OH), Scott Przybysz (St. Louis, MO), Mark Dyck (Martinsburg, WV), and Clare Kramer (Orlando, FL).
The drawings include comprehensive ICRA (Infection Control Risk Assessment) plans with detailed containment and dust control requirements organized by classification levels (I through IV). Key requirements include isolation of HVAC systems, installation of critical barriers meeting NFPA 241 standards, maintenance of negative air pressure using HEPA-equipped filtration units, and implementation of antechambers for personnel decontamination. The renovation includes demolition of existing partitions, doors, and fixtures, along with new partition installation, flooring, ceiling systems, and MEP (mechanical, electrical, plumbing) work. Specific areas addressed include offices, conference rooms, restrooms, storage areas, and testing facilities throughout both floors. The facility is fully sprinklered, and all work must comply with fire-rated assembly requirements and OSHA silica dust control regulations.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
METAL CANOPY
2500# Capacity:
CORRIDOR
OFFICE
FILE ROOMCONFERENCE
ROOM
CHIEF
ASSISTANT
HR CHIEF
OFFICE
OFFICEOFFICEVESTIBULE/
WAITING
OFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE
OFFICE OFFICEOFFICE
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
OFFICE
OFFICE
AREA
OFFICE
OFFICE
TELEPHONE
STAIR #1
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
CORRIDOR
OFFICEOFFICE
HR OFFICEHAS CHIEF
LOUNGEPSYCH.
NURSE
PATIENT
EDUCATOR
CLINICAL
EDUCATOR
CORRIDOR
ACIPACIPADMIN
SUPPORT
CLERK
ASSOCIATE
CHIEF EDUCATOR
CHIEF NURSE
STORAGE
CLASSROOM
STAIR #2
INFOMATICS
STAFF
RELATIONS
DIRECTOR
NURSE
RECRUITER
CONFERENCE
ROOM
CLOSET
H.A.C.
FIRE
ELEVATOR
MACHINE
ROOM
CORRIDOR
TIMEKEEPERS
STORAGE
NURSE
EDUCATION (2)
STORAGE
WOMENS
RESTROOM
VESTIBULE
MENS
RESTROOM
TESTING
OFFICE
TESTING
OFFICE
NURSE
RECRUITMENT (3)
INFOMATICS
STORAGE
CORRIDOR
RECEPTION/
WAITING
VESTIBULE/
WAITING
C O R R
ID
O R
C O R R
ID
O
RC
O R R
ID
O R
C O R R
ID
O R
CORRIDOR
C1-02-41
41-118a?
41-11841-114
41-113
41-111
41-10841-107V1-01-41
41-106 41-109 41-110 41-112 41-115 41-116 41-117
41-121 41-11941-123 41-12541-12741-12941-13141-13341-105
41-138a
41-138
41-104
41-138b
41-135
S1-1-41
41-12041-12241-12441-12641-12841-130
C1-05-41
41-13241-134 41-13641-137
V1-04-4141-139 41-14041-141
C1-09-41
41-14341-14541-146 41-147
41-148
41-149
S1-2-41
41-151 41-153 41-155
41-158
41-155a
41-103
41-101
41-102
C1-06-41
41-142
41-144 41-150
41-159a
41-160
V1-03-41
41-159
41-15741-15641-15441-152
C1-11-41
V1-02-41
V1-01-41
C 1-
C 1-
1C 1-
C 1-
C1-01-41
W/H
ICRA MATRIX- TABLE 04
CONSTRUCTION PROJECT TYPE
A B C D
LOW I II II III
MEDIUM I II III IV
HIGH I II IV IV
HIGHEST II III IV IV
PATIENT
RISK GROUP
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON
COMPLETION OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE
FREE OF CONTAMINANTS AND LOOSE MATERIAL.
TABLE 05- DURING CONSTRUCTION PROJECT TABLE 6- UPON COMPLETION OF PROJECT
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
3. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
4. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN
SPECIFICATIONS.
5. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
C
LA
S
I
ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO
OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G.,
MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).
2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE
LEAVING THE WORK AREA.
3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE
HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM
TO ADDRESS DIFFUSER ISOLATION.
4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING
STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A
WEEK OR ISOLATED FROM THE MAIN SYSTEM.
5. SEAL DOORS TO PREVENT DUST MIGRATION.
6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY
CLEANING AND DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN
IDENTIFIED EXIT ROUTE.
7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA
MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS
PRIOR TO REMOVAL FROM THE AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST
BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION
AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF
VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK
AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY
AND WHEN VISIBLY SOILED.
MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP
MOPPING OR HEPA VACUUMING SURFACES AT LEAST DAILY.
C
LA
II
ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241
REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS
REMOVED, TO THE DECK ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE
COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS
MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK
ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND
CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE
FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE
ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED
OUTDOORS, OR COMPLY WITH THE ALTERNATIVE METHOD OUTLINED IN
APPENDIX A OF THIS DOCUMENT. THESE CONTROL MEASURES MUST BE
MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. HEPA
FILTERED EXHAUST IF DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE AT
A DISTANCE OF 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND
OPERABLE WINDOWS. EXHAUSTING DISCHARGED AIR INTO SHARED OR
RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.,
BATHROOM EXHAUST) IS PROHIBITED.
INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC,
MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO
CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN
THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND
ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR
FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND
CONTROL MEASURES.
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
3. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL
REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE
BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN
PERFORMED. ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.
4. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A
MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN
REMOVING HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA
VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD
BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
5. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE
WORK AREA.
6. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION
EQUIPMENT) MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD
AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM
THE WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.
7. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
8. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
9. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL
AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.
10. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
C
LA
III
ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL
BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE
CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS’ PPE AND CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF
VISIBLE DUST BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA
VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.
WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN
ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM
TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE
CHANGED IMMEDIATELY.
C
LA
IV
PRIOR TO START OF WORK IN THESE AREAS, GC
SHALL CONSULT WITH VA COR TO ENSURE
PERMITS ARE OBTAINED AND ICRA
REQUIREMENTS ARE MET AND MAINTAINED
DURING CONSTRUCTION.
ICRA LEGEND
ICRA BARRIER
ICRA KEYNOTE
TAG
F
CONSTRUCTION
FENCE
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT. VA COR SHALL APPROVE DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
ICRA NOTES - REMOVAL
1. PROVIDE TEMPORARY / PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY INDICATED ON PLANS. CONTRACTOR
SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.
2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS
SHALL AUTOMATICALLY LOCK UPON CLOSURE.
3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL
ICRA DOORS.
4. ALL ICRA PARTITIONS SHALL BE WALL TYPE "T.1". REFER TO AE300 FOR MORE INFORMATION.
5. CONTRACTOR SHALL COMPLY WITH NFPA 241 FOR DURATION OF DEMOLITION AND CONSTRUCTION.
ICRA NOTES - GENERAL
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD & PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR
IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. THE CONTRACTOR SHALL USE TEMPORARY PRESSURE SENSORS CONNECTED TO THE BUILDING AUTOMATION SYSTEM (BAS)- REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. THE CONTRACTOR SHALL TRACK, TREND, AND ALARM PROJECT AREA PRESSURE TO ENSURE PROOF OF NEGATIVE PRESSURE
ENVIRONMENT AT ALL TIMES UNTIL APPROVED BY VA COR TO REMOVE.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING
A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH
TIME THE WORKER EXITS THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
8. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630. CONTRACTOR SHALL REMOVE CONSTRUCTION WASTE IN CONTAINERS SMALL ENOUGH TO MAINTAIN CORRIDOR EGRESS FOR DAILY VA HOSPITAL
FUNCTIONS.
9. CONTRATOR SHALL USE THE EXISTING SERVICE ELEVATORS FOR MATERIAL LOADING AND WASTE REMOVAL. CONTRACTOR SHALL COORDINATE AND USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS
THROUGH THE FACILITY.
10. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
ICRA NOTES - CONSTRUCTION
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
AuthorChecker
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 41 1ST FLOOR ICRA PLAN
41-GC400
-2
-1
-G
C
/2
/2
.p d f
N
PLAN
NORTH
N
TRUE
NORTH
1" = 10'-0"A14
BUILDING 41 - OVERALL ICRA PLAN - 1ST FLOOR
BCS
N
E
AREA
COPY
HIMS
ROOF
HATCH/
LADDER
COPY
AREA
23 ----
STORAGE
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O
R MENS
RESTROOM
VESTIBULE
WOMENS
RESTROOM
TRANSCRIPTION
CORRIDOR
PROGRAM
SUPPORT
TRANSCRIPTION
SUPERVISOR
ASSISTANT
TRANSCRIPTION
SUPERVISOR
CHIEF
HIMS
SECRETARY
CONFERENCE
ROOM
EDUCATION\
CORRIDOR
STAIR #2
STORAGE
PROCESS
IMPROVEMENT
ASSISTANT
CODING
SUPERVISOR
ASSISTANT
CORRIDOR
CODING
SUPERVISOR
PHARMACIST
OFFICE
DOCTOR
OFFICE
H.A.C.
CORRIDOR
LOBBY
LOUNGE HAS
CORRIDOR
NEUROLOGY
PHY. OFFICE
COMPUTER ROOM
INFOMATICS
QA/MS
CORRIDOR
CONFERENCE
ROOM
PHARMACY
ASSISTANT
CHIEF
PHARMACY
CHIEF
STAIR #1
TELEPHONE
MULTI PURPOSE
FILE ROOM
OFFICE- SW OFFICE OFFICE
RESIDENTS (6)
INPATIENT
CONSULT
LIASON
DOCTORAL
INTERN
ISO
PSYCHOLOGIST
PSYCHOLOGIST
PSYCHOLOGIST
ISO
COMPLAINCE
COMPLAINCE
COMPLAINCE
COMPLAINCE
INTERNS
OFFICE- SW
CORRIDOR
OFFICE- SW
RESTROOM
CODING AND
PROCESS
IMPROVEMENT
---- OFFICE- SW
MED/DIGESTIVE
DISEASE
OFFICE- SW
OFFICE- SWOFFICE- SW
OFFICE- SW
104 SF
24 SF
S
F
S
F
S
F
146 SF
32 SF
142 SF
260 SF
290 SF
121 SF126 SF115 SF
136 SF
90 SF
251 SF
123 SF
29 SF
197 SF
123 SF
130 SF 130 SF
247 SF
131 SF 130 SF
130 SF
103 SF
376 SF
146 SF
120 SF
174 SF 147 SF
184 SF
202 SF 141 SF 118 SF
445 SF
386 SF 115 SF 157 SF
170 SF
47 SF
120 SF
100 SF 100 SF 100 SF
407 SF
100 SF 100 SF
118 SF
118 SF
118 SF
110 SF
110 SF
110 SF
67 SF
148 SF
225 SF
374 SF
100 SF
91 SF
67 SF
98 SF
104 SF
144 SF140 SF
136 SF
306 SF
67 SF
93 SF
82 SF
79 SF 79 SF
164 SF
164 SF
151 SF
125 SF
121 SF124 SF
91 SF
41-213a
41-246a
C
C
C
41-246
V2-03-41
41-247
41-230
C2-07-41
41-23141-23241-234
41-235
41-236
41-237
41-238
C1-09-41
S2-2-41
41-239
41-240 41-241
C2-10-41
41-243 41-244 41-245
41-201
C2-02-41
V2-01-41
41-202
V2-04-41 41-229
C2-05-41
41-228 41-227 41-224
C2-04-41
41-222 41-221 41-220
S2-1-41
41-226
41-225
41-205 41-206 41-208
41-223
41-209 41-210
41-215
41-218
41-219
41-217
41-216
41-214
41-212
41-213
41-211
41-207
41-204
C2-01-41
41-242b
41-203c
41-233c
41-233b41-233a 41-233
41-242
41-242a
41-238b
41-238a
41-203 41-203a
41-226c 41-226b
41-226a
41-202c 41-202b41-202a
41-203b
2500# Capacity:
2500# Capacity:
F E C
W/H
FEC
FEC
F E C
ICRA MATRIX- TABLE 04
CONSTRUCTION PROJECT TYPE
A B C D
LOW I II II III
MEDIUM I II III IV
HIGH I II IV IV
HIGHEST II III IV IV
PATIENT
RISK GROUP
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON
COMPLETION OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE
FREE OF CONTAMINANTS AND LOOSE MATERIAL.
TABLE 05- DURING CONSTRUCTION PROJECT TABLE 6- UPON COMPLETION OF PROJECT
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
3. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
4. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN
SPECIFICATIONS.
5. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
C
LA
I
ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO
OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G.,
MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).
2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE
LEAVING THE WORK AREA.
3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE
HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM
TO ADDRESS DIFFUSER ISOLATION.
4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING
STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A
WEEK OR ISOLATED FROM THE MAIN SYSTEM.
5. SEAL DOORS TO PREVENT DUST MIGRATION.
6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY
CLEANING AND DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN
IDENTIFIED EXIT ROUTE.
7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA
MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS
PRIOR TO REMOVAL FROM THE AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST
BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION
AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF
VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK
AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY
AND WHEN VISIBLY SOILED.
MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP
MOPPING OR HEPA VACUUMING SURFACES AT LEAST DAILY.
C
LA
II
ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241
REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS
REMOVED, TO THE DECK ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE
COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS
MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK
ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND
CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE
FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE
ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED
OUTDOORS, OR COMPLY WITH THE ALTERNATIVE METHOD OUTLINED IN
APPENDIX A OF THIS DOCUMENT. THESE CONTROL MEASURES MUST BE
MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. HEPA
FILTERED EXHAUST IF DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE AT
A DISTANCE OF 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND
OPERABLE WINDOWS. EXHAUSTING DISCHARGED AIR INTO SHARED OR
RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.,
BATHROOM EXHAUST) IS PROHIBITED.
INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC,
MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO
CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN
THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND
ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR
FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND
CONTROL MEASURES.
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
3. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL
REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE
BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN
PERFORMED. ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.
4. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A
MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN
REMOVING HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA
VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD
BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
5. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE
WORK AREA.
6. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION
EQUIPMENT) MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD
AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM
THE WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.
7. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
8. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
9. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL
AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.
10. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
C
LA
III
ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL
BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE
CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS’ PPE AND CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF
VISIBLE DUST BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA
VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.
WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN
ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM
TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE
CHANGED IMMEDIATELY.
C
LA
IV
PRIOR TO START OF WORK IN THESE AREAS, GC
SHALL CONSULT WITH VA COR TO ENSURE
PERMITS ARE OBTAINED AND ICRA
REQUIREMENTS ARE MET AND MAINTAINED
DURING CONSTRUCTION.
ICRA LEGEND
ICRA BARRIER
ICRA KEYNOTE
TAG
F
CONSTRUCTION
FENCE
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT. VA COR SHALL APPROVE DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
ICRA NOTES - REMOVAL
1. PROVIDE TEMPORARY / PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY INDICATED ON PLANS. CONTRACTOR
SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.
2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS
SHALL AUTOMATICALLY LOCK UPON CLOSURE.
3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL
ICRA DOORS.
4. ALL ICRA PARTITIONS SHALL BE WALL TYPE "T.1". REFER TO AE300 FOR MORE INFORMATION.
5. CONTRACTOR SHALL COMPLY WITH NFPA 241 FOR DURATION OF DEMOLITION AND CONSTRUCTION.
ICRA NOTES - GENERAL
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD & PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR
IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. THE CONTRACTOR SHALL USE TEMPORARY PRESSURE SENSORS CONNECTED TO THE BUILDING AUTOMATION SYSTEM (BAS)- REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. THE CONTRACTOR SHALL TRACK, TREND, AND ALARM PROJECT AREA PRESSURE TO ENSURE PROOF OF NEGATIVE PRESSURE
ENVIRONMENT AT ALL TIMES UNTIL APPROVED BY VA COR TO REMOVE.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING
A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH
TIME THE WORKER EXITS THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
8. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630. CONTRACTOR SHALL REMOVE CONSTRUCTION WASTE IN CONTAINERS SMALL ENOUGH TO MAINTAIN CORRIDOR EGRESS FOR DAILY VA HOSPITAL
FUNCTIONS.
9. CONTRATOR SHALL USE THE EXISTING SERVICE ELEVATORS FOR MATERIAL LOADING AND WASTE REMOVAL. CONTRACTOR SHALL COORDINATE AND USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS
THROUGH THE FACILITY.
10. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
ICRA NOTES - CONSTRUCTION
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
AuthorChecker
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 41 2ND FLOOR ICRA PLAN
41-GC401
-2
-1
-G
C
/2
/2
.p d f
N
PLAN
NORTH
N
TRUE
NORTH
1" = 10'-0"A13
BUILDING 41 - OVERALL ICRA PLAN - 2ND FLOOR
Capacity:
CORRIDOR
OFFICE
FILE ROOMCONFERENCE
ROOM
CHIEF
ASSISTANT
HR CHIEF
OFFICE
OFFICEOFFICEVESTIBULE/
WAITING
OFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE
OFFICE OFFICEOFFICE
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
OFFICE
OFFICE
AREA
OFFICE
OFFICE
TELEPHONE
STAIR #1
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
CORRIDOR
OFFICEOFFICE
HR OFFICEHAS CHIEF
LOUNGEPSYCH.
NURSE
PATIENT
EDUCATOR
CLINICAL
EDUCATOR
CORRIDOR
ACIPACIPADMIN
SUPPORT
CLERK
ASSOCIATE
CHIEF EDUCATOR
CHIEF NURSE
STORAGE
CLASSROOM
STAIR #2
INFOMATICS
STAFF
RELATIONS
DIRECTOR
NURSE
RECRUITER
CONFERENCE
ROOM
CLOSET
H.A.C.
FIRE
ELEVATOR
MACHINE
ROOM
CORRIDOR
TIMEKEEPERS
STORAGE
NURSE
EDUCATION (2)
STORAGE
WOMENS
RESTROOM
VESTIBULE
MENS
RESTROOM
TESTING
OFFICE
TESTING
OFFICE
NURSE
RECRUITMENT (3)
INFOMATICS
STORAGE
CORRIDOR
RECEPTION/
WAITING
VESTIBULE/
WAITING
C O R R
ID
O R
C O R R
ID
O
RC
O R R
ID
O R
C O R R
ID
O R
CORRIDOR
C1-02-41
41-118a?
41-11841-114
41-113
41-111
41-10841-107V1-01-41
41-106 41-109 41-110 41-112 41-115 41-116 41-117
41-121 41-11941-123 41-12541-12741-12941-13141-13341-105
41-138a
41-138
41-104
41-138b
41-135
S1-1-41
41-12041-12241-12441-12641-12841-130
C1-05-41
41-13241-134 41-13641-137
V1-04-4141-139 41-14041-141
C1-09-41
41-14341-14541-146 41-147
41-148
41-149
S1-2-41
41-151 41-153 41-155
41-158
41-155a
41-103
41-101
41-102
C1-06-41
41-142
41-144 41-150
41-159a
41-160
V1-03-41
41-159
41-15741-15641-15441-152
C1-11-41
V1-02-41
V1-01-41
C 1-
C 1-
1C 1-
C 1-
C1-01-41
W/H
41-AE401
E9
41-AE401
E13
D9
D2D4
D1
D3
NEW TR
41-110
6 7
41-110
8' - 0" 5" 10' - 0"
E X
IS
TI
N G
V .I.
F.
FEC3
3 2
PLYWD-01 PLYWD-01
PLYWD-01
A3
41-109
FLOOR PLAN LEGEND
A3WALL AND DOOR TO REMAIN /
EXISTING CONDITION
WALL AND DOOR TO BE
DEMOLISHED
NEW WORK PARTITION /
NEW WORK DOOR
NEW PARTITION TAG
DEMO PARTITION
NEW PARTITION
NEW PARTITION INFILL
TO MATCH EXISTING
ADJACENT
CONSTRUCTION
PLYWD-01 3/4" AC GRADE FRT
PLYWOOD- SEE
KEYNOTE 8 & FINISH
SCHEDULE
FEC SEMI-RECESSED FIRE
EXTINGUISHER
CABINET- SEE AE-502
FOR DETAILS
ICRA PARTITION- SEE
GC SHEETS FOR ICRA
DETAILS
NOTE: NOT ALL DEMOLITION AND PLAN KEYNOTES APPLY
TO THE FLOOR PLANS ON THIS SHEET
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
LTCAL
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 41- 1ST FLOOR- ENLARGED
PLANS- DEMO AND NEW WORK
41-AE401
-2
-1
-A
E
/0
/2
.p d f
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
N
PLAN
NORTH
N
TRUE
NORTH
1" = 10'-0"A13
BUILDING 41 - OVERALL 1ST FLOOR PLAN
1/4" = 1'-0"E13
41 BUILDING - 1ST FLOOR - DEMO WORK PLAN
1/4" = 1'-0"E9
41 BUILDING - 1ST FLOOR - NEW WORK PLAN
KEYNOTES - DEMOLITION
D1 REMOVE EXISTING DOOR, FRAME, AND HARDWARE IN THEIR ENTIRETY.
D2 REMOVE EXISTING FLOOR FINISH AND BASE WHERE REQUIRED. PREP SUBSURFACE, AS
REQUIRED, TO RECEIVE NEW FLOOR FINISH- SEE FINISH SCHEDULE
D3 REMOVE PORTION OF EXISTING WALL, AS REQUIRED, AND PREP OPENING TO RECEIVE NEW
DOOR AND DOOR FRAME- SEE DOOR SCHEDULE
D4 REMOVE EXISTING WALL IN ITS ENTIRETY TO EXTENTS SHOWN ON FLOOR PLAN.
D5 REMOVE ALL EXISTING PLUMBING FIXTURES IN THEIR ENTIRETY. CAP ALL PIPES AND VALVES
PRIOR TO START OF NEW WORK- SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
PATCH/REPAIR WALL AND PREP, AS REQUIRED, TO RECEIVE NEW FINISH
D6 REMOVE PORTION OF EXISTING WALL TO EXTENTS SHOWN ON FLOOR PLAN.
D7 EXISTING COLUMN SHALL REMAIN. CONTRACTOR SHALL COVER AND PROTECT EXISTING
COLUMNS DURING DEMO AND NEW WORK PHASES.
D8 REMOVE EXISTING CASEWORK AND COUNTERTOPS IN THEIR ENTIRETY. REMOVE ALL EXISTING
APPLIANCES, AS REQUIRED, AND RETURN TO VA.
D9 REMOVE EXISTING DOOR, FRAME, AND HARDWARE IN THEIR ENTIRETY. PREP EXISTING
OPENING TO RECEIVE NEW DOOR AND DOOR FRAME- SEE DOOR SCHEDULE FOR NEW DOOR
SIZE.
D10 REMOVE EXISTING WINDOW IN ITS ENTIRETY. PREP OPENING TO RECEIVE NEW WALL INFILL-
SEE NEW WORK FLOOR PLAN
D11 REMOVE EXISTING SLIDING DOOR STOREFRONT SYSTEM IN ITS ENTIRETY. PREP EXISTING
OPENING TO RECEIVE NEW DOORS AND NEW WALL INFILL- SEE NEW WORK FLOOR PLAN
D12 REMOVE EXISTING CONCRETE CURB IN ITS ENTIRETY. PREP SUBFLOOR TO RECEIVE NEW
FLOOR FINISH- SEE NEW WORK FLOOR PLAN
D13 REMOVE EXISTING FENCE, FENCE STRUCTURE, GATE AND HARDWARE IN THEIR ENTIRETY.
KEYNOTES - PLAN
1 PROVIDE AND INSTALL NEW DOOR, DOOR FRAME, AND HARDWARE- SEE DOOR SCHEDULE
2 NEW PARTITION- SEE WALL TYPE. PREP NEW PARTITION, AS REQUIRED, TO SEE NEW
FINISHES- SEE FINISH SCHEDULE
3 PROVIDE AND INSTALL NEW FLOORING AND WALL BASE, AS REQUIRED, FLOORING AND WALL
BASE SHALL MATCH EXISTING ADJACENT FLOORING AND WALL BASE. PREP WALL TO RECEIVE
NEW FINISHES ON EXISTING SIDE OF WALL. NEW FINISHES SHALL MATCH EXISTING.
4 PROVIDE AND INSTALL STAINLESS STEEL SECURITY MESH AT ALL WINDOWS. APPLY BLACK
OUT FILM (BF-01) TO WINDOW GLAZING PRIOR TO INSTALLATION OF SECURITY MESH. SEE
DETAIL
5 RE-FRAME OPENING TO RECEIVE NEW WALL INFILL. WALL INFILL SHALL MATCH EXISTING
WALL CONSTRUCTION. NEW WALL INFILL SHALL BE FLUSH WITH ADJACENT WALL
CONSTRUCTION, TAPE, MUD, AND FLOAT, AS REQUIRED, AND PREP TO RECEIVE NEW PAINT.
6 PROVIDE & INSTALL NEW 3/4" AC GRADE FRT PLYWOOD ON WALLS TO EXTENTS SHOWN ON
PLANS. BOTTOM EDGE OF PLYWOOD SHALL BE INSTALLED 12" AFF- SEE FINISH SCHEDULE
7 PROVIDE & INSTALL NEW FLOOR FINISH AND WALL BASE- SEE FINISH SCHEDULE. REFER TO
ELECTRICAL DRAWINGS FOR GROUND OF STATIC DISSIPATING FLOOR.
8 INFILL EXISTING OPENING IN FLOOR ASSEMBLY WHERE EXISTING CHASE WAS REMOVED. NEW
CONCRETE INFILL SHALL MATCH THE EXISTING ADJACENT FLOOR/ROOF ASSEMBLY
CONSTRUCTION TO MAINTAIN THE EXISTING RATING OF THE FIRE RATED ASSEMBLY. TOP OF
INFILL FINISH SHALL BE ALIGNED WITH AND BE FLUSH WITH ADJACENT TOP OF SLAB
ELEVATION. REFER TO STRUCTURAL DRAWINGS FOR ADDITONAL INFORMATION. PREP NEW
CONCRETE INFILL, AS REQUIRED, TO RECEIVE NEW FLOOR FINISH- SEE FINISH SCHEDULE
9 FRAME OPENING IN EXISTING WALL TO PROVIDE ACCESS TO NEW DOOR AND NEW TR ROOM
10 PROVIDE AND INSTALL NEW BLACK OUT FILM ON INTERIOR SIDE OF EXISTING WINDOW. SEE
BF-01 IN FINISH SCHEDULE.
D#
N
E
AREA
COPY
HIMS
ROOF
HATCH/
LADDER
COPY
AREA
23 ----
STORAGE
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O
R MENS
RESTROOM
VESTIBULE
WOMENS
RESTROOM
TRANSCRIPTION
CORRIDOR
PROGRAM
SUPPORT
TRANSCRIPTION
SUPERVISOR
ASSISTANT
TRANSCRIPTION
SUPERVISOR
CHIEF
HIMS
SECRETARY
CONFERENCE
ROOM
EDUCATION\
CORRIDOR
STAIR #2
STORAGE
PROCESS
IMPROVEMENT
ASSISTANT
CODING
SUPERVISOR
ASSISTANT
CORRIDOR
CODING
SUPERVISOR
PHARMACIST
OFFICE
DOCTOR
OFFICE
H.A.C.
CORRIDOR
LOBBY
LOUNGE HAS
CORRIDOR
NEUROLOGY
PHY. OFFICE
COMPUTER ROOM
INFOMATICS
QA/MS
CORRIDOR
CONFERENCE
ROOM
PHARMACY
ASSISTANT
CHIEF
PHARMACY
CHIEF
STAIR #1
TELEPHONE
MULTI PURPOSE
FILE ROOM
OFFICE- SW OFFICE OFFICE
RESIDENTS (6)
INPATIENT
CONSULT
LIASON
DOCTORAL
INTERN
ISO
PSYCHOLOGIST
PSYCHOLOGIST
PSYCHOLOGIST
ISO
COMPLAINCE
COMPLAINCE
COMPLAINCE
COMPLAINCE
INTERNS
OFFICE- SW
CORRIDOR
OFFICE- SW
RESTROOM
CODING AND
PROCESS
IMPROVEMENT
---- OFFICE- SW
MED/DIGESTIVE
DISEASE
OFFICE- SW
OFFICE- SWOFFICE- SW
OFFICE- SW
104 SF
24 SF
S
F
S
F
S
F
146 SF
32 SF
142 SF
260 SF
290 SF
121 SF126 SF115 SF
136 SF
90 SF
251 SF
123 SF
29 SF
197 SF
123 SF
130 SF 130 SF
247 SF
131 SF 130 SF
130 SF
103 SF
376 SF
146 SF
120 SF
174 SF 147 SF
184 SF
202 SF 141 SF 118 SF
445 SF
386 SF 115 SF 157 SF
170 SF
47 SF
120 SF
100 SF 100 SF 100 SF
407 SF
100 SF 100 SF
118 SF
118 SF
118 SF
110 SF
110 SF
110 SF
67 SF
148 SF
225 SF
374 SF
100 SF
91 SF
67 SF
98 SF
104 SF
144 SF140 SF
136 SF
306 SF
67 SF
93 SF
82 SF
79 SF 79 SF
164 SF
164 SF
151 SF
125 SF
121 SF124 SF
91 SF
41-213a
41-246a
C
C
C
41-246
V2-03-41
41-247
41-230
C2-07-41
41-23141-23241-234
41-235
41-236
41-237
41-238
C1-09-41
S2-2-41
41-239
41-240 41-241
C2-10-41
41-243 41-244 41-245
41-201
C2-02-41
V2-01-41
41-202
V2-04-41 41-229
C2-05-41
41-228 41-227 41-224
C2-04-41
41-222 41-221 41-220
S2-1-41
41-226
41-225
41-205 41-206 41-208
41-223
41-209 41-210
41-215
41-218
41-219
41-217
41-216
41-214
41-212
41-213
41-211
41-207
41-204
C2-01-41
41-242b
41-203c
41-233c
41-233b41-233a 41-233
41-242
41-242a
41-238b
41-238a
41-203 41-203a
41-226c 41-226b
41-226a
41-202c 41-202b41-202a
41-203b
2500# Capacity:
2500# Capacity:
F E C
W/H
FEC
FEC
F E C
41-AE402
E10
41-AE402
E13
D2
D9
NEW TR
41-225
EXISTING V.I.F.
13' - 2" ±
E X
IS
TI
N G
V .I.
F.
9'
2"
PLYWD-01
PLYWD-01 PLYWD-01
6 7
FEC
FLOOR PLAN LEGEND
A3WALL AND DOOR TO REMAIN /
EXISTING CONDITION
WALL AND DOOR TO BE
DEMOLISHED
NEW WORK PARTITION /
NEW WORK DOOR
NEW PARTITION TAG
DEMO PARTITION
NEW PARTITION
NEW PARTITION INFILL
TO MATCH EXISTING
ADJACENT
CONSTRUCTION
PLYWD-01 3/4" AC GRADE FRT
PLYWOOD- SEE
KEYNOTE 8 & FINISH
SCHEDULE
FEC SEMI-RECESSED FIRE
EXTINGUISHER
CABINET- SEE AE-502
FOR DETAILS
ICRA PARTITION- SEE
GC SHEETS FOR ICRA
DETAILS
NOTE: NOT ALL DEMOLITION AND PLAN KEYNOTES APPLY
TO THE FLOOR PLANS ON THIS SHEET
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
LTCAL
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 41- 2ND FLOOR-
ENLARGED PLANS- DEMO AND NEW
WORK
41-AE402
-2
-1
-A
E
/2
/2
.p d f
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
N
PLAN
NORTH
N
TRUE
NORTH
1" = 10'-0"A13
BUILDING 41 - OVERALL 2ND FLOOR PLAN
1/4" = 1'-0"E13
41 BUILDING - 2ND FLOOR - DEMO WORK PLAN
1/4" = 1'-0"E10
41 BUILDING - 2ND FLOOR - NEW WORK PLAN
KEYNOTES - DEMOLITION
D1 REMOVE EXISTING DOOR, FRAME, AND HARDWARE IN THEIR ENTIRETY.
D2 REMOVE EXISTING FLOOR FINISH AND BASE WHERE REQUIRED. PREP SUBSURFACE, AS
REQUIRED, TO RECEIVE NEW FLOOR FINISH- SEE FINISH SCHEDULE
D3 REMOVE PORTION OF EXISTING WALL, AS REQUIRED, AND PREP OPENING TO RECEIVE NEW
DOOR AND DOOR FRAME- SEE DOOR SCHEDULE
D4 REMOVE EXISTING WALL IN ITS ENTIRETY TO EXTENTS SHOWN ON FLOOR PLAN.
D5 REMOVE ALL EXISTING PLUMBING FIXTURES IN THEIR ENTIRETY. CAP ALL PIPES AND VALVES
PRIOR TO START OF NEW WORK- SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
PATCH/REPAIR WALL AND PREP, AS REQUIRED, TO RECEIVE NEW FINISH
D6 REMOVE PORTION OF EXISTING WALL TO EXTENTS SHOWN ON FLOOR PLAN.
D7 EXISTING COLUMN SHALL REMAIN. CONTRACTOR SHALL COVER AND PROTECT EXISTING
COLUMNS DURING DEMO AND NEW WORK PHASES.
D8 REMOVE EXISTING CASEWORK AND COUNTERTOPS IN THEIR ENTIRETY. REMOVE ALL EXISTING
APPLIANCES, AS REQUIRED, AND RETURN TO VA.
D9 REMOVE EXISTING DOOR, FRAME, AND HARDWARE IN THEIR ENTIRETY. PREP EXISTING
OPENING TO RECEIVE NEW DOOR AND DOOR FRAME- SEE DOOR SCHEDULE FOR NEW DOOR
SIZE.
D10 REMOVE EXISTING WINDOW IN ITS ENTIRETY. PREP OPENING TO RECEIVE NEW WALL INFILL-
SEE NEW WORK FLOOR PLAN
D11 REMOVE EXISTING SLIDING DOOR STOREFRONT SYSTEM IN ITS ENTIRETY. PREP EXISTING
OPENING TO RECEIVE NEW DOORS AND NEW WALL INFILL- SEE NEW WORK FLOOR PLAN
D12 REMOVE EXISTING CONCRETE CURB IN ITS ENTIRETY. PREP SUBFLOOR TO RECEIVE NEW
FLOOR FINISH- SEE NEW WORK FLOOR PLAN
D13 REMOVE EXISTING FENCE, FENCE STRUCTURE, GATE AND HARDWARE IN THEIR ENTIRETY.
KEYNOTES - PLAN
1 PROVIDE AND INSTALL NEW DOOR, DOOR FRAME, AND HARDWARE- SEE DOOR SCHEDULE
2 NEW PARTITION- SEE WALL TYPE. PREP NEW PARTITION, AS REQUIRED, TO SEE NEW
FINISHES- SEE FINISH SCHEDULE
3 PROVIDE AND INSTALL NEW FLOORING AND WALL BASE, AS REQUIRED, FLOORING AND WALL
BASE SHALL MATCH EXISTING ADJACENT FLOORING AND WALL BASE. PREP WALL TO RECEIVE
NEW FINISHES ON EXISTING SIDE OF WALL. NEW FINISHES SHALL MATCH EXISTING.
4 PROVIDE AND INSTALL STAINLESS STEEL SECURITY MESH AT ALL WINDOWS. APPLY BLACK
OUT FILM (BF-01) TO WINDOW GLAZING PRIOR TO INSTALLATION OF SECURITY MESH. SEE
DETAIL
5 RE-FRAME OPENING TO RECEIVE NEW WALL INFILL. WALL INFILL SHALL MATCH EXISTING
WALL CONSTRUCTION. NEW WALL INFILL SHALL BE FLUSH WITH ADJACENT WALL
CONSTRUCTION, TAPE, MUD, AND FLOAT, AS REQUIRED, AND PREP TO RECEIVE NEW PAINT.
6 PROVIDE & INSTALL NEW 3/4" AC GRADE FRT PLYWOOD ON WALLS TO EXTENTS SHOWN ON
PLANS. BOTTOM EDGE OF PLYWOOD SHALL BE INSTALLED 12" AFF- SEE FINISH SCHEDULE
7 PROVIDE & INSTALL NEW FLOOR FINISH AND WALL BASE- SEE FINISH SCHEDULE. REFER TO
ELECTRICAL DRAWINGS FOR GROUND OF STATIC DISSIPATING FLOOR.
8 INFILL EXISTING OPENING IN FLOOR ASSEMBLY WHERE EXISTING CHASE WAS REMOVED. NEW
CONCRETE INFILL SHALL MATCH THE EXISTING ADJACENT FLOOR/ROOF ASSEMBLY
CONSTRUCTION TO MAINTAIN THE EXISTING RATING OF THE FIRE RATED ASSEMBLY. TOP OF
INFILL FINISH SHALL BE ALIGNED WITH AND BE FLUSH WITH ADJACENT TOP OF SLAB
ELEVATION. REFER TO STRUCTURAL DRAWINGS FOR ADDITONAL INFORMATION. PREP NEW
CONCRETE INFILL, AS REQUIRED, TO RECEIVE NEW FLOOR FINISH- SEE FINISH SCHEDULE
9 FRAME OPENING IN EXISTING WALL TO PROVIDE ACCESS TO NEW DOOR AND NEW TR ROOM
10 PROVIDE AND INSTALL NEW BLACK OUT FILM ON INTERIOR SIDE OF EXISTING WINDOW. SEE
BF-01 IN FINISH SCHEDULE.
T
MOP RACK
2500# Capacity:
OFFICE
FILE ROOMCONFERENCE
ROOM
CHIEF
ASSISTANT
HR CHIEF
OFFICE
OFFICEOFFICEVESTIBULE/
WAITING
OFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE
OFFICE OFFICEOFFICE
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
OFFICE
OFFICE
AREA
OFFICE
OFFICE
TELEPHONE
STAIR #1
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
CORRIDOR
OFFICEOFFICE
HR OFFICEHAS CHIEF
LOUNGEPSYCH.
NURSE
PATIENT
EDUCATOR
CLINICAL
EDUCATOR
CORRIDOR
ACIPACIPADMIN
SUPPORT
CLERK
ASSOCIATE
CHIEF EDUCATOR
CHIEF NURSE
STORAGE
CLASSROOM
STAIR #2
INFOMATICS
STAFF
RELATIONS
DIRECTOR
NURSE
RECRUITER
CONFERENCE
ROOM
CLOSET
H.A.C.
FIRE
ELEVATOR
MACHINE
ROOM
CORRIDOR
TIMEKEEPERS
STORAGE
NURSE
EDUCATION (2)
STORAGE
WOMENS
RESTROOM
VESTIBULE
MENS
RESTROOM
TESTING
OFFICE
TESTING
OFFICE
NURSE
RECRUITMENT (3)
INFOMATICS
STORAGE
CORRIDOR
RECEPTION/
WAITING
VESTIBULE/
WAITING
C O R R
ID
O R
C O R R
ID
O
RC
O R R
ID
O R
C O R R
ID
O R
CORRIDOR
C1-02-41
41-118a?
41-11841-114
41-113
41-111
41-10841-107V1-01-41
41-106 41-109 41-110 41-112 41-115 41-116 41-117
41-121 41-11941-123 41-12541-12741-12941-13141-13341-105
41-138a
41-138
41-104
41-138b
41-135
S1-1-41
41-12041-12241-12441-12641-12841-13041-13241-134 41-13641-137
V1-04-4141-139 41-14041-141
C1-09-41
41-14341-14541-146 41-147
41-148
41-149
S1-2-41
41-151 41-153 41-155
41-158
41-155a
41-103
41-101
41-102
C1-06-41
41-142
41-144 41-150
41-159a
41-160
V1-03-41
41-159
41-15741-15641-15441-152
V1-02-41
V1-01-41
C 1-
C 1-
1C 1-
C1-01-41
FEC
F E C
F E C
FEC
W/H
2D
D
41-AE701
F12
41-AE701
F9
NEW TR
41-110
1 2
2'
7" 6'
9"
RACK RACK
4' - 6"
D30
D31
GENERAL NOTE APPLICABLE TO ALL DRAWINGS - ITEMS AND CONDITIONS DETAILED NOTED OR
OTHERWISE IDENTIFIED ON ONE OF THE SECTIONS OR DETAILS ARE APPLICABLE AND BINDING
TO ALL OTHER SECTIONS AND DETAILS FOR IDENTICAL OR SIMILAR CONDITIONS.
1. CONTRACTOR SHALL REFERENCE ICRA, HAZARDOUS MATERIALS, DEMOLITION AND NEW
WORK SHEETS FOR ALL DISCIPLINES IN COORDINATING AND CONFIRMING DEMOLITION
SCOPE, REQUIREMENTS, PROCEDURES, AND WASTE REMOVAL.
2. CONTRACTOR SHALL COMPLY WITH APPLICABLE REGULATIONS, AS DEFINED ELSEWHERE
IN THE SPECIFICATIONS AND DRAWINGS, TO INCLUDE OSHA SILICA DUST CONTROL
REGULATIONS 29 CFR 1926.1153, 29 CFR 1910.134.
3. GENERAL CONTRACTOR SHALL FILL OUT ATTACHMENT C OF 138-022HV LOCATED IN SPEC
SECTION 01 35 26.19 FOR ALL DEMOLISHED EQUIPMENT INSTALLED IN THIS SCOPE OF
WORK.
FIRE PROTECTION DEVICES, EXIT SIGNS, AND TELECOMMUNICATION EQUIPMENT WITHIN THE
SCOPE OF WORK IS TO BE DEMOLISHED.
GENERAL DEMOLITION RCP NOTES
DEMO PLASTER /
GYPSUM BOARD CEILING
RCP LEGEND
NOTE: SPOT ELEVATION SUFFIX "C.H." INDICATES FLAT CEILING HEIGHT ABOVE FINISH FLOOR.
SUFFIX "L.P." AND "H.P." INDICATE LOW POINT AND HIGH POINT OF SLOPED CEILING. WHERE ADJACENT, TRANSITION BETWEEN FLAT AND SLOPED CEILINGS SHALL UTILIZE APPROVED PRE-
FINISHED ALUMINUM TRANSITION STRIP. REFER TO SPECIFICATIONS.
