39 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 EQP SCHD 041833.pdf
PDF 4 MB Posted
- Solicitation number
- W51EW7-26-R-A002
About this file
This is an equipment schedules document from the U.S. Army Engineer District, Baltimore, Corps of Engineers, detailing technical specifications for HVAC systems and related equipment for the Enlisted Barracks Phase II project.
The document comprises three primary equipment schedules: a Variable Air Volume Terminal Unit Schedule that specifies 15 terminal units with varying capacities ranging from 2.0 to 12.0 CFM, heating and cooling requirements, and unit-specific pressure settings; a Fan Coil Unit Schedule for the Barracks Building containing 10 units with specifications including heating and cooling capacities, unit dimensions, and mounting details; and a Fin Tube Radiation Schedule listing four fin tube units with specific heating estimates and enclosure requirements. Each schedule includes detailed technical parameters such as CFM ratings, pressure drops, heating estimates, remarks columns, and equipment identifiers. The document provides comprehensive sizing information for HVAC terminal equipment, including specifications for damper and panel materials, water pressure ratings, and remarks noting manufacturer specifications such as "See Horizontal Crossover Piping" and "Optional Wired Float Type." The equipment schedules serve as construction documentation for mechanical systems installation and verification, with all units referenced to Baltimore District specifications and drawing standards.
View the file
Other files
Show 40 more
Latest 50 of 127 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .