Solicitation Amendment W51EW726RA0020004 SF 30.pdf

PDF 4 MB Posted

Attached to
SOLICITATION - National Capital Region (NCR) Multiple Award Task Order Contract (MATOC)
Solicitation number
W51EW7-26-R-A002
Issued by

About this file

This is Amendment 0004 to Solicitation W51EW7-26-R-A002, issued by the Mission and Installation Contracting Command (MICC), Theater Support Center (TSC), for a National Capital Region (NCR) Multiple Award Task Order Contract (MATOC) supporting U.S. Army Installation Management Command (IMCOM) Installation Directorate - Sustainment. The solicitation seeks facility sustainment, restoration, and modernization (SRM) services, including renovation, repairs, and minor construction across seven Army installations within a 70-mile radius of the National Capital Region: Aberdeen Proving Ground, Fort Belvoir, Fort Detrick, Fort George G. Meade, Fort Walker, Joint Base Myer-Henderson Hall, and Arlington National Cemetery. This is a total Small Business Set-Aside under NAICS Code 236210 (Industrial Building Construction) with a $45,000,000 size standard. The Government will award a Firm-Fixed Price Indefinite-Delivery Indefinite-Quantity MATOC under FAR Part 15 using a Best Value Lowest Price Technically Acceptable source selection methodology. The contract ceiling is $1,050,778,375 with a minimum guarantee of $5,000 per awardee during the five-year ordering period (30 July 2026 – 29 July 2031), plus two optional one-year extension periods. Invoicing will be conducted at the Task Order level via Wide Area Workflow (WAWF).

Amendment 0004 revises the NCR MATOC Statement of Work (dated 24 April 2026) to incorporate on-ramp/off-ramp language, updates the Rate Sheet to include a "Site Safety & Health Officer" key personnel position, and revises the Seed Project SOW (dated 15 April 2026) across Description of Work, General Requirements, and technical sections (Demolition, Mechanical, Electrical, Architectural) and Submittals. The amendment extends the Past Performance Questionnaire due date to 3 June 2026 at 2:00 PM CT, updates the Contractor Bid Sheet to allow up to 50 subcontractor fields, and revises Section L (proposal organization requirements) and compliance matrices. New attachments include Questions and Answers, Seed Project SOW Floor Plan Layout with Staging Area and Haul Routes, a Site Visit Sign-in Sheet (dated 23 March 2026), and a Hazardous Material Survey Report (dated 4 May 2026). All other terms and conditions of Solicitation W51EW7-26-R-A002 remain unchanged and in full force and effect.

