30 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PWR RISR SIG 041891.pdf
PDF 6 MB Posted
- Solicitation number
- W51EW7-26-R-A002
About this file
This is a technical schematic drawing for electrical wiring panel schedules and floor plan receptacles for a military facility. The document is a U.S. Army Corps of Engineers architectural/engineering drawing titled "Receptacles and Panel Board Schedules" dated 1987, with drawing number F-721-90-2.
The drawing contains multiple components including a floor plan showing receptacle locations at a 1/4" = 1'-0" scale, and three detailed wiring panel schedules (labeled B, C, and D) specifying three-phase, four-wire electrical systems at 120/208 volts and 225 amps. Each panel schedule provides comprehensive technical specifications including phase assignments, wire sizes, amperage ratings, and surface-mounted mounting configurations for various circuits. The schedules detail individual circuit descriptions, load calculations showing connected loads ranging from approximately 22 to 48 amps and demand loads of 25 to 28 amps, and technical electrical parameters. The document includes a graphic scales reference, north arrow orientation indicator, and notes indicating this drawing pertains to Phase 2E electrical work for a barracks phase 2E electrical and supply building. The schematic notation indicates compliance with standard electrical codes and specifications for military construction projects.
View the file
Other files
Show 40 more
Latest 50 of 127 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .