80KSC020R0024 LC39B ECS Amendment 06 Slip Pages.pdf
PDF 26 KB Posted
- Attached to
- Upgrade Environmental Control System (ECS), Launch Complex (LC) 39B Federal contract opportunity
- Solicitation number
- 80KSC020R0024
About this file
This solicitation seeks proposals to upgrade the Environmental Control System at Launch Complex 39B at NASA's Kennedy Space Center in Florida. Key requirements include replacing the existing cooling tower, relocating ductwork, heaters and instrumentation, adding new heaters and high pressure ducts, replacing filter housings and valves, modifying gaseous nitrogen piping and controls systems hardware, and installing new humidifiers. Offerors must provide all labor, equipment, materials and activities necessary to complete the upgrade. Proposals are due by July 14, 2020 with award anticipated within 90 days thereafter and project completion required within one year of receiving the notice to proceed.
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
80KSC020R0024
TBD
John F. Kennedy Space Center, NASA Procurement Office Code: OP-CS Kennedy Space Center, FL 32899
The contractor shall furnish all labor, equipment, materials, and related activities necessary to upgrade the Environmental Control System at Launch Complex 39-B at Kennedy Space Center, Florida.
This is a Full and Open, Lowest Price Technically Acceptable (LPTA) procurement.
Offeror MUST enter their cage code and DUNS number in block 14, page 2 of the SF 1442.
Offeror MUST be registered SAM and VETS-4212.
Offeror MUST submit electronic offer as specified in section L.15.
KSC-IDIQbids@mail.nasa.gov Attn: C. M. Julius Williams John F. Kennedy Space Center, NASA Procurement Office Code: OP-CS Bldg M7-0301, Room: 5416A Kennedy Space Center, FL 32899
4200729166
OP-CS
C. M. Julius Williams, Contracting Officer (321) 861-2661
99263
1 7606/01/2020
07/14/2020
2:00 PM
*Section F.1
NASA/KSC SOLICITATION 80KSC020R0024
SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT
weld joint, the weld shall be repaired by a qualified welder in accordance with paragraph 3.4
CORRECTIONS AND REPAIRS.
(2) Specification section 40 05 13.96, paragraph 1.5.1, is changed from:
Record in detail and qualify the Welding Procedure Specifications for every proposed welding procedure. Qualification for each welding procedure shall conform to the requirements of ASME B31.3, and to this specification. The welding procedures shall specify end preparation for butt welds including cleaning, alignment, and root openings. Preheat, interpass temperature control, and postheat treatment of welds shall be as required by approved welding procedures, unless otherwise indicated or specified. The type of backing rings or consumable inserts, if used, shall be described and if they are to be removed, the removal process shall be described. Copies of the welding procedure specifications and procedure qualification test results for each type of welding required shall be submitted in accordance with paragraph SUBMITTALS. Approval of any procedure does not relieve the Contractor of the sole responsibility for producing acceptable welds. Welding procedures shall be identified individually and shall be referenced on the detail drawings or keyed to the contract drawings.
To:
Record in detail and qualify the Welding Procedure Specifications for every proposed welding procedure. Qualification for each welding procedure shall conform to the requirements of ASME BPVC SEC IX, ASME B31.3, AWS D17.1, and to this specification. The welding procedures shall specify end preparation for butt welds including cleaning, alignment, and root openings. Preheat, interpass temperature control, and postheat treatment of welds shall be as required by approved welding procedures, unless otherwise indicated or specified. The type of backing rings or consumable inserts, if used, shall be described and if they are to be removed, the removal process shall be described. Copies of the welding procedure specifications and procedure qualification test results for each type of welding required shall be submitted in accordance with paragraph SUBMITTALS. Approval of any procedure does not relieve the Contractor of the sole responsibility for producing acceptable welds. Welding procedures shall be identified individually and shall be referenced on the detail drawings or keyed to the contract drawings.
(3) Specification section 23 00 00, paragraph 2.7.1.7, add the following sentence:
Proof pressurize the individual sections and completed chamber assembly to 1.1 times the system design pressure (8.8 psig) per ASME B31.3 requirements for pneumatic leak testing.
(4) Specification section 23 07 00, paragraph 2.4.2.1, is changed from:
Cover single wall duct insulation with white PVC jacket, 0.24-inch thick.
To:
The pipe and fitting covers shall be white PVC, 1 or 2 piece, high impact strength, ultraviolet resistant rating, with minimum thickness of 0.030 inches.
(5) Drawing Number 79K40792 is changed according to the table below:
NASA/KSC SOLICITATION 80KSC020R0024
SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT
Sheet Zone Item From To
I-523 D/4&3 Cable 35426W54 Existing New I-523 B/4&3 Cable 35426W61 Existing New I-524 C/8 through 5 Enclosure Connector J54, First 7 columns Regular text Bold Text I-524 C/8 through 5 Enclosure Connector J61, First 7 columns Regular text Bold Text I-529 A/7&6 Cable 35427W38 New Existing I-529 A/7&6 Cable 35427W38 Delete Flag Note F I-530 E/7&6 Enclosure Connector J38, Columns 2 through 7 Regular text Bold Text I-537 D/7&6 Cable 37568W28 New Existing I-538 C/6 Enclosure Connector J61, J63, & J64, Column 2 Bold Text Regular Test I-543 A thru C/7 thru 5 Cable 37462W29 through 37462W36 New Existing I-543 A thru C/7 thru 5 Cable 37462W29 through 37462W36 Delete Flag Note A I-543 G&H/4 thru 2 Cable 37462W37 through 37462W42 New Existing I-543 G&H/4 thru 2 Cable 37462W37 through 37462W42 Delete Flag Note A I-543 B thru E/4 thru 2 Cable 37462W47 through 37462W60 New Existing I-543 B thru E/4 thru 2 Cable 37462W47 through 37462W60 Delete Flag Note A M-206 F-7 A Number A601046 A601106 M-206 F-7 A Number A601047 A601107 M-206 F-7 A Number A601048 A601108 M-206 D5/6 A Number A601050 A601110 M-206 D5/6 A Number A601051 A601111 M-206 D5/6 A Number A601052 A601112 M-206 D5/6 A Number A601053 A601113 M-206 H-3 A Number A601049 A601109 M-206 F-3 A Number A601054 A601114
(c) "Or Equal" Items”
Throughout the technical specifications and drawings of this contract, where certain manufacturers’ trade names and model numbers are specified and followed by the term "or equal," the manufacturer's name and data as specified shall represent the minimum standard type, quality, and capacity acceptable for incorporation into the work covered by this contract. The products of other manufacturers will be considered as being acceptable, provided that such products fully meet or exceed all minimum structural or use and operational features of the particular manufacturers’ items as specified, and provided that the other manufacturers’ items are easily interchangeable and can be adequately incorporated within the allocated space in the building or structure. In all cases, the acceptability of "or equal" items shall be at the Contracting Officer's discretion, based upon data submitted by the Contractor in accordance with the requirements under the Shop Drawings Clause.
(d) Omissions from the drawings or specifications, or the omission or misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work but they shall be performed as if fully and correctly set forth and described in the drawings and specifications.
(e) The Contractor shall check all drawings furnished him immediately upon their receipt and shall