This is a Statement of Work (SOW) for a seed project involving the conversion of Building 4504, first floor, from barracks to office space at Aberdeen Proving Grounds, Maryland. The project runs from February 25 to April 15, 2026, with a required completion deadline of 3,600 calendar days barring contingencies. The contractor must provide all plant, labor, materials, equipment, and supervision for minor design, construction, demolition, and renovation work, with final drawings requiring a Maryland Professional Engineer stamp.

The SOW encompasses demolition of existing block walls, plumbing, fixtures, electrical systems, HVAC, ceiling systems, and roofing; installation of new HVAC systems (VRF not acceptable), hot water storage, and water heaters; electrical upgrades including duplex receptacles every ten feet, LED lighting with motion detection and dimmer switches, and GFCI/AFCI combinations; and architectural work including Level 4 drywall, suspended ceilings, vinyl flooring with cove base, and paint with specific mold-resistant properties. Additional requirements include reconfiguring bathrooms, converting a TV room into a kitchen with granite counters and commercial-grade cabinets, installing a fire sprinkler system for all three floors with an addressable fire alarm panel compatible with Aberdeen Fire Department systems, procuring a qualified fire protection engineer, and conducting operations and maintenance training on fire protection and HVAC systems with video documentation. The contractor must coordinate with the Contracting Officer Representative for water and electrical connections through city utilities, obtain permits including excavation and asbestos health and safety plans, submit design drawings at 30%, 70%, and 100% completion with professional engineer certification, and provide detailed submittals for doors, windows, carpet, tile, cabinets, counters, sinks, faucets, paint, HVAC systems, and fire suppression equipment. A mandatory site visit is scheduled for March 23, 2026, from 0900-1100 EST at Building 4504, 6474 Springfield Street, Aberdeen Proving Grounds, Maryland 21005.

View the file

Other files

File Type Posted
Attachment 0001 - NCR MATOC SOW 1JUL2026.pdf PDF
Solicitation Amendment W51EW726RA0020009 SF30.pdf PDF
Attachment 0008 - NCR MATOC Section L v8.pdf PDF
Attachment 0009 - NCR MATOC Section M v6.pdf PDF
Solicitation Amendment W51EW726RA0020008 SF30.pdf PDF
Attachment 0015 - NCR MATOC QA A0008 v2.pdf PDF
Attachment 0001 - NCR MATOC SOW 8JUN2026.pdf PDF
Solicitation Amendment W51EW726RA0020007 SF30.pdf PDF
Solicitation Amendment W51EW726RA0020006 SF30.pdf PDF
Soicitation Amendment W51EW726RA0020005 SF 30.pdf PDF
Attachment 0003 - Past Performance Questionnaire v2.docx DOCX document
Attachment 0012 - Seed Project SOW Floor Plan Layout.pptx PPTX presentation
Attachment 0006 - Contractor Bid Sheet v2.xlsx XLSX spreadsheet
Solicitation Amendment W51EW726RA0020004 SF 30.pdf PDF
Attachment 0002 - NCR MATOC Rate Sheet- NTE v2.xlsx XLSX spreadsheet
Attachment 0001 - NCR MATOC SOW 24APR2026 v2.pdf PDF
Attachment 0014 - Hazardous Material Survey Report 04MAY2026.pdf PDF
Attachment 0013 - NCR MATOC SITE VISIT SIGN IN SHEET 23MAR2026.pdf PDF
Attachment 0008 - NCR MATOC Section L v6.pdf PDF
Attachment 0011 - NCR MATOC QA A0003 Rev1.pdf PDF
Solicitation Amendment W51EW726RA0020003 SF 30.pdf PDF
Solicitation Amendment W51EW726RA0020002 SF 30.pdf PDF
Attachment 0009 - NCR MATOC Section M v4.pdf PDF
Solicitation Amendment W51EW726RA0020001 SF 30.pdf PDF
Attachment 0008 - NCR MATOC Section L v5.pdf PDF
Attachment 0010 - NCR MATOC QA A0001.pdf PDF
19 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR LHTG 041883.pdf PDF
Attachment 0001_SOW Attachment 1.3 - Daily Report Template.pdf PDF
46 - Attachment 0004 SEED PROJ SOW 2007 MECH PLN UPGD 054886.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.1 JBMHH Color Map.pdf PDF
27 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 LEGD 041881.pdf PDF
59 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd FLR DOM 041860.pdf PDF
63 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PLUMB PLN 041872.pdf PDF
30 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PWR RISR SIG 041891.pdf PDF
Attachment 0001_SOW Attachment 1.1 - DD1354.pdf PDF
Attachment 0002 - NCR MATOC Rate Sheet - NTE.xlsx XLSX spreadsheet
67 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 ROOF FRM PLN 041805.pdf PDF
7 - Attachment 0004 - SEED PROJ SOW Attach 1991 ENL BRKS PH 4 RM SCHED 041792.pdf PDF
58 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR DRN 041855.pdf PDF
22 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR SIG 041888.pdf PDF
57 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1ST FLR DOM 041859.pdf PDF
45 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 SITE PLN CW MTW 041851.pdf PDF
65 - Attachment 0004 - SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR FR PLN 041806.pdf PDF
18 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR LHTG 041884.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.3 JBMHH DPW Fillable Excavation Permit.pdf PDF
2 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 ELEV SECTS 041758.pdf PDF
39 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 EQP SCHD 041833.pdf PDF
49 - Attachment 0004 SEED PROJ SOW 2016 WTR BFLW DEVICE 079605.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.9 MYER Example Service Request Ticket.pdf PDF
21 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR RECEPT 041885.pdf PDF
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0004 Seed Project SOW