DEMO 2X4 ACT CEILING
TILE & GRID
DEMO 2X2 ACT CEILING
TILE & GRID
DEMO 2X4 LIGHT
FIXTURE
DEMO SUPPLY
DIFFUSER
DEMO RETURN
DIFFUSER
NEW 2X2 ACT CEILING
TILE & GRID
NEW 2X4 LIGHT
FIXTURE - SEE ELEC
NEW SUPPLY
DIFFUSER - SEE MECH
NEW RETURN
DIFFUSER - SEE MECH
NEW 6" X 4'-0 LIGHT
FIXTURE - SEE ELEC
NEW 6" DIA. DOWN LIGHT
FIXTURE - SEE ELEC
GENERAL NOTE APPLICABLE TO ALL DRAWINGS - ITEMS AND CONDITIONS DETAILED NOTED OR
OTHERWISE IDENTIFIED ON ONE OF THE SECTIONS OR DETAILS ARE APPLICABLE AND BINDING
TO ALL OTHER SECTIONS AND DETAILS FOR IDENTICAL OR SIMILAR CONDITIONS.
1. ALL NEW TRS SHALL BE OPEN TO DECK ABOVE.
2. REFER TO ELECTRICAL DRAWINGS FOR LIGHT PATTERN AND EXIT LIGHT LOCATIONS.
NOTIFY ARCHITECT OF DISCREPANCIES PRIOR TO SHOP DRAWINGS.
3. ALL WALLS SHOWN SHALL EXTEND TO THE STRUCTURAL DECK (SEE WALL TYPES).
CORRIDOR CHASE WALLS AND LOCKER WING WALLS SHALL EXTEND 4" MINIMUM ABOVE
THE CEILING.
4. WHERE CEILING TILES ARE SCHEDULED, REFER TO MECHANICAL, PLUMBING AND
ELECTRICAL DRAWINGS FOR ITEMS NOT SHOWN ON CEILING PLAN. GRILLES, SPEAKERS,
SPRINKLERS, HEAT & SMOKE DETECTORS, SHALL BE CENTERED IN TILES (WHERE
SCHEDULED) UNLESS NOTED OTHERWISE.
5. IN AREAS OF EXPOSED STRUCTURE, PAINT EXPOSED STRUCTURE, UNDERSIDE OF DECK,
SPRINKLER PIPING, CONDUIT AND ALL MISCELLANEOUS OVERHEAD ITEMS. COLORS SHALL
BE SELECTED BY ARCHITECT.
GENERAL RCP NOTES
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
COMPASS
8734 GALLOWAY TRAIL
NOVELTY, OH. 44072
619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 KING ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
James A. Haley Veterans Hospital 13000 Bruce B. Downs Blvd.
Tampa, FL. 33612
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CONSULTANT:
SCOTT PRZYBYSZ
15 SUNNEN DR. SUITE 104
ST. LOUIS, MO 63143
314-951-2535
CONSULTANT:
MARK DYCK
148 S. QUEEN ST. SUITE 201
MARTINSBURG, WV. 25401
304-266-3115
CONSULTANT:
CLARE KRAMER
2815 DIRECTORS ROW
SUITE 500
ORLANDO, FL. 32809
407-917-2430
04/04/2025
673-20-107
LTCAL
EHRM INFRASTRUCTURE UPGRADES
TAMPA, FL.
ISSUED FOR CONSTRUCTION
BUILDING 41- 1ST FLOOR-
REFLECTED CEILING PLANS- DEMO
AND NEW WORK
41-AE701
-2
-1
-A
E
/2
/2
.p d f
N
TRUE NORTH
SITE KEY PLAN
SCALE: NOT TO SCALE
N
PLAN
NORTH
N
TRUE
NORTH
1" = 10'-0"A12
TRAILER 41- 1ST FLOOR REFLECTED CEILING PLAN
1/4" = 1'-0"F12
TRAILER 41- 41-110 NEW WORK RCP
1/4" = 1'-0"F9
TRAILER 41- 41-110 DEMO WORK RCP
KEYNOTES - DEMOLITION RCP
D30 REMOVE EXISTING CEILING TILE, GRID, SUPPORTS, AND FRAMING IN THEIR ENTIRETY.
D31 REMOVE EXISTING LIGHT FIXTURES, DIFFUSERS,GRILLES AND ALL CEILING MOUNTED
ACCESORRIES LOCATED WITHIN EXISTING CEILING BEING DEMOLISHED.
D32 REMOVE EXISTING GYPSUM BOARD CEILING AND SUPPORTS IN THEIR ENTIRETY TO EXTENTS
SHOWN ON REFLECTED CEILING PLAN.
D33 EXISTING CEILING SHALL REMAIN. CONTRACTOR SHALL REWORK EXISTING CEILING GRID, TILE, LIGHTING, AND AIR REGISTERS, AS REQUIRED.
D36 EXISTING PLASTER CEILING, AIR TERMINALS, LIGHT FIXTURES, AND CEILING FAN SHALL
REMAIN
D37 EXISTING PLASTER CEILING SHALL REMAIN. CONTRACTOR SHALL REMOVE EXISTING AIR
TERMINALS, LIGHTS FIXTURES, AND CEILING FAN IN THEIR ENTIRETY FROM EXISTING PLASTER
CEILING.
D38 EXISTING CEILING OPEN TO STRUCTURE ABOVE. CONTRACTOR SHALL REMOVE EXISTING
LIGHT FIXTURES AND AIR TERMINALS, AS REQUIRED.
D39 REMOVE EXISTING SOFFIT AND SUPPORTS, IN THEIR ENTIRETY, TO EXTENTS SHOWN ON
REFLECTED CEILING PLAN
D40 REMOVE EXISTING MINISPLIT IN ITS ENTIRETY- SEE MECHANICAL DRAWINGS
D41 EXISTING CEILING AND SUPPORTS SHALL REMAIN
D42 REMOVE EXISTING CEILING MOUNTED CURTAIN TRACK IN ITS ENTIRETY.
D43 EXISTING LIGHT FIXTURE SHALL REMAIN. CONTRACTOR SHALL PROTECT EXISTING ITEMS TO
REMAIN, AS REQUIRED, THROUGHOUT DEMOLITION AND NEW CONSTRUCTION WORK
KEYNOTES - RCP
1 NEW TR SHALL BE EXPOSED TO STRUCTURE ABOVE. ALL EXPOSED STRUCTURE AND DECK
SHALL BE SPRAYED WITH 2HR FIRE RESISTIVE MATERIAL PER UL N759
2 NEW SUSPENDED LIGHTING FIXTURE- SEE ELECTRICAL. NEW LIGHT FIXTURE SHALL BE HUNG
FROM UNDERSIDE OF EXISTING DECK ABOVE
3 NEW LAY IN CEILING TILE AND GRID SHALL MATCH EXISTING ADJACENT CEILING TILE AND GRID IN SIZE, TYPE, AND COLOR. PROVIDE AND INSTALL NEW LIGHT FIXTURES CENTERED IN
NEW CEILING TILE.
4 EXISTING CEILING, SOFFIT, MOLDING, TRIM AND CEILING FIXTURES SHALL REMAIN.
CONTRACTOR SHALL REWORK EXISTING CEILING AND SOFFIT TO REMAIN, AS REQUIRED.
5 RELOCATED LIGHT FIXTURE IN EXISTING CEILING GRID
6 RELOCATED AIR TERMINAL. CONTRACTOR SHALL TEST AND BALANCE AS REQUIRED- SEE
MECHANICAL FOR DETAILS
7 EXISTING LAY-IN CEILING TILE, CEILING GRID, LIGHT FIXTURES AND ALL CEILING MOUNTED
EQUIPMENT SHALL REMAIN. CONTRACTOR SHALL REWORK EXISTING CEILING, AS REQUIRED,
FOR DEMOLITION AND NEW WORK
8 PROVIDE AND INSTALL NEW LAY IN CEILING TILE AND GRID. NEW TILE AND GRID SHALL MATCH
EXISTING ADJACENT CEILING TILE AND GRID IN SIZE, TYPE, AND COLOR.
9 PROVIDE AND INSTALL NEW DRYWALL CEILING AND SUPPORTS, AS REQUIRED, TO EXTEND
EXISTING DRYWALL CEILING TO NEW WALL. NEW DRYWALL CEILING SHALL MATCH EXISTING
CEILING HEIGHT ABOVE FINISH FLOOR. TAPE, MUD, AND FLOAT, AS REQUIRED, TO PROVIDE
SMOOTH TRANSITION BETWEEN EXISTING AND NEW. PREP TO RECEIVE NEW PAINT.
N
E
AREA
COPY
HIMS
ROOF
HATCH/
LADDER
COPY
AREA
23 ----
STORAGE
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O
R MENS
RESTROOM
VESTIBULE
WOMENS
RESTROOM
TRANSCRIPTION
CORRIDOR
PROGRAM
SUPPORT
TRANSCRIPTION
SUPERVISOR
ASSISTANT
TRANSCRIPTION
SUPERVISOR
CHIEF
HIMS
SECRETARY
CONFERENCE
ROOM
EDUCATION\
CORRIDOR
STAIR #2
STORAGE
PROCESS
IMPROVEMENT
ASSISTANT
CODING
SUPERVISOR
ASSISTANT
CORRIDOR
CODING
SUPERVISOR
PHARMACIST
OFFICE
DOCTOR
OFFICE
H.A.C.
CORRIDOR
LOBBY
LOUNGE HAS
CORRIDOR
NEUROLOGY
PHY. OFFICE
COMPUTER ROOM
INFOMATICS
QA/MS
CORRIDOR
CONFERENCE
ROOM
PHARMACY
ASSISTANT
CHIEF
PHARMACY
CHIEF
STAIR #1
TELEPHONE
MULTI PURPOSE
FILE ROOM
OFFICE- SW OFFICE OFFICE
RESIDENTS (6)
INPATIENT
CONSULT
LIASON
DOCTORAL
INTERN
ISO
PSYCHOLOGIST
PSYCHOLOGIST
PSYCHOLOGIST
ISO
COMPLAINCE
COMPLAINCE
COMPLAINCE
COMPLAINCE
INTERNS
OFFICE- SW
CORRIDOR
OFFICE- SW
RESTROOM
CODING AND
PROCESS
IMPROVEMENT
---- OFFICE- SW
MED/DIGESTIVE
DISEASE
OFFICE- SW
OFFICE- SWOFFICE- SW
OFFICE- SW
41-213a
41-246a
C
C
C
41-246
V2-03-41
41-247
41-230
C2-07-41
41-23141-23241-234
41-235
41-236
41-237
41-238
C1-09-41
S2-2-41
41-239
41-240 41-241
C2-10-41
41-243 41-244 41-245
41-201
C2-02-41
V2-01-41
41-202
V2-04-41 41-229
C2-05-41
41-228 41-227 41-224
C2-04-41
41-222 41-221 41-220
S2-1-41
41-226
41-225
41-205 41-206 41-208
41-223
41-209 41-210
41-215
41-218
41-219
41-217
41-216
41-214
41-212
41-213
41-211
41-207
41-204
C2-01-41
41-242b
41-203c
41-233c
41-233b41-233a 41-233
41-242
41-242a
41-238b
41-238a
41-203 41-203a
41-226c 41-226b
41-226a
41-202c 41-202b41-202a
41-203b
2500# Capacity:
2500# Capacity:
F E C
W/H
FEC
FEC
F E C
41-AE702
E9
41-AE702
E12
D31 D30
NEW TR
41-225
RACK
5'
3" 2'
0"
7' - 0"
GENERAL NOTE APPLICABLE TO ALL DRAWINGS - ITEMS AND CONDITIONS DETAILED NOTED OR
OTHERWISE IDENTIFIED ON ONE OF THE SECTIONS OR DETAILS ARE APPLICABLE AND BINDING
TO ALL OTHER SECTIONS AND DETAILS FOR IDENTICAL OR SIMILAR CONDITIONS.
1. CONTRACTOR SHALL REFERENCE ICRA, HAZARDOUS MATERIALS, DEMOLITION AND NEW
WORK SHEETS FOR ALL DISCIPLINES IN COORDINATING AND CONFIRMING DEMOLITION
SCOPE, REQUIREMENTS, PROCEDURES, AND WASTE REMOVAL.
2. CONTRACTOR SHALL COMPLY WITH APPLICABLE REGULATIONS, AS DEFINED ELSEWHERE
IN THE SPECIFICATIONS AND DRAWINGS, TO INCLUDE OSHA SILICA DUST CONTROL
REGULATIONS 29 CFR 1926.1153, 29 CFR 1910.134.
3. GENERAL CONTRACTOR SHALL FILL OUT ATTACHMENT C OF 138-022HV LOCATED IN SPEC
SECTION 01 35 26.19 FOR ALL DEMOLISHED EQUIPMENT INSTALLED IN THIS SCOPE OF
WORK.
FIRE PROTECTION DEVICES, EXIT SIGNS, AND TELECOMMUNICATION EQUIPMENT WITHIN THE
SCOPE OF WORK IS TO BE DEMOLISHED.
GENERAL DEMOLITION RCP NOTES
DEMO PLASTER /
GYPSUM BOARD CEILING
RCP LEGEND
NOTE: SPOT ELEVATION SUFFIX "C.H." INDICATES FLAT CEILING HEIGHT ABOVE FINISH FLOOR.
SUFFIX "L.P." AND "H.P." INDICATE LOW POINT AND HIGH POINT OF SLOPED CEILING. WHERE ADJACENT, TRANSITION BETWEEN FLAT AND SLOPED CEILINGS SHALL UTILIZE APPROVED PRE-
FINISHED ALUMINUM TRANSITION STRIP. REFER TO SPECIFICATIONS.
DEMO 2X4 ACT CEILING
TILE & GRID
DEMO 2X2 ACT CEILING
TILE & GRID
DEMO 2X4 LIGHT
FIXTURE
DEMO SUPPLY
DIFFUSER
DEMO RETURN
DIFFUSER
NEW 2X2 ACT CEILING
TILE & GRID
NEW 2X4 LIGHT
FIXTURE -…
This is the start of the file's text. The full file is on GovTribe.