7 - Attachment 0004 - SEED PROJ SOW Attach 1991 ENL BRKS PH 4 RM SCHED 041792.pdf
PDF 6 MB Posted
- Solicitation number
- W51EW7-26-R-A002
About this file
This is a Room Finish Schedule document for an Enlisted Barracks Phase II project, depicting construction specifications and material requirements across multiple rooms and spaces within a military facility.
The schedule details finish materials for administration and supply areas, residential quarters, and support facilities. Key rooms specified include stipulated officer quarters, supply storage areas, corridors, waiting areas, closets, mechanical rooms, and various office spaces numbered 101-118. Materials are categorized by building component—floor, base, wall, wainscoat, and ceiling—with specifications indicating material types such as VCT (vinyl composition tile), resilient flooring, drywall, SATC (self-adhering tape and compound), gyp board, concrete, and plastic laminate. Multiple entries note "2-HOUR FIRE RATED" requirements for ceilings in designated spaces, indicating fire safety compliance standards. The document employs standard architectural notation with column headers for material codes, dimensions, and construction specifications. At the bottom, the sheet is designated as F-721-30-12 B7 and dated 4/1792, suggesting this is a baseline architectural drawing from a larger construction contract or military facilities project. The schedule serves as a reference document for contractors and construction teams to ensure consistent application of specified finishes throughout the barracks facility.
View the file
Other files
Show 40 more
Latest 50 of 127 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .