Attachment 0008 - NCR MATOC Section L v8.pdf

PDF 126 KB Posted

Attached to
SOLICITATION - National Capital Region (NCR) Multiple Award Task Order Contract (MATOC)
Solicitation number
W51EW7-26-R-A002
Issued by

About this file

This document contains Section L of a Request for Proposal (RFP) for an Indefinite Delivery Indefinite Quantity (IDIQ) contract, providing instructions for offerors on proposal preparation and submission requirements. The solicitation (RFP W51EW7-26-R-A002) is a total Small Business Set-Aside (SBSA) for the NCR MATOC (Maintenance, Alteration, Repair, and Operations Construction) program, with a Statement of Work dated 08JUN2026. This is a price-excluded procurement under FAR 15.304(c)(1)(ii)(A), meaning price will not be evaluated for initial IDIQ parent contract awards. The Government will make basic IDIQ awards to all small business concerns whose proposals receive an "Acceptable" technical conformance rating. Proposals must be submitted solely through the PIEE Solicitation Module by the RFP close date, with strict adherence to file naming conventions and a maximum batch upload size of 1.9 GB. Questions must be submitted by 03APR2026 at 10:00 am CT to the Contracting Officer (Danette Wilson) or Contract Specialist (Amy Hahka).

The proposal must include a Cover Letter (2 pages) with the RFP number, proposal validity date (180 days from RFP close), at least two authorized prime offeror representatives, signed SF 1442, signed SF 30 amendments, and exceptions documentation. Volume I – Factor 1: Technical Proposal Conformance must be 75 pages maximum and include four written compliance plans: Sub-Factor 1A (MATOC Program Management Plan with organizational chart, Project Manager letter of commitment, and single point of contact); Sub-Factor 1B (Quality Control System Plan with three-phase control system description and Quality Control Manager commitment letter); Sub-Factor 1C (Site Safety and Health Plan with Personal Protective Equipment Program, Confined Space Entry Procedures, and Safety and Health Officer commitment letter); and Sub-Factor 1D (Environmental Protection Plan with hazardous waste procedures and solid waste diversion reporting plan). Evaluation is limited to verifying presence and completeness of required plans only; the Government will not assess qualitative merits, feasibility, or quality of the technical approach. Material exceeding page limits will not be read or evaluated and may result in proposal rejection.

View the file

Other files

File Type Posted
Attachment 0001 - NCR MATOC SOW 1JUL2026.pdf PDF
Solicitation Amendment W51EW726RA0020009 SF30.pdf PDF
Attachment 0009 - NCR MATOC Section M v6.pdf PDF
Solicitation Amendment W51EW726RA0020008 SF30.pdf PDF
Attachment 0015 - NCR MATOC QA A0008 v2.pdf PDF
Attachment 0001 - NCR MATOC SOW 8JUN2026.pdf PDF
Solicitation Amendment W51EW726RA0020007 SF30.pdf PDF
Solicitation Amendment W51EW726RA0020006 SF30.pdf PDF
Soicitation Amendment W51EW726RA0020005 SF 30.pdf PDF
Attachment 0003 - Past Performance Questionnaire v2.docx DOCX document
Attachment 0012 - Seed Project SOW Floor Plan Layout.pptx PPTX presentation
Attachment 0006 - Contractor Bid Sheet v2.xlsx XLSX spreadsheet
Solicitation Amendment W51EW726RA0020004 SF 30.pdf PDF
Attachment 0002 - NCR MATOC Rate Sheet- NTE v2.xlsx XLSX spreadsheet
Attachment 0001 - NCR MATOC SOW 24APR2026 v2.pdf PDF
Attachment 0014 - Hazardous Material Survey Report 04MAY2026.pdf PDF
Attachment 0013 - NCR MATOC SITE VISIT SIGN IN SHEET 23MAR2026.pdf PDF
Attachment 0004 - Seed Project SOW 15APR2026 v2.pdf PDF
Attachment 0008 - NCR MATOC Section L v6.pdf PDF
Attachment 0011 - NCR MATOC QA A0003 Rev1.pdf PDF
Solicitation Amendment W51EW726RA0020003 SF 30.pdf PDF
Solicitation Amendment W51EW726RA0020002 SF 30.pdf PDF
Attachment 0009 - NCR MATOC Section M v4.pdf PDF
Solicitation Amendment W51EW726RA0020001 SF 30.pdf PDF
Attachment 0008 - NCR MATOC Section L v5.pdf PDF
Attachment 0010 - NCR MATOC QA A0001.pdf PDF
19 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR LHTG 041883.pdf PDF
Attachment 0001_SOW Attachment 1.3 - Daily Report Template.pdf PDF
46 - Attachment 0004 SEED PROJ SOW 2007 MECH PLN UPGD 054886.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.1 JBMHH Color Map.pdf PDF
27 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 LEGD 041881.pdf PDF
59 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd FLR DOM 041860.pdf PDF
63 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PLUMB PLN 041872.pdf PDF
30 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PWR RISR SIG 041891.pdf PDF
Attachment 0001_SOW Attachment 1.1 - DD1354.pdf PDF
Attachment 0002 - NCR MATOC Rate Sheet - NTE.xlsx XLSX spreadsheet
67 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 ROOF FRM PLN 041805.pdf PDF
7 - Attachment 0004 - SEED PROJ SOW Attach 1991 ENL BRKS PH 4 RM SCHED 041792.pdf PDF
58 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR DRN 041855.pdf PDF
22 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR SIG 041888.pdf PDF
57 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1ST FLR DOM 041859.pdf PDF
45 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 SITE PLN CW MTW 041851.pdf PDF
65 - Attachment 0004 - SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR FR PLN 041806.pdf PDF
18 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR LHTG 041884.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.3 JBMHH DPW Fillable Excavation Permit.pdf PDF
2 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 ELEV SECTS 041758.pdf PDF
39 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 EQP SCHD 041833.pdf PDF
49 - Attachment 0004 SEED PROJ SOW 2016 WTR BFLW DEVICE 079605.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.9 MYER Example Service Request Ticket.pdf PDF
21 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR RECEPT 041885.pdf PDF
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L.1 Information to Offerors and Instructions for Proposal Preparation

L.1.1 Open-Ended Award Pool: These instructions are a guide for preparing a proposal. Review the Statement of Work (SOW) dated 08JUN2026 contained in this Request for Proposal (RFP) for further insight into the areas that must be addressed within the proposal. Include detailed information sufficient to enable the Government evaluators to conduct a meaningful review and make a determination relative to the Offeror’s compliance with the requirements in each of the evaluated areas. The Government will make basic IDIQ contract awards to all small business concerns whose proposals are determined to be technically conforming (conformance rated 'Acceptable'). Because this is a price-excluded procurement under FAR 15.304(c)(1)(ii)(A) no price-technical tradeoff will be conducted, and price will not be evaluated for the initial IDIQ parent contract awards.

L.1.2 Price-Exclusion and Small Business-Set-Aside: This RFP is being solicited as a total Small Business Set-Aside (SBSA). Pursuant to the statutory authority of 10 U.S.C. § 3206(c)(3) and the regulatory authority of FAR 15.304(c)(1)(ii)(A), cost or price is completely excluded as an evaluation factor for the initial award of the IDIQ contracts.

The Government is not obligated to determine a competitive range, conduct discussions with all Offerors, or solicit final revised proposals. It is the Offeror’s responsibility to provide current, complete, and accurate information in the proposal as required by this RFP (including amendments, attachments, and exhibits).

L.1.3 Compliance and Rejection: Offerors are cautioned to examine this RFP in its entirety to ensure that its proposal conforms to all the requirements of this RFP, contains all necessary information, provides all required documentation, and is complete in all respects. The Government is not obligated to make another request for the required information, nor does the Government assume the duty to search for data to cure problems it finds in proposals. The Government will consider an Offeror’s noncompliance with the proposal instructions, to include incomplete proposals, to be indicative of the type of conduct that it may expect from the Offeror during contract performance which may result in the Offeror’s proposal being rejected and no longer considered for award.

L.1.4 Authorized Signature: The Offeror’s proposal must be executed and signed by a representative of the Offeror authorized to commit the Offeror to contractual obligations.

Offerors shall provide the name of the authorized representative or the signatory, the position title, telephone number, and electronic mail address of that individual.

L.1.5 Proposal Validity: The Offeror’s proposal shall be valid for 180 days from the date of RFP close. The Offeror shall clearly state proposal validity in the Cover Letter as instructed in Table1 under Section L.3.

L.2 SUBMISSION OF QUESTIONS

Offerors are expected to examine the entire RFP. It is the responsibility of the Offeror to ensure its questions are received by 03APR2026 at 10:00 am CT. Please submit all questions against this solicitation by utilizing Attachment 0005 – NCR MATOC RFP Questions, and send to the following POCs:

Contracting Officer: Danette Wilson; danette.d.wilson.civ@army.mil Contract Specialist: Amy Hahka: amy.k.hahka.civ@army.mil

L.3 SUBMISSION OF PROPOSALS

Proposals shall be prepared in a clear and legible manner and submitted SOLELY through the Solicitation Module of PIEE, located at https://piee.eb.mil/. Proposal submissions sent by any other method, to include proprietary or third-party File Transfer Protocol sites, DoD SAFE, fax, hardcopy, DVD/CD-ROM proposals, hand-carried offers, or by any other means will not be accepted. The Solicitation Module of PIEE places a limit of 1.9 GB on individual document uploads, with no system limitations on the quantity of uploaded attachments. If an Offeror is uploading multiple files at one time, the total size of the batch upload shall not exceed 1.9 GB. To avoid maximizing system limitations, Offerors shall upload documents in separate multiple file groupings under

1.9 GB. The file naming convention for proposal submission shall be as follows:

VOL_I_FACTOR 1_Technical_Offeror_Name

Strict compliance shall be followed with the provided proposal submission naming convention, as proposal upload will fail within the Solicitation Module of PIEE unless followed. Please note, no spaces or special characters are allowed anywhere in the file name, except for underscores as provided above. PIEE training material and guides for registering and submitting proposals can be found at the links below and is provided to assist in locating the full scope of resources available at the PIEE website. PIEE Solicitation Module Training is available at the following:

https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml https://pieetraining.eb.mil/wbtxhtml/wbt/sol/solicitation/proposals.xhtml

L.3.1 NOTE: ALL MATERIAL IN EXCESS OF THE PAGE LIMITS WILL NOT BE

READ OR EVALUATED AND MAY BE CONSIDERED CAUSE FOR REJECTION OF

YOUR PROPOSAL.

mailto:danette.d.wilson.civ@army.mil mailto:amy.k.hahka.civ@army.mil https://piee.eb.mil/ https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml https://pieetraining.eb.mil/wbtxhtml/wbt/sol/solicitation/proposals.xhtml

TABLE 1: COMPLIANCE MATRIX PROPOSAL ORGANIZATION AND PAGE COUNT

Description / Volume Instructions Page Limit Cover Letter Must Include: RFP # W51EW7-26-R-A002, Proposal

Validity Date, At least 2 Authorized Prime Offeror Representatives, Signed SF 1442, All signed SF 30 Solicitation Amendments, Exceptions to the Solicitation (the Offeror must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale for Government evaluation).

- Excluded from page count: Signed copy of RFP W51EW7-26-R-A002, Signed SF 1442, All signed SF 30 Solicitation Amendments, Exceptions to the Solicitation.

2 pages

Volume I – Factor 1:

Technical Proposal Conformance

Must Include: Title Page, Table of Contents, Acronym List, and Written Compliance Plans for:

▪ Sub-Factor 1A: MATOC Program Management Plan

▪ Sub-Factor 1B: Quality Control System Plan

▪ Sub-Factor 1C: Site Safety and Health Plan (SSHP)

▪ Sub-Factor 1D: Environmental Protection Plan (EPP)

- Excluded from page count: Title Page, Table of Contents, Acronym List, Signed Letters of Commitment.

75 pages

• Pages that exceed the established page limitations will NOT be evaluated or considered.

L.3.2 Specific formatting is provided below:

Margins (Top, Bottom, Left, Right): 1” Gutter: 0” From Edge (Header, Footer): 0.5” Page Size, Width: 8.5” Page Size, Height: 11”

Each paragraph shall be single spaced and shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or Time New Roman fonts are required.

L.3.11 Tables, Charts, Graphs, and Figures. Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, task layout, schedules, plans, etc. These displays shall be uncomplicated, legible, and shall not exceed 11 x 17 inches in size. For tables, charts, graphs, and figures, the text shall be no smaller than Arial or Times New Roman 10-point font. Text lines in all tables, charts, graphs, and figures shall have single (1) line spacing. All tables, charts, graphs, and figures will be included in the page count, and each 11 x 17 inch page containing such tables, charts, graphs, and figures shall be counted as one (1) page. Any tables, charts, graphs and/or figures containing smaller than Arial or Times New Roman 10-point font will be considered non-compliant and ineligible for award.

L.4 VOLUME I; FACTOR 1: TECHNICAL PROPOSAL CONFORMANCE

The evaluation under Factor 1 is strictly limited to verifying the presence and completeness of required technical plans. The Government will not evaluate the qualitative merits, feasibility, or quality of the proposed technical approach. Any ‘Unacceptable’ rating under these sub-factors represents a rejection based on the objective, documentary non-conformance of the proposal itself, and does not constitute a responsibility determination. Therefore no SBA Certificate of Competency (CoC) referral is required.

L.4.1 SUB-FACTOR 1A: MATOC PROGRAM MANAGEMENT PLAN

CONFORMANCE

The Offeror shall submit a written MATOC Program Management Plan that contains the following objective elements:

▪ A program-level organizational chart identifying Key Personnel (Project Manager, Quality Control Manager, Project Superintendent, SSHO) responsible for overall management IAW NCR MATOC SOW Section 5.

▪ A signed letter of commitment for the Project Manager meeting the minimum qualifications in NCR MATOC SOW 5.1.

▪ A designated single point of contact responsible for communicating with the Contracting Officer (KO) and Contracting Officer Representative (COR).

L.4.2. SUB-FACTOR 1B: QUALITY CONTROL SYSTEM PLAN CONFORMANCE

The Offeror shall submit a written Quality Control Plan (QCP) that contains the following objective elements:

▪ Written, non-blank sections describing the three-phase control system (Preparatory, Initial, and Follow-up) IAW NCR MATOC SOW Part 1 Section 11.

▪ Qualifications mapping and a signed letter of commitment for the Quality Control Manager (QCM) meeting the minimum qualifications of NCR MATOC SOW 5.2.

L.4.3. SUB-FACTOR 1C: SITE SAFETY AND HEALTH PLAN (SSHP)

CONFORMANCE

The Offeror shall submit a written SSHP that contains the following objective elements:

▪ A written Personal Protective Equipment (PPE) Program IAW NCR MATOC

SOW 3.7.2.

▪ Written, non-blank Confined Space Entry Procedures IAW NCR MATOC SOW 3.7.7.

▪ Qualifications mapping and a signed letter of commitment for the SSHO meeting the minimum qualifications of NCR MATOC SOW 5.4.

L.4.4. SUB-FACTOR 1D: ENVIRONMENTAL PROTECTION PLAN (EPP)

CONFORMANCE

The Offeror shall submit a written EPP that contains the following objective elements:

▪ Written procedures for Hazardous Waste and Solid Waste Disposal IAW NCR MATOC SOW 4 Section 1.2.

▪ A written plan for compiling and submitting Solid Waste Diversion Reports.