This document contains pre-proposal questions and answers for an upgrade to the Environmental Control System at Launch Complex 39B at NASA's Kennedy Space Center. NASA requires upgrading the ECS to support the crewed Space Launch System Artemis II mission, including replacing the existing cooling tower, relocating ductwork, heaters and instrumentation, adding new heaters and high pressure ducts, replacing filter housings and valves, revising gaseous nitrogen piping from aluminum to stainless steel, modifying controls systems hardware, installing new humidifiers, and related incidental work. Questions from potential offerors are answered, clarifying that comparable filter products from manufacturers 3B and Norman are acceptable in place of the declined bid from VACCO, and that stainless steel jacketing 0.016 inches thick is required for flange insulation on aluminum and stainless steel ducts in tunnels and above bulkhead plates.
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE PROPOSAL QUESTIONS AND ANSWERS 80KSC020R0024
Amendment 0008
No
Reference for Question (Section
Paragraph/Page) QUESTIONS ANSWERS Amendment
Number
49 M-508
Drawing M-508 provides a brief specification of the panel filters and says custom made by VACCO or approved equal. Must be B31.3 compliant.
The VACCO representative is declining to bid the project. Are comparable products from the following manufacturers be acceptable:
3B, Norman. Please concur or advise.
On drawing M-508 NEW GN2 FILTER SCHEDULE, the two cells under “DESCRIPTION/MODEL” column are changed to:
"100% EFFICIENT AT 70 MICRONS AND 98% EFFICIENT
AT 40 MICRONS, ASTM B31.3 COMPLIANT. BASIS OF
DESIGN IS CUSTOM MANUFACTURED FROM NORMAN
FILTER COMPANY OR APPROVED EQUAL. PROVIDE
WITH TWO S.S. TAPS AND DIFFERENTIAL PRESSURE
GAUGE (0-5PSI) AND 1/4” STAINLESS STEEL TUBING
AND TWO S.S.TUBING SHUT-OFF VALVES."
See updated Drawings via Solicitation Section C.2(b)(6).
50 Amendment 0006, Question 16
Please confirm that PVC jacket .030 is to be used on all double wall flange insulation kits over pyrogel for ECS ducts in the tunnel and above grade? Note: Detail MBY on M- 615 states use Stainless jacket over pyrogel. If stainless jacket is be used what is the thickness required?
Stainless steel jacketing is required for all flange insulation applications on double-wall aluminum and double-wall stainless steel ducts in the tunnels and above the bulkhead plate and shall be minimum 0.016” thick. PVC jacketing is allowed on the interior single-wall ducts only.