View the file

Other files

File Type Posted
Attachment 0014 - Hazardous Material Survey Report 04MAY2026.pdf PDF
Attachment 0001 - NCR MATOC SOW 24APR2026 v2.pdf PDF
Solicitation Amendment W51EW726RA0020001 SF 30.pdf PDF
Attachment 0007 - Seed Project Site Visit Map.pptx PPTX presentation
Attachment 0006 - Contractor Bid Sheet.xlsx XLSX spreadsheet
61 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 3rd FLR DOM 041861.pdf PDF
55 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 DWG INDEX 041710.pdf PDF
40 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 EQP SCHD 041834.pdf PDF
32 - Attachment 0004 SEED PROJ SOW 2008 Panel Schedules Overall Renov 072831.pdf PDF
27 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 LEGD 041881.pdf PDF
26 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 DEMO SITE PLAN 041875.pdf PDF
23 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR RECEPT 041886.pdf PDF
20 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR PWR 041887.pdf PDF
16 - Attachment 0004 SEED PROJ SOW Attach 1991 ENCLOSURE.pdf PDF
6 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 CLG PLN 041761.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.3 JBMHH DPW Fillable Excavation Permit.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.2 JBMHH Dig Permit Process.pdf PDF
Attachment 0001_SOW Attachment 1.8 - Equipment Warranty Tag Form.pdf PDF
Attachment 0001_SOW Attachment 1.7 - Project Schedule_v1.xlsx XLSX spreadsheet
Attachment 0001_SOW Attachment 1.4 - Site Specific Requirements.pdf PDF
Attachment 0001_SOW Attachment 1.3 - Daily Report Template.pdf PDF
69 - Attachment 0004 SEED PROJ SOW 2020 Title Sheet Alter 1st Flr BTH 085806.pdf PDF
66 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 FDN PLN 041804.pdf PDF
63 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PLUMB PLN 041872.pdf PDF
60 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd FLR DRN 041856.pdf PDF
54 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR DOM WTR 041859.pdf PDF
53 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 ATTIC FLR PLN 041826.pdf PDF
50 - Attachment 0004 SEED PROJ SOW 2020 MECH PLMB ALTER 1ST FLR BTH 085810.pdf PDF
47 - Attachment 0004 SEED PROJ SOW 2014 WTR BFLW DEVICE 079606.pdf PDF
46 - Attachment 0004 SEED PROJ SOW 2007 MECH PLN UPGD 054886.pdf PDF
43 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 MTW DETS 041854.pdf PDF
36 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 DETS 041836.pdf PDF
31 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 SITE PLN 041877.pdf PDF
30 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PWR RISR SIG 041891.pdf PDF
28 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 LTG FIX SCHED 041882.pdf PDF
25 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 ATTIC SIG 041890.pdf PDF
24 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR SIG 041889.pdf PDF
19 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR LHTG 041883.pdf PDF
17 - Attachment 0004 SEED PROJ SOW 2020 Legends Alter 1st FLR BTH 085812.pdf PDF
12 - Attachment 0004 SEED PROJ SOW Attach 1991 EBK VBRJS OG 4 TLT PLNS 041784.pdf PDF
11 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 STAIR PLNS 041783.pdf PDF
9 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 SIGNAGE 2nd 041798.pdf PDF
3 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 1st FLR PLN 041753.pdf PDF
Attachment 0002 - NCR MATOC Rate Sheet - NTE.xlsx XLSX spreadsheet
Attachment 0001_SOW APPENDIX 2.7.8 MYER DPW Excavation Permit.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.7 JBMHH Schematic Outline.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.1 JBMHH Color Map.pdf PDF
Attachment 0001_SOW APPENDIX 2.1.2 APG Environmental Requirements.pdf PDF
Attachment 0001_SOW Attachment 1.6 - Engineering Form 4025.pdf PDF
Attachment 0001_SOW Attachment 1.5 - QCR Submittal Form.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

a. Revise NCR MATOC SOW dated Block 14 (Description of Amendment/Modification):

24APR2026; para 1, Contract Description; Incorporating On-Ramp/Off-Ramp Language

b. Revise NCR MATOC Rate Sheet - NTE v2; to include Key Personnel Position "Site Safety & Health Officer"

c. Revise Past Performance Questionnaire due date to 03 June, 2026, at 2:00 pm CT.

d. Revise Seed Project SOW dated 15APR2026, as follows:

- Description of Work

- General Requirements

- 1. Demolition

- 2. Mechanical

- 3. Electrical

- 4. Architectural

- Submittals During the Contract

e. Revise Contractor Bid Sheet v2; 'Subcontractors' Tab, Added Additional Subcontractor Fields (up to 50)

f. Revise NCR MATOC Section L v6, as follows:

- L.3.3

- L.3.8 Table 1: Compliance Matrix Proposal Organization and Page Count:

1. Cover Letter

2. Volume II - Factor 2: Past Performance

- L.5.1

g. Provide Questions and Answers

h. Provide Seed Project SOW Floor Plan Layout, Staging Area, Haul Routes

i. Provide NCR MATOC Site Visit Sign-in Sheet dated 23MAR2026

3. Incorporate the following revised Attachments within Section J:

- Attachment 0001 - NCR MATOC SOW 24APR2026

- Attachment 0002 - NCR MATOC Rate Sheet - NTE v2

- Attachment 0003 - Past Performance Questionnaire v2

- Attachment 0004 - Seed Project SOW 15APR2026

- Attachment 0006 - Contractor Bid Sheet v2

- Attachment 0008 - NCR MATOC Section L v6

- Attachment 0011 - NCR MATOC QA A0003 Rev1

- Attachment 0012 - Seed Project SOW Floor Plan Layout

- Attachment 0013 - NCR MATOC Site Visit Sign-in Sheet 23MAR2026

- Attachment 0014 - Hazardous Material Survey Report 04MAY2026

Section A - Solicitation/Contract Form

W51EW726RA0020004

The following changes have been made:

