J045--626A4-22-202 - AJP-Upgrade Steam Distribution System

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C24926R0017
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Integrated Service Network 9 seeks demolition and new construction to upgrade the steam distribution system at Tennessee Valley Healthcare System VA Medical Center in Murfreesboro, Tennessee, with proposals due May 28, 2026. The procurement is 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns; offerors must be listed and verified in the SBA Dynamic Small Business Search Registry at time of offer and award.

Place of performance is 3400 Lebanon Road, Murfreesboro, Tennessee 37129. Work includes general construction, civil, structural, architectural, mechanical, plumbing, electrical, low voltage, and industrial hygiene. The period of performance is 546 calendar days after Notice to Proceed, with normal working hours Monday through Thursday, 6 a.m. to 4:30 p.m., though weekend and evening work may be required with advance approval and Contracting Officer's Representative coordination. All work, including materials, carries a one-year warranty.

The estimated magnitude is between $10 million and $20 million under NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors) with a $19 million small business size standard. Key technical requirements include prior hospital steam distribution upgrades at VA facilities valued at $2 million or more (and $7 million for VA projects specifically), prohibition on clamp-on saddles and ductile or cast-iron materials unless noted otherwise, mandatory brazing for all copper piping, and provision of 30 additional analog pressure gauges at Contracting Officer's Representative-coordinated locations. The project includes asbestos abatement estimated at approximately 22,824 linear feet of steam tunnels. Steam shutdowns are prohibited if outside temperatures fall below 58 degrees Fahrenheit unless temporary building support is identified beforehand; outside temperature delays result in no additional cost to the government.

Evaluation uses Lowest Price Technically Acceptable (LPTA) methodology, weighing Relevant Construction Experience (including 10 specific prior project requirements), Key Personnel Experience (9 requirements for Project Manager/Site Superintendent), and Past Performance (two satisfactory-rated Past Performance Questionnaires). Performance and Payment bonds per FAR 52.228-15 are required. SDVOSB contractors must self-perform a minimum of 15 percent of contract costs using their own personnel. Amendment 0004 (effective May 21, 2026) lowered Requirement #3 thresholds from $5 million to $2 million for below-grade steam line distribution and personnel experience, and incorporated FAR clause 52.222-90 addressing diversity, equity, and inclusion discrimination prohibitions. Mandatory site visits occurred April 16 and April 23, 2026; Requests for Information were due April 28, 2026 at 1:00 PM Central Time. John L. Mccomas is Contracting Officer; Network Contracting Office 9 administers from Murfreesboro.

Notice text

2 versions

Update #2 · Latest ·

STATEMENT OF WORK GENERAL INFORMATION Title of Project: Project# 626A4-22-202 AJP-Upgrade Steam Distribution System Scope of Work: The contractor shall furnish all labor, material, equipment and supervision necessary to accomplish the work for Project# 626A4-22-202 "AJP-Upgrade Steam Distribution System at the Tennessee Valley Healthcare System, VA Medical Center, 3400 Lebanon Road, Murfreesboro, TN 37129 in accordance with the specifications and drawings. Work includes demolition and new construction including, but not limited to, general construction, civil, structural, architectural, mechanical, plumbing, electrical, low voltage, industrial hygiene, and certain other items. Statement Of Bid Item(S) BID ITEM 1: Includes all work per drawings and specifications. Period of Performance: 546 calendar days GENERAL REQUIREMENTS All work, including materials, will be warranted for a period of one year unless otherwise indicated in the specifications and drawings. Normal working hours are Monday through Thursday from 6 a.m. to 4:30 p.m. Contractor may be required to work some nights and or weekends to perform this work and maintain functionality of affected areas, and to minimize disruptions to the Medical Center s operations. Weekend and evening work shall be identified on the project schedule submitted by the contractor and approved by the VA before work begins. Steam shutdowns will not be allowed if outside temperatures are below 58 F or a temporary means of supporting the building(s) is identified prior to the shutdown. Contractor must consider this when producing a schedule. Outside temperature related issues will result in no additional cost to the government. No clamp-on saddles are allowed in the system. In addition to the specifications and drawing s locations, provide an additional 30 analog pressure gauges to install at locations coordinated with the COR during construction. Ductile and Cast-iron materials are strictly prohibited unless otherwise noted in the specifications and drawings. See specifications and drawings for additional requirements. ADDITIONAL ATTACHMENTS Attachment 2A - Regulated Building Materials Survey Report Attachment 2B - Engineering Service Confined Space Entry Policy Attachment 2C - BOD Electrical Condensate Packages END OF STATEMENT OF WORK

Update #1 ·

STATEMENT OF WORK

GENERAL INFORMATION

Title of Project: Project# 626A4-22-202 AJP-Upgrade Steam Distribution System

Scope of Work: The contractor shall furnish all labor, material, equipment and supervision necessary to accomplish the work for Project# 626A4-22-202 "AJP-Upgrade Steam Distribution System at the Tennessee Valley Healthcare System, VA Medical Center, 3400 Lebanon Road, Murfreesboro, TN 37129 in accordance with the specifications and drawings. Work includes demolition and new construction including, but not limited to, general construction, civil, structural, architectural, mechanical, plumbing, electrical, low voltage, industrial hygiene, and certain other items.

Statement Of Bid Item(S)

BID ITEM 1: Includes all work per drawings and specifications. Period of Performance: 546 calendar days

GENERAL REQUIREMENTS

All work, including materials, will be warranted for a period of one year unless otherwise indicated in the specifications and drawings.

Normal working hours are Monday through Thursday from 6 a.m. to 4:30 p.m.

Contractor may be required to work some nights and or weekends to perform this work and maintain functionality of affected areas, and to minimize disruptions to the Medical Center s operations. Weekend and evening work shall be identified on the project schedule submitted by the contractor and approved by the VA before work begins.

Steam shutdowns will not be allowed if outside temperatures are below 58 F or a temporary means of supporting the building(s) is identified prior to the shutdown. Contractor must consider this when producing a schedule. Outside temperature related issues will result in no additional cost to the government.

No clamp-on saddles are allowed in the system.

In addition to the specifications and drawing s locations, provide an additional 30 analog pressure gauges to install at locations coordinated with the COR during construction.

Ductile and Cast-iron materials are strictly prohibited unless otherwise noted in the specifications and drawings.

See specifications and drawings for additional requirements.

ADDITIONAL ATTACHMENTS

Attachment 2A - Regulated Building Materials Survey Report

Attachment 2B - Engineering Service Confined Space Entry Policy

Attachment 2C - BOD Electrical Condensate Packages

END OF STATEMENT OF WORK

Files

Show all 19

Notice history

Notice Type Posted
Z2DZ--626A4-22-202 AJP-Upgrade Steam Distribution System Award Award Notice
This notice Latest solicitation Solicitation
J045--626A4-22-202 - AJP-Upgrade Steam Distribution System Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Durham, North Carolina 27705, United States · NAICS 236220 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Veterans Affiars Medical Center Durham NC 27705 · NAICS 236220 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
Z1DZ--Replace Dental Vacuum Piping Department of Veteran Affairs VA Sierra Pacific Network (Visn 5) North Las Vegas, Nevada 89086, United States · NAICS 236220 Veterans Integrated Service Network 21 Service-Disabled Veteran-Owned Small Business
Z2NZ-- 658-23-108 Correct Stormwater Drainage Salem, Virginia 24153, United States · NAICS 237110 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
Z1DA--Modernize Damen (Bldg. 1) Elevators Construction 537-24-101 Chicago, Illinois 60612, United States · NAICS 238290 Veterans Integrated Service Network 12 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity