This solicitation seeks proposals to upgrade the Environmental Control System at Launch Complex 39B at NASA's Kennedy Space Center in Florida. Key requirements include replacing the existing cooling tower, relocating ductwork, heaters and instrumentation, adding new heaters and high pressure ducts, replacing filter housings and valves, modifying gaseous nitrogen piping, updating controls systems hardware, installing new humidifiers, and related work. The solicitation is a full and open competition using lowest price technically acceptable evaluation. Proposals are due by July 14, 2020. Award will be made to the offeror with the lowest priced technically acceptable proposal for either a 150 or 180 day performance period. The work must support NASA's Space Launch System Artemis II crewed mission.
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
STANDARD FORM 30 BLOCK 14 CONTINUATION PAGE 80KSC020R0024
Amendment 0005
B) Update solicition Standard Form 1442 cover page page count;see attached “Slip Pages,” 5 pages attached.
C) Update solicitation section C.2 paragraph (b); see attached "Slip Pages," 5 pages attached.
D) Update solicitation and added multiple paragraphs in section M.1 (c)(4); see attached “Slip Pages,” 5 pages attached.
E) Proposal due date and time remain unchanged at July 14, 2020 by 2:00 PM EST.
Note: For Reference, “80KSC020R0024 ECS at LC39B Questions And Answers 1 & 2” (3 pages) and a conformed copy of the full solicitation (75 pages) are individually and separately uploaded to beta.SAM.gov.
///End of Block 14. DESCRIPTON OF AMENDMENT/MODIFICATION///
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
80KSC020R0024
TBD
John F. Kennedy Space Center, NASA Procurement Office Code: OP-CS Kennedy Space Center, FL 32899
The contractor shall furnish all labor, equipment, materials, and related activities necessary to upgrade the Environmental Control System at Launch Complex 39-B at Kennedy Space Center, Florida.
This is a Full and Open, Lowest Price Technically Acceptable (LPTA) procurement.
Offeror MUST enter their cage code and DUNS number in block 14, page 2 of the SF 1442.
Offeror MUST be registered SAM and VETS-4212.
Offeror MUST submit electronic offer as specified in section L.15.
KSC-IDIQbids@mail.nasa.gov Attn: C. M. Julius Williams John F. Kennedy Space Center, NASA Procurement Office Code: OP-CS Bldg M7-0301, Room: 5416A Kennedy Space Center, FL 32899
4200729166
OP-CS
C. M. Julius Williams, Contracting Officer (321) 861-2661
99263
1 7506/01/2020
07/14/2020
2:00 PM
*Section F.1
NASA/KSC SOLICITATION 80KSC020R0024
SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT
C.1 SCOPE OF WORK (JAN 2018)
The Contractor shall furnish all management, supervision, labor, transportation, facilities, materials, tools, equipment, disposal, and documentation (except any property, including utilities, specified in the Schedule to be Government-Furnished) to perform all work for the Task(s) named below, and defined in the contract drawings, maps, specifications, and/or statements of work.
Line Item Description
0001 Upgrade ECS, LC-39B, Pre and Post Artemis I work with a 180 calendar day Post-Artemis I performance schedule
0002 Alternate Proposal, Upgrade ECS, LC-39B Pre and Post Artemis I work with a 150 calendar day Post-Artemis I performance schedule
(End of Clause)
C.2 CONTRACT DRAWINGS, MAPS, SPECIFICATIONS, AND/OR STATEMENTS OF WORK
(JAN 2018)
(a) Five sets of full scale contract drawings, maps, specifications, and/or statements of work (excluding publications incorporated into the technical provisions by reference), plus one CD or DVD containing electronic, portable document format (PDF) versions, and an electronic copy of the 3D model, will be furnished at award to the Contractor without charge. The work shall conform to the following contract drawings, maps, specifications, and/or statements of work, attached to this contract.
Drawing Number 79K40792, titled “Upgrade ECS at LC-39B,” dated 04/13/2020, sheets 1 through 240.
Specification Number 79K40793, titled “Upgrade ECS at LC-39B,” dated 04/13/2020, pages 1 through 797.
(b) Addenda to Drawings, Maps, Specifications, and/or Statements of Work: N/A
(1) Specification section 40 05 13.96, paragraph 3.2, is changed from:
Visual inspection of all welds installed by the Contractor shall be performed by the Contractor to detect surface and internal discontinuities in completed welds. All tack welds, weld passes, and completed welds shall be visually inspected. When inspection and testing indicates defects in a weld joint, the weld shall be repaired by a qualified welder in accordance with paragraph CORRECTIONS AND REPAIRS.
To:
Visual inspection of 100 percent of pressure piping and ECS pressure duct welds shall be performed by the Contractor to detect surface and internal discontinuities in completed welds.
All tack welds, weld passes, and completed welds shall be visually inspected. In addition for all ECS pipe and pressure ductwork, magnetic particle or liquid penetrant for aluminum examinations shall be performed on 100 percent of multi-pass thickness, root and cap passes, and any 1/2 inch filler pass in-between. When inspection and testing indicates defects in a
SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT
weld joint, the weld shall be repaired by a qualified welder in accordance with paragraph 3.4
CORRECTIONS AND REPAIRS.
(2) Specification section 40 05 13.96, paragraph 1.5.1, is changed from:
Record in detail and qualify the Welding Procedure Specifications for every proposed welding procedure. Qualification for each welding procedure shall conform to the requirements of ASME B31.3, and to this specification. The welding procedures shall specify end preparation for butt welds including cleaning, alignment, and root openings. Preheat, interpass temperature control, and postheat treatment of welds shall be as required by approved welding procedures, unless otherwise indicated or specified. The type of backing rings or consumable inserts, if used, shall be described and if they are to be removed, the removal process shall be described. Copies of the welding procedure specifications and procedure qualification test results for each type of welding required shall be submitted in accordance with paragraph SUBMITTALS. Approval of any procedure does not relieve the Contractor of the sole responsibility for producing acceptable welds. Welding procedures shall be identified individually and shall be referenced on the detail drawings or keyed to the contract drawings.
To:
Record in detail and qualify the Welding Procedure Specifications for every proposed welding procedure. Qualification for each welding procedure shall conform to the requirements of ASME BPVC SEC IX, ASME B31.3, AWS D17.1, and to this specification. The welding procedures shall specify end preparation for butt welds including cleaning, alignment, and root openings. Preheat, interpass temperature control, and postheat treatment of welds shall be as required by approved welding procedures, unless otherwise indicated or specified. The type of backing rings or consumable inserts, if used, shall be described and if they are to be removed, the removal process shall be described. Copies of the welding procedure specifications and procedure qualification test results for each type of welding required shall be submitted in accordance with paragraph SUBMITTALS. Approval of any procedure does not relieve the Contractor of the sole responsibility for producing acceptable welds. Welding procedures shall be identified individually and shall be referenced on the detail drawings or keyed to the contract drawings.
(3) Specification section 23 00 00, paragraph 2.7.1.7, add the following sentence:
Proof pressurize the individual sections and completed chamber assembly to 1.1 times the system design pressure (8.8 psig) per ASME B31.3 requirements for pneumatic leak testing.
(c) "Or Equal" Items”
Throughout the technical specifications and drawings of this contract, where certain manufacturers’ trade names and model numbers are specified and followed by the term "or equal," the manufacturer's name and data as specified shall represent the minimum standard type, quality, and capacity acceptable for incorporation into the work covered by this contract. The products of other manufacturers will be considered as being acceptable, provided that such products fully meet or exceed all minimum structural or use and operational features of the particular manufacturers’ items as specified, and provided that the other manufacturers’ items are easily interchangeable and can be adequately incorporated within the allocated space in the
SECTION M – EVALUATION FACTORS FOR AWARD
Contracting Officer’s assessment of the appropriate subcontracting goals for this procurement.
(iii) Large Business Offerors must meet all of the following standards to receive an
“Acceptable” rating on this sub-factor:
(A) The Small Business Subcontracting Plan addresses all of the 15 requirements of FAR Clause 52.219-9 (Alternate II), Small Business Subcontracting Plan, paragraphs (d)(1) thru (15).
(B) The rationale provided for any proposed subcontracting goal that is less than the
Contracting Officer’s recommended goal includes an independent assessment of the small business opportunities and demonstrates a reasonable attempt was made to meet the Contracting Officer’s recommended small business subcontracting goals.
(C) The Small Business Subcontracting Plan demonstrates a reasonable commitment to the use of small business subcontractors.
(d) EVALUATION PROCESS
The following describes the general methodology that will be used for proposal evaluation:
(1) Offerors will be checked in the System for Award Management for current entity registration, representations and certifications, and the exclusions and Non-procurement Programs and the Federal Awardee Performance and Integrity Information System. Offerors will be checked against the List of Parties Excluded From Federal Procurement and Non-procurement Programs. Offerors who appear on the List will be eliminated without further consideration.
Proposals will also be checked for responsiveness. The Contracting Officer will follow guidance at FAR 15.306 for resolving minor informalities or irregularities.
(2) A joint venture will be evaluated as a single offeror.
(3) The Contracting Officer will conduct a price analysis on each offeror’s submitted price.
(4) The technical (non-price) volume of the offeror with the lowest evaluated reasonable price of the 150 day proposals will be given to the technical evaluators for review. If the technical (non-price) proposal is determined to be technically “Acceptable”, award shall be made to that offeror, subject to a positive responsibility determination in accordance with FAR Part 9.
In order for a technical proposal to be determined technically “Acceptable”, all of the non-price factors in the technical proposal must be individually evaluated as “Acceptable”.
(5) If the technical proposal is determined to be technically “Unacceptable” the technical (non-price) volume of the offeror with the next lowest evaluated reasonable price of the 150 day proposals will be given to the technical evaluators for review. If the technical (non-price) proposal of the offeror with the next lowest evaluated reasonable price is determined to be technically “Acceptable” award shall be made to that offeror subject to a positive responsibility determination in accordance with FAR Part 9.
(6) If the technical proposal is determined to be technically “Unacceptable” the process described
SECTION M – EVALUATION FACTORS FOR AWARD
will be conducted again, as many times as necessary, until such time as the Government identifies a technically “Acceptable” 150 day proposal.
(7) If none of the 150 day non-price/technical proposals are determined technically “acceptable,” the non-price/technical proposal of the lowest proposed 180 day price will be provided to the technical evaluators for review. If the non-price/technical proposal is determined to be technically “acceptable,” award shall be made to that offeror subject to a positive
(8) If the technical proposal is determined to be technically “Unacceptable” the technical (non-price) volume of the offeror with the next lowest evaluated reasonable price of the 180 day proposals will be given to the technical evaluators for review. If the technical (non-price) proposal of the offeror with the next lowest evaluated reasonable price is determined to be technically “Acceptable” award shall be made to that offeror subject to a positive
(9) If the technical proposal is determined to be technically “Unacceptable” the process described will be conducted again, as many times as necessary, until such time as the Government identifies a technically “Acceptable” 180 day proposal.
(710) Should no proposal be determined technically acceptable, the Contracting Officer may cancel the solicitation or establish a competitive range consisting of a maximum of the three lowest priced offers. After receipt of the offerors’ responses raised during the discussions with all offerors included in the competitive range, responses will be rated again in the same manner as in the initial evaluation.
(End of Provision)
PRE PROPOSAL QUESTIONS AND ANSWERS 80KSC020R0024
Amendment 0005
No
Reference for Question (Section
Paragraph/Page) QUESTIONS ANSWERS Amendment
Number
I Series Drawings Per the I Series drawings, please provide the cable harness/sub assembly drawings for the following: 120E3400107, 120E3400122, 120E3400171, 120E3400082, 120E3400172, 120E3400099 & K0000082927.
See "All I Series Drawings" posted in beta.SAM.gov 0005
I Series Drawings Per the I Series drawings, please provide the following documents:
120E3100001 (Heavy Duty Cable Specification) 120E3100003 (Electrical Cable Fabrication Requirements)
See "All I Series Drawings" posted in beta.SAM.gov 0005
Page 412 Section 3.3.2 Please clarify the specific insulation material used for Exposed ECS duct, Rectangular and Round.
Per drawing details on M-610, M-611, M-612, and general note 34 on M-101, the duct insulation is to be 3" thick rigid phenolic, Superwool 607 HT (high temperature), or equal.
15 Page 400 Section 2.2.1.4 Is there Phenolic Insulation as mentioned in this section for High temperatures?
Superwool 607 HT, or equal. This is for high temperature applications.
17 I Series Drawings Per I-537 drawing cable legend please provide cable type and manufacture for part number 29502.
Cable is a four conductorR, #12, Belden part number 29502 0005
19 Access Ladder The access ladder does not have any details. Is this ladder to be standard un-caged access ladder?
Yes, the access ladder is an un-caged ladder similar to the current existing ladder.
Ref: I 702 and 703 Is the location for the new MIL-Spec connectors added to the enclosures a firm fixed location or is there flexibility in the locations? (ref sheets I-702 and I-703)
Yes the locations are flexible as constructability is the major factor in the connector locations. All connector relocations will need to be submitted in shop drawings for review
Sheet 1-702 Details for
RIO 3
On Sheet I-702 the right side detail for RIO 3 does not reflect existing conditions and cannot be located as indicated. Should these be moved to the top of the enclosure?
Yes. Locations can be adjusted as needed and shall be submitted in shop drawings.
1-207 I-207 indicates Panel 35441 to be replaced and remains with modifications. Please confirm this is to be an entirely new enclosure with functionality as described on I-301 note C and I-302 note D and just reusing the enclosure number "35441" for the new panel.
Concur, new panel enclosure as described in drawings panel number being reused.
Drawing M-402, Note A, Note M-405 Note B
Is the contractor to use the existing supports on reloacted humidifiers? Is the same type of supports to be used on the new humidifiers? Note: No support details for humidifiers are shown on drawings.
If an existing humidifier is being relocated to the same location, then the existing support system may be re-used. Otherwise provide a new support system as indicated on the Humidifer Support Detail on drawing M-614 Detail MBW.
28 RFP page 67 para B Please clarify the evaluation of price proposals See updated and added paragraphs in solicitation section M.1 (c)(4).
Specifications We were unable to locate a specification for the cleanliness of the existing duct/removed and moved duct for this project. Are there specifications for this?
The ductwork is to be left in a "Generally Clean" condition as indicated on drawing M-101, Note 16 and Note 24. Also refer to spec section 23 00 00, 3.11 for vacuum clean and wipe clean.
M-318 thru M-329 We have unable to locate an insulation specification for the duct work in the tunnel The insulation for the double wall ductwork in the tunnel shall be 3" thick phenolic, Superwool 607 HT or equal, as indicated on drawing M-611.
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0005 |
| Code[0]: KSC |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: C. M. Julius Williams, Contracting Officer |
| Description[0]: The purpose of Amendment 0005 is to: |
A) Provide Government answers to submitted questions; see attached "Questions & Answers 2," 1 page attached.
Continued on page 2, "STANDARD FORM 30 BLOCK 14 CONTINUATION PAGE."
| FacilityCode[0]: |
| Code[2]: KSC |
| IssuedBy[0]: NASA/John F. Kennedy Space Center |
Office of Procurement Mail Code OP-CS
KENNEDY SPACE CENTER FL, 32899
| NameandAddress[0]: |
| AdministeredBy[0]: NASA/John F. Kennedy Space Center |
Office of Procurement Mail Code OP-CS
KENNEDY SPACE CENTER FL, 32899
| ContractIDCode[0]: | |
| ReqNumber[0]: 4200729166 | |
| AmendmentNo[1]: 80KSC020R0024 | |
| ModificationNo[0]: | |
| ProjectNo[0]: 99263 | |
| Page[0]: 1 | |
| Pages[0]: 2 | |
| EffectiveDate[0]: June 25, 2020 | |
| Dated9B[0]: June 1, 2020 | |
| Dated10B[0]: | |
| CheckBox9[0]: 1 | |
| CheckBox10[0]: Off | |
| CheckBox11[0]: 1 | |
| CheckBox13A[0]: Off | |
| CheckBox13B[0]: Off | |
| CheckBox13C[0]: Off | |
| CheckBox13D[0]: Off | |
| IsNot[0]: Off | |
| Is[0]: Off | |
| Extended[0]: Off | |
| NotExtended[0]: 1 | |
| 2020-06-25T20:00:21-0400 | |
| CHRISTOPHER WILLIAMS |
| DateSigned[0]: |
| DateSigned[1]: Jun 25, 2020 |
| Copies[0]: 1 |
| CopiesReturned[0]: |
File details come from the government source that posted it. Updated .