Miscellaneous text in this section has been modified to:

1. Headquarters Mission Installation and Contracting Command (HQ MICC), Theater Support Center hereby requests proposals for facility sustainment, restoration and modernization (SRM), to include renovation, repairs, and minor construction of real property on seven (7) Army installations located within or in close proximity of the National Capital Region (NCR) in support of U.S. Army Installation Management Command (IMCOM) Installation Directorate - Sustainment (ID- Sustainment). This acquisition will procure all labor necessary to complete SRM identified in each installation's Annual Work Plan in accordance with (IAW) the Statement of Work (SOW) dated 10FEB2026. The seven (7) installations included in this effort are geographically aligned within a 70-mile radius as provided below:

a) U.S. Army Garrison Aberdeen Proving Ground (USAG-APG)

b) Fort Belvoir (USAG-FBVA)

c) Fort Detrick (USAG-DETI)

d) Fort George G. Meade (USAG-Meade)

e) Fort Walker (USAG-Walk)

f) Joint Base Myer-Henderson Hall (USAG-Myer)

g) Arlington National Cemetery (ANC)

2. This Request for Proposal (RFP) is being solicited as a total Small Business Set-Aside (SBSA), under NAICS Code 236210, Industrial Building Construction, size standard $45,000,000.00. The PSC is Z2JZ, Repair or Alteration of Miscellaneous Buildings. Offerors must be a certified small business as of the date of proposal submission.

3. The Government will evaluate proposals using a Best Value Lowest Price Technically Acceptable (LPTA) Source Selection methodology to award a Firm-Fixed Price (FFP) Indefinite- Delivery Indefinite-Quantity (IDIQ) Multiple Award Task Order Contract (MATOC), under the authority of Federal Acquisition Regulation (FAR) Part 15, Contracting by Negotiation.

4. The Period of Performance (PoP) for this effort includes a five (5) year Ordering Period plus two

(2) one-year option periods. If the Government decides to exercise any of the option years, it will do so via Federal Acquisition Regulation (FAR) Clause 52.217-9, Option to Extend the Term of the Contract.

5-Year Ordering Period: 30 July 2026 - 29 July 2031

Option Year 1: 30 July 2031 - 29 July 2032

Option Year 2: 30 July 2032 - 29 July 2033

5. Invoicing shall be conducted in Wide Area Workflow (WAWF) at the Task Order (TO) level, as all obligations will be executed upon TO award.

6. See Section J for a full list of Attachments to this RFP.

7. Minimum Guarantee: The minimum guarantee per MATOC contract is $5,000.00 for the 5-year ordering period. The Government will satisfy the minimum by issuance of task order(s) totaling at least $5,000 to each awardee during the base ordering period. No additional minimum guarantee applies to any option ordering period(s), if exercised.

8. Maximum Ceiling: The established ceiling value of this MATOC is $1,050,778,375.

9. Proposals must be received in their entirety to be considered for award. Proposal submission shall be IAW Section L.3 of this solicitation. The closing date and time for receipt of proposals is as follows:

CLOSING DATE: 24 April 2026

CLOSING TIME: 2:00 PM CT

10. Please submit questions regarding this RFP as soon as possible. Questions will be accepted until 3 April 2026 at 2:00 PM CT, after which no further questions will be entertained. Questions will be answered via an amendment to the solicitation.

11. All questions pertaining to this solicitation shall be submitted in writing to Amy Hahka, amy.k.

hahka.civ@army.mil, and Danette Wilson, danette.d.wilson.civ@army.mil.