ATTACHMENT 0004 SEED PROJECT

STATEMENT OF WORK

Project Title: Convert 4504 to Office Area

Date: February 25April 15, 2026

Description of Work: Provide all plant, labor, materials, equipment and supervision to perform all work necessary for the minor design and construction, demolition, and renovation of converting barracks to office space. First floor Building 4504. Maryland P.E. (Professional Engineer) stamp required for final drawings.

General Requirements:

1. Coordination is required between each discipline.

2. Each engineering discipline shall provide drawings/calculations signed off by a licensed engineer for Government review/comments at 30%, 70%, and 100%.

3. Contractor coordination required with the Contracting Officer Representative

(COR) for preapproval of any water connection work through the City of Aberdeen. Drawings are required for City of Aberdeen approval.

4. Contractor coordination required with the COR for preapproval for any electrical connection work through the City Light & Power.

5. All work shall be done in accordance with Unified Facilities Criteria, National Electrical Code, National Fire Protection Association, International Plumbing Code and all other codes and standards typical of US Army Corps of Engineer projects. Certification and licensing requirements found in these codes shall be followed.

1.6. At the conclusion of the work under this contract, the Contractor shall conduct an operations and maintenance training class for Government maintenance personnel for the fire protection system and HVAC (heating, ventilations and air conditioning). The Contractor shall video tape the training and render to the Government two copies of the video tape at the conclusion of the project.

2.7. Paint: Contractor is to provide samples after award for government selection. Various color samples are to be provided by the contractor and final color determination will be made after award.

3.8. All lights to be LED (light emitting diode) with motion detections and dimmers switch with integral occupancy/vacancy sensing in the fixtures. The lighting shall be standalone room-based controlled.

4.9. A combination of GFCI (ground faults circuit interrupter) and AFCI (Arc-fault circuit interrupter) shall be used.

5.10. Tile/Carpet: Contractor is to provide samples after award for government selection. Various color samples are to be provided by the contractor and final color determination will be made after award. Ceramic Tile: minimum PEI

(porcelain enamel institute) 3. Carpet tiles: Carpet Materials; 100% Nylon;

Backing; Unitary Backing (or minimum 28 lb tuft bind), Construction: Textured Loop. Density: Minimum 7000 oz/yd3, Dye Method: 100% solution Dyed, Gauge: 1/10, Stitches per inch: 9.8, Finished Pile Thickness: 0.144 inches, Pile weight 28 oz/ yd2, Flammability: The minimum critical radiant flux shall be no less than 0.45 watts per square centimeter, as tested in accordance with NFPA (National Fire Protection Association) 253, Static Propensity Permanent conductive filament. 3.5 K.V. (kilovolt) or less (as tested in accordance with AATCC (American Association of Textile Chemists and Colorists))-134, ADHESIVE & SEALANT: Provide a waterproof, non-flammable, and non-staining adhesive for carpet installation meeting applicable air quality standards governed by the Clean Air Act. Adhesives shall comply with applicable regulations regarding toxic and hazardous materials IAW the Environmental Protection Agency (EPA), Department of Transportation (DOT), and Occupational Safety and Health Administration (OSHA), with a maximum VOC (volatile organic compound) content of 50 grams/liter. Provide adhesive with flashpoint of minimum 60 degrees C (Celsius)/ 140 degrees F (Fahrenheit) in accordance with ASTM (American Society for Testing and Materials) 3278.

Adhesives shall meet minimum standards as specified by carpet manufacturer.

Any primer shall meet these standards and be compatible with other materials. All carpet seams, lineal and widthwise shall be sealed with an approved carpet seam sealant. Sealant shall meet minimum standards as specified by carpet manufacturer. Sealants containing trichloroethane and/or toluene are not approved. Seam sealant shall have a maximum VOC content of 50 grams/ liter.

6.11. Cabinets: Contractor is to provide samples after award for government selection. Various color samples are to be provided by the contractor and final color determination will be made after award.

7.12. Counters and sinks: Contractor is to provide samples after award for government selection. Various color samples are to be provided by the contractor and final color determination will be made after award. Counters to be granite level 2.

8.13. Window treatments are to be in the white color family. Contractor is to provide samples after award for government selection. Various color samples are to be provided by the contractor and final color determination will be made after award.

9.14. The contractor's Project Manager and Quality Control Manager shall attend weekly progress meetings chaired by the Government's Project Manager.

10.15. Grout shall be sealed with mildew resistant sealant.

11.16. All paint surfaces are to be primed. Primer is to be stain blocking, mildew resistance, seal odors and a sealant.

12.17. All paint surfaces are to be sanded and prepared for painting three coats of paint, not including primer. After first coat of paint, the Government is to inspect and verify color selection. Color may be changed after 1st coat. Paint colors and finish to be selected after award.

Paint: Coating density:11.68lbs/gal. vol solids 42+/-2%; weight solids 60 +/-2%. Bathroom (three coats, one primer, two finish): primer to have mold killing properties (fungicidal protective coating) and paint is to be mildew resistant finish, except where noted.

18. Level 4 Ddrywall includes tape and joint compound, sanded.

19. New building automation system required. Johnson Controls

METASYS, to maintain compatibility with base.

13.

Period of Performance: Barring any contingencies that arise during construction, the Government requires this project be completed within 3600 calendar days.

Completion is defined as completion of all contractual obligations and requirements, except for the submission of the final as-built drawings.

Existing Conditions: Proposed site is Building 4504.

Hazardous Material: Our survey records have identified Asbestos Containing Material and lead base paints. Mercury may be present in the lighting system.

1. Demolition A. Remove the current block walls in bathroom and associated plumbing, fixtures, mirrors, closets, electrical etc. in the bedrooms (2 plus 2).

B. Remove asbestos.

C. Remove and properly dispose of all debris.

D. Remove piping systems for first floor only. Piping embedded in concrete may remain however capping is required a minimum of Concrete fill is required. .

E. Remove the entrance roofing system (only for the canopy).

F. Remove carpet/tile.

G. Remove HVAC system, 1st floor only.

H. Remove ceiling system.

I. Remove hot water storage tank J. Remove water heater

H.

2. Mechanical

A. Install new HVAC system to accommodate the new space and layout. (1ST floor only). VRF is not acceptable.

B. Install new hot water storage tank to accommodate new space and layout.

A.C. Install new water heater to accommodate new space and layout.

3. Electrical

A. Provide duplex receptable electrical outlets (20 amps.) every ten feet along each wall throughout the floor.

B. Panel is to be upgraded to meet code.

C. Lighting is to be upgraded to meet new configuration IAW the National Electrical

Code (NEC) which mandates specific safety, functionality, and energy efficiency by specifying location, control, and installation standards.

D. Reutilize currentProvide an electrical room to house all electrical panels and fire alarm panels in existing short apparatus bay. Room shall have one (1) overhead light circuit switched and one (1) 20-amp circuit duplex outlet.

E. All controls are to be METASYS compatible. The BAS shall commute back to the building operation and control center (BOCC) in Building 4304.

D.

4. Architectural

A. Exterior CMU walls are to be sealed with mold resistant sealer. Walls to be metal studded with Level 4 drywall and painted.

B. Exterior walls to be R23 insulated with closed cell spray foam insulation at 3.5"- 4"..

C. Provide new window treatments blinds 2.5-inch slats vinyl D. Hallway:

1. New suspended/drop ceiling system (2' by 2'), sag and mold resistance, humidity resistance, 0.85 light reflectance, Class A fire rated with lighting system. Ceiling tiles shall be regular edge with smooth face.

2. Replace all existing hallway exit doors including stairway doors with new insulated steel minimum 90-minute fire rating exit doors and frame with panic hardware, emergency sign and emergency light in accordance with OSHA standards..

3. PVC baseboard molding 4-inch height/rounded edge.

4. Install vinyl floor 4), with four-inch-high cove base

5. Paint walls in accordance with General Requirements #16.

E. Stairwell

3.1. -inch-high cove base

E.F. Each room is to have:

1. New suspended/drop ceiling (2' by 2'), sag and mold resistance, humidity resistance, 0.85 light reflectance, Class A fire rated with lighting system. Ceiling tiles shall be regular edge with smooth face.

2. 2. Install carpetvinyl floor tiles , with four-inch-high cove base.

3. Interior walls are to be finished with Level 4 drywall with paint interior including trim with one coat primer and two coats semi-gloss finish paint. Paint colors shall be white.

4. PVC baseboard molding 4-inch height/rounded edge.

3. 5. Separate climate control.

6. Remove Temporary office which is located in the Conference Room.

G. Replace all existing doors with new like doors to include matching hardware.

F.H. Reconfigure the laundry room into a male and a female bathroom:

1. New suspended/drop ceiling system (2' by 2'), sag and mold resistance, humidity resistance, 0.85 light reflectance, Class A fire rated with lighting system. Ceiling tiles shall be regular edge with smooth face.

1.2. Toilet stalls (two for men's; three for women's, one each requires ADA compliant) with one (1) heavy duty exhaust fans with registers over each stall. Powdered-coated steel doors/partition/urinal dividers.

2.3. Two urinals 1 gallon or less per flush, manual flush (Not water less). (installation of urinals in men's only)

3.4. Three granite under mount sink and granite counter (minimum four feet) and fixture including mirrors the length of the countertop.

Each sink is to have one electrical outlet. Two paper towel dispenser and two soap dispensers. Counter to have ceramic back splash six inches.

4.5. Single control faucets, solid brass construction, ceramic disc valves, High-temperature limit stop.

5.6. One 20amp electrical outlet per sink.

6.7. Ceramic tile walls four feet high (orientation: tall side upward direction), remaining wall to be Level 4 drywall; ceramic floors tiles , and grout to be treated with mildew resistant sealant.

7. Electrical outlet minimum of every 10 feet with ground fault circuit, interrupter (GFI or DFCI).

8.

I. Bathrooms 116B and 117B

1. New suspended/drop ceiling system (2' by 2'), sag and mold resistance, humidity resistance, 0.85 light reflectance, Class A fire rated with lighting system. Ceiling tiles shall be regular edge with smooth face.

2. Toilet stalls (two for men's; three for women's, one each requires ADA compliant) with one (1) heavy duty exhaust fans with registers over each stall. Powdered-coated steel doors/partition/urinal dividers.

3. Two urinals 1 gallon or less per flush, manual flush (Not water less). (men's only)

4. Three granite under mount sink and granite counter (minimum four feet) and fixture including mirrors the length of the countertop. Each sink is to have one electrical outlet.

Two paper towel dispensers and two soap dispensers. Counter to have ceramic back splash six inches.

Replace floor and wall tiles

5. Replace mirror/towel dispenser/soap dispenser Counter to have ceramic back splash six inches.

G.J. New Kitchen in Bay: Convert TV Room into a new kitchen:

1. Counter system garbage disposal, 1725 rpm, 1 hp, continuous feed, stainless steel.

Switch near sink.

2. Granite counter (white color group) full length of wall with three-inch matching granite splash guard.

3. Under mount stainless steel double deep bowled sink.

4. Stainless steel, commercial grade, 140-degree swivel, pull down sprayer, touchless/touch on single-handle faucet.

5. Wall over the countertop and sink is to be porcelain tiles. Grout is to be sealed for waterproofing. Overhead light fixture over sink switched separately.

6. Various color samples are to be provided by the contractor and final color determination will be made after award.

7. Over counter oak cabinets and base counter oak cabinets with stainless steel hardware (samples of pulls, knobs and hinges to be submitted for selection). Also to have waste pull out container; two tier cookware organizers; tall pantry with slide;

and corners to have lazy Susan turnstile shelf system.

8. All cabinets are to be commercial grade with ball bearing slides.

9. Electrical outlet minimum of every 10 feet and 4 feet max in kitchen counter area with ground fault circuit interrupter (GFI or GFCI).

10. Install , with four-inch-high cove base.

11. Install new roofing system over canopy entrance.

12. Install allone new insulated exit doors with panic hardware, emergency sign and emergency light, according to required code and OSHA standards.

13. Construct room with a mop sink.

14. Interior walls are to be finished with Level 4 drywall with paint interior including trim with one coat primer and two coats semi-gloss finish paint. Paint colors shall be white.

15. Various color samples are to be provided by the contractor and final color determination will be made after award.

H.K. Fire Protection System

1. Procure the service of a qualified fire protection engineer.

2. Install fire sprinkler system for entire building (to include 2nd and 3rd floors)..

3. Entire existing fire alarm system shall be replaced, with a mass notification system installed. The transmitter shall be AES Model 7707P-88-ULP-M to remain compatible with the APG Fire Department. Install fire alarm system and panel which will be compatible with the current system used by the APG Fire Department.

3.4. Complete Flow Test and compile results into a report as a required submittal (see SOW

4.5. This shall be a wet system.

a. Provide and install new addressable Fire Alarm Control Panel (FACP), power supplies and transmitter at locations to be identified by the fire department. This room shall have 24hr. HVAC support for cooling. The new fire alarm system shall have remote annunciators field located and recessed/surface mounted as required by the latest code. Contractor shall locate the FACP in the same room where the sprinkler equipment is located currently. The annunciator panel shall be located by the front entrance of the building. The exact location shall be coordinated with the fire department thru the COR. Provide and install new compliant field wiring in RED EMT (emergency medical technician) connected to new addressable detection and notification devices. New pull stations shall be properly located at all exit doors and be located no further than 60 inches from the exit door measured froorm the latch side. All existing pull stations, if any, shall be demolished. Contractor shall provide and install all new tamper switches, flow switches, andswitches, duct detectors and associated wiring. Provide and install new detector/horn/strobe devices throughout the building to replace the existing devices. All old bells, horns and strobes, if any, shall be demolished after the new system is accepted. All old fire alarm wiring and conduit, if any, shall be removed from the building. All conduits that are placed into the wall shall be cut and marked EMPTY with black permanent marker or labelled and black plastic capped. Empty conduits through walls shall be sealed with fire rated caulk. Do not reuse existing conduit. All new ceiling and wall wiring shall be run in exposed RED conduit. A dedicated underground piping system shall be installed to support Fire Suppression System per regulation. The connection to the water supply shall be coordinated through the COR with the City of Aberdeen.

The new system will be installed by qualified NICET (National Institute for Certification in Engineering Technologies) technicians. A NICET Level III (Fire Alarm Systems) supervisor shall be on site at all times.

The system should be structureddesigned and installed in the overhead with main trunk lines located in the common hallways. All junction boxes shall be RED and clearly marked with the appropriate circuit identification. All wall mount junction boxes shall be RED if not recessed. Any device that may require an alternate field location will be approved by the Contracting All new duct smoke detectors shall be addressable. All duct smoke detectors shall activate alarm for building evacuation. Heat/smoke/carbon monoxide detection shall be located in all boiler, electrical, and mechanical rooms.

A minimum of two (2) addressable heat detectors shall be located overhead in weatherproof enclosures in these spaces.

I.L. Contract mop sink near bathrooms.

J.M. Contract new roofing system to matching existing.

K.N. Exterior Work:

1. Exterior work for ADA (Americans with Disabilities Act) compliant:

restripemodify existing ADA parking spots (one Van and one other car) to accommodate two (2) ADA parking spaces. lot and Demo existing sidewalk from the closest point of new ADA parking spaces to the entrance of the building to accommodate two ensure ADA complianceparking spaces (one Van, other car). This includes markings and signage. One (1) bBuilding entrance shall be modified for ADA access adjacent to parking.

Important Services and Permit Requirements: Contractor shall be responsible to obtain the necessary permits/plans as listed below:

1. Coordination with Privatized Utility (i.e. City of Aberdeen, City Light & Power, BG&E, etc.)

2. Asbestos Health and Safety Plan/Activity Hazard Analysis

Important Services and Permit Requirements: Contractor shall be responsible to obtain the necessary permits/plans as listed below:

1. Excavation Permit

2. Coordination with Privatized Utility (i.e. City of Aberdeen, City Light &

Power, BG&E, etc.)

3. Soil Stockpile Plan if required based upon the plandesign.

4. Asbestos Health and Safety Plan/Activity Hazard Analysis

Submittals with Proposal:

1. Cost Proposal via Contractor Bid Sheet

2. Schedule

Submittals During the Contract:

1. Doors - selectionsdesign and specifications.

2. Windows design and specification.

3.2. Carpet and tile samplesdesign and specifications.

4.3. Garbage disposal selectiondesign and specification.

5.4. Range design and specification.

6.5. Counter samplesdesign and specifications.

7.6. Cabinets samplesdesign and specifications.

8.7. Sink selectionsdesign and specifications.

9.8. Faucet selectionsdesign and specifications.

10.9. Tile selectionsdesign and specifications.

11.10. Paint, Ceiling Grid and Tile, exhaust fans, Dryvit, Roof Canopy, HVAC units. selectionsdesign and specification.

12.11. As-built drawings Design at 30%, 70% and 100% completion. PE Stamp required for 100% final drawings.

13.12. As-built drawings. Must be submitted in the latest version of Bentley MicroStation

CONNECT (*.dgn) and in Adobe (*.pdf) file format.

14.13. HVAC system, light fixtures, paint colors, roof materials.

15.14. Flow Test Report Coordination with the City of Aberdeen is required through the

COR.

16.15. Window treatment samples and specifications

17.16. Fire suppression equipment

SEED PROJECT SITE VISIT:

Date: Monday, 23 March 2026 Time: 0900 1100 EST

Project Location: 6474 Springfield Street, Building 4504 Aberdeen Proving Grounds (APG), Maryland 21005

See Attachment 0007 Seed Project Site Visit Map

Site Visit POC: Ray McDermott raymond.j.mcdermott.civ@army.mil

(410) 306-2352

Visitor Access Information is located at this link:

https://home.army.mil/apg/about/visitor-information

Seed Project Site Visit Instructions: Interested Contractors are welcome to visit the site during the hours of 0900-1100 EST on the date specified above. Questions regarding the seed project will not be entertained during the Site Visit. All Contractors are to submit Site Visit questions against the NCR MATOC RFP W51EW7-26-R-A002 to the POCs provided below:

Danette Wilson; danette.d.wilson.civ@army.mil Amy Hahka; amy.k.hahka.civ@army.mil

No phone calls will be entertained to answer questions regarding the Site Visit. All questions must be submitted in writing against the NCR MATOC RFP. Responses to submitted Site Visit questions will be provided via an amendment to the solicitation. No photography allowed during Site Visit, or pictures captured via cell phones.

SEED PROJECT SOW ATTACHMENTS (EMBEDDED):

APG SEED PROJECT ARCHITECTURAL

1. Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 ELEV 041759

2. Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 ELEV SECTS 041758

3. Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 1st FLR PLN 041753

4. Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 1st FLR PLN 041754

5. Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 DOOR SCHD 041786

6. Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 CLG PLN 041761

7. Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 RM SCHED 041792

8. Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 SIGNAGE 1ST 041797

9. Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 SIGNAGE 2ND

041798

10. Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 SIGNAGE 3RD

041799

11. Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 STAIR PLNS 041783

12. Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 TLT PLNS 041784

13. Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 WIN SCHED 041803

14. Attachment 0004 SEED PROJ SOW Attach 2020 ALTER 1ST FLR BTH 085808

15. Attachment 0004 SEED PROJ SOW Attach 2020 ALTER 1st FLR BTH 085807

16. Attachment 0004 SEED PROJ SOW Attach 1991 ENCLOSURE

APG SEED PROJECT ELECTRICAL

17. Attachment 0004 SEED PROJ SOW 2020 Legends Alter 1st FLR BTH 085812

18. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR LHTG 041884

19. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR LHTG 041883

20. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR PWR 041887

21. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR RECEPT 041885

22. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR SIG 041888

23. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR RECEPT 041886

24. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR SIG 041889

25. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 ATTIC SIG 041890

26. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 DEMO SITE PLAN 041875

27. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 LEGD 041881

28. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 LTG FIX SCHED 041882

29. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PNLDB SCHED 041892

30. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PWR RISR SIG 041891

31. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 SITE PLN 041877

32. Attachment 0004 SEED PROJ SOW 2008 Panel Schedules Overall Renov 072831

APG SEED PROJECT MECHANICAL

33. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR PLN 041825

34. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 CONT DIAG 041828

35. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 CONT DIAG 041835

36. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 DETS 041836

37. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 DETS 041837

38. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 DETS 041838

39. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 EQP SCHD 041833

40. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 EQP SCHD 041834

41. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 LGND ABBR 041823

42. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 MCH RM PLN SCT 041827

43. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 MTW DETS 041854

44. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PROF SW MTW 041853

45. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 SITE PLN CW MTW 041851

46. Attachment 0004 SEED PROJ SOW 2007 MECH PLN UPGD 054886

47. Attachment 0004 SEED PROJ SOW 2014 WTR BFLW DEVICE 079606

48. Attachment 0004 SEED PROJ SOW 2016 WTR BFLW DEVICE 079604

49. Attachment 0004 SEED PROJ SOW 2016 WTR BFLW DEVICE 079605

50. Attachment 0004 SEED PROJ SOW 2020 MECH PLMB ALTER 1st FLR BTH 085810

51. Attachment 0004 SEED PROJ SOW 2020 MECH PLMB ALTER 1st FLR BTH 085811

52. Attachment 0004 SEED PROJ SOW 2020 ALTER 1st FLR BTH 085809

53. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 ATTIC FLR PLN 041826

APG SEED PROJECT OTHER DRAWINGS

54. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR DOM WTR 041859

55. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 DWG INDEX 041710

56. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 TITLE SHT 041709

APG SEED PROJECT PARKING

57. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1ST FLR DOM 041859

58. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1ST FLR DRN 041855

59. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd FLR DOM 041860

60. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd FLR DRN 041856

61. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 3RD FLR DOM 041861

62. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 3rd FLR DRN 041857

63. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PLUMB PLN 041872

64. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 VENT RISER 041858

APG SEED PROJECT SANITARY

65. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2ND 3RD FLR FR PLN 041806

66. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 FDN PLN 041804

67. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 ROOF FRM PLN 041805

68. Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 SECT DETS 041810

APG SEED PROJECT TITLE

69. Attachment 0004 SEED PROJ SOW 2020 Title Sheet Alter 1st Flr BTH 085806

File details come from the government source that posted it. Updated .