W51EW7-26-R-A002 AMENDMENT 0002

Mission and Installation Contracting Command (MICC), Theater Support Center (TSC), hereby issues Amendment 0002 against Solicitation W51EW7-26-R-A002 for the National Capital Region (NCR) Multiple Award Task Order Contract (MATOC) in support of U.S. Army Installation Management Command (IMCOM) Installation Directorate - Sustainment (ID-Sustainment). The purpose of Amendment 0002 is as follows:

- Extend the Solicitation Due Date FROM 24APR2026 TO 08MAY2026 at 2:00 pm CT.

- Notify all interested Offerors that a future amendment is forthcoming answering questions previously submitted.

Offerors shall acknowledge this Amendment within their proposal submission. As a result of Amendment 0002, the solicitation closing date and time are hereby changed to 08MAY2026, 2:00 pm CT. Please continue to monitor as questions previously submitted will be www.sam.gov answered in a subsequent amendment to this solicitation. The suspense for submission of questions has passed as of 03APR2026, and as such, no further questions will be entertained. All other terms and conditions of Solicitation W51EW7-26-R-A002 remain unchanged and in full effect.

W51EW7-26-R-A002 AMENDMENT 0001

1. Mission and Installation Contracting Command (MICC), Theater Support Center (TSC), hereby issues Amendment 0001 against Solicitation W51EW7-26-R-A002 for the National Capital Region (NCR) Multiple Award Task Order Contract (MATOC), in support of U.S. Army Installation Management Command (IMCOM) Installation Directorate - Sustainment (ID-Sustainment).

2. The purpose of Amendment 0001 is as follows:

a. Revise Section L.3.8, Table 1: Compliance Matrix Proposal Organization and Page Count

b. Revise Section L.3.8, Table 1: Volume I - Factor 1; Technical Capability Approach

c. Revise Section L.3.10

d. Revise Section L.5

e. Revise Section M.5.1.1

f. Revise RFP SF 1442, Block 13(d), from 14 days to 180 days.

3. Incorporate the following revised Attachments within Section J:

- Attachment 0008 - NCR MATOC Section L v5

- Attachment 0009 - NCR MATOC Section M v4

- Attachment 0010 - NCR MATOC QA 0001

4. Offerors shall acknowledge this Amendment within their proposal submission.

W51EW726RA0020004

https://www.sam.gov

5. As a result of this Amendment, the solicitation closing date and time remain unchanged on 24APR2026, at 2:00 pm CT.

6. Please continue to monitor www.sam.gov as additional questions that have already been received will be answered in subsequent amendments to this solicitation. The suspense for submission of questions has passed as of 03APR2026, and as such, no further questions will be entertained.

7. All other terms and conditions of Solicitation W51EW7-26-R-A002 remain unchanged and in full force and effect.

W51EW7-26-R-A002 AMENDMENT 0003

1. Mission and Installation Contracting Command (MICC), Theater Support Center (TSC), hereby issues Amendment 0003 against Solicitation W51EW7-26-R-A002 for the National Capital region (NCR) Multiple Award Task Order Contract (MATOC) in support of U.S. Army Installation Management Command (IMCOM) Installation Directorate - Sustainment (ID-Sustainment). The purpose of Amendment 0003 is as follows:

a. Extend the Solicitation Close Date and Proposal Due Date from 08MAY2026 to 03JUN2026 at 2:00 pm CT.

b. Notify all interested Offerors that a future amendment is forthcoming answering questions previously submitted. Due to the number of questions submitted, the Government is ensuring all information is updated accurately.

2. All other terms and conditions of Solicitation W51EW7-26-R-A002 remain unchanged and in full force and effect.

W51EW7-26-R-A002 AMENDMENT 0004

1. Mission and Installation Contracting Command (MICC), Theater Support Center (TSC), hereby issues Amendment 0004 against Solicitation W51EW7-26-R-A002 for the National Capital Region (NCR) Multiple Award Task Order Contract (MATOC), in support of U.S. Army Installation Management Command (IMCOM) Installation Directorate - Sustainment (ID-Sustainment).

2. The purpose of Amendment 0004 is as follows:

a. Revise NCR MATOC SOW dated 24APR2026; para 1, Contract Description; Incorporating On- Ramp/Off-Ramp Language

b. Revise NCR MATOC Rate Sheet - NTE v2; to include Key Personnel Position "Site Safety & Health Officer"

c. Revise Past Performance Questionnaire due date to 03 June, 2026, at 2:00 pm CT.

d. Revise Seed Project SOW dated 15APR2026, as follows:

- Description of Work

- General Requirements

- 1. Demolition

- 2. Mechanical

- 3. Electrical

- 4. Architectural

- Submittals During the Contract

e. Revise Contractor Bid Sheet v2; 'Subcontractors' Tab, Added Additional Subcontractor Fields (up to 50)

f. Revise NCR MATOC Section L v6, as follows:

- L.3.3

- L.3.8 Table 1: Compliance Matrix Proposal Organization and Page Count:

1. Cover Letter

2. Volume II - Factor 2: Past Performance

- L.5.1

g. Provide Questions and Answers

h. Provide Seed Project SOW Floor Plan Layout, Staging Area, Haul Routes

i. Provide NCR MATOC Site Visit Sign-in Sheet dated 23MAR2026

3. Incorporate the following revised Attachments within Section J:

- Attachment 0001 - NCR MATOC SOW 24APR2026

- Attachment 0002 - NCR MATOC Rate Sheet - NTE v2

- Attachment 0003 - Past Performance Questionnaire v2

- Attachment 0004 - Seed Project SOW 15APR2026

- Attachment 0006 - Contractor Bid Sheet v2

- Attachment 0008 - NCR MATOC Section L v6

- Attachment 0011 - NCR MATOC QA A0003 Rev1

- Attachment 0012 - Seed Project SOW Floor Plan Layout

- Attachment 0013 - NCR MATOC Site Visit Sign-in Sheet 23MAR2026

- Attachment 0014 - Hazardous Material Survey Report 04MAY2026

4. Offerors shall acknowledge this Amendment within their proposal submission.

5. All other terms and conditions of Solicitation W51EW7-26-R-A002 shall remain unchanged and in full force and effect.

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

Attachment 0001 - NCR MATOC Statement of Work (SOW) 24APR2026

Attachment 0002 - NCR MATOC Rate Price Sheet - NTE v2

Attachment 0003 - Past Performance Questionnaire v2

Attachment 0004 - NCR MATOC - Seed Project SOW 15APR2026

Attachment 0005 - NCR MATOC RFP Questions

Attachment 0006 - Contractor Bid Sheet v2

Attachment 0007 - Seed Project Site Visit Map

Attachment 0008 - NCR MATOC Section L v6

Attachment 0009 - NCR MATOC Section M v4

Attachment 0010 - NCR MATOC QA 0001

Attachment 0011 - NCR MATOC QA A0003 Rev1

Attachment 0012 - Seed Project SOW Floor Plan Layout

Attachment 0013 - NCR MATOC Site Visit Sign-in Sheet 23MAR2026

Attachment 0014 - Hazardous Material Survey Report 04MAY2026

IDCode: J
Page: 1
Pages: 9
AmendNo: 0004
EffDate: 04 MAY 2026
ReqNo:
ProjNo: A028618
IssCode: W51EW7
AdmCode:
IssuedBy: W6QM MICC TSC

USA MICC THEATER SUPPORT CENTER, 2219 INFANTRY POST ROAD

JBSA FT SAM HOUSTON, TX 78234-0000

UNITED STATES

AMY HAHKA, EMAIL: AMY.K.HAHKA.CIV@ARMY.MIL TELEPHONE: 5209447286

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W51EW726RA002
SolDate: 13 MAR 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: DANETTE D. WILSON
ContDate:
CODate: 04 MAY